CN218066986U CN202122198326.8U CN202122198326U CN218066986U CN 218066986 U CN218066986 U CN 218066986U CN 202122198326 U CN202122198326 U CN 202122198326U CN 218066986 U CN218066986 U CN 218066986U
Authority
CN
China
Prior art keywords
bracing piece
bearing frame
tower crane
installation base
otic placode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122198326.8U
Other languages
Chinese (zh)
Inventor
韦惠春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Changchi Elevator Parts Co ltd
Original Assignee
Foshan Changchi Elevator Parts Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Changchi Elevator Parts Co ltd filed Critical Foshan Changchi Elevator Parts Co ltd
Priority to CN202122198326.8U priority Critical patent/CN218066986U/en
Application granted granted Critical
Publication of CN218066986U publication Critical patent/CN218066986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a tower crane test installation base, it is including supporting base, bearing frame, test connection seat and a plurality of first bracing piece, and the bearing frame is installed on supporting the base, and the test connection seat is installed on the top of bearing frame, and the bearing frame setting is surrounded around to many first bracing pieces, and the upside and the bearing frame of first bracing piece are connected, and the downside and the support base of first bracing piece are connected, and the downside of first bracing piece is to keeping away from the direction slope setting of bearing frame. The supporting base comprises at least two main beams and at least two auxiliary beams perpendicular to the main beams, the auxiliary beams are installed on the main beams, and the bearing frame is fixedly connected to the auxiliary beams. The tower crane test installation base still includes the many second bracing pieces that encircle the bearing frame setting, the one end of second bracing piece with the girder is connected, and the second bracing piece other end is connected with the auxiliary girder. Has the advantages that: the mounting base is detachable, can be repeatedly utilized and is convenient to transport and mount.

Description

Tower crane test installation base
Technical Field
The utility model relates to a tower crane technical field specifically is a tower crane test installation base.
Background
The tower crane needs a firm foundation during testing, the common method of the current tower crane foundation is to pour a concrete platform with a very large thickness on site, however, the volume of the poured concrete platform of the constructed tower crane foundation is generally large, the construction period is long, the concrete platform can not be reused, after the tower crane is dismantled, the rest concrete platform needs to be additionally dismantled, the method has the problems of low construction efficiency, environmental pollution and cost increase caused by very large waste of resources, and therefore, the tower crane testing foundation which can be repeatedly used and quickly installed is needed at present
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tower crane test installation base aims at solving the not detachable technical problem of installation base of tower crane among the prior art.
In order to achieve the above object, the utility model provides a tower crane test installation base, it is including supporting base, bearing frame, test connection seat and a plurality of first bracing piece, the bearing frame is installed support on the base, the test connection seat is installed the top of bearing frame, many first bracing piece is surrounded the bearing frame sets up, the upside of first bracing piece with the bearing frame is connected, the downside of first bracing piece with support the base and connect, the downside of first bracing piece is to keeping away from the direction slope setting of bearing frame. The installation base is simple in structure and convenient to install.
Preferably, the support base comprises at least two main beams and at least two auxiliary beams perpendicular to the main beams, the auxiliary beams are mounted on the main beams, and the bearing frame is fixedly connected to the auxiliary beams. The number of the main beams and the auxiliary beams can be adjusted according to actual conditions, and applicability to working scenes is improved.
Preferably, tower crane test installation base is still including encircleing many second bracing pieces that the bearing frame set up, the one end of second bracing piece with the girder is connected, the second bracing piece other end with the secondary beam is connected. The main beam and the auxiliary beam are connected more firmly.
Preferably, a plurality of first connecting ear plates connected with the first supporting rods are arranged on the supporting base, a plurality of second connecting ear plates are arranged on the bearing frame, the first supporting rods and the first connecting ear plates are arranged in a one-to-one correspondence manner, one end of each first supporting rod is connected with the corresponding first connecting ear plate, and the other end of each first supporting rod is connected with the corresponding second connecting ear plate. Connection structure is simple, makes things convenient for the connection of first bracing piece.
Preferably, be equipped with a plurality of third on the girder and connect the otic placode, be equipped with on the secondary beam a plurality ofly with the corresponding fourth of third engaging otic placode connects the otic placode, and is a plurality of the second bracing piece is with a plurality of the third connect the otic placode with the fourth connects the otic placode one-to-one setting, the one end of second bracing piece and corresponding the third is connected the otic placode, the other end of second bracing piece and corresponding the fourth is connected the otic placode. The connecting structure is simple, the connection of the second supporting rod is convenient,
preferably, a first connecting shaft for fixing the first supporting rod is inserted into each of the first connecting ear plate and the second connecting ear plate. The first supporting rod is more firmly installed.
Preferably, a second connecting shaft for fixing the second supporting rod is inserted into each of the third connecting ear plate and the fourth connecting ear plate. The second support rod is more firmly installed.
Preferably, the first support rod comprises two connecting rods arranged at intervals, and the two connecting rods are fixedly connected together through a connecting piece. Two connecting rods are arranged at intervals, so that the connecting lug plate is positioned between the two connecting rods, and the installation of the first supporting rod is more stable.
Preferably, the cross section of each connecting rod is U-shaped, and the openings of two adjacent connecting rods are reversely arranged. The connecting shaft is protected, and the stability of connection is ensured.
Preferably, said connecting rod has a plurality of reinforcing plates at its cross-section "U". The connection strength of the connecting rod is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic structural view of a tower crane test installation base of the present invention;
fig. 2 is a schematic structural view of the first support rod of the present invention;
fig. 3 is a cross-sectional view of the first support rod of the present invention.
In the drawings: 1-supporting base, 11-main beam, 12-auxiliary beam, 2-bearing frame, 3-testing connecting base, 4-first supporting rod, 41-connecting rod, 42-connecting piece, 43-reinforcing plate, 5-second supporting rod, 6-first connecting lug plate, 7-second connecting lug plate, 8-third connecting lug plate and 9-fourth connecting lug plate.
The objects, features and advantages of the present invention will be further described with reference to the accompanying drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without making creative efforts belong to the protection scope of the present invention.
It should be noted that, if the present invention relates to a directional indication, the directional indication is only used to explain the relative position relationship between the components, the motion situation, etc. in a specific posture, and if the specific posture is changed, the directional indication is changed accordingly.
In addition, if there is a description relating to "first", "second", etc. in the embodiments of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, the technical solutions in the embodiments may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should not be considered to exist, and is not within the protection scope of the present invention.
As shown in figures 1 to 2, a tower crane test installation base, its characterized in that, it is including supporting base 1, bearing frame 2, test connection seat 3 and a plurality of first bracing piece 4, bearing frame 2 is installed support on the base 1, test connection seat 3 is installed the top of bearing frame 2, many first bracing piece 4 centers on bearing frame 2 sets up, the upside of first bracing piece 4 with bearing frame 2 is connected, the downside of first bracing piece 4 with support base 1 and connect, the downside of first bracing piece 4 is to keeping away from the direction slope of bearing frame 2 sets up.
Specifically, a tower crane test installation chassis, including supporting base 1, bearing frame 2, test connection seat 3 and first bracing piece 4, support base 1 and place subaerial, bearing frame 2 is installed on supporting base 1, test connection seat 3 is installed on bearing frame 2, test connection seat 3 is used for being connected with the base of tower crane, fix the tower crane on bearing frame 2, many first bracing pieces 4 surround bearing frame 2 slope settings, first bracing piece 4 provides a diagonal holding power for bearing frame 2, the power that brings for the weight of some tower cranes of bearing frame 2 dispersion simultaneously, reduce the stress that bearing frame 2 bore, improve bearing frame 2's life, first bracing piece 4 and bearing frame 2 and support and form a triangle-shaped between the 1 three of base, triangle-shaped's stability is strongest, make the tower crane can more stable install on tower crane test installation base.
Preferably, the test connection seat 3 is a flange plate, and the flange plate is connected and used conveniently and can bear larger pressure.
Preferably, a counterweight (not shown) is further disposed on the supporting base 1.
Further, the support base 1 includes at least two main beams 11 and at least two auxiliary beams 12 perpendicular to the main beams 11, the auxiliary beams 12 are installed on the main beams 11, and the bearing frame 2 is fixedly connected to the auxiliary beams 12.
Specifically, the support base 1 includes at least two main beams 11 and at least two auxiliary beams 12, the main beams 11 are placed on the ground, the auxiliary beams 12 are perpendicular to the main beams 11 and are detachably disposed on the main beams 11, the number of the main beams 11 and the number of the auxiliary beams 12 are not limited, and the number of the main beams 11 and the number of the auxiliary beams 12 can be set according to actual conditions.
More preferably, the counterweight is provided on the secondary beam 12.
Further, tower crane test installation base still includes encircleing many second bracing pieces 5 that bearing frame 2 set up, the one end of second bracing piece 5 with girder 11 is connected, the 5 other ends of second bracing piece with auxiliary girder 12 is connected.
Specifically, the second support rod 5 is arranged, the main beam 11 and the auxiliary beam 12 are further connected by the second support rod 5, so that the strength of the main beam 11 and the auxiliary beam 12 is enhanced, the stress on the main beam 11 and the auxiliary beam 12 is dispersed, and meanwhile, the second support rod 5, the first support rod 4 and the bearing frame 2 form a triangle, so that the bearing frame 2 is more stable; the second support rod 5, the auxiliary beam 12 and the main beam 11 form a triangle, and the stability of the support base 1 is improved.
Furthermore, a plurality of first connecting ear plates 6 connected with the first supporting rods 4 are arranged on the supporting base 1, a plurality of second connecting ear plates 7 are arranged on the bearing frame 2, the plurality of first supporting rods 4 are arranged in one-to-one correspondence with the plurality of first connecting ear plates 6 and the plurality of second connecting ear plates 7, one end of each first supporting rod 4 is connected with the corresponding first connecting ear plate 6, and the other end of each first supporting rod 4 is connected with the corresponding second connecting ear plate 7.
Specifically, support and be equipped with a plurality of first connection otic placodes 6 around the bearing frame 2 on the base 1, be equipped with on the bearing frame 2 with a plurality of first connection otic placodes 6 complex a plurality of second connection otic placodes 7, the one end and the first connection otic placode 6 of first bracing piece 4 are connected, the other end and the second of first bracing piece 4 are connected otic placode 7, thereby play and install first bracing piece 4 detachably between supporting base 1 and bearing frame 2, play the effect of supporting bearing frame 2, first bracing piece 4 detachably installs between supporting base 1 and bearing frame 2, the convenience of first bracing piece 4 when the transportation has been improved, tower crane test installation base is in the transportation, can dismantle first bracing piece 4 earlier, wait tower crane test installation base transport the assigned position and then adorn first bracing piece 4, and improve space utilization, first bracing piece 4 demountable installation simultaneously, the suitability of tower crane test installation base has also been improved.
Further, be equipped with a plurality of third on the girder 11 and connect otic placodes 8, be equipped with on the secondary beam 12 a plurality of with the corresponding fourth of third connection otic placode 8 connects otic placode 9, and is a plurality of second bracing piece 5 is with a plurality of third connection otic placode 8 with the setting of fourth connection otic placode 9 one-to-one, the one end of second bracing piece 5 and corresponding third connection otic placode 8 is connected, the other end of second bracing piece 5 and corresponding fourth connection otic placode 9 is connected.
Specifically, it connects otic placode 8 to surround the bearing frame 2 and is equipped with a plurality of third on the girder 11, be equipped with on the auxiliary girder 12 and connect otic placode 9 with a plurality of third a plurality of fourth of 8 complex of otic placodes, the one end and the third of second bracing piece 5 are connected otic placode 8, the other end and the fourth of second bracing piece 5 are connected otic placode 9, thereby play to install second bracing piece 5 detachably between girder 11 and auxiliary girder 12, second bracing piece 5 detachably installs between girder 11 and auxiliary girder 12, the tower crane convenience of second bracing piece 5 when the transportation has been improved, tower crane test installation base is in the transportation, can dismantle second bracing piece 5 earlier, wait that the test installation base transports the assigned position and then adorns second bracing piece 5, and space utilization is improved, second bracing piece 5 demountable installation simultaneously, the suitability of tower crane test installation base has also been improved.
Further, a first connecting shaft for fixing the first supporting rod 4 is inserted into each of the first connecting ear plate 6 and the second connecting ear plate 7.
Specifically, first connecting axle is used for fixing first bracing piece 4 on first connection otic placode 6 and second connection otic placode 7, make the more stable of first bracing piece 4 installation, bolted connection is a common connection structure that can dismantle, bolted connection has simple structure, the installation and removal is convenient, use extensively, the firm advantage of installation, the buckle is connected and is compared with bolted connection, the buckle is connected and is dismantled the degree of difficulty height, and cause the damage to the work piece when dismantling easily, lead to causing economic loss, and bolted connection connects simply, all can not cause the damage to the work piece during the dismouting.
Furthermore, a second connecting shaft for fixing the second support rod 5 is inserted into each of the third connecting ear plate 8 and the fourth connecting ear plate 9.
Specifically, the second connecting axle is used for fixing second bracing piece 5 on third connection otic placode 8 and fourth connection otic placode 9, make the more stable of second bracing piece 5 installation, bolted connection is a common connection structure that can dismantle, bolted connection has simple structure, install and remove the convenience, use extensively, the firm advantage of installation, buckle connection compares with bolted connection, the dismantlement degree of difficulty of buckle connection is high, and cause the damage to the work piece when dismantling easily, lead to causing economic loss, and bolted connection connects simply, can not cause the damage to the work piece during the dismouting.
Preferably, the first connecting ear plate 6 and the second connecting ear plate 7 are one ear plate.
Further, the first supporting rod 4 comprises two connecting rods 41 arranged at intervals, and the two connecting rods 41 are fixedly connected together through a connecting piece 42.
Specifically, the two connecting rods 41 are arranged at intervals, the gap between the two connecting rods 41 can be just inserted into the first connecting ear plate 6, when the first supporting rod 4 is connected with the first connecting ear plate 6, the first connecting ear plate 6 is inserted into the gap between the two connecting rods 41 to form the structure of the connecting rods 41, the first connecting ear plate 6 and the connecting rods 41, and then the first connecting shaft sequentially penetrates through the connecting rods 41, the first connecting ear plate 6 and the connecting rods 41 to more stably install the first supporting rod 4 on the first connecting ear plate 6, so that the first supporting rod 4 is more stably installed;
preferably, the second connecting ear plate 7, the third connecting ear plate 8 and the fourth connecting ear plate 9 have the same structure as the first connecting ear plate 6; the second support bar 5 has the same structure as the first support bar 4.
Preferably, the connecting pieces 42 are welded on the two adjacent connecting rods 41, so that the two adjacent connecting rods 41 are fixed together, the welded structure has the advantages of good connection performance, high rigidity and good integrity, and different shapes, sizes and even different materials can be connected by welding, so that the purposes of reducing weight, saving materials, optimizing resources and the like are achieved.
Furthermore, the cross section of each connecting rod 41 is U-shaped, and the openings 44 of two adjacent connecting rods 41 are reversely arranged.
Specifically, the cross section of each connecting rod 41 is U-shaped, the openings 44 of two adjacent connecting rods 41 are reversely arranged, so that the cross section of the two connected connecting rods 41, namely the cross section of the first supporting rod 4 or the cross section of the second supporting rod 5 are J-shaped, the shape of each connecting rod 41 is favorable for protecting the connecting shaft, and the connecting shaft is protected by the connecting shaft because the tower crane test installation base is arranged outdoors under most conditions and often meets severe working conditions, and the connecting rods 41 can be used for protecting the connecting shaft to shield the connecting shaft, so that the connecting shaft is prevented from severe weather conditions such as vertical wind and rain, and the connection stability of the first supporting rod 4 or the second supporting rod 5 is ensured.
Furthermore, a plurality of reinforcing plates 43 are provided at the cross-section "u" of the connecting rod 41.
Specifically, the shape of the reinforcing plate 43 is the same as the cross section of the connecting rod 41, the reinforcing plate 43 is arranged in the u-shaped groove of the connecting rod 41, the reinforcing plate 43 abuts against the inner surface of the connecting rod 41, and the reinforcing plate 43 is fixed on the connecting rod 41 by welding, without limiting the number of the reinforcing plates 43, the number of the reinforcing plates 43 can be set according to the length of the connecting rod 41, the reinforcing plate 43 can enhance the supporting capability of the connecting rod 41, prevent the connecting rod 41 from deforming, and improve the connecting strength of the first supporting rod 4 and the second supporting rod 5.
The above only is the preferred embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structure changes made by the contents of the specification and the drawings under the inventive concept of the present invention, or the direct/indirect application in other related technical fields are included in the patent protection scope of the present invention.

Claims (10)

1. The utility model provides a tower crane test installation base, its characterized in that, it is including supporting base (1), bearing frame (2), test connection seat (3) and a plurality of first bracing piece (4), install bearing frame (2) support on base (1), test connection seat (3) are installed the top of bearing frame (2), many first bracing piece (4) are encircleed with bearing frame (2) set up, the upside of first bracing piece (4) with bearing frame (2) are connected, the downside of first bracing piece (4) with support base (1) and connect, the downside of first bracing piece (4) is to keeping away from the direction slope setting of bearing frame (2).
2. The tower crane test installation base of claim 1, characterized in that the support base (1) comprises at least two main beams (11) and at least two auxiliary beams (12) arranged perpendicular to the main beams (11), the auxiliary beams (12) are installed on the main beams (11), and the bearing frame (2) is fixedly connected to the auxiliary beams (12).
3. The tower crane test installation base of claim 2, characterized in that, tower crane test installation base still includes many second bracing pieces (5) that encircle bearing frame (2) sets up, the one end of second bracing piece (5) with girder (11) are connected, second bracing piece (5) other end with auxiliary girder (12) are connected.
4. The tower crane test installation base of claim 1, wherein, be equipped with on support base (1) with a plurality of first connection otic placodes (6) that first bracing piece (4) are connected, be equipped with a plurality of second connection otic placodes (7) on bearing frame (2), it is a plurality of first bracing piece (4) and a plurality of first connection otic placode (6) with second connection otic placode (7) one-to-one sets up, the one end of first bracing piece (4) and corresponding first connection otic placode (6) are connected, the other end of first bracing piece (4) and corresponding second connection otic placode (7) are connected.
5. The tower crane test installation base of claim 3, characterized in that, be equipped with a plurality of third on girder (11) and connect otic placodes (8), be equipped with on secondary beam (12) a plurality of with the corresponding fourth of third connection otic placode (8) connects otic placode (9), a plurality of second bracing piece (5) and a plurality of third connection otic placode (8) with fourth connection otic placode (9) one-to-one sets up, the one end of second bracing piece (5) with corresponding the third is connected otic placode (8), the other end of second bracing piece (5) and corresponding fourth connection otic placode (9) are connected.
6. The tower crane test installation base of claim 4, wherein the first connecting lug plate (6) and the second connecting lug plate (7) are provided with a first connecting shaft for fixing the first supporting rod (4) in an inserted manner.
7. The tower crane test installation base of claim 5, wherein a second connecting shaft for fixing the second supporting rod (5) is inserted into the third connecting lug plate (8) and the fourth connecting lug plate (9).
8. The tower crane test installation base of claim 1, wherein the first support rod (4) comprises two connecting rods (41) arranged at intervals, and the two connecting rods (41) are fixedly connected together through a connecting piece (42).
9. The tower crane test installation base according to claim 8, wherein the cross section of each connecting rod (41) is U-shaped, and the openings (44) of two adjacent connecting rods (41) are oppositely arranged.
10. The tower crane test installation base according to claim 9, wherein a plurality of reinforcing plates (43) are arranged at a cross-section "U" of the connecting rod (41).
CN202122198326.8U 2021-09-10 2021-09-10 Tower crane test installation base Active CN218066986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122198326.8U CN218066986U (en) 2021-09-10 2021-09-10 Tower crane test installation base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122198326.8U CN218066986U (en) 2021-09-10 2021-09-10 Tower crane test installation base

Publications (1)

Publication Number Publication Date
CN218066986U true CN218066986U (en) 2022-12-16

Family

ID=84412752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122198326.8U Active CN218066986U (en) 2021-09-10 2021-09-10 Tower crane test installation base

Country Status (1)

Country Link
CN (1) CN218066986U (en)

Similar Documents

Publication Publication Date Title
CN102076921A (en) Upgradeable lattice tower and components thereof
CN218066986U (en) Tower crane test installation base
CN212002581U (en) A floor counter weight mast for 5G construction
CN211647537U (en) Communication tower reinforcing apparatus
CN212836642U (en) Cantilever beam structure
CN210134691U (en) Support tower mast and antenna tower
CN220469575U (en) Highway construction safety encloses fender
CN212863926U (en) Tower crane fixing frame conflicting with lattice column
CN216071094U (en) Special transportation fixed bolster of gas turbine
CN212269228U (en) Main beam of inverted triangle hoist portal crane
CN216641367U (en) Power transmission tower operation and maintenance platform
CN214170122U (en) Mounting base for mobile communication base station equipment
CN214246744U (en) H shaped steel bottom fixed bolster
CN217923118U (en) Mast-type lifting equipment
CN213329959U (en) Assembled elevator shaft operation platform
CN220015219U (en) Supporting construction is consolidated to arch bar
CN209099870U (en) A kind of mast lifting device
CN215830054U (en) A positioning tool for I-steel roof beam
CN113073892B (en) Cooling tower
CN217503275U (en) Communication equipment mounting device
CN220467271U (en) Low headroom pile foundation steel reinforcement cage segmentation hoist and mount frame
CN217975650U (en) Tower bottom base of 18 m stay wire new energy station model
CN212200486U (en) Tower crane foundation concrete base and tower crane underframe fixing structure
CN212897486U (en) Attached tower crane supporting beam up-to-the-air mounting platform
CN219175335U (en) Anchor pile static load test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant