CN211871186U - Concrete column hangs gets device for building engineering - Google Patents
Concrete column hangs gets device for building engineering Download PDFInfo
- Publication number
- CN211871186U CN211871186U CN202020427755.0U CN202020427755U CN211871186U CN 211871186 U CN211871186 U CN 211871186U CN 202020427755 U CN202020427755 U CN 202020427755U CN 211871186 U CN211871186 U CN 211871186U
- Authority
- CN
- China
- Prior art keywords
- concrete column
- rod sleeve
- rod
- adjusting device
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims description 11
- 230000000694 effects Effects 0.000 abstract description 3
- 238000003780 insertion Methods 0.000 description 4
- 230000037431 insertion Effects 0.000 description 4
- 230000005484 gravity Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a concrete column hangs and gets device for building engineering, including base, stand, adjusting device and hook assembly, stand fixed mounting is in the upper end of base, adjusting device fixed mounting is in the upper end of base, hook assembly fixed mounting is at adjusting device's surface, adjusting device includes first motor, the output of first motor rotates and is connected with first lead screw, the surface cover of first lead screw is equipped with first rod cover, the front end fixed mounting of first rod cover has the crossbeam frame. The utility model discloses a set up adjusting device, reach and carry out the effect of horizontal handling after carrying out perpendicular handling to the concrete column, make the handling of concrete column more convenient, also accelerated the handling efficiency of concrete column simultaneously, through setting up hook assembly, it is more convenient to make the lifting hook body change, has avoided the lifting hook body to damage seriously to obtain not changing the condition that leads to the incident of being qualified for the next round of competitions easily.
Description
Technical Field
The utility model relates to a concrete column hangs gets device specifically is a concrete column hangs gets device for building engineering.
Background
In the modern building industry, concrete is required to be built during construction, a concrete column is one of prefabricated members made of concrete, and the concrete column is often required to be transported, dispatched and transported during construction, but the transportation is very inconvenient due to the large volume and high weight of the concrete column.
In the prior art, the concrete column is usually bound and lifted by a lifting hook, usually in a vertical direction, and when the concrete column needs to be lifted to other positions, the concrete column is very inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete column hangs gets device for building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a concrete column hangs gets device for building engineering, includes base, stand, adjusting device and hook assembly, stand fixed mounting is in the upper end of base, adjusting device fixed mounting is in the upper end of base, hook assembly fixed mounting is at adjusting device's surface.
Adjusting device includes first motor, the output of first motor rotates and is connected with first lead screw, the surface cover of first lead screw is equipped with first rod cover, the front end fixed mounting of first rod cover has the crossbeam frame, one side fixed mounting of first rod cover has first slider, the inside cover of first slider is equipped with the pole setting, the upper end fixed mounting of crossbeam frame has the second motor, the output of second motor rotates and is connected with the second lead screw, the surface cover of second lead screw is equipped with the second rod cover, the lower extreme fixed mounting of second rod cover has the second slider, the slide rail has been seted up to the inside of crossbeam frame.
As a further aspect of the present invention: the lifting hook device comprises a socket, and an insertion block is sleeved in the socket.
As a further aspect of the present invention: the lower extreme fixed mounting of inserted block has the lifting hook body, one side fixed mounting of lifting hook body has the pull ring.
As a further aspect of the present invention: the socket is characterized in that a bolt penetrates through the socket, a nut is sleeved at one end of the bolt, and a rope ladder is fixedly mounted at the lower end of the cross beam frame.
As a further aspect of the present invention: the first rod sleeve and the second rod sleeve are internally provided with threads, and the first rod sleeve and the second rod sleeve are respectively meshed with the first screw rod and the second screw rod.
As a further aspect of the present invention: bolt holes are formed in the inserting blocks, and the bolts are meshed with the bolt holes.
As a further aspect of the present invention: and the second sliding block is connected with the sliding rail in a sliding manner, and the first sliding block is connected with the vertical rod in a sliding manner.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this concrete column hangs gets device for building engineering through setting up adjusting device, reaches and carries out the effect of horizontal handling after carrying out perpendicular handling to the concrete column, makes the handling of concrete column more convenient, has also accelerated the handling efficiency of concrete column simultaneously.
2. This concrete column hangs gets device for building engineering through setting up hook assembly, makes the lifting hook body change more convenient, has avoided the lifting hook body to damage seriously to obtain not changing the condition that leads to the incident of being qualified for the next round of competitions easily.
Drawings
Fig. 1 is a schematic structural diagram of a concrete column hoisting device for construction engineering.
Fig. 2 is an enlarged schematic structural view of a concrete column hoisting device for construction engineering at a position a in fig. 1.
Fig. 3 is an enlarged schematic structural view of a concrete column hoisting device for construction engineering at the position B in fig. 1.
Shown in the figure: 1. a base; 2. a column; 3. an adjustment device; 301. a first motor; 302. a first lead screw; 303. a first rod sleeve; 304. a cross beam frame; 305. a first slider; 306. erecting a rod; 307. a second motor; 308. a second lead screw; 309. a second rod sleeve; 310. a second slider; 311. a slide rail; 4. a hook device; 401. a socket; 402. inserting a block; 403. a hook body; 404. a pull ring; 405. a bolt; 406. a nut; 407. rope ladder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, in an embodiment of the present invention, a concrete column hoisting device for building engineering, includes base 1, stand 2, adjusting device 3 and hook assembly 4, stand 2 fixed mounting is in the upper end of base 1, adjusting device 3 fixed mounting is in the upper end of base 1, hook assembly 4 fixed mounting is at adjusting device 3's surface.
The adjusting device 3 comprises a first motor 301, an output end of the first motor 301 is rotatably connected with a first screw rod 302, the outer surface of the first screw rod 302 is sleeved with a first rod sleeve 303, the insides of the first rod sleeve 303 and a second rod sleeve 309 are both provided with threads, the first rod sleeve 303 and the second rod sleeve 309 are respectively meshed with the first screw rod 302 and the second screw rod 308, the front end of the first rod sleeve 303 is fixedly provided with a cross beam frame 304, one side of the first rod sleeve 303 is fixedly provided with a first slide block 305, the inside of the first slide block 305 is sleeved with an upright rod 306, the upper end of the cross beam frame 304 is fixedly provided with a second motor 307, the output end of the second motor 307 is rotatably connected with a second screw rod 308, the outer surface of the second screw rod 308 is sleeved with a second rod sleeve 309, the lower end of the second rod sleeve 309 is fixedly provided with a second slide block 310, the second slide block 310 is slidably connected with a slide rail 311, and the first slide blocks 305 and, the inside of the beam frame 304 is provided with a slide rail 311, the first motor 301 is opened at the same time, the first motor 301 drives the first screw 302 to rotate, because the first screw 302 is engaged with the first rod sleeve 303, the first rod sleeve 303 vertically moves upwards on the first screw 302 under the action of the first slide block 305 and the vertical rod 306, the two groups of first rod sleeves 303 simultaneously drive the beam frame 304 to descend, after the concrete column is bound and fixed with the hook body 403, the first motor 301 is controlled to rotate reversely, the first rod sleeve 303 drives the beam frame 304 to move upwards along with the first rod sleeve 303, after the column is lifted to a required position, the second motor 307 is opened, the second motor 307 drives the second rod sleeve 309 to move transversely, the second rod sleeve 309 is limited under the action of the second slide block 310 to move in parallel, the second rod sleeve 309 drives the second slide block 310 to move the hook body 403 to a required position, so as to achieve the effect of vertically lifting and transversely lifting the concrete column, the hoisting of the concrete column is more convenient, and the hoisting efficiency of the concrete column is accelerated.
The lifting hook device 4 comprises a socket 401, an insertion block 402 is sleeved inside the socket 401, a bolt hole is formed inside the insertion block 402, a bolt 405 is meshed with the bolt hole, a lifting hook body 403 is fixedly installed at the lower end of the insertion block 402, a pull ring 404 is fixedly installed on one side of the lifting hook body 403, the bolt 405 is arranged inside the socket 401 in a penetrating mode, a nut 406 is sleeved at one end of the bolt 405, a rope ladder 407 is fixedly installed at the lower end of a cross beam frame 304, when the hook body 403 is damaged and needs to be replaced, the pull ring 404 is held, the nut 406 is first unscrewed from the bolt 405, the bolt 405 is then loosened, the bolt 405 is separated from the socket 401 and the plug 402, under the action of gravity, the hook body 403 drives the insert block 402 to slide out of the socket 401, can accomplish the change to lifting hook body 403, make lifting hook body 403 change more convenient, avoid lifting hook body 403 to damage the condition that can seriously not get the change and lead to the incident of being qualified for the next round of competitions easily.
The utility model discloses a theory of operation is: meanwhile, the first motor 301 is turned on, the first motor 301 drives the first lead screw 302 to rotate, as the first lead screw 302 is engaged with the first rod sleeve 303, the first rod sleeve 303 vertically moves upwards on the first lead screw 302 under the action of the first sliding block 305 and the vertical rod 306, the two groups of first rod sleeves 303 simultaneously drive the cross beam frame 304 to descend, after the concrete column is bound and fixed with the hook body 403, the first motor 301 is controlled to rotate reversely, the first rod sleeve 303 drives the cross beam frame 304 to move upwards along with the first rod sleeve 303, after the cross beam frame is lifted to a required position, the second motor 307 is turned on, the second motor 307 drives the second rod sleeve 309 to move transversely, the second rod sleeve 309 is limited under the action of the second sliding block 310 to move in parallel, the second rod sleeve 309 drives the second sliding block 310 to move the hook body 403 to the required position, when the hook body 403 is damaged and needs to be replaced, the pull ring 404 is held, firstly, the nut 406 is unscrewed from the bolt 405, then the bolt 405 is unscrewed, so that the bolt 405 is separated from the socket 401 and the insert block 402, and under the action of gravity, the hook body 403 drives the insert block 402 to slide out of the socket 401, and then the replacement of the hook body 403 can be completed.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (7)
1. The utility model provides a concrete column hangs gets device for building engineering, includes base (1), stand (2), adjusting device (3) and hook assembly (4), its characterized in that: the upright post (2) is fixedly arranged at the upper end of the base (1), the adjusting device (3) is fixedly arranged at the upper end of the base (1), and the hook device (4) is fixedly arranged on the outer surface of the adjusting device (3);
the adjusting device (3) comprises a first motor (301), the output end of the first motor (301) is rotatably connected with a first screw rod (302), a first rod sleeve (303) is sleeved on the outer surface of the first screw rod (302), a cross beam frame (304) is fixedly installed at the front end of the first rod sleeve (303), a first sliding block (305) is fixedly arranged on one side of the first rod sleeve (303), a vertical rod (306) is sleeved in the first sliding block (305), a second motor (307) is fixedly installed at the upper end of the cross beam frame (304), the output end of the second motor (307) is rotatably connected with a second screw rod (308), the outer surface of the second screw rod (308) is sleeved with a second rod sleeve (309), a second sliding block (310) is fixedly mounted at the lower end of the second rod sleeve (309), and a sliding rail (311) is arranged inside the cross beam frame (304).
2. The concrete column hoisting device for construction engineering according to claim 1, characterized in that: the lifting hook device (4) comprises a socket (401), and an inserting block (402) is sleeved inside the socket (401).
3. The concrete column hoisting device for construction engineering according to claim 2, characterized in that: the lower extreme fixed mounting of inserted block (402) has lifting hook body (403), one side fixed mounting of lifting hook body (403) has pull ring (404).
4. The concrete column hoisting device for construction engineering according to claim 2, characterized in that: the socket is characterized in that a bolt (405) penetrates through the socket (401), a nut (406) is sleeved at one end of the bolt (405), and a rope ladder (407) is fixedly mounted at the lower end of the cross beam frame (304).
5. The concrete column hoisting device for construction engineering according to claim 1, characterized in that: the first rod sleeve (303) and the second rod sleeve (309) are internally provided with threads, and the first rod sleeve (303) and the second rod sleeve (309) are respectively meshed with the first screw rod (302) and the second screw rod (308).
6. The concrete column hoisting device for construction engineering according to claim 2, characterized in that: bolt holes are formed in the inserting blocks (402), and the bolts (405) are meshed with the bolt holes.
7. The concrete column hoisting device for construction engineering according to claim 1, characterized in that: the second sliding block (310) is connected with the sliding rail (311) in a sliding mode, and the first sliding block (305) is connected with the vertical rod (306) in a sliding mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020427755.0U CN211871186U (en) | 2020-03-28 | 2020-03-28 | Concrete column hangs gets device for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020427755.0U CN211871186U (en) | 2020-03-28 | 2020-03-28 | Concrete column hangs gets device for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211871186U true CN211871186U (en) | 2020-11-06 |
Family
ID=73257380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020427755.0U Expired - Fee Related CN211871186U (en) | 2020-03-28 | 2020-03-28 | Concrete column hangs gets device for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211871186U (en) |
-
2020
- 2020-03-28 CN CN202020427755.0U patent/CN211871186U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216235715U (en) | Gantry crane with double-beam electric hoist | |
CN211871186U (en) | Concrete column hangs gets device for building engineering | |
CN214834620U (en) | Supporting platform for lighting well | |
CN115182637A (en) | Rapid first-aid repair device and method for power transmission line | |
CN112919361B (en) | Pipeline vertical hoisting device | |
CN210710381U (en) | Attached lifting scaffold for building | |
CN111894440A (en) | Electric power overhauls support convenient to remove transport | |
CN108726358B (en) | Batch hoisting device and method for main reinforcement of high-rise concrete structure | |
CN211078316U (en) | Adjustable pipeline installation crane | |
CN214399581U (en) | Lifting device for electromechanical engineering | |
CN214195482U (en) | High-altitude operation platform for construction of steel structure engineering | |
CN213512947U (en) | Solar monitoring all-in-one machine | |
CN209113443U (en) | A kind of road construction inspection well cover opening device | |
CN219098479U (en) | Hoisting balance beam | |
CN217051258U (en) | A new type of hoisting equipment for prefabricated stairs | |
CN222082230U (en) | A mobile and adjustable lifting platform for a ditch photovoltaic power generation system | |
CN217780598U (en) | Energy-concerving and environment-protective type is hanger for construction | |
CN215411076U (en) | Electromechanical device's installation bears uses regulation bed hedgehopping device | |
CN216105701U (en) | Hoisting device for engineering reinforcement construction | |
CN220318949U (en) | Multi-section box column verticality correcting device for assembled high-rise residential building steel structure | |
CN218968770U (en) | Lifting device for installation of power equipment | |
CN216638445U (en) | A line erection device for wind power generation | |
CN108547438B (en) | Lifting support and construction method thereof | |
CN221346240U (en) | Scaffold convenient and fast to carry | |
CN205087796U (en) | Lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Miaomiao Inventor after: Ma Chuyou Inventor before: Li Miaomiao |
|
CB03 | Change of inventor or designer information | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |