CN218029094U - Convenient installation device of building engineering construction jib - Google Patents

Convenient installation device of building engineering construction jib Download PDF

Info

Publication number
CN218029094U
CN218029094U CN202221660099.4U CN202221660099U CN218029094U CN 218029094 U CN218029094 U CN 218029094U CN 202221660099 U CN202221660099 U CN 202221660099U CN 218029094 U CN218029094 U CN 218029094U
Authority
CN
China
Prior art keywords
fixed
rod
fixedly connected
worm
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221660099.4U
Other languages
Chinese (zh)
Inventor
徐风
邓旭
吕文达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221660099.4U priority Critical patent/CN218029094U/en
Application granted granted Critical
Publication of CN218029094U publication Critical patent/CN218029094U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a convenient installation device of building engineering construction jib relates to jib installation technical field, the on-line screen storage device comprises a base, the last fixed surface of base is connected with the fixed plate, the last fixed surface of fixed plate is connected with two symmetrical first fixed blocks, the last fixed surface of fixed plate is connected with the main part body, be provided with the worm between two first fixed blocks, the both ends of worm run through two first fixed blocks respectively and rotate with two first fixed blocks and be connected, the worm runs through the main part body and rotates with the main part body and be connected, the one end fixedly connected with of worm rotates the handle, the last fixed surface of fixed plate is connected with the turbine, the worm meshes with the turbine mutually, the output pivot fixedly connected with threaded rod of turbine, through first fixed block, rotate the handle, the worm, the turbine, the main part body, a connecting cylinder, including a motor, the installation of completion jib that first gear and second gear can be better, staff's operating mass and operating time have been guaranteed.

Description

Convenient installation device of building engineering construction jib
Technical Field
The utility model relates to a jib installation technical field specifically is a convenient installation device of building engineering construction jib.
Background
A suspension bar is one of the most important components of an indoor ceiling, plays an important role in ceiling installation, plays a role in connecting the entire ceiling surface with the top of a room, is the basis of the entire ceiling engineering, and is often used as a support member in a construction site, and is generally installed on a ceiling or a header.
Most of the existing suspender installation devices are formed by climbing ladders by constructors, manually screwing suspenders with sliding wires into drilled holes, and have large workload, so that the workers need to hoist each positioning point, and climb the ladders back and forth, which wastes time and labor, thereby increasing the workload of the workers; therefore, the convenient installation device for the construction suspender of the building engineering is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a convenient installation device of building engineering construction jib in order to compensate the not enough of prior art.
In order to achieve the above purpose, the utility model provides a following technical scheme: a convenient installation device for a construction suspender of building engineering comprises a base, wherein a fixed plate is fixedly connected to the upper surface of the base, two symmetrical first fixed blocks are fixedly connected to the upper surface of the fixed plate, a limiting pipe is fixedly connected to the upper surface of the fixed plate, a worm is arranged between the two first fixed blocks, two ends of the worm respectively penetrate through the two first fixed blocks and are rotatably connected with the two first fixed blocks, the worm penetrates through the limiting pipe and is rotatably connected with the limiting pipe, one end of the worm is fixedly connected with a rotating handle, the upper surface of the fixed plate is rotatably connected with a turbine, the worm is meshed with the turbine, the upper surface of the turbine is fixedly connected with a threaded rod, the outer surface of the threaded rod is in threaded connection with a threaded pipe, the outer surface of the threaded pipe is fixedly connected with a symmetrical third connecting rod, two ends of the third connecting rods, which are far away from each other, are fixedly connected with upper surface sliding blocks, the inner wall of the limiting pipe is provided with the two symmetrical first sliding chutes, the two sliding blocks are respectively and are slidably connected inside the two first sliding chutes are respectively connected with the outer surface of the two first sliding chutes, the clamping jaw is connected with a connecting cylinder, the outer surface of the connecting rod of the connecting cylinder is fixedly connected with a fifth connecting rod, the fifth fixed block, the outer surface of the clamping jaw, the connecting rod is fixedly connected with a rotating shaft of the sliding chute of a motor, and a second sliding chute of a clamping jaw, and a second sliding jaw is connected with a second sliding chute of a second sliding jaw, the outer surface of the sliding rod is rotatably connected with two symmetrical expansion bolts, the upper surface of the first connecting rod is rotatably connected with two symmetrical second gears, a toothed chain is arranged above the first connecting rod, and the two second gears are in transmission connection with the first gear through the toothed chain.
Furthermore, a second fixing block is fixedly connected to the upper surface of the base, and two symmetrical limiting frames are fixedly connected to the outer surface of the second fixing block.
Furthermore, a sliding rod is arranged outside the second fixing block, two symmetrical third fixing blocks are fixedly connected to the upper surface of the base, and one end, close to the third fixing blocks, of the sliding rod penetrates through the second fixing block and is in sliding connection with the second fixing block.
Furthermore, one end of the sliding rod, which is close to the limiting frame, is connected with a positioning plate in a sliding manner through a limiting groove formed in the outer surface of the sliding rod, and the positioning plate is matched with a fixing groove formed in the outer surface of the limiting frame through the limiting frame.
Furthermore, one end of the sliding rod close to the second connecting rod is fixedly connected with a fourth fixed block, and the fourth fixed block is hinged with a folding rod through a pin shaft.
Furthermore, the one end that the slide bar was kept away from to the folding rod rotates and is connected with the second connecting rod, the both ends of second connecting rod run through two third fixed blocks respectively and rotate with two third fixed blocks and be connected.
Further, two the equal fixedly connected with lifter of upper surface of third fixed block and second fixed block, the top of base is provided with the connecting plate, and is three the upper end of lifter all with the bottom surface fixed connection of connecting plate, the last fixed surface of connecting plate is connected with the operation case, the last fixed surface of operation case is connected with the electric drill.
Compared with the prior art, the convenient installation device of this building engineering construction jib possesses following beneficial effect:
1. the utility model discloses a first fixed block, the rotation handle, the worm, the turbine, the main part body, the connecting cylinder, including a motor, an end cap, a controller, and a cover plate, the completion jib installation that first gear and second gear can be better, staff's operating mass and operating time have been guaranteed, thereby do not need staff everywhere position, all want the ladder to go up to exceed the hoist and mount, then carry the ladder again, place is hoisting to the lower place, the device can be better install the jib, avoid the staff to make a round trip to carry out artifical hoist and mount, more effectual operating time of having saved, greatly increased work efficiency.
2. The utility model discloses a second fixed block, the slide bar, the third fixed block, the second connecting rod, the height of electric drill can be adjusted to folding rod and spacing, because the height at electric drill place will be higher than general roofing to need finely tune, guaranteed that the electric drill can not collide with the wall body when removing, also can carry out necessary fine setting to the degree of depth of drilling, thereby guaranteed that the thru hole can not be too dark, lead to boring the wall body and pass.
Drawings
FIG. 1 is a schematic view of the three-dimensional structure of the present invention;
FIG. 2 is a schematic view of a part of the structure of the present invention;
FIG. 3 is a schematic view of the inner structure of the fixing tube of the present invention;
FIG. 4 is an enlarged schematic view of the structure at the position A in FIG. 1 of the present invention
Fig. 5 is an enlarged schematic view of the structure at B in fig. 3 according to the present invention.
In the figure: 1. a base; 2. a fixing plate; 3. a first fixed block; 4. rotating the handle; 5. a worm; 6. a turbine; 7. a threaded rod; 8. a first chute; 9. a threaded pipe; 10. a slider; 11. a limiting pipe; 12. a connecting cylinder; 13. a second chute; 14. a fifth fixed block; 15. a motor; 16. a first connecting rod; 17. a first gear; 18. a chain; 19. a second sprocket; 20. an expansion bolt; 21. a third chute; 22. a second fixed block; 23. a slide bar; 24. a folding bar; 25. a second connecting rod; 27. a third fixed block; 28. a connecting plate; 29. a third connecting rod; 30. a fourth fixed block; 31. a clamping jaw; 32. a slide bar; 33. an operation box; 34. electric drilling; 36. a limiting frame; 37. positioning a plate; 38. a lifting rod.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
The embodiment provides a convenient installation device of building engineering construction jib, and the device can be better installs the jib, avoids the staff to make a round trip to carry out artifical hoist and mount, more effectually has saved operating time, greatly increased work efficiency.
Referring to fig. 1-5, the convenient installation device for the construction suspender of the building engineering comprises a base 1, wherein a fixing plate 2 is fixedly connected to the upper surface of the base 1, two symmetrical first fixing blocks 3 are fixedly connected to the upper surface of the fixing plate 2, and the first fixing blocks 3 can stabilize a worm 5, so that a supporting point is provided for rotation of the worm 5.
The upper surface of the base 1 is fixedly connected with a second fixing block 22, the outer surface of the second fixing block 22 is fixedly connected with two symmetrical limiting frames 36, the outer part of the second fixing block 22 is provided with a sliding rod 23, the upper surface of the base 1 is fixedly connected with two symmetrical third fixing blocks 27, one end of the sliding rod 23 close to the third fixing blocks 27 penetrates through the second fixing block 22 and is in sliding connection with the second fixing block 22, one end of the sliding rod 23 close to the limiting frames 36 is in sliding connection with a positioning plate 37 through a limiting groove formed in the outer surface of the sliding rod 23, the positioning plate 37 is matched with the limiting frames 36 through fixing grooves formed in the outer surface of the limiting frames 36, the sliding rod 23 can be clamped through the limiting frames 36, the positioning plate 37 can be moved upwards when the sliding rod 23 is moved to a preset position, due to the limiting grooves, the positioning plate 37 is prevented from being drawn out of the inner part of the sliding rod 23, and then the positioning plate 37 is placed into the fixing grooves of the limiting frames 36, so that the sliding rod 23 cannot move.
One end fixedly connected with fourth fixed block 30 that slide bar 23 is close to second connecting rod 25, fourth fixed block 30 articulates through the round pin axle has folding rod 24, folding rod 24 is kept away from the one end of slide bar 23 and is rotated and be connected with second connecting rod 25, move to the direction of second connecting rod 25 through slide bar 23, thereby can extrude folding rod 24 and upwards merge, the both ends of second connecting rod 25 run through two third fixed blocks 27 respectively and rotate with two third fixed blocks 27 and be connected, the equal fixedly connected with lifter 38 of upper surface of two third fixed blocks 27 and second fixed block 22, the top of base 1 is provided with connecting plate 28, can drive connecting plate 28 when upwards at folding rod 24 through lifter 38, play the supporting role, thereby guaranteed that connecting plate 28 can not incline, the upper end of three lifter 38 all with the bottom surface fixed connection of connecting plate 28, the last fixed surface of connecting plate 28 is connected with operation case 33, the last fixed surface of operation case 33 is connected with electric drill 34.
The upper surface fixedly connected with of fixed plate 2 is spacing to manage 11, be provided with worm 5 between two first fixed blocks 3, the both ends of worm 5 run through two first fixed blocks 3 respectively and rotate with two first fixed blocks 3 and be connected, worm 5 runs through spacing pipe 11 and rotates with spacing pipe 11 and be connected, the one end fixedly connected with of worm 5 rotates handle 4, rotate worm 5 through rotating handle 4, thereby drive turbine 6 through worm 5, the completion is to the rising or the decline of screw-thread pole 7, thereby stability when the jib is installed has been guaranteed.
The upper surface of fixed plate 2 rotates and is connected with turbine 6, worm 5 meshes with turbine 6 mutually, the last fixed surface of turbine 6 is connected with threaded rod 7, the surface threaded connection of threaded rod 7 has screwed pipe 9, the symmetrical third connecting rod 29 of the surface fixed connection of screwed pipe 9, the equal fixedly connected with slider 10 of one end that two third connecting rods 29 kept away from each other, two symmetrical first spouts 8 have been seted up to the inner wall of spacing pipe 11, two sliders 10 sliding connection are respectively in the inside of two first spouts 8, through 8 limit positions of first spout, screwed pipe 9 can the rebound has been guaranteed, rebound can carry out the rebound simultaneously to connecting cylinder 12 through the rebound of screwed pipe 9, when having guaranteed connecting cylinder 12 and adorning the jib soon, the position can not take place the deviation.
The inside of spacing pipe 11 is provided with connecting cylinder 12, the external fixed surface of connecting cylinder 12 is connected with fifth fixed block 14, fixed surface is connected with motor 15 on the fifth fixed block 14, can provide the strong point for motor 15 through fifth fixed block 14, when preventing that motor 15 from rotating, no strong point rotation takes place, the first gear 17 of output pivot fixedly connected with of motor 15, the external fixed surface of connecting cylinder 12 is connected with head rod 16, the output pivot of motor 15 runs through head rod 16 and rotates with head rod 16 and be connected, rotate first gear 17 through motor 15. So that the first gear 17 is used as main power for subsequent and mechanical power supply to complete installation.
The outer surface of the first connecting rod 16 is provided with a second chute 13, the inner wall of the second chute 13 is connected with a clamping jaw 31 in a sliding manner, the outer surface of the clamping jaw 31 is provided with a third chute 21, the inner wall of the third chute 21 is connected with a sliding rod 32 in a sliding manner, the outer surface of the sliding rod 32 is connected with two symmetrical expansion bolts 20 in a rotating manner, the upper surface of the first connecting rod 16 is connected with two symmetrical second chain wheels 19 in a rotating manner, a chain 18 is arranged above the first connecting rod 16, the two second chain wheels 19 are connected with the first gear 17 in a transmission manner through the chain 18, the clamping jaw 31 can be pulled out through the second chute 13 so as to adjust the angle, a suspender or two suspenders are installed, the second chain wheels 19 are driven to rotate through the chain 18, the height can be finely adjusted in the third chute 21 through the sliding rod 32, so that the expansion bolts 20 cannot be separated when the second chain wheels 19 rotate, the suspender can be better installed, manual hoisting of workers is avoided, the working time is effectively saved, and the working efficiency is greatly increased.
The working principle is as follows: through rotating, it rotates to rotate handle 4 and drive worm 5, thereby it rotates to drive turbine 6, rotation through turbine 6 can drive screwed pipe 9 and upwards remove, thereby guarantee because first spout 8 limits the position of slider 10 and third connecting rod 29, the rotation of turbine 6 can drive screwed pipe 9 and upwards remove, can drive connecting cylinder 12 and upwards remove through screwed pipe 9 and upwards remove, fix a position connecting cylinder 12 through third connecting rod 29 and prevent that connecting cylinder 12 from taking place the displacement, through the 14 location motor 15 of fifth fixed block, can prevent that motor 15 from driving first gear 17 and taking place the rotation when rotating, drive chain 18 through first gear 17, then drive second sprocket 19 through chain 18, drive expansion bolts 20 through second sprocket 19 and carry out fixed mounting to the jib, the device can be better installs the jib, avoid the staff to make a round trip to carry out artifical hoist and mount, more effectively saved operating time, greatly increased work efficiency.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. The utility model provides a convenient installation device of building engineering construction jib, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with a fixed plate (2), the upper surface of the fixed plate (2) is fixedly connected with two symmetrical first fixed blocks (3), the upper surface of the fixed plate (2) is fixedly connected with a limit pipe (11), a worm (5) is arranged between the two first fixed blocks (3), two ends of the worm (5) respectively penetrate through the two first fixed blocks (3) and are rotatably connected with the two first fixed blocks (3), the worm (5) penetrates through the limit pipe (11) and is rotatably connected with the limit pipe (11), one end of the worm (5) is fixedly connected with a rotating handle (4), the upper surface of the fixed plate (2) is rotatably connected with a turbine (6), the worm (5) is meshed with the turbine (6), the upper surface of the turbine (6) is fixedly connected with a threaded rod (7), the outer surface of the worm (7) is in threaded connection with a threaded pipe (9), the outer surface of the threaded pipe (9) is fixedly connected with symmetrical third connecting rods (29), one ends of the two third connecting rods (29) are fixedly connected with a threaded rod (10), two sliding chutes (8) of the two first sliding chutes (8) are respectively formed in the inner wall of the two first sliding chutes (8), the utility model discloses a chain wheel, including spacing pipe (11), connecting cylinder (11), motor (16), second spout (13), first connecting rod (18), second connecting rod (18), chain sprocket (17), chain wheel (18) and chain wheel (17), the inside of spacing pipe (11) is provided with connecting cylinder (12), fixed surface is connected with motor (15) on fifth fixed block (14), the output pivot fixedly connected with first gear (17) of motor (15), the outer fixed surface of connecting cylinder (12) is connected with head rod (16), the output pivot of motor (15) runs through head rod (16) and rotates with head rod (16) and is connected, second spout (13) have been seted up to the surface of head rod (16), the inner wall sliding connection of second spout (13) has clamping jaw (31), third spout (21) have been seted up to the surface of clamping jaw (31), the inner wall sliding connection of third spout (21) has slide bar (32), the surface rotation of slide bar (32) is connected with two symmetrical expansion bolts (20), the upper surface rotation of head rod (16) is connected with two symmetrical second sprocket (19) through first chain wheel (17).
2. The convenient mounting device of building engineering construction jib of claim 1, characterized in that: the upper surface of base (1) is fixed and is connected with second fixed block (22), second fixed block (22) surface fixed connection has two symmetrical spacing (36).
3. The convenient mounting device of building engineering construction jib of claim 2, characterized in that: a sliding rod (23) is arranged outside the second fixing block (22), two symmetrical third fixing blocks (27) are fixedly connected to the upper surface of the base (1), and one end, close to the third fixing blocks (27), of the sliding rod (23) penetrates through the second fixing block (22) and is in sliding connection with the second fixing block (22).
4. The convenient mounting device of building engineering construction jib of claim 3, characterized in that: one end of the sliding rod (23) close to the limiting frame (36) is connected with a positioning plate (37) through a limiting groove formed in the outer surface of the sliding rod (23) in a sliding mode, and the positioning plate (37) is matched with a fixing groove formed in the outer surface of the limiting frame (36) and the limiting frame (36).
5. The convenient mounting device of building engineering construction jib of claim 4, characterized in that: one end fixedly connected with fourth fixed block (30) that slide bar (23) are close to second connecting rod (25), fourth fixed block (30) articulate through the round pin axle has folding rod (24).
6. The convenient mounting device of building engineering construction jib of claim 5, characterized in that: one end of the folding rod (24) far away from the sliding rod (23) is rotatably connected with a second connecting rod (25), and two ends of the second connecting rod (25) penetrate through the two third fixing blocks (27) respectively and are rotatably connected with the two third fixing blocks (27).
7. The convenient mounting device of building engineering construction jib of claim 6, characterized in that: two the equal fixedly connected with lifter (38) of upper surface of third fixed block (27) and second fixed block (22), the top of base (1) is provided with connecting plate (28), and is three the upper end of lifter (38) all with the bottom surface fixed connection of connecting plate (28), the last fixed surface of connecting plate (28) is connected with operation case (33), the last fixed surface of operation case (33) is connected with electric drill (34).
CN202221660099.4U 2022-06-29 2022-06-29 Convenient installation device of building engineering construction jib Active CN218029094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221660099.4U CN218029094U (en) 2022-06-29 2022-06-29 Convenient installation device of building engineering construction jib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221660099.4U CN218029094U (en) 2022-06-29 2022-06-29 Convenient installation device of building engineering construction jib

Publications (1)

Publication Number Publication Date
CN218029094U true CN218029094U (en) 2022-12-13

Family

ID=84379061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221660099.4U Active CN218029094U (en) 2022-06-29 2022-06-29 Convenient installation device of building engineering construction jib

Country Status (1)

Country Link
CN (1) CN218029094U (en)

Similar Documents

Publication Publication Date Title
CN208895234U (en) A kind of flange processing platform
CN210396193U (en) Temporary supporting device for prefabricated wall
CN213990803U (en) Monitoring camera for subway scheduling
CN216973405U (en) Pile foundation construction protects a section of thick bamboo and transfers positioner
CN218029094U (en) Convenient installation device of building engineering construction jib
CN211176541U (en) Wisdom street lamp convenient to erect
CN105135377B (en) A kind of bazooka
CN215443969U (en) Automatic rod feeding manipulator of full-hydraulic anchoring drilling machine
CN213512947U (en) Solar monitoring all-in-one machine
CN112854772B (en) Building assembly type wallboard mounting machine
CN211200523U (en) Mechanical arm of earth boring machine
CN213299851U (en) Street lamp with automatic lifting system
CN220300280U (en) Glass curtain wall construction hoist device
CN218748610U (en) Drilling tool for concrete floor
CN217461375U (en) Auxiliary platform for construction of steel roof truss of large-scale factory building
CN216077013U (en) Derrick for petroleum drilling and repairing equipment
CN213686434U (en) Multi-angle searchlight is used in building engineering construction
CN218968717U (en) Tower crane attaches wall structure
CN211871186U (en) Concrete column hangs gets device for building engineering
CN217718403U (en) Intelligent security engineering monitoring equipment
CN210850853U (en) Building engineering material perforating device
CN215924328U (en) Lift for building construction
CN220190300U (en) Multifunctional hydroelectric installation rack
CN218324291U (en) Safety device is used in construction in room
CN218608652U (en) Dust fall equipment for house construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant