CN218090401U - Paving construction elevation control line hanging frame - Google Patents
Paving construction elevation control line hanging frame Download PDFInfo
- Publication number
- CN218090401U CN218090401U CN202222609370.8U CN202222609370U CN218090401U CN 218090401 U CN218090401 U CN 218090401U CN 202222609370 U CN202222609370 U CN 202222609370U CN 218090401 U CN218090401 U CN 218090401U
- Authority
- CN
- China
- Prior art keywords
- base
- bottom plate
- fixed
- roof
- elasticity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Machines (AREA)
Abstract
The utility model relates to a construction technical field specifically is a construction control elevation hanging wire frame mats formation. The bottom plate comprises a bottom plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located directly over the base, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively. The utility model discloses the original structure on ground can not be destroyed to the structure to can remove at any time, can adapt to the quantity requirement of different height requirement and control line.
Description
Technical Field
The utility model relates to a construction technical field specifically is a construction control elevation hanging wire frame mats formation.
Background
The traditional asphalt mixture paving construction control elevation adopts a 'pile nailing method', namely, after a fixed point is measured, a drill is used for drilling a hole by a percussion drill, a steel chisel is hammered into the hole, the steel chisel is used for tensioning a control line, and other section control points adopt bricks to cushion the control line so as to meet the paving elevation control requirement.
The existing steel wire elevation control device with the application number of CN 201720660737.5 comprises a horizontal supporting rod, a sliding sleeve, an adjusting bolt, a built-in nut and an anchoring steel rod, wherein the anchoring steel rod is sleeved in the sliding sleeve, the horizontal supporting rod is fixed on one side of the sliding sleeve, the built-in nut is fixed on the opening on the other side of the sliding sleeve, the adjusting bolt is in threaded connection with the built-in nut, and the adjusting bolt is used for fixing the position of the sliding sleeve on the anchoring steel rod. The copper wire has been seted up to the tip of horizontal support pole and has been placed the recess, however, uses this kind of device, need insert ground with the drill rod, has the damage to ground, can influence the appearance quality and the service function on ground when serious, owing to pound into ground with the drill rod stake in addition, therefore the position is comparatively fixed, when needing to remove the position once more, can only reset, wastes time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to a construction control elevation hanging wire frame of mating formation that can remove and do not harm ground is provided.
The utility model provides a problem, the technical scheme of adoption is:
the utility model provides a construction control elevation hanging wire frame mats formation, comprising a base plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located the base directly over, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
use this hanging wire frame to replace drill rod and fragment of brick, through universal wheel shift position, adjust the height of elasticity clamp through first telescopic link, use elasticity clamp bearing control line, constitute when causing the diameter great when the control line by the multiunit wire rod, adjust the elasticity clamp so that the control line passes, through a plurality of elasticity clamp that sets up, can put down the multiunit control line, the utility model discloses the original structure on ground can not be destroyed to the structure can remove at any time, can adapt to the different height requirement and the quantity requirement of control line.
Preferably, the present invention further provides:
the front of the base is provided with a drawer.
The elasticity clamp includes the elasticity hoop body, and the elasticity hoop body is fixed in the bottom of dead lever, and the bottom of the elasticity hoop body is provided with the opening, and elasticity hoop body open-ended both ends are provided with respectively and connect the otic placode, have seted up the connecting hole on the connection otic placode respectively, run through jointly in two connecting holes has the shank of bolt, and the last cover of shank of bolt is equipped with limit nut.
The lower part of the front surface of the upright post is vertically provided with a second telescopic rod, and the output ends of the second telescopic rods are respectively provided with a circular ring.
And a graduated scale is arranged on the top surface of the bottom plate and on one side of the upright post.
Drawings
Fig. 1 is a schematic view of a three-dimensional structure of a paving construction elevation control line hanging rack according to an embodiment of the present invention;
fig. 2 is a schematic side view of a construction elevation hanging rack for paving construction control according to an embodiment of the present invention;
fig. 3 is a schematic view of a top view structure of a paving construction control elevation line hanging rack according to an embodiment of the present invention;
fig. 4 is a schematic view of a front view structure of a paving construction control elevation wire hanging rack according to an embodiment of the present invention;
labeled as: 1. a base plate; 2. a universal wheel; 3. a first telescopic rod; 4. a base; 5. a drawer; 6. a column; 7. a top plate; 8. an elastic clamp; 9. connecting holes; 10. a bolt shank; 11. a limit nut; 12. a handle; 13. a second telescopic rod; 14. a circular ring; 15. a graduated scale.
Detailed Description
The invention will be further described with reference to the following examples, which are intended only for better understanding of the invention and therefore do not limit the scope of the invention.
The utility model provides a construction control elevation hanging wire frame mats formation, comprising a base plate 1, the bottom of bottom plate 1 is provided with universal wheel 2, the vertical first telescopic link 3 of a plurality of that is provided with in top of bottom plate 1, the top of first telescopic link 3 is fixed with base 4 jointly, be fixed with stand 6 on the both corners of base 4 top surface rear side respectively, 6 tops of stand are fixed with roof 7 jointly, roof 7 is parallel with base 4 and is located base 4 directly over, 7 bottom surfaces of roof just are located two stands and vertically are provided with a plurality of dead lever between 6, the bottom of dead lever is provided with elasticity clamp 8 respectively.
The front surface of the base 4 is provided with a drawer 5, the drawer 5 is provided with a handle 12, and some construction materials, such as wires and the like, are placed in the drawer 5 and are used by workers.
The lower part of the front face of the upright post 6 is vertically provided with a second telescopic rod 13, the output ends of the second telescopic rods 13 are respectively provided with a circular ring 14, the inner cavities of the circular rings 14 are opposite, when a control wire positioned on the side face of the wire hanging rack needs to change the direction, the steering position can not be reached due to the complex wire hanging rack in the field condition, at the moment, the circular rings 14 are adjusted to reach the steering position through the second telescopic rods 13, and the control wire penetrates through the two circular rings 14, so that the direction is changed.
And a graduated scale 15 is arranged on the top surface of the bottom plate 1 and on one side of the upright post 6, and the height of the elastic clamp 8 is observed through the graduated scale 15 so as to be adjusted.
Use this hanging wire frame to replace drill rod and fragment of brick, through universal wheel shift position, adjust the height of elasticity clamp through first telescopic link, use elasticity clamp bearing control line, constitute when causing the diameter great when the control line by the multiunit wire rod, adjust the elasticity clamp so that the control line passes, through a plurality of elasticity clamp that sets up, can put down the multiunit control line, the utility model discloses the original structure on ground can not be destroyed to the structure can remove at any time, can adapt to the different height requirement and the quantity requirement of control line.
The above description is only a preferred and practical embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent variations made by using the contents of the specification and the drawings are included in the scope of the present invention.
Claims (5)
1. The utility model provides a construction control elevation hanging wire frame paves which characterized in that: the bottom plate comprises a bottom plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located directly over the base, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively.
2. The paving construction control elevation hanging rack according to claim 1, characterized in that: the front of the base is provided with a drawer.
3. The paving construction elevation control hanging rack according to claim 1, characterized in that: the elasticity clamp includes the elasticity hoop body, and the elasticity hoop body is fixed in the bottom of dead lever, and the bottom of the elasticity hoop body is provided with the opening, and elasticity hoop body open-ended both ends are provided with respectively and connect the otic placode, have seted up the connecting hole on the connection otic placode respectively, run through jointly in two connecting holes has the shank of bolt, and the last cover of shank of bolt is equipped with limit nut.
4. The paving construction elevation control hanging rack according to claim 1, characterized in that: the lower part of the front surface of the upright post is vertically provided with a second telescopic rod, and the output ends of the second telescopic rods are respectively provided with a circular ring.
5. The paving construction elevation control hanging rack according to claim 1, characterized in that: and a graduated scale is arranged on the top surface of the bottom plate and positioned on one side of the upright post.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222609370.8U CN218090401U (en) | 2022-09-30 | 2022-09-30 | Paving construction elevation control line hanging frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222609370.8U CN218090401U (en) | 2022-09-30 | 2022-09-30 | Paving construction elevation control line hanging frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218090401U true CN218090401U (en) | 2022-12-20 |
Family
ID=84454691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222609370.8U Active CN218090401U (en) | 2022-09-30 | 2022-09-30 | Paving construction elevation control line hanging frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218090401U (en) |
-
2022
- 2022-09-30 CN CN202222609370.8U patent/CN218090401U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212077602U (en) | Novel bridge steel structure supports mound | |
CN218090401U (en) | Paving construction elevation control line hanging frame | |
CN221276598U (en) | Building pile driving device | |
CN214170030U (en) | Strutting arrangement is used in building engineering construction | |
CN216075107U (en) | Vibratory pile hammer integrating feeding, overturning, clamping and pile sinking | |
CN209784075U (en) | novel rock-soil bearing capacity testing device | |
CN210485152U (en) | Tripod of engineering survey and drawing usefulness | |
CN202832237U (en) | Novel tower for hole drilling of slewing drilling machine | |
CN211549130U (en) | A stand foundation structure for building site | |
CN214531162U (en) | Concrete foundation embedded part pouring fixing device | |
CN219472019U (en) | Investigation device is used in highway bridge construction | |
CN216712594U (en) | A inserted bar hanging wire positioner for road bed fill | |
CN219060874U (en) | Height-adjustable template supporting structure | |
CN216179848U (en) | Anchor clamps for construction | |
CN211482265U (en) | Landscape tree transplanting correction device | |
CN214939001U (en) | Paver walking side's pipe strutting arrangement for municipal construction | |
CN220551710U (en) | Damping base for mining machinery | |
CN213709614U (en) | Tower crane foundation assembling structure | |
CN216641529U (en) | Supporting structure for building | |
CN213538626U (en) | Portable and adjustable pavement structure layer elevation control device | |
CN218737796U (en) | Adjustable drawing frame for field use | |
CN219910823U (en) | Ground anchor assembly hand-free positioning sleeve | |
CN208830832U (en) | A kind of outdoor fence support column being easily installed | |
CN221837934U (en) | Connecting structure of supporting leveling frame for attached lifting scaffold | |
CN221095099U (en) | Pre-buried steel pipe bored concrete pile precision control frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |