CN218031757U - Assembled pipe jacking construction main jacking cylinder frame - Google Patents

Assembled pipe jacking construction main jacking cylinder frame Download PDF

Info

Publication number
CN218031757U
CN218031757U CN202221947552.XU CN202221947552U CN218031757U CN 218031757 U CN218031757 U CN 218031757U CN 202221947552 U CN202221947552 U CN 202221947552U CN 218031757 U CN218031757 U CN 218031757U
Authority
CN
China
Prior art keywords
frame
cylinder
jacking
shaped
shaped frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221947552.XU
Other languages
Chinese (zh)
Inventor
周宇清
魏旭峰
刘宗钦
马建峰
张峻珲
孙冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Tunnel Engineering Co ltd
Original Assignee
Zhongyifeng Tunnel Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Tunnel Engineering Co ltd filed Critical Zhongyifeng Tunnel Engineering Co ltd
Priority to CN202221947552.XU priority Critical patent/CN218031757U/en
Application granted granted Critical
Publication of CN218031757U publication Critical patent/CN218031757U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an assembled pipe jacking construction main jacking cylinder frame, which comprises a lower connection; the two L-shaped frame bodies are symmetrically spliced at two ends of the lower connection to form a U-shaped whole; the L-shaped frame body is formed by sequentially splicing a lower frame, a middle frame and an upper frame; and a plurality of oil cylinder holes are arranged at intervals along the outline of the L-shaped frame body, and clamping parts are arranged at two ends of each oil cylinder hole. The main jacking cylinder frame for the assembly type pipe jacking construction is simple to manufacture, flexible to install and dismantle, capable of obviously improving the construction efficiency, convenient to transport and capable of effectively reducing the cost; the assembled design can be adjusted and assembled according to the construction requirements, is suitable for jacking pipes with various sizes, has a wider application range and has wide application prospect.

Description

Assembled pipe jacking construction main jacking cylinder frame
Technical Field
The utility model relates to a push pipe construction field, in particular to assembled push pipe construction owner pushes up hydro-cylinder frame.
Background
In the field of construction engineering, along with the progress of scientific technology, the trenchless jacking pipe technology is widely applied to underground space construction, and the application of rectangular jacking pipes in underground engineering is more and more extensive depending on the utilization rate of sections and the maturity of trenchless mechanical equipment and a construction process.
The rectangular pipe jacking oil cylinder frame is manufactured on site at the initial stage, and has the defects of low construction speed, long consumed time, low machining and manufacturing precision and incapability of being reused after use. Although some integral improved generation also progressively appear in later stage, integral improved generation is tearing the in-process in ann and tearing open, because of the support body is great, unable nimble adjustment leads to ann to tear open inconvenient, needs more personnel to cooperate, and because of the support body is great when the transportation, needs solitary vehicle transportation, leads to the cost of transportation to increase.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve is: in order to overcome the defects of the prior art, the main jacking cylinder frame for the fabricated jacking pipe construction is provided.
In order to achieve the technical effects, the utility model discloses a technical scheme be: a main jacking cylinder frame for assembly type pipe jacking construction comprises a lower connection part; the two L-shaped frame bodies are symmetrically spliced at two ends of the lower connection to form a U-shaped whole body; the L-shaped frame body is formed by sequentially splicing a lower frame, a middle frame and an upper frame; and a plurality of oil cylinder holes are arranged at intervals along the outline of the L-shaped frame body, and clamping parts are arranged at two ends of each oil cylinder hole.
In an optional scheme, the two ends of the lower link, the two ends of the lower frame, the two ends of the middle frame and the lower end of the upper frame are provided with butt joint plates, and the butt joint plates are provided with bolt holes.
In an optional scheme, the lower frame, the middle frame and the upper frame are all provided with lifting lugs.
In an alternative scheme, the L-shaped frame body is made of steel, and the surface of the L-shaped frame body is provided with an anti-rust layer.
In an optional scheme, an oil cylinder penetrates through the oil cylinder hole, and the jacking force of the oil cylinder is 2000 KN-3000 KN.
In an alternative, each of the L-shaped frame bodies is provided with nine cylinder bores;
the lower frame is provided with four oil cylinder holes, the middle frame is provided with three oil cylinder holes, and the upper frame is provided with two oil cylinder holes.
In an alternative scheme, the clamp component comprises a U-shaped clamp riding on the periphery of the oil cylinder hole and two fixing blocks fixed on the L-shaped frame body, and the U-shaped clamp is fixedly connected with the two fixing blocks through nuts.
In an alternative scheme, the bottom of the lower frame is provided with a cushion block groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the main jacking oil cylinder frame is simple to manufacture, flexible to mount and dismount, capable of obviously improving the construction efficiency, convenient to transport and capable of effectively reducing the cost;
2. the assembled design can be adjusted and assembled according to the construction requirements, is suitable for jacking pipes with various sizes, has a wider application range and has wide application prospect.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented according to the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and the embodiments, and it is obvious that the described embodiments are some embodiments, not all embodiments of the present invention.
Drawings
FIG. 1 is a front view of a fabricated pipe jacking construction main jacking cylinder frame of the embodiment;
FIG. 2 is a side view of a fabricated pipe jacking construction main jacking cylinder frame of the embodiment;
FIG. 3 is a schematic view of the structure of the clamp member;
FIG. 4 is a schematic view of the assembly of the cylinder;
the reference numbers and corresponding designations in the drawings are: 1. the hydraulic cylinder comprises a lower connection, a 2.L-shaped frame body, a 2a cylinder hole, a 21 lower frame, a 21a cushion block groove, a 22 middle frame, a 23 upper frame, a 3 clamping hoop member, a 31.U-shaped clamping hoop, a 32 fixing block, a 4 butt joint plate, a 5 lifting lug and a 6 oil cylinder.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic drawings and illustrate the basic structure of the present invention only in a schematic manner, and thus show only the components related to the present invention.
Referring to fig. 1-3, the embodiment discloses a main jacking cylinder frame for fabricated pipe jacking construction, which comprises a lower connection 1; the number of the L-shaped frame bodies 2 is two, and the L-shaped frame bodies are symmetrically spliced at two ends of the lower connecting body 1 to form a U-shaped whole; wherein the L-shaped frame body 2 is formed by sequentially splicing a lower frame 21, a middle frame 22 and an upper frame 23; a plurality of oil cylinder holes 2a are arranged at intervals along the outline of the L-shaped frame body 2, and clamp pieces 3 are arranged at two ends of each oil cylinder hole 2a; the clamp member 3 includes a U-shaped clamp 31 riding on the outer periphery of the cylinder bore 2a and two fixing blocks 32 fixed to the L-shaped frame 2, and the U-shaped clamp 31 and the two fixing blocks 32 are fixedly connected by nuts.
Above-mentioned structure has adopted the assembled design, and with the whole seven sections little support bodies of linking 1, two lower framves 21, two well framves 22 and two upper cradles 23 totally of dividing into of hydro-cylinder frame, adopt the mode of concatenation to fix between the adjacent little support body, have easy dismounting, the convenient advantage of transportation. The distribution of oil cylinder hole 2a is in lower carriage 21, on well frame 22 and the upper ledge 23, be used for installing hydro-cylinder 6, and usable clamp piece 3 is consolidated hydro-cylinder 6, U type clamp 31 that both ends inserted in fixed block 32 promptly can fasten hydro-cylinder 6 on L shape support body 2, stability and fastness after with 6 installations of improvement hydro-cylinder, because of the design that adopts this kind of mode, hydro-cylinder 6 and hydro-cylinder frame are whole can install in advance before dispatching from the factory, little support body (get rid of down link 1) and the hydro-cylinder 6 that corresponds can not open the transportation promptly, this space that just makes to occupy is littleer, after transporting the scene, every little direct unit mount of support body can, the equipment is more efficient.
The specific splicing mode is as follows: the two ends of the lower connecting rod 1, the two ends of the lower frame 21, the two ends of the middle frame 22 and the lower end of the upper frame 23 are provided with butt joint plates 4, and the butt joint plates 4 are provided with bolt holes.
The butt joint plates 4 are arranged on the small frame bodies and are matched with high-strength bolts for connection, so that the whole oil cylinder frame can be conveniently assembled, any welding work is not needed, and the safety is higher; when the support is dismounted, the high-strength bolts screwed out of the bolt holes can realize the separation of the small support bodies. In order to ensure the installation stability of the lower frame 21, the middle frame 22 and the upper frame 23 in the height direction, rib plates can be welded on the butt joint plate 4 of the middle frame 22, the connecting plate of the upper frame 23 and the connecting plate of the lower frame 21, so that the firmness of the butt joint plates 4 is enhanced, and further the construction safety is ensured.
The lower frame 21, the middle frame 22, and the upper frame 23 are provided with the lifting lugs 5.
Through installation lug 5, make things convenient for the hoist and mount construction, for the stability of further improvement hoist and mount, lug 5 is generally installed at the top of undercarriage 21, well frame 22, upper bracket 23, and the position of avoiding butt plate 4 is noticed, avoids interfering the influence hoist and mount operation.
The L-shaped frame body 2 is made of steel, and the surface of the L-shaped frame body 2 is provided with an anti-rust layer.
L shape framework 2 that steel made is high in strength, and life is of a specified duration, for example, the lower carriage 21 of this embodiment, well frame 22 and upper carriage 23 are channel-section steel welded frame column structure, and foraminiferous steel sheet is welded to both sides around this frame column structure, and the left and right sides welds the rice font and supports, and overall structure is firm, and low in manufacturing cost is honest and clean. The antirust layer can be a paint layer, the cost is low, and the attractive effect of the L-shaped frame body 2 can be improved.
Referring to fig. 4, an oil cylinder 6 penetrates through the oil cylinder hole 2a, and the jacking force of the oil cylinder 6 is 2000 KN-3000 KN; each L-shaped frame body 2 is provided with nine cylinder bores 2a; wherein the lower frame 21 is provided with four cylinder bores 2a, the middle frame 22 is provided with three cylinder bores 2a, and the upper frame 23 is provided with two cylinder bores 2a.
At present, the jacking force of the rectangular jacking pipe is mostly within 30000KN, the layout is suitable for most jacking pipe construction, and the uniform stress on two sides of the jacking pipe is ensured. It should be noted that the number of the cylinder bores 2a of the lower frame 21, the middle frame 22, and the upper frame 23 is not limited to the above description, and the number of the cylinder bores 2a may be arranged according to construction requirements.
Still referring to fig. 1, in some embodiments, the bottom of the lower frame 21 is provided with a pad groove 21a.
Due to the fact that the rectangular jacking pipes are large in size, the universality and reusability of the whole oil cylinder frame are considered. Only the length of the lower connecting part 1 needs to be changed in the aspect of width, and only the cushion block needs to be additionally arranged at the cushion block groove 21a in the aspect of height, so that the transformation cost is low, and meanwhile, the universality and the reusability of the oil cylinder frame are improved.
The present invention is not limited to the above specific embodiments, and for those skilled in the art, the above conception can be used without any creative work, and all the changes made fall within the protection scope of the present invention.

Claims (8)

1. A main jacking cylinder frame for fabricated pipe jacking construction is characterized by comprising
A lower connection (1);
the number of the L-shaped frame bodies (2) is two, and the two L-shaped frame bodies are symmetrically spliced at two ends of the lower connection (1) to form a U-shaped whole body; the L-shaped frame body (2) is formed by sequentially splicing a lower frame (21), a middle frame (22) and an upper frame (23); and
and a plurality of oil cylinder holes (2 a) are arranged at intervals along the outline of the L-shaped frame body (2), and clamping parts (3) are arranged at two ends of each oil cylinder hole (2 a).
2. The fabricated pipe-jacking construction main jacking cylinder frame as claimed in claim 1, wherein butt plates (4) are provided at both ends of the lower link (1), both ends of the lower frame (21), both ends of the middle frame (22) and the lower end of the upper frame (23), and bolt holes are provided on the butt plates (4).
3. The fabricated pipe-jacking construction main jacking cylinder frame as claimed in claim 2, wherein said lower frame (21), said middle frame (22) and said upper frame (23) are provided with lifting lugs (5).
4. The fabricated pipe-jacking construction main top cylinder frame as claimed in claim 1, wherein the L-shaped frame body (2) is made of steel, and the surface of the L-shaped frame body (2) is provided with a rust preventive layer.
5. The fabricated pipe jacking construction main jacking cylinder frame as claimed in claim 1, wherein a cylinder (6) is inserted into said cylinder bore (2 a), and the jacking force of said cylinder (6) is 2000KN to 3000KN.
6. The fabricated pipe-jacking construction main top cylinder frame as claimed in claim 5, wherein each of said L-shaped frame bodies (2) is provided with nine cylinder bores (2 a);
wherein the lower rack (21) is provided with four cylinder bores (2 a), the middle rack (22) is provided with three cylinder bores (2 a), and the upper rack (23) is provided with two cylinder bores (2 a).
7. The fabricated pipe jacking main jack cylinder frame according to claim 1, wherein the clip member (3) includes a U-shaped clip (31) riding on the outer periphery of the cylinder bore (2 a) and two fixing blocks (32) fixed to the L-shaped frame body (2), the U-shaped clip (31) and the two fixing blocks (32) being fixedly connected by a nut.
8. The fabricated push pipe construction main top cylinder frame as claimed in any one of claims 1 to 7, wherein a bottom of the lower frame (21) is provided with a pad groove (21 a).
CN202221947552.XU 2022-07-27 2022-07-27 Assembled pipe jacking construction main jacking cylinder frame Active CN218031757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221947552.XU CN218031757U (en) 2022-07-27 2022-07-27 Assembled pipe jacking construction main jacking cylinder frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221947552.XU CN218031757U (en) 2022-07-27 2022-07-27 Assembled pipe jacking construction main jacking cylinder frame

Publications (1)

Publication Number Publication Date
CN218031757U true CN218031757U (en) 2022-12-13

Family

ID=84386003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221947552.XU Active CN218031757U (en) 2022-07-27 2022-07-27 Assembled pipe jacking construction main jacking cylinder frame

Country Status (1)

Country Link
CN (1) CN218031757U (en)

Similar Documents

Publication Publication Date Title
CN218031757U (en) Assembled pipe jacking construction main jacking cylinder frame
CN103615601A (en) Locomotive pipeline and cable composite assembling method
CN104647280A (en) Device for automatically pulling and installing vibration reduction pad for pipe plate
CN212202081U (en) Tunnel engineering steel bow member fixing device
CN206940344U (en) A kind of cold rolling mill hydraulic cylinder changing device
CN202622271U (en) Cylinder body welding fixture
CN213738242U (en) Horizontal installation utility tool for internal parts of large tower
CN110510504B (en) Hoisting method of deck pipe system unit module
CN211193694U (en) Rod and tube bundle propeller
CN210566709U (en) Quick guide support for pipeline
CN212563537U (en) Universal bracket for wind power tower cylinder
CN210802198U (en) Incomplete core pulling device for portable heat exchanger
CN110757398A (en) Baffle rod tube bundle propeller and construction method thereof
CN201760476U (en) Straightening machine for small-sized steel tubes
CN202689570U (en) Concrete distributing device and concrete pump truck
CN202864831U (en) Connection structure of car lifting machine pump station and stand column
CN211924101U (en) Pipeline installation fixing device for lifting operation room
CN105058337A (en) Disassembling and assembling rack universal for frame-type gun turrets
CN202007019U (en) Supporting device of belt conveyor
CN207522480U (en) A kind of lubricating oil oil cooler core pulling specific purpose tool
CN210996607U (en) Drilling tool for mounting hole of lifting device
CN203571222U (en) Ladder-type cable bridge
CN214739780U (en) Simple steel structure construction steel platform mounting structure
CN219633636U (en) Tank body and reinforcing ring assembling tool
CN210997373U (en) Tool for disassembling and assembling core package of double-cylinder multistage centrifugal pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant