CN218028415U - Structure for split-level installation of suspended ceiling - Google Patents
Structure for split-level installation of suspended ceiling Download PDFInfo
- Publication number
- CN218028415U CN218028415U CN202220253666.8U CN202220253666U CN218028415U CN 218028415 U CN218028415 U CN 218028415U CN 202220253666 U CN202220253666 U CN 202220253666U CN 218028415 U CN218028415 U CN 218028415U
- Authority
- CN
- China
- Prior art keywords
- wall body
- wall
- fixedly connected
- transverse
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The structure for installing the suspended ceiling in the staggered layer comprises a first installation part and a second installation part, wherein the first installation part comprises a first wall body which can be embedded into a triangular keel, a side wall is fixedly connected to the side of the first wall body, the upper end of the side wall is fixedly connected with a connecting part which is provided with a cavity with a narrow opening and a wide inner part, a shielding part fixedly connected with the side wall is arranged below the connecting part, and a gap for inserting a first decorative plate is formed between the shielding part and the bottom surface of the connecting part; the second mounting part comprises a second wall body which can be embedded into the triangular keel, the second wall body is connected with a second transverse surface and a third transverse surface which extend in the horizontal direction, and a gap for inserting a second decorative plate is formed between the second transverse surface and the third transverse surface; the first wall body and the second wall body are equal in length; when the triangular keel is installed, the outer side face of the first wall body is attached to the outer side face of the second wall body and embedded into the same triangular keel.
Description
Technical Field
The utility model relates to a structure of furred ceiling staggered floor installation.
Background
The micro staggered floor profile suitable for the honeycomb board integrated ceiling disclosed by the prior patent document publication No. CN211369232U comprises a profile body, wherein the profile body comprises a top plate, a bottom plate and side plates, a clamping groove for clamping a light-transmitting plate is formed among the top plate, the bottom plate and the side plates, a first clamping groove for placing a hanging piece is formed in the top of the top plate, a second clamping groove for placing a connecting piece is formed in the lower surface of the bottom plate, one end part of one side wall of the first clamping groove is bent towards one side and extends to form a transverse plate, and a first receiving cavity is formed between the transverse plate and the top plate; the end part of one side wall of the second clamping groove is bent towards one side to form a first horizontal section, the end part of the first horizontal section is bent downwards to form a vertical section, the tail end of the vertical section is bent towards one side and extends to form a second horizontal section, a second receiving cavity is formed between the second horizontal section and the first horizontal section, and the direction of inserting one ceiling board into the first receiving cavity is parallel to and opposite to the direction of inserting the other ceiling board into the second receiving cavity. According to the cellular board staggered installation scheme disclosed by the prior art, the cellular board after installation cannot be simply and conveniently detached, so that the later maintenance is difficult.
SUMMERY OF THE UTILITY MODEL
The utility model provides a simple structure, maintain convenient structure of furred ceiling staggered floor installation.
The utility model adopts the technical proposal that: the structure for installing the suspended ceiling in the staggered layer comprises a first installation part and a second installation part, wherein the first installation part comprises a first wall body which can be embedded into a triangular keel, a side wall is fixedly connected to the side of the first wall body, the upper end of the side wall is fixedly connected with a connecting part which is provided with a cavity with a narrow opening and a wide inner part, a shielding part fixedly connected with the side wall is arranged below the connecting part, and a gap for inserting a first decorative plate is formed between the shielding part and the bottom surface of the connecting part; the second mounting part comprises a second wall body which can be embedded into the triangular keel, the second wall body is connected with a second transverse surface and a third transverse surface which extend in the horizontal direction, and a gap for inserting a second decorative plate is formed between the second transverse surface and the third transverse surface; the first wall body and the second wall body are equal in length; when the triangular keel is installed, the outer side face of the first wall body is attached to the outer side face of the second wall body and embedded into the same triangular keel.
The side wall is provided with a first extending section extending towards the first wall body, the first wall body is fixedly connected with the side wall through a first transverse surface extending transversely, and a gap is formed between the first extending section and the first transverse surface.
Wherein, the one end that is close to first wall body on the first extension is fixed to be connected with a second extension, and second extension both ends are fixed first extension, first cross plane of linking to each other respectively.
Wherein, the outer surface of the shielding part is arc-shaped.
Wherein, still include a fixed hook, fixed hook includes a block portion with the top surface width looks adaptation of triangular keel, block portion includes that two have the side of buckling, links to each other through the second transverse plane is fixed between the limit of both sides, and the side links to each other one can stretch into the hook piece of hook firm connecting portion.
Wherein the third lateral surface is coplanar with the first lateral surface.
Compared with the prior art, the beneficial effects of the utility model reside in that: the utility model discloses an among the mounting structure, still be the independent structure after first decorative board and the installation of second decorative board, nevertheless the outward appearance is neat as one after the installation, and overall structure is reliable and stable, and it is convenient to install, and can consult and insert lighting lamp light, pleasing to the eye and concrete third dimension after the installation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the first mounting member of the present invention.
Fig. 3 is a schematic structural diagram of the second mounting member of the present invention.
Fig. 4 is a schematic structural diagram of the usage state of the present invention.
Detailed Description
The invention will be further explained by the embodiments with reference to the drawings.
As shown in fig. 1 to 4, the structure for installing the suspended ceiling in staggered floors comprises a first installation part 1 and a second installation part 2, wherein the first installation part 1 comprises a first wall body 11 capable of being embedded into a triangular keel 4, a side wall 14 is fixedly connected to the side of the first wall body 11, a connecting part 12 with a cavity with a narrow opening and a wide inside is fixedly connected to the upper end of the side wall 14, a shielding part 13 fixedly connected with the side wall 14 is arranged below the connecting part 12, a gap for inserting a first decorative plate 3 is arranged between the shielding part 13 and the bottom surface of the connecting part 12, the second installation part 2 comprises a second wall body 21 capable of being embedded into the triangular keel 4, the second wall body 21 is connected with a second transverse surface 22 and a third transverse surface 23 which extend in the horizontal direction, and a gap for inserting a second decorative plate 32 is arranged between the second transverse surface 22 and the third transverse surface 23; the first wall body 11 and the second wall body 21 are equal in length; when the triangular keel is installed, the outer side surface of the first wall body 11 is fitted to the outer side surface of the second wall body 21 and fitted into the same triangular keel 4. In this embodiment, the first wall 11 and the second wall 21 both have a convex body for enhancing the engaging effect, a gap for inserting the first decorative plate 3 is formed between the shielding portion 13 and the bottom surface of the connecting portion 12, a gap for inserting the second decorative plate 32 is formed between the second transverse surface 22 and the third transverse surface 23, the two gaps are located at different horizontal planes, and a height difference can be formed after installation.
In this embodiment, the side wall 14 has a first extending section 141 extending towards the first wall 11, the first wall 11 and the side wall 14 are fixedly connected by a first transverse surface 142 extending transversely, and a gap is formed between the first extending section 141 and the first transverse surface 142. In the embodiment, the height difference exists between the first decorative plate 3 and the second decorative plate 32 after installation, and the gap between the first extending section 141 and the first transverse surface 142 is positioned between the first decorative plate 3 and the second decorative plate 32, and a lighting lamp can be arranged after the gap is formed at the position, so that the suspended ceiling is decorated. Preferably, the third lateral surface 23 is coplanar with the first lateral surface 142.
In this embodiment, one end of the first extending section 141 close to the first wall 11 is fixedly connected to a second extending section 143, and two ends of the second extending section 143 are respectively fixedly connected to the first extending section 141 and the first cross surface 142.
In this embodiment, the outer surface of the shielding portion 13 is arc-shaped.
In this embodiment, the fixing hook 5 is further included, the fixing hook 5 includes an engaging portion 51 adapted to the width of the top surface of the triangular keel 4, the engaging portion 51 includes two bent side edges, the two side edges are fixedly connected with each other through the second transverse surface 22, and the side edges are connected with a hook member 52 capable of extending into the hook fastening portion 12. In this embodiment, in order to enhance the stability and firmness of the installation, the fixing hook 5 is engaged with the triangular keel 4 through the engaging portion 51, and then is firmly hooked with the first installation component 1 through the hook member 52.
Claims (6)
1. The structure for split-level installation of the suspended ceiling is characterized by comprising a first installation part and a second installation part, wherein the first installation part comprises a first wall body which can be embedded into a triangular keel, a side wall is fixedly connected to the side of the first wall body, the upper end of the side wall is fixedly connected with a connecting part which is provided with a cavity with a narrow opening and a wide inner part, a shielding part fixedly connected with the side wall is arranged below the connecting part, and a gap for inserting a first decorative plate is formed between the shielding part and the bottom surface of the connecting part;
the second mounting part comprises a second wall body which can be embedded into the triangular keel, the second wall body is connected with a second transverse surface and a third transverse surface which extend in the horizontal direction, and a gap for inserting a second decorative plate is formed between the second transverse surface and the third transverse surface; the first wall body and the second wall body are equal in length;
when the triangular keel is installed, the outer side face of the first wall body is attached to the outer side face of the second wall body and embedded into the same triangular keel.
2. A suspended ceiling split-level mounting structure as claimed in claim 1, wherein the side wall has a first extension extending in a direction towards the first wall, the first wall and the side wall being fixedly connected by a first transverse face extending transversely, the first extension and the first transverse face having a gap therebetween.
3. A structure for split-level installation of a suspended ceiling according to claim 2, wherein the first extending section is fixedly connected to a second extending section at an end close to the first wall, and the first extending section and the first cross surface are fixedly connected to two ends of the second extending section respectively.
4. A suspended ceiling split-level installation structure as claimed in claim 1 wherein the external surface of the shield portion is curved.
5. A suspended ceiling split-level installation structure as claimed in claim 1, further comprising a fixing hook, wherein the fixing hook comprises a clamping portion adapted to the width of the top surface of the triangular keel, the clamping portion comprises two bent side edges, the two side edges are fixedly connected with each other through the second transverse surface, and the side edges are connected with a hook member capable of extending into the hook connection portion.
6. A suspended ceiling split-level mounting arrangement as claimed in claim 2, wherein the third transverse plane is coplanar with the first transverse plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220253666.8U CN218028415U (en) | 2022-02-08 | 2022-02-08 | Structure for split-level installation of suspended ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220253666.8U CN218028415U (en) | 2022-02-08 | 2022-02-08 | Structure for split-level installation of suspended ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218028415U true CN218028415U (en) | 2022-12-13 |
Family
ID=84339121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220253666.8U Active CN218028415U (en) | 2022-02-08 | 2022-02-08 | Structure for split-level installation of suspended ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218028415U (en) |
-
2022
- 2022-02-08 CN CN202220253666.8U patent/CN218028415U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200448343Y1 (en) | Lamp balloon fixing structure of race way | |
CN200985580Y (en) | Panel horizontal inserted type suspended ceiling | |
CN102900193A (en) | Cellular board ceiling system | |
CN218028415U (en) | Structure for split-level installation of suspended ceiling | |
CN102102417B (en) | Exposed keel structural member | |
KR100384514B1 (en) | An ornament panel for the ceiling | |
CN201310178Y (en) | Skirting line | |
CN207405848U (en) | A kind of jesting beam | |
CN203023987U (en) | Ceiling lamp | |
CN201915538U (en) | Edgewise keel structural component | |
CN201915537U (en) | Exposed keel structural component | |
CN218028414U (en) | Structure for split-level installation of suspended ceiling | |
CN113530071A (en) | Assembled letter hangs furred ceiling mounting structure | |
CN210264451U (en) | Mounting structure of assembled window guardrail that wafts | |
CN201268906Y (en) | Hoisting ceiling structure | |
CN211286483U (en) | Fixed buckle of multiple spot, decoration material and fixed subassembly of decoration material | |
CN202227557U (en) | Keel and cellular board suspended ceiling system constructed by same | |
CN218814907U (en) | Seamless decoration panel | |
CN201344424Y (en) | Ceiling lamp | |
CN215888880U (en) | Assembled letter hangs furred ceiling mounting structure | |
CN217105774U (en) | Suspended ceiling mounting structure | |
CN205480569U (en) | Decorative lighting integrated configuration of outdoor building curtain | |
CN217896958U (en) | Ceiling keel fixing structure | |
CN220124437U (en) | Assembled curtain box | |
CN211666051U (en) | Aluminum honeycomb panel furred ceiling mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: JIAXING KIND ELECTRICAL TECHNICAL CO.,LTD. Assignor: ZHEJIANG KIND INTEGRATED CEILING Co.,Ltd. Contract record no.: X2023330000562 Denomination of utility model: Structure for staggered installation of suspended ceilings Granted publication date: 20221213 License type: Common License Record date: 20230828 |
|
EE01 | Entry into force of recordation of patent licensing contract |