CN218090401U - Paving construction elevation control line hanging frame - Google Patents

Paving construction elevation control line hanging frame Download PDF

Info

Publication number
CN218090401U
CN218090401U CN202222609370.8U CN202222609370U CN218090401U CN 218090401 U CN218090401 U CN 218090401U CN 202222609370 U CN202222609370 U CN 202222609370U CN 218090401 U CN218090401 U CN 218090401U
Authority
CN
China
Prior art keywords
base
bottom plate
fixed
roof
elasticity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222609370.8U
Other languages
Chinese (zh)
Inventor
陈曦
方芳
刘莹
李彦雷
王超凡
晁锡麟
纪洪鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202222609370.8U priority Critical patent/CN218090401U/en
Application granted granted Critical
Publication of CN218090401U publication Critical patent/CN218090401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model relates to a construction technical field specifically is a construction control elevation hanging wire frame mats formation. The bottom plate comprises a bottom plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located directly over the base, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively. The utility model discloses the original structure on ground can not be destroyed to the structure to can remove at any time, can adapt to the quantity requirement of different height requirement and control line.

Description

Paving construction elevation control line hanging frame
Technical Field
The utility model relates to a construction technical field specifically is a construction control elevation hanging wire frame mats formation.
Background
The traditional asphalt mixture paving construction control elevation adopts a 'pile nailing method', namely, after a fixed point is measured, a drill is used for drilling a hole by a percussion drill, a steel chisel is hammered into the hole, the steel chisel is used for tensioning a control line, and other section control points adopt bricks to cushion the control line so as to meet the paving elevation control requirement.
The existing steel wire elevation control device with the application number of CN 201720660737.5 comprises a horizontal supporting rod, a sliding sleeve, an adjusting bolt, a built-in nut and an anchoring steel rod, wherein the anchoring steel rod is sleeved in the sliding sleeve, the horizontal supporting rod is fixed on one side of the sliding sleeve, the built-in nut is fixed on the opening on the other side of the sliding sleeve, the adjusting bolt is in threaded connection with the built-in nut, and the adjusting bolt is used for fixing the position of the sliding sleeve on the anchoring steel rod. The copper wire has been seted up to the tip of horizontal support pole and has been placed the recess, however, uses this kind of device, need insert ground with the drill rod, has the damage to ground, can influence the appearance quality and the service function on ground when serious, owing to pound into ground with the drill rod stake in addition, therefore the position is comparatively fixed, when needing to remove the position once more, can only reset, wastes time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to a construction control elevation hanging wire frame of mating formation that can remove and do not harm ground is provided.
The utility model provides a problem, the technical scheme of adoption is:
the utility model provides a construction control elevation hanging wire frame mats formation, comprising a base plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located the base directly over, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
use this hanging wire frame to replace drill rod and fragment of brick, through universal wheel shift position, adjust the height of elasticity clamp through first telescopic link, use elasticity clamp bearing control line, constitute when causing the diameter great when the control line by the multiunit wire rod, adjust the elasticity clamp so that the control line passes, through a plurality of elasticity clamp that sets up, can put down the multiunit control line, the utility model discloses the original structure on ground can not be destroyed to the structure can remove at any time, can adapt to the different height requirement and the quantity requirement of control line.
Preferably, the present invention further provides:
the front of the base is provided with a drawer.
The elasticity clamp includes the elasticity hoop body, and the elasticity hoop body is fixed in the bottom of dead lever, and the bottom of the elasticity hoop body is provided with the opening, and elasticity hoop body open-ended both ends are provided with respectively and connect the otic placode, have seted up the connecting hole on the connection otic placode respectively, run through jointly in two connecting holes has the shank of bolt, and the last cover of shank of bolt is equipped with limit nut.
The lower part of the front surface of the upright post is vertically provided with a second telescopic rod, and the output ends of the second telescopic rods are respectively provided with a circular ring.
And a graduated scale is arranged on the top surface of the bottom plate and on one side of the upright post.
Drawings
Fig. 1 is a schematic view of a three-dimensional structure of a paving construction elevation control line hanging rack according to an embodiment of the present invention;
fig. 2 is a schematic side view of a construction elevation hanging rack for paving construction control according to an embodiment of the present invention;
fig. 3 is a schematic view of a top view structure of a paving construction control elevation line hanging rack according to an embodiment of the present invention;
fig. 4 is a schematic view of a front view structure of a paving construction control elevation wire hanging rack according to an embodiment of the present invention;
labeled as: 1. a base plate; 2. a universal wheel; 3. a first telescopic rod; 4. a base; 5. a drawer; 6. a column; 7. a top plate; 8. an elastic clamp; 9. connecting holes; 10. a bolt shank; 11. a limit nut; 12. a handle; 13. a second telescopic rod; 14. a circular ring; 15. a graduated scale.
Detailed Description
The invention will be further described with reference to the following examples, which are intended only for better understanding of the invention and therefore do not limit the scope of the invention.
The utility model provides a construction control elevation hanging wire frame mats formation, comprising a base plate 1, the bottom of bottom plate 1 is provided with universal wheel 2, the vertical first telescopic link 3 of a plurality of that is provided with in top of bottom plate 1, the top of first telescopic link 3 is fixed with base 4 jointly, be fixed with stand 6 on the both corners of base 4 top surface rear side respectively, 6 tops of stand are fixed with roof 7 jointly, roof 7 is parallel with base 4 and is located base 4 directly over, 7 bottom surfaces of roof just are located two stands and vertically are provided with a plurality of dead lever between 6, the bottom of dead lever is provided with elasticity clamp 8 respectively.
The front surface of the base 4 is provided with a drawer 5, the drawer 5 is provided with a handle 12, and some construction materials, such as wires and the like, are placed in the drawer 5 and are used by workers.
Elasticity clamp 8 includes the elasticity hoop body, the bottom at the dead lever is fixed to the elasticity hoop body, the bottom of the elasticity hoop body is provided with the opening, elasticity hoop body open-ended both ends are provided with the connection otic placode respectively, connecting hole 9 has been seted up on the connection otic placode respectively, it has shank of bolt 10 to run through in two connecting holes 9 altogether, the cover is equipped with stop nut 11 on the shank of bolt 10, position and then the elasticity of adjusting elasticity clamp 8 through adjusting stop nut 11, constitute when causing the diameter great when the control line by the multiunit wire rod, rotatory stop nut 11 makes the expansion of elasticity clamp 8 hold the control line.
The lower part of the front face of the upright post 6 is vertically provided with a second telescopic rod 13, the output ends of the second telescopic rods 13 are respectively provided with a circular ring 14, the inner cavities of the circular rings 14 are opposite, when a control wire positioned on the side face of the wire hanging rack needs to change the direction, the steering position can not be reached due to the complex wire hanging rack in the field condition, at the moment, the circular rings 14 are adjusted to reach the steering position through the second telescopic rods 13, and the control wire penetrates through the two circular rings 14, so that the direction is changed.
And a graduated scale 15 is arranged on the top surface of the bottom plate 1 and on one side of the upright post 6, and the height of the elastic clamp 8 is observed through the graduated scale 15 so as to be adjusted.
Use this hanging wire frame to replace drill rod and fragment of brick, through universal wheel shift position, adjust the height of elasticity clamp through first telescopic link, use elasticity clamp bearing control line, constitute when causing the diameter great when the control line by the multiunit wire rod, adjust the elasticity clamp so that the control line passes, through a plurality of elasticity clamp that sets up, can put down the multiunit control line, the utility model discloses the original structure on ground can not be destroyed to the structure can remove at any time, can adapt to the different height requirement and the quantity requirement of control line.
The above description is only a preferred and practical embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent variations made by using the contents of the specification and the drawings are included in the scope of the present invention.

Claims (5)

1. The utility model provides a construction control elevation hanging wire frame paves which characterized in that: the bottom plate comprises a bottom plate, the bottom of bottom plate is provided with the universal wheel, the vertical first telescopic link of a plurality of that is provided with in top of bottom plate, the top of first telescopic link is fixed with the base jointly, be fixed with the stand on the both corners of base top surface rear side respectively, the stand top is fixed with the roof jointly, the roof is parallel with the base and is located directly over the base, the roof bottom surface just is located the vertical a plurality of dead lever that is provided with between two stands, the bottom of dead lever is provided with the elasticity clamp respectively.
2. The paving construction control elevation hanging rack according to claim 1, characterized in that: the front of the base is provided with a drawer.
3. The paving construction elevation control hanging rack according to claim 1, characterized in that: the elasticity clamp includes the elasticity hoop body, and the elasticity hoop body is fixed in the bottom of dead lever, and the bottom of the elasticity hoop body is provided with the opening, and elasticity hoop body open-ended both ends are provided with respectively and connect the otic placode, have seted up the connecting hole on the connection otic placode respectively, run through jointly in two connecting holes has the shank of bolt, and the last cover of shank of bolt is equipped with limit nut.
4. The paving construction elevation control hanging rack according to claim 1, characterized in that: the lower part of the front surface of the upright post is vertically provided with a second telescopic rod, and the output ends of the second telescopic rods are respectively provided with a circular ring.
5. The paving construction elevation control hanging rack according to claim 1, characterized in that: and a graduated scale is arranged on the top surface of the bottom plate and positioned on one side of the upright post.
CN202222609370.8U 2022-09-30 2022-09-30 Paving construction elevation control line hanging frame Active CN218090401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222609370.8U CN218090401U (en) 2022-09-30 2022-09-30 Paving construction elevation control line hanging frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222609370.8U CN218090401U (en) 2022-09-30 2022-09-30 Paving construction elevation control line hanging frame

Publications (1)

Publication Number Publication Date
CN218090401U true CN218090401U (en) 2022-12-20

Family

ID=84454691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222609370.8U Active CN218090401U (en) 2022-09-30 2022-09-30 Paving construction elevation control line hanging frame

Country Status (1)

Country Link
CN (1) CN218090401U (en)

Similar Documents

Publication Publication Date Title
CN212077602U (en) Novel bridge steel structure supports mound
CN218090401U (en) Paving construction elevation control line hanging frame
CN221276598U (en) Building pile driving device
CN214170030U (en) Strutting arrangement is used in building engineering construction
CN216075107U (en) Vibratory pile hammer integrating feeding, overturning, clamping and pile sinking
CN209784075U (en) novel rock-soil bearing capacity testing device
CN210485152U (en) Tripod of engineering survey and drawing usefulness
CN202832237U (en) Novel tower for hole drilling of slewing drilling machine
CN211549130U (en) A stand foundation structure for building site
CN214531162U (en) Concrete foundation embedded part pouring fixing device
CN219472019U (en) Investigation device is used in highway bridge construction
CN216712594U (en) A inserted bar hanging wire positioner for road bed fill
CN219060874U (en) Height-adjustable template supporting structure
CN216179848U (en) Anchor clamps for construction
CN211482265U (en) Landscape tree transplanting correction device
CN214939001U (en) Paver walking side's pipe strutting arrangement for municipal construction
CN220551710U (en) Damping base for mining machinery
CN213709614U (en) Tower crane foundation assembling structure
CN216641529U (en) Supporting structure for building
CN213538626U (en) Portable and adjustable pavement structure layer elevation control device
CN218737796U (en) Adjustable drawing frame for field use
CN219910823U (en) Ground anchor assembly hand-free positioning sleeve
CN208830832U (en) A kind of outdoor fence support column being easily installed
CN221837934U (en) Connecting structure of supporting leveling frame for attached lifting scaffold
CN221095099U (en) Pre-buried steel pipe bored concrete pile precision control frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant