CN218060935U - Hollow ceramic plate curtain wall structure - Google Patents

Hollow ceramic plate curtain wall structure Download PDF

Info

Publication number
CN218060935U
CN218060935U CN202222215263.7U CN202222215263U CN218060935U CN 218060935 U CN218060935 U CN 218060935U CN 202222215263 U CN202222215263 U CN 202222215263U CN 218060935 U CN218060935 U CN 218060935U
Authority
CN
China
Prior art keywords
curtain wall
pendant
plate
cross beam
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222215263.7U
Other languages
Chinese (zh)
Inventor
黄正波
王赓挥
庄学章
杨晖平
庄高祥
许�鹏
郑平球
洪登军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Keyuan Construction Group Co ltd
Original Assignee
Shenzhen Keyuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Keyuan Construction Group Co ltd filed Critical Shenzhen Keyuan Construction Group Co ltd
Priority to CN202222215263.7U priority Critical patent/CN218060935U/en
Application granted granted Critical
Publication of CN218060935U publication Critical patent/CN218060935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a hollow pottery board curtain wall construction, including argil board, argil board passes through the pendant system and hangs on the stand of building outer wall, be equipped with hollow logical chamber in the argil board, it sets up along argil board equidistance interval to lead to the chamber, the pendant system is including the U-shaped card strip that has logical groove, the pendant fixing base, the pendant passes the back of argil board and sets up behind the card strip hole on the U-shaped card strip and sets up the nut threaded connection in the logical groove of U-shaped card strip through the bolt, it is fixed with argil board's connection to realize the pendant, the pendant fixing base includes horizontal part and vertical part, the horizontal part passes through bolt assembly to be fixed on the curtain crossbeam, the vertical part is relative with argil board, be equipped with the extension that the one end of keeping away from argil board extends towards in the vertical part, the pendant is hung on the extension and fixed through locking screw threaded connection. Compared with the prior art, the hand performance and the installation flatness of the ceramic plate curtain wall are greatly improved, and the ceramic plate is stressed more uniformly.

Description

Hollow ceramic plate curtain wall structure
Technical Field
The utility model relates to a curtain wall construction, in particular to hollow pottery board curtain wall construction.
Background
As an exterior wall structure of a building, a ceramic plate curtain wall can be provided with ceramic plates with different shapes according to the exterior and interior requirements of the building for installation, the side edge of the ceramic plate of the existing ceramic plate curtain wall is provided with a hollow through hole, the ceramic plates are installed in a hanging way, generally, a plurality of hook hangers are installed after a T-shaped groove is prefabricated on the back of the hollow ceramic plate, and then the ceramic plates are hung and assembled on a curtain wall supporting member. The connection mode has the problems that the precision requirement on the T-shaped notch is high, the stress on the hanging part of the argil plate is not uniform, and the like, so that the danger of breakage of the argil plate caused by collision generated under the wind load action of the T-shaped notch, the hook hanging part and the argil plate exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hollow pottery board curtain wall construction, the technical problem that solve are atress performance and the security that improves argil board curtain.
In order to solve the above problem, the utility model discloses a following technical scheme realizes: a hollow ceramic plate curtain wall structure comprises an argil plate, wherein the argil plate is hung on a stand column of an outer wall of a building through a hanging piece system, hollow through cavities are formed in the argil plate and are arranged at equal intervals along the argil plate, the hanging piece system comprises a U-shaped clamping strip with a through groove, a hanging piece and a hanging piece fixing seat, the U-shaped clamping strip is arranged in at least two through cavities on the argil plate, the hanging piece penetrates through the back face of the argil plate and a clamping strip hole formed in the U-shaped clamping strip through bolts and then is in threaded connection with a nut arranged in the through groove of the U-shaped clamping strip, so that the hanging piece is fixedly connected with the argil plate, the hanging piece fixing seat is L-shaped and comprises a horizontal portion and a vertical portion, the horizontal portion is fixed on a curtain wall cross beam through a bolt assembly, the vertical portion is opposite to the argil plate, an extending portion extending towards one end far away from the argil plate is arranged on the vertical portion, the hanging piece is hung on the extending portion, an extending portion is provided with an extending portion, a hanging piece screw hole is arranged on the hanging piece, and when the hanging piece is hung on the extending portion, the hanging piece fixing seat, the hanging piece is connected with a hanging screw hole.
Furthermore, a bolt clamping groove is formed in the cross beam of the curtain wall and arranged along the length direction of the cross beam of the curtain wall, and bolts of the bolt assemblies are clamped in the bolt clamping grooves.
Furthermore, the hanging piece is provided with an adjusting screw which is propped against the extending part.
Furthermore, a rubber gasket is arranged between the hanging piece and the argil plate.
Furthermore, the hanging piece comprises a clay plate connecting part opposite to the clay plate and a hook arranged on the clay plate connecting part, a hanging opening of the hook faces the hanging piece fixing seat, and a hanging piece screw hole is formed in the hook body of the hook, which is positioned above the extending part.
Furthermore, an adhesive tape is arranged at one end of the vertical part opposite to the connection part of the argil plate.
Further, the curtain wall cross beam is fixed on the stand through the cross beam fixing seat, the cross beam fixing seat is T-shaped and comprises a stand fixing part and a cross beam connecting part, the stand fixing part is fixedly connected with the stand, the cross beam connecting part is connected with the curtain wall cross beam, cross beam inserting pieces which are fixedly connected through bolt assemblies are arranged on the surfaces of the two opposite sides of the cross beam connecting part and the curtain wall cross beam respectively, and the two ends of the curtain wall cross beam are inserted into the adjacent cross beam inserting pieces respectively and are fastened through self-tapping screws.
Furthermore, concave-convex insections are arranged on the surface of one end of the horizontal part, which is far away from the cross beam of the curtain wall.
Furthermore, the thickness of the argil plate is 35mm, the water absorption rate is less than 0.8, and the bending strength is 2.23N/mm 2
Compared with the prior art, set up U-shaped card strip through the hollow logical chamber on argil plate, and run through the pendant with through the bolt, behind the card strip through-hole of the back of argil plate and U-shaped card strip with set up the nut threaded connection in the logical groove of U-shaped card strip, fixed with being connected of realization pendant and argil plate, then curtain crossbeam on the stand sets up the pendant fixing base on the curtain crossbeam, it is fixed to pass through locking screw with pendant fixing base, thereby realized the installation to argil plate, change into through traditional T type groove and set up U-shaped card strip then be connected fixedly through bolt assembly and pendant in the original logical chamber of argil plate, can improve the hand performance and the installation roughness of argil plate curtain greatly, and the adoption sets up the area of contact that U-shaped card strip can increase pendant system and argil plate, make argil plate atress more even.
Drawings
Fig. 1 is a plan view of the present invention.
Fig. 2 is a cross-sectional view of the present invention.
Fig. 3 is a partially enlarged view of fig. 2.
Fig. 4 is a schematic structural view of the curtain wall beam of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1, 2 and 3, the utility model discloses a hollow ceramic plate curtain wall structure, which comprises a ceramic plate 1, wherein the ceramic plate 1 is hung on a vertical column 100 of a building outer wall through a hanging part system, a curtain wall cross beam 6 is arranged on the vertical column 100, the ceramic plate 1 is provided with a front surface and a back surface, the back surface of the ceramic plate 1 is opposite to the building outer wall, hollow through cavities 2 are arranged in the ceramic plate 1, the through cavities 2 are arranged at equal intervals along the ceramic plate 1, the axial line of the through cavities 2 is horizontal to the ground of the building, the through cavities are arranged at equal intervals from top to bottom, the hanging part system comprises a U-shaped clamping strip 3 with a through groove 32, a hanging part 4, a hanging part fixing seat 5, the U-shaped clamping strip 3 is arranged in at least two through cavities 2 on the ceramic plate 1, the hanging part 4 passes through the back surface of the ceramic plate 1 through a bolt 201 and a clamping strip hole 31 arranged on the U-shaped clamping strip 3 and then is in threaded connection with a nut 200 arranged in the through groove 32 of the U-shaped clamping strip 3, the hanging piece 4 is connected and fixed with the argil plate 1, the hanging piece fixing seat 5 is L-shaped and comprises a horizontal portion 51 and a vertical portion 52, a hole for a bolt to penetrate through is formed in the horizontal portion 51, the horizontal portion 51 is fixed on the curtain wall cross beam 6 through a bolt assembly, the vertical portion 52 is opposite to the argil plate 1, an extending portion 53 extending towards one end far away from the argil plate 1 is formed in the vertical portion 52, the hanging piece 4 is hung on the extending portion 53, an extending portion screw hole 54 is formed in the extending portion 53, a hanging piece screw hole 41 is formed in the hanging piece 4, when the hanging piece 4 is hung on the extending portion 53, the extending portion screw hole 54 is opposite to the hanging piece screw hole 41 and is in threaded connection with the hanging piece screw hole 8 through a locking screw 8, and the hanging piece 4 is fixed on the hanging piece fixing seat 5.
Through above-mentioned structure, replaced the tradition to realize articulating at the mode of the prefabricated T type groove in the back of hollow argil board, improved the atress performance and the installation plane degree of pottery board curtain greatly.
As shown in fig. 1, 2 and 4, the curtain wall cross beams 6 are fixed on the vertical columns 100 through the cross beam fixing seats 7, the curtain wall cross beams 6 are arranged in multiple rows according to the height of a building, the building cross beams 6 in each row are spliced with each other through the cross beam fixing seats 7, the curtain wall cross beams are aluminum alloy sections, and the interior of each curtain wall cross beam is provided with a through cavity; crossbeam fixing base 7 is the T font, include the crossbeam connecting portion 72 of being connected fixed stand fixed part 71 and being connected with curtain wall cross beam 6 with stand 100, be equipped with the through-hole on the crossbeam connecting portion 72, the through-hole is equipped with two and sets up from top to bottom respectively, be equipped with respectively on crossbeam connecting portion 72 and the curtain wall cross beam 6 relative both sides through bolt assembly through the through-hole connect fixed crossbeam plug-in components 12, be equipped with on crossbeam plug-in components 12 with the grafting portion 121 of the logical chamber looks adaptation of curtain wall cross beam, the both ends of curtain wall cross beam 6 are inserted respectively and are established on the grafting portion 121 of adjacent crossbeam plug-in components 12 and are connected the fastening with curtain wall cross beam 6 and grafting portion 121 through self tapping screw.
As shown in fig. 2 and 4, the insertion part 121 is provided with an insertion part screw hole 122, and an axis of the insertion part screw hole 122 extends linearly from the clay plate 1 toward the upright post 100 so that the axis of the insertion part screw hole 122 is perpendicular to the back surface of the clay plate 1.
As shown in fig. 2, a bolt clamping groove 61 is formed in the curtain wall cross beam 6, the bolt clamping groove 61 is arranged along the length direction of the curtain wall cross beam 6, and a bolt of the bolt assembly is clamped in the bolt clamping groove 61; specifically, the bolt catching groove 61 is provided on an end of the curtain wall cross member 6 opposite to the horizontal portion 51, preferably in the middle of the end.
As shown in fig. 2, an adjusting screw 9 is provided on the hanger 4, the adjusting screw 9 is in threaded connection with a screw hole on the hanger 4, and the lower end of the adjusting screw 9 abuts against the extending portion 53.
As shown in figure 2, in order to prevent the pendant 4 from being connected with the back of the clay plate 1 in a hard manner, a rubber gasket 10 is arranged between the pendant 4 and the clay plate 1 to realize flexible contact, so that the danger that the clay plate is broken due to collision of a U-shaped clamping strip, the pendant and the clay plate under the action of wind load is avoided, and the risk that the fixing point of the clay plate is damaged due to local stress concentration of the clay plate after the traditional pendant system is assembled is reduced.
As shown in fig. 2 and 3, in the present invention, the hanging member 4 includes a clay plate connecting portion 43 opposite to the clay plate 1 and a hook 44 provided on the clay plate connecting portion 43, a through hole for the bolt 201 to pass through is provided on the clay plate connecting portion 43, the hanging opening 42 of the hook 44 faces the hanging member fixing seat 5, and the hanging member screw hole 41 and the adjusting screw 9 are provided on the hook body of the hook 44 above the extending portion 53. As can be seen from fig. 2, the hook 44 is provided in the middle of the clay plate connection portion 43, and the connection point of the bolt assembly for connection with the clay plate and the U-shaped clip is provided at the upper end of the clay plate connection portion 43 (i.e., above the hook 44).
As shown in fig. 2 and 3, a rubber strip 11 is provided at the end of the vertical part 52 opposite to the clay-plate connecting part 43 so that no gap is present between the lower end of the clay-plate connecting part 43 and the vertical part 5; specifically, a rubber strip clamping groove 56 is formed in the surface of one side, opposite to the clay plate 1, of the vertical portion 52 and near the extending portion 53, and the rubber strip 11 is clamped in the rubber strip clamping groove 56.
As shown in fig. 1, an uneven insection 55 is provided on one end surface of the horizontal portion 51 remote from the curtain-walling transom 6 to increase the slipperiness of the bolt assembly.
As an embodiment of the utility model, the thickness of the clay plate 1 is 35mm, the water absorption is less than 0.8, and the bending strength is 2.23N/mm 2 The size of the through cavity 2 is 16.9 multiplied by 9.9mm; the hole for connection on the horizontal portion 51 is a kidney-shaped hole.
During assembly, the construction direction of the beam fixing seats 7 is horizontal construction, the beam fixing seats are arranged at intervals and fixed on the upright posts 100 according to actual requirements, then the beam plug-in components 12 are fastened on the beam connecting parts 72 through bolt components, according to the horizontal construction principle, firstly, one row (height direction) of curtain wall beams 6 are plugged on the plug-in parts 121 and then fastened through self-tapping screws, and then, the other row is installed; after the curtain wall cross beams 6 are installed, installing the hanging piece fixing seat 5, inserting the bolt of the bolt assembly into the bolt clamping groove 61 and moving to a set position, sleeving the hole on the horizontal part 51 of the hanging piece fixing seat 5 on the bolt and then fastening the bolt through the nut of the bolt assembly; then, the ceramic plate 1 is prefabricated in a factory, the nut 200 in the U-shaped clamping strip 3 is limited and fixed, the nut 200 is opposite to the clamping strip hole 31, then the ceramic plate 1 is perforated, the nut 200 is exposed, at the moment, a gasket can be arranged between the nut 200 and the through groove 32 of the U-shaped clamping strip, a sleeve 300 is also arranged in the perforated hole on the ceramic plate 1, then the nut passes through a hole on the ceramic plate connecting part 43 of the pendant 4, the rubber gasket 10, the perforated hole on the ceramic plate 1 and the clamping strip hole 31 through a bolt 201 and then is connected and fastened with the nut 200 in a threaded manner, finally, the locking screw 8 is sequentially hooked and locked, the pendant 4 is connected and fixed with the pendant fixing seat 5, and the ceramic plate 1 is adjusted and positioned by adjusting the adjusting screw 9.
The utility model discloses a change traditional T type groove into and set up U-shaped card strip then be connected fixedly through bolt assembly and pendant through the original logical chamber of argil board, can improve the hand performance and the installation roughness of argil board curtain greatly, adopt moreover to set up the area of contact that U-shaped card strip can increase pendant system and argil board, make argil board atress more even.

Claims (9)

1. The utility model provides a hollow pottery plate curtain wall structure, includes argil board (1), argil board (1) hang on the stand of building outer wall through the pendant system, its characterized in that: the hanging system comprises U-shaped clamping strips (3) with through grooves, hanging pieces (4) and hanging piece fixing seats (5), wherein the U-shaped clamping strips (3) are arranged in at least two through cavities (2) on the ceramic plate (1), the hanging pieces (4) penetrate through the back surface of the ceramic plate (1) through bolts and clamping strip holes (31) formed in the U-shaped clamping strips (3) and are in threaded connection with nuts arranged in the through grooves of the U-shaped clamping strips (3) so as to realize the connection and fixation of the hanging pieces (4) and the ceramic plate (1), the hanging piece fixing seats (5) are L-shaped and comprise horizontal portions (51) and vertical portions (52), the hanging pieces (51) are fixed on cross beams (6) through bolt assemblies, the vertical portions (52) are opposite to the ceramic plate (1), extension portions (53) extending towards one end far away from the ceramic plate (1) are arranged on the vertical portions (52), the hanging pieces (4) are arranged on the hanging pieces (4) and are connected with the screw hole extension portions (54), when the hanging pieces (4) are hung on the screw hole extension portions (41), the hanging pieces (53), the hanging pieces (4) and are locked on the screw hole extension portions (54), so as to fix the pendant (4) on the pendant fixing seat (5).
2. The hollow ceramic panel curtain wall construction of claim 1, wherein: be equipped with bolt clamping groove (61) on curtain wall crossbeam (6), bolt clamping groove (61) set up along the length direction of curtain wall crossbeam (6), and bolt assembly's bolt card is established in bolt clamping groove (61).
3. The hollow ceramic plate curtain wall structure as claimed in claim 2, wherein: the hanging piece (4) is provided with an adjusting screw (9), and the adjusting screw (9) is propped against the extending part (53).
4. The hollow ceramic panel curtain wall construction of claim 3, wherein: a rubber gasket (10) is arranged between the hanging piece (4) and the clay plate (1).
5. The hollow ceramic panel curtain wall construction of claim 4, wherein: the hanger (4) comprises a clay plate connecting part (43) opposite to the clay plate (1) and a hook (44) arranged on the clay plate connecting part (43), a hanging opening (42) of the hook (44) faces the hanger fixing seat (5), and a hanger screw hole (41) is arranged on the part, above the extending part (53), of the hook body in the hook (44).
6. The hollow ceramic panel curtain wall construction of claim 4, wherein: the vertical part (52) is provided with a rubber strip (11) at one end opposite to the clay plate connecting part (43).
7. The hollow ceramic plate curtain wall structure as claimed in claim 1, wherein: curtain wall cross beam (6) are fixed on the stand through cross beam fixing base (7), cross beam fixing base (7) are the T font, include stand fixed part (71) of being connected fixedly with the stand and cross beam connecting portion (72) of being connected with curtain wall cross beam (6), both sides relative in cross beam connecting portion (72) and curtain wall cross beam (6) are equipped with respectively on the surface and connect fixed crossbeam plug-in components (12) through bolt assembly, the both ends of curtain wall cross beam (6) are inserted respectively and are established on adjacent crossbeam plug-in components (12) and through self tapping screw fastening.
8. The hollow ceramic panel curtain wall construction of claim 1, wherein: one end surface of the horizontal part (51) far away from the curtain wall cross beam (6) is provided with concave and convex insections (55).
9. The hollow ceramic plate curtain wall structure as claimed in claim 1, wherein: the thickness of the pottery clay plate (1) is 35mm, the water absorption is less than 0.8, and the bending strength is 2.23N/mm 2
CN202222215263.7U 2022-08-20 2022-08-20 Hollow ceramic plate curtain wall structure Active CN218060935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222215263.7U CN218060935U (en) 2022-08-20 2022-08-20 Hollow ceramic plate curtain wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222215263.7U CN218060935U (en) 2022-08-20 2022-08-20 Hollow ceramic plate curtain wall structure

Publications (1)

Publication Number Publication Date
CN218060935U true CN218060935U (en) 2022-12-16

Family

ID=84405721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222215263.7U Active CN218060935U (en) 2022-08-20 2022-08-20 Hollow ceramic plate curtain wall structure

Country Status (1)

Country Link
CN (1) CN218060935U (en)

Similar Documents

Publication Publication Date Title
CN110952698A (en) Curtain wall panel hanging component and using method thereof
CN218060935U (en) Hollow ceramic plate curtain wall structure
CN115288340A (en) Hollow ceramic plate curtain wall structure
CN114016643B (en) High-strength assembled curved curtain wall structure
CN210827979U (en) Fade-proof and corrosion-proof aluminum veneer curtain wall
CN111287356B (en) Glass curtain wall's sunken wall body system of decorating
CN210685087U (en) Double-layer curtain wall grating structure
CN220550734U (en) Building curtain mount
CN217027663U (en) Big face hangs ceramic brick connection structure futilely
CN217924594U (en) Connecting structure for wall surface
CN217998552U (en) Aluminum alloy curtain wall structure
CN213477350U (en) Light gauge steel fast-assembling furred ceiling system
CN218346511U (en) Concrete slab horizontal installation self-locking device
CN215167537U (en) Integrated wall surface structure
CN110984010A (en) Sound insulation wallboard with multiple mounting modes
CN214034184U (en) Structure of envelopping of steel structure house indoor steel beam
CN217871259U (en) Glass curtain wall crossbeam stand pin formula connected system
CN221194075U (en) Stone wall surface dry hanging structure
CN221168339U (en) Assembled suspended ceiling
CN216810767U (en) Fast-assembling single face attaches wall light steel skeleton system
CN221255979U (en) Connection structure of wallboard
CN217974944U (en) Curtain wall connecting assembly and curtain wall mounting system
CN220848218U (en) Connecting device of building decoration curtain wall
CN217000561U (en) Integral type guardrail structure
CN215926447U (en) Novel furred ceiling light gauge steel connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant