CN218083489U - Get hole construction and use drilling support - Google Patents

Get hole construction and use drilling support Download PDF

Info

Publication number
CN218083489U
CN218083489U CN202222267261.2U CN202222267261U CN218083489U CN 218083489 U CN218083489 U CN 218083489U CN 202222267261 U CN202222267261 U CN 202222267261U CN 218083489 U CN218083489 U CN 218083489U
Authority
CN
China
Prior art keywords
support
guide rail
drilling
groove
collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222267261.2U
Other languages
Chinese (zh)
Inventor
董芳
杨稳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222267261.2U priority Critical patent/CN218083489U/en
Application granted granted Critical
Publication of CN218083489U publication Critical patent/CN218083489U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a get hole construction and use drilling support, it relates to drilling support field, and it includes the guide rail, is used for adjusting the guide rail is to the removal of house top distance puts up and is used for the locating support of location rig, the guide rail sets up remove to put up, the locating support slides and sets up on the guide rail, the locating support is followed the length direction of guide rail slides, be provided with on the guide rail and be used for driving the subassembly that slides that the locating support slided, be provided with on the locating support and be used for driving the rig is bored or is extracted the drive assembly at house top. This application has the security that improves drilling to the house top, labour saving and time saving's effect.

Description

Get hole construction and use drilling support
Technical Field
The application relates to the field of drilling supports, in particular to a drilling support for hole taking construction.
Background
During the construction of the decoration, especially during the suspended ceiling, it is necessary to drill the top of the building in order to install the support.
In the related art, when drilling, a portal scaffold auxiliary frame is usually erected, an operator stands on the scaffold auxiliary frame and holds an electric percussion drill to drill holes; and after the local area is drilled, moving the auxiliary frame of the portal scaffold to the next drilling position.
In view of the above related technologies, the inventor thinks that there is a great potential safety hazard when people stand high and work, and adjusting the position is time-consuming and labor-consuming.
SUMMERY OF THE UTILITY MODEL
In order to improve personnel and stand that there is the potential safety hazard in eminence drilling construction, adjust the problem that drilling position wastes time and energy, this application provides a get drilling support for hole construction.
The application provides a get hole construction and use drilling support adopts following technical scheme:
the utility model provides a get hole construction and use drilling support, includes the guide rail, is used for adjusting the guide rail is to the removal frame of house top distance and the locating support who is used for the location rig, the guide rail sets up remove on the frame, the locating support slides and sets up on the guide rail, the locating support is followed the length direction of guide rail slides, be provided with on the guide rail and be used for driving the subassembly that slides that the locating support slided, be provided with on the locating support and be used for driving the rig is bored or is extracted the drive assembly at house top.
Through adopting above-mentioned technical scheme, at first utilize the removal frame to remove the guide rail to the relative position that needs drilling, at this moment, utilize the subassembly that slides to drive the locating support and set up the rig on the locating support and move along the length direction of guide rail, when removing to relative position, utilize drive assembly to drive the rig and drill into the house top, when drilling is accomplished, utilize drive assembly to make the rig extract the house top, realized the drilling to the house top, time saving and labor saving has good security.
In a specific possible embodiment, the driving assembly comprises an upper bracket and a lower bracket, the upper bracket is detachably connected with the positioning bracket through a connecting assembly, the drilling machine is arranged on the lower bracket, the upper bracket and the lower bracket are connected in a sliding mode along the height direction, and an adjusting piece for adjusting the distance between the upper bracket and the lower bracket is arranged on the lower bracket.
Through adopting above-mentioned technical scheme, when the drive rig pulled out or bored into the house top, utilize the regulating part to adjust the distance between upper bracket and the lower carriage, and then adjusted the distance between rig and the house top, be favorable to improving the stability of drilling.
In a specific possible embodiment, the adjusting element comprises an adjusting electric cylinder, which is arranged on the lower support, and the piston rod of the adjusting electric cylinder is connected with the upper support.
By adopting the technical scheme, the distance between the upper support and the lower support is adjusted by utilizing the adjusting electric cylinder, and the adjusting electric cylinder is simple and easy to obtain.
In a specific possible implementation scheme, the sliding assembly comprises a screw rod and a motor, one end of the screw rod is rotatably connected with the guide rail, the other end of the screw rod is fixedly connected with an output shaft of the motor, the motor is arranged on the guide rail, the length direction of the screw rod is parallel to the length direction of the guide rail, and the screw rod is in threaded connection with the positioning support.
By adopting the technical scheme, when the positioning support and the drilling machine arranged on the positioning support are driven to move along the length direction of the guide rail, the motor is started, the motor drives the screw rod to rotate, the screw rod and the positioning support rotate relatively, the positioning support moves along the length direction of the guide rail under the guiding action of the guide rail until the drilling machine moves to the drilling position, and the drilling machine is convenient to operate and simple and easy to obtain.
In a specific embodiment, be provided with the collection subassembly that is used for collecting drilling waste material on the upper bracket, the collection subassembly includes collection cloth section of thick bamboo and bandage, the one end of collecting cloth section of thick bamboo is provided with the elastic cord, the elastic cord hoop is established on the organism of rig, the one end of bandage with collection cloth section of thick bamboo fixed connection, the other end of bandage is tied up and is established on the upper bracket, be provided with the discharge gate on the collection cloth section of thick bamboo, be provided with on the collection cloth section of thick bamboo and be used for the ligature area of discharge gate.
Through adopting above-mentioned technical scheme, when the rig is drilled, utilize collection cloth section of thick bamboo to collect the dirt bits and the rubble that drop, avoid dirt bits and rubble to drop as far as possible and injure personnel by a crashing object, after drilling is accomplished, untie the ligature area, at this moment, be convenient for pour out the dirt bits and the rubble in the collection cloth section of thick bamboo, utilize the bandage will collect cloth section of thick bamboo location on the upper bracket, realized the collection of opening to collecting the cloth section of thick bamboo, utilize the elastic cord to establish collection cloth section of thick bamboo hoop on the rig, realized the location to collecting cloth section of thick bamboo one end.
In a specific possible embodiment, the end of the collecting cloth cylinder remote from the drilling machine is provided with a collecting cylinder, which is positioned on the upper bracket.
Through adopting above-mentioned technical scheme, utilize the collecting vessel to prop open collecting the opening that the lower carriage was kept away from to the cloth section of thick bamboo, be favorable to the increase to collecting the collection area of cloth section of thick bamboo.
In a specific embodiment, coupling assembling includes connecting rod and lug, the one end of connecting rod with locating support fixed connection, the other end of connecting rod is offered and is used for supplying upper bracket male mounting groove, the lug with upper bracket fixed connection, first perpendicular groove and first annular have been seted up on the cell wall of mounting groove, the one end in first perpendicular groove with the end wall intercommunication of connecting rod, the other end in first perpendicular groove with first annular intercommunication, the lug with first perpendicular groove and first annular slides and sets up.
Through adopting above-mentioned technical scheme, when installation collecting cloth section of thick bamboo and collecting vessel, insert the mounting groove with the upper bracket in, at this moment, the lug slides along vertical direction in first perpendicular inslot, when the lug removed to first annular in, rotates the upper bracket, and the lug slides in first annular, has realized the location installation to the upper bracket.
In a specific possible implementation scheme, a second vertical groove and a second annular groove are arranged on the groove wall of the mounting groove, the second vertical groove is communicated with the first annular groove, the second vertical groove is communicated with the second annular groove, and the first vertical groove and the second vertical groove are arranged in a staggered mode.
Through adopting above-mentioned technical scheme, when the lug removed the notch that erects the groove to the second with the upper bracket insert the second and erect the groove, until the lug slips into the second annular in, rotate the upper bracket for the lug card is gone into in the second annular, utilizes first perpendicular groove and the perpendicular groove of second of crisscross setting, and the vibration of avoiding the upper bracket to exist at drilling process as far as possible breaks away from the connecting rod, has good security.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the method comprises the steps that firstly, a guide rail is moved to a relative position needing drilling by a moving frame, at the moment, a positioning support and a drilling machine arranged on the positioning support are driven by a sliding assembly to move along the length direction of the guide rail, when the guide rail is moved to the relative position, the drilling machine is driven by a driving assembly to drill into the top of a house, and when drilling is completed, the drilling machine is pulled out of the top of the house by the driving assembly, so that drilling on the top of the house is realized, time and labor are saved, and the safety is good;
2. insert the second with the upper bracket when the lug moves the notch that erects the groove to the second and erect the groove, until the lug slides in the second annular, rotate the upper bracket for in the lug card goes into the second annular, utilize first perpendicular groove and the perpendicular groove of second of crisscross setting, avoid as far as possible the upper bracket to break away from the connecting rod at the vibration that drilling in-process exists, have good security.
Drawings
Fig. 1 is a schematic overall structure diagram of a drilling support for hole drilling construction in an embodiment of the present application.
Fig. 2 is a schematic overall structure diagram for embodying the collecting assembly in the embodiment of the present application.
Fig. 3 is an exploded view of an embodiment of the present application for embodying a connecting assembly.
Description of reference numerals: 1. a guide rail; 2. a movable frame; 201. a frame body; 202. a brace; 3. positioning the bracket; 4. a slipping component; 41. a screw rod; 42. a motor; 5. a drive assembly; 51. an upper bracket; 52. a lower bracket; 6. an adjustment member; 61. adjusting an electric cylinder; 7. a connecting assembly; 71. a connecting rod; 72. a bump; 8. a collection assembly; 81. collecting a cloth cylinder; 82. binding a belt; 9. mounting a rod; 10. connecting grooves; 11. installing a bolt; 12. mounting a nut; 13. connecting holes; 14. a universal wheel; 15. a drilling machine; 16. placing a platform; 17. a slot; 18. a coupling; 19. mounting grooves; 20. a first vertical slot; 21. a first ring groove; 22. a second vertical slot; 23. a second ring groove; 24. elastic bands; 25. a discharge port; 26. binding tapes; 27. a collection canister; 28. and a connecting belt.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses get hole construction and use drilling support.
Referring to fig. 1, a get hole construction and use drilling support includes guide rail 1, remove frame 2 and locating support 3, guide rail 1 is provided with two, two equal fixed connection settings of guide rail 1 are on the roof of removing frame 2, remove frame 2 includes support body 201 and four spike 202, support body 201 welds four installation poles 9 on the lateral wall towards ground, installation pole 9 and spike 202 one-to-one, install and offer the spread groove 10 that is used for supplying spike 202 to peg graft on the lateral wall towards ground of pole 9, be provided with between spike 202 and the installation pole 9 construction mounting bolt 11 and mounting nut 12, evenly be provided with a plurality of connecting holes 13 along the length direction of installation pole 9 on the installation pole 9, the other end of spike 202 slides through the universal wheel 14 that stops of taking the foot, when adjusting the height of removing frame 2, pass connecting hole 13 and spike 202 and mounting nut 12 threaded connection with the one end of mounting bolt 11.
The distance between the guide rails 1 and the top of the house is adjusted by utilizing the moving frame 2, the positioning support 3 is used for positioning the drilling machine 15, the positioning support 3 is in a shape of '208663', the positioning support 3 is arranged between the two guide rails 1, the positioning support 3 is connected with the two guide rails 1 in a sliding manner, a sliding assembly 4 for driving the positioning support 3 to slide is arranged on the guide rails 1, and a driving assembly 5 for driving the drilling machine 15 to drill into or pull out of the top of the house is arranged on the positioning support 3.
Referring to fig. 2 and 3, the driving assembly 5 includes an upper bracket 51 and a lower bracket 52, the lower bracket 52 is in a "U" shape, the upper bracket 51 is provided with two vertical rods, the upper bracket 51 is detachably connected with the positioning bracket 3 through the connecting assembly 7, the lower bracket 52 is provided with a placing platform 16 for placing the body of the drilling machine 15, the drill rod of the drilling machine 15 is arranged upwards, the lower bracket 52 is provided with a slot 17 for the upper bracket 51 to be inserted in a sliding manner, the upper bracket 51 and the lower bracket 52 are connected in a sliding manner along the height direction, an adjusting part 6 for adjusting the distance between the upper bracket 51 and the lower bracket 52 is arranged in the slot 17, the adjusting part 6 is provided with an adjusting electric cylinder 61, the cylinder body of the adjusting electric cylinder 61 is fixedly connected with the slot bottom of the slot 17, and the piston rod of the adjusting electric cylinder 61 is fixedly connected with the upper bracket 51 through a coupler 18.
When the drilling machine 15 is driven to be pulled out or drilled into the top of a house, the distance between the upper support 51 and the lower support 52 is adjusted by the adjusting electric cylinder 61, so that the distance between the drilling machine 15 and the top of the house is adjusted, and the stability of drilling is improved.
Connecting assembly 7 includes connecting rod 71 and lug 72, connecting rod 71 and upper bracket 51 are the cylinder pole, the lateral wall fixed connection on one end and the locating support 3 orientation ground of connecting rod 71, the other end of connecting rod 71 is offered and is used for supplying upper bracket 51 male mounting groove 19, the vertical setting of mounting groove 19, the perisporium fixed connection of lower carriage 52 is kept away from to lug 72 and upper bracket 51, first perpendicular groove 20 and first annular 21 have been seted up on the cell wall of mounting groove 19, the one end of first perpendicular groove 20 and the end wall intercommunication that connecting rod 71 is close to place the platform 16, the other end and the first annular 21 intercommunication of first perpendicular groove 20, lug 72 and first perpendicular groove 20 and the setting of sliding of first annular 21, be provided with second perpendicular groove 22 and second annular 23 on the cell wall of mounting groove 19, second perpendicular groove 22 and the setting of first perpendicular groove 21 intercommunication, lug 72 and second perpendicular groove 22 and the setting of sliding of second annular 23, second perpendicular groove 22 and the setting of second perpendicular groove 23, first perpendicular groove 20 and the vertical setting of second perpendicular groove 22 are all vertical, first perpendicular groove 20 and the crisscross setting.
When the upper bracket 51 is installed on the positioning bracket 3, the upper bracket 51 is inserted into the installation groove 19, at the moment, the lug 72 slides in the vertical direction in the first vertical groove 20, when the lug 72 moves into the first annular groove 21, the upper bracket 51 is rotated, the lug 72 slides into the first annular groove 21, when the lug 72 moves into the notch of the second vertical groove 22, the upper bracket 51 is inserted into the second vertical groove 22 until the lug 72 slides into the second annular groove 23, and the upper bracket 51 is rotated, so that the lug 72 is clamped into the second annular groove 23, and the installation of the upper bracket 51 and the positioning bracket 3 is realized; by utilizing the first vertical slots 20 and the second vertical slots 22 which are arranged in a staggered mode, the situation that the lug 72 is separated from the second vertical slot 22 and the upper support 51 is separated from the connecting rod 71 due to vibration of the upper support 51 in the drilling process is avoided as much as possible, and the safety is good.
Referring to fig. 1, the sliding assembly 4 includes a screw rod 41 and a motor 42, one end of the screw rod 41 is rotatably connected with an end wall of one of the guide rails 1, the other end of the screw rod 41 is fixedly connected with an output shaft of the motor 42, the motor 42 is fixedly connected to the guide rail 1, a length direction of the screw rod 41 is parallel to a length direction of the guide rail 1, and the screw rod 41 passes through the positioning bracket 3 and is in threaded connection with the positioning bracket 3.
When the positioning support 3 is driven to move along the length direction of the guide rail 1, the motor 42 is started, the motor 42 drives the screw rod 41 to rotate, the screw rod 41 and the positioning support 3 rotate relatively, the positioning support 3 is limited by the other guide rail 1, the positioning support 3 moves along the length direction of the guide rail 1 until the drilling machine 15 moves to the drilling position, the electric cylinder 61 is driven and adjusted to adjust the distance from the drilling machine 15 to the top of a house for drilling, and the electric drilling machine is convenient to operate and simple and easy to obtain.
Referring to fig. 2, the upper bracket 51 is provided with a collecting assembly 8 for collecting drilling waste, the collecting assembly 8 includes two collecting cloth drums 81 and two binding bands 82, the binding bands 82 correspond to the upper bracket 51 one by one, one end of the binding band 82 is fixedly connected with the collecting cloth drums 81, the other end of the binding band 82 is bound to the upper bracket 51, one end of the collecting cloth drum 81 is provided with an elastic band 24, the elastic band 24 is hooped on the body of the drilling machine 15, the side wall of the collecting cloth drum 81 is provided with a discharge hole 25, the collecting cloth drum 81 is bound with the discharge hole 25 by using the binding band 26, one end of the collecting cloth drum 81 far away from the drilling machine 15 is fixedly connected with the collecting drum 27, the collecting drum 27 is conical, in this embodiment, the collecting drum 27 is made of polypropylene plastic, the small end of the collecting drum 27 is fixedly connected with the collecting cloth drum 81, the large end of the collecting drum 27 faces the top of the house, two connecting bands 28 are fixedly connected to the collecting drum 27, the connecting bands 28 correspond to the upper bracket 51 one by one, one end of the connecting band 28 is tied to the upper bracket 51, and the positioning of the collecting drum 27 is realized.
The collecting cloth cylinder 81 is propped away from the opening of the lower bracket 52 by the collecting cylinder 27, which is beneficial to collecting dust and broken stones generated when the drilling machine 15 drills; when the drilling machine 15 drills holes, the collecting cloth cylinder 81 is used for collecting falling dust and broken stones, the dust and broken stones are prevented from falling to the greatest extent and injuring people, after the drilling is completed, the binding belt 26 is unfastened, at the moment, the dust and broken stones in the collecting cloth cylinder 81 are convenient to pour out, the collecting cloth cylinder 81 is hooped on the drilling machine 15 through the elastic band 24, the positioning of one end of the collecting cloth cylinder 81 is achieved, and the dust and broken stones are prevented from falling out of the collecting cloth bag to the greatest extent; the collecting cloth cylinder 81 and the collecting cylinder 27 are easily installed and removed by removing the upper bracket 51, and the operation is easy.
The implementation principle of the drilling support for hole taking construction in the embodiment of the application is as follows: at first utilize the removal frame 2 to remove guide rail 1 to the relative position that needs drilling, at this moment, utilize the subassembly 4 that slides to drive positioning bracket 3 and set up rig 15 on positioning bracket 3 along the length direction motion of guide rail 1, when removing to relative position, utilize drive assembly 5 to drive rig 15 and bore the house top, when drilling is accomplished, utilize drive assembly 5 to make rig 15 extract the house top, realized the drilling to the house top, time saving and labor saving, and has good security.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a get hole construction and use drilling support which characterized in that: including guide rail (1), be used for adjusting guide rail (1) is to removal frame (2) of house top distance and locating support (3) that are used for fixing a position rig (15), guide rail (1) sets up remove on the frame (2), locating support (3) slide and set up on guide rail (1), locating support (3) are followed the length direction of guide rail (1) slides, be provided with on guide rail (1) and be used for driving locating support (3) the subassembly (4) that slides, be provided with on locating support (3) and be used for driving rig (15) bores or extracts drive assembly (5) at house top.
2. The drilling support for hole taking construction as claimed in claim 1, wherein: the driving assembly (5) comprises an upper support (51) and a lower support (52), the upper support (51) is detachably connected with the positioning support (3) through a connecting assembly (7), the drilling machine (15) is arranged on the lower support (52), the upper support (51) is connected with the lower support (52) in a sliding mode along the height direction, and an adjusting piece (6) used for adjusting the distance between the upper support (51) and the lower support (52) is arranged on the lower support (52).
3. The drilling support for hole taking construction as claimed in claim 2, wherein: the adjusting piece (6) comprises an adjusting electric cylinder (61), the adjusting electric cylinder (61) is arranged on the lower support (52), and a piston rod of the adjusting electric cylinder (61) is connected with the upper support (51).
4. The drilling support for hole taking construction according to claim 1, wherein: the sliding assembly (4) comprises a screw rod (41) and a motor (42), one end of the screw rod (41) is rotatably connected with the guide rail (1), the other end of the screw rod (41) is fixedly connected with an output shaft of the motor (42), the motor (42) is arranged on the guide rail (1), the length direction of the screw rod (41) is parallel to the length direction of the guide rail (1), and the screw rod (41) is in threaded connection with the positioning support (3).
5. The drilling support for hole taking construction according to claim 2, wherein: be provided with on upper bracket (51) and be used for carrying out the collection subassembly (8) of collecting to the drilling waste material, collection subassembly (8) are including collecting cloth section of thick bamboo (81) and bandage (82), the one end of collecting cloth section of thick bamboo (81) is provided with elastic cord (24), elastic cord (24) hoop is established on the organism of rig (15), the one end of bandage (82) with collect cloth section of thick bamboo (81) fixed connection, the other end of bandage (82) is tied up and is established on upper bracket (51), be provided with discharge gate (25) on the collecting cloth section of thick bamboo (81), be provided with on collecting cloth section of thick bamboo (81) and be used for the ligature area (26) of discharge gate (25).
6. The drilling support for hole taking construction according to claim 5, wherein: one end, far away from the drilling machine (15), of the collecting cloth cylinder (81) is provided with a collecting cylinder (27), and the collecting cylinder (27) is positioned on the upper support (51).
7. The drilling support for hole taking construction as claimed in claim 2, wherein: coupling assembling (7) include connecting rod (71) and lug (72), the one end of connecting rod (71) with locating support (3) fixed connection, the other end of connecting rod (71) is offered and is used for supplying upper bracket (51) male mounting groove (19), lug (72) with upper bracket (51) fixed connection, first perpendicular groove (20) and first annular (21) have been seted up on the cell wall of mounting groove (19), the one end of first perpendicular groove (20) with the end wall intercommunication of connecting rod (71), the other end of first perpendicular groove (20) with first annular (21) intercommunication, lug (72) with first perpendicular groove (20) and first annular (21) slide and set up.
8. The drilling support for hole taking construction as claimed in claim 7, wherein: be provided with the second on the cell wall of mounting groove (19) and erect groove (22) and second annular groove (23), the second erect groove (22) with first annular groove (21) intercommunication sets up, the second erect groove (22) with second annular groove (23) intercommunication sets up, first erect groove (20) with the second erects the crisscross setting of groove (22).
CN202222267261.2U 2022-08-26 2022-08-26 Get hole construction and use drilling support Active CN218083489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222267261.2U CN218083489U (en) 2022-08-26 2022-08-26 Get hole construction and use drilling support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222267261.2U CN218083489U (en) 2022-08-26 2022-08-26 Get hole construction and use drilling support

Publications (1)

Publication Number Publication Date
CN218083489U true CN218083489U (en) 2022-12-20

Family

ID=84449998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222267261.2U Active CN218083489U (en) 2022-08-26 2022-08-26 Get hole construction and use drilling support

Country Status (1)

Country Link
CN (1) CN218083489U (en)

Similar Documents

Publication Publication Date Title
CN106150354A (en) Multi-purpose device is installed in a kind of environmental protection fast power-saving for building punching
CN218083489U (en) Get hole construction and use drilling support
CN207642201U (en) A kind of automated processing equipment of high-speed railway rail bridge pile foundation reinforcing bar
CN108005074A (en) It is a kind of can mechanization remove steel sheet pile steel structure bridge cofferdam construction equipment
CN209699582U (en) A kind of multi-functional water power punching fluting apparatus
CN114955893A (en) House beam hoisting device
CN208633587U (en) A kind of housing construction temporary traffic jump frame
CN218535160U (en) Vertical bar planting trompil auxiliary device
CN208416007U (en) Movable building engineering construction sunshade
CN219795161U (en) Soil cleaning structure for pile driver
CN111645202A (en) Movable automatic lifting rack of drilling machine for reinforcing railway retaining wall
CN219299229U (en) Strip mine side slope reinforcing drilling machine
CN212104088U (en) Hammer beating and pulling device of pile beating and pulling machine
CN219492211U (en) Novel special down-the-hole drill of hydraulic engineering construction
CN218953343U (en) Angle-adjustable roof bolter support
CN220739556U (en) Adjustable movable roof perforating device
CN215369824U (en) Geological survey drilling equipment convenient to use
CN219404851U (en) Concrete column bar planting drilling equipment
CN219840580U (en) Small pile driver for building construction
CN219754477U (en) Horizontal support for hand-held hydraulic drilling machine
CN214773083U (en) Efficient decoration perforating device
CN216277246U (en) Building deep hole base construction is with interim rail guard
CN113031184B (en) Optical fiber embedding device
CN218373829U (en) Anchor rod construction device for constructional engineering
CN213807578U (en) Mine geological exploration anti-collapse device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant