CN218028061U - Inspection well flowing water tank mounting frame - Google Patents
Inspection well flowing water tank mounting frame Download PDFInfo
- Publication number
- CN218028061U CN218028061U CN202222183958.1U CN202222183958U CN218028061U CN 218028061 U CN218028061 U CN 218028061U CN 202222183958 U CN202222183958 U CN 202222183958U CN 218028061 U CN218028061 U CN 218028061U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- water flowing
- supporting seat
- rod
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The application relates to an inspection well flume mounting rack, which relates to the field of pipeline construction and comprises a mounting base, wherein a supporting seat for supporting a prefabricated flume is arranged on the mounting base, and an adjusting assembly for adjusting the height of the supporting seat is arranged on the supporting seat; the mounting base is provided with at least two fixing rods, the fixing rods are located at the positions of two ends of the prefabricated water flowing groove, one end, far away from the mounting base, of each fixing rod is provided with a pressing rod, and the pressing rods abut against one side, far away from the supporting seat, of the prefabricated water flowing groove. The prefabricated tye in this application can support fixedly in the inspection shaft, avoids prefabricated tye to take place to remove at the concrete placement in-process to lead to the tye after the pouring shaping to have surface unevenness and quality defect such as height difference, influence the follow-up use of tye.
Description
Technical Field
The application relates to the field of pipeline construction, in particular to an inspection well water flowing tank mounting frame.
Background
The inspection well is used for maintaining power supply, water drainage, pollution discharge, communication, cable television, gas pipes, street lamp lines and the like of urban underground infrastructure, and is convenient to install. It is usually installed at the intersection of pipelines, turning, where the pipe diameter or slope changes, and at certain intervals on straight pipeline sections, and is convenient for regular inspection of the attached structures.
The drainage pipeline inspection well in the inspection well is an important structure in a drainage pipeline system, and has the functions of facilitating maintenance and inspection, changing water flow direction, converging, reducing and the like. The drainage pipeline inspection well is generally provided with a flume connected with a drainage pipeline, and the shape of the flume is consistent with that of the drainage pipeline, so that smooth flow of water flow is facilitated.
The currently commonly used launder is a prefabricated launder, a casting forming method is generally adopted when the prefabricated launder is fixed in an inspection well, the casting forming method is to adopt a wood template to erect a mold on site, then place the prefabricated launder in the mold, form a concrete filling layer between the prefabricated launder and the mold, and finally fill concrete in the concrete filling layer so as to fix the prefabricated launder in the inspection well. However, when concrete is filled into the concrete filling layer, the prefabricated water flowing grooves are easy to move in the process due to the lack of a structure for supporting and fixing the prefabricated water flowing grooves, and the water flowing grooves after pouring forming often have the quality defects of uneven surfaces, different heights and the like, so that the subsequent use of the water flowing grooves is affected.
SUMMERY OF THE UTILITY MODEL
In order to solve the easy emergence removal of tye when concrete placement to lead to there being surface irregularity and the quality defect's such as height difference problem of tye after the casting shaping tye, this application provides an inspection well tye mounting bracket.
The application provides an inspection well flowing water groove mounting bracket adopts following technical scheme:
an inspection well water flowing channel installation frame comprises an installation base, wherein the installation base is provided with a supporting seat for supporting a prefabricated water flowing channel, and the supporting seat is provided with an adjusting assembly for adjusting the height of the supporting seat; the mounting base is provided with at least two fixing rods, the fixing rods are located at two ends of the prefabricated water flowing groove, one end, far away from the mounting base, of each fixing rod is provided with a pressing rod, and the pressing rods abut against one side, far away from the supporting seat, of the prefabricated water flowing groove.
By adopting the technical scheme, the supporting seat supports the prefabricated launder, the fixed rods are positioned at two ends of the prefabricated launder, the fixed rods are abutted with two ends of the prefabricated launder, so that the movement of the prefabricated launder in the front-back direction is limited, the pressing rods on the fixed rods are abutted against one side of the prefabricated launder, which is far away from the supporting seat, and the movement of the prefabricated launder in the up-down direction is limited by the cooperation of the pressing rods and the supporting seat, so that the prefabricated launder is pressed and fixed; after the prefabricated water flowing grooves are fixed, concrete is poured into the area between the prefabricated water flowing grooves and the installation base, the prefabricated water flowing grooves are not prone to moving in the concrete pouring process, and stability is high, so that the water flowing grooves after pouring are smooth in surface and consistent in height, and follow-up normal use of the water flowing grooves can be met.
Optionally, the fixed rod includes a support rod arranged on the mounting base and a movable rod coaxially slidably connected to the support rod, the movable rod is far away from one end of the support rod and connected to the pressing rod, and a limiting part for fixing the position of the movable rod is arranged on the movable rod.
By adopting the technical scheme, the movable rod can slide on the supporting rod, so that the overall length of the fixed rod is changed, the height of the pressing rod is further adjusted, and when the pressing rod is adjusted to abut against one side of the prefabricated water flowing groove away from the supporting seat, the position of the pressing rod is fixed through the limiting part; through the regulation to compressing tightly the pole height for compress tightly the subassembly and can compress tightly fixedly the prefabricated tye under the different construction operating mode, thereby improve the holistic suitability of mounting bracket.
Optionally, the limiting part includes a limiting hole formed in the side wall of the movable rod, a fixing bolt penetrates through the limiting hole, a waist-shaped hole parallel to the supporting rod is formed in the side wall of the supporting rod, and the fixing bolt penetrates through the waist-shaped hole.
By adopting the technical scheme, the bolt and the nut penetrate through the limiting hole and the waist-shaped hole, when the pressing rod is adjusted to abut against one side of the prefabricated water flowing groove away from the supporting seat, the bolt and the nut are screwed until the bolt and the nut abut against the side wall of the supporting rod, and therefore the position of the pressing rod is fixed; when the position that compresses tightly the pole needs to be changed, rotate bolt and nut to its with the separation of bracing piece lateral wall can, the movable rod can carry out nimble slip on the bracing piece this moment to make the position that compresses tightly the pole can carry out nimble regulation.
Optionally, a guide groove parallel to the length direction of the prefabricated water flowing groove is formed in the mounting base, a guide block is connected in the guide groove in a sliding mode, and the fixing rod is fixed on the guide block.
By adopting the technical scheme, the prefabricated water flowing groove is arranged on the supporting seat, and then the fixed rod is moved to be abutted against the two ends of the prefabricated water flowing groove, so that the movement of the prefabricated water flowing groove in the front-back direction is limited; the guide block slides in the guide groove to drive the fixing rod to move along the length direction of the guide groove, so that the fixing rod can fix prefabricated water flowing grooves with different lengths, and the overall applicability of the mounting frame is improved.
Optionally, one end of the guide groove, which is far away from the support seat, is provided with a blocking plate.
Through adopting above-mentioned technical scheme, the baffler limits the position of guide block in the guide way, prevents that the guide block from sliding to the roll-off guide way.
Optionally, the blocking plate is connected with a limit screw through a thread, and one end of the limit screw is abutted to the guide block.
Through adopting above-mentioned technical scheme, when the dead lever removed to support tight with prefabricated tye both ends, screw up limit screw to limit screw one end and support the guide block tight to with the fixed position of guide block in the guide way, further with the fixed position of dead lever, prevent that the dead lever from producing when concrete placement and removing, further improve the holistic stability of mounting bracket.
Optionally, the adjusting assembly includes an adjusting screw rod penetrating through the supporting seat and in threaded fit with the supporting seat, and a supporting plate for supporting the prefabricated water flowing channel is arranged at one end of the adjusting screw rod, which is far away from the supporting seat.
By adopting the technical scheme, the support rod supports the prefabricated water channels through the support plate, the height of the support plate can be adjusted by rotating the adjusting screw rod, and when the support plate is adjusted to different heights, the prefabricated water channels in the support plate are at different heights, so that the support plate can support the prefabricated water channels under different construction working conditions, and the overall applicability of the mounting frame is improved.
Optionally, the support plate is an arc plate.
By adopting the technical scheme, the arc-shaped plate can increase the contact area of the support plate and the prefabricated water flowing groove, and further enhance the contact stability of the support plate and the prefabricated water flowing groove.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the supporting seat supports the prefabricated launder, the fixed rods are positioned at two ends of the prefabricated launder, the fixed rods are abutted with the two ends of the prefabricated launder, so that the movement of the prefabricated launder in the front-back direction is limited, the pressing rods on the fixed rods are abutted against one side of the prefabricated launder away from the supporting seat, and the movement of the prefabricated launder in the up-down direction is limited through the cooperation of the pressing rods and the supporting seat, so that the prefabricated launder is pressed and fixed; after the prefabricated water flowing grooves are fixed, concrete is poured into the area between the prefabricated water flowing grooves and the installation base, the prefabricated water flowing grooves are not prone to moving in the concrete pouring process, and stability is high, so that the water flowing grooves after pouring are smooth in surface and consistent in height, and the follow-up normal use of the water flowing grooves can be met;
2. the height of the compression rod in the compression assembly is adjusted, so that the compression assembly can compress and fix the prefabricated launders under different construction working conditions, and the overall applicability of the mounting frame is improved;
3. when the supporting plate is adjusted to different heights, the prefabricated water channels on the supporting plate are located at different heights, so that the supporting plate can support the prefabricated water channels under different construction working conditions, and the overall applicability of the mounting frame is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of an inspection well flume mounting frame in the embodiment of the application.
FIG. 2 is a cross-sectional view of FIG. 1
Fig. 3 is a schematic structural view of the fixing lever of fig. 1.
Description of the reference numerals: 1. installing a base; 2. a supporting base; 3. an adjustment assembly; 31. adjusting the screw rod; 32. a support plate; 4. fixing the rod; 41. a movable rod; 42. a support bar; 5. a hold down bar; 6. a guide groove; 7. a guide block; 8. a barrier plate; 9. a limit screw; 10. a limiting hole; 11. a waist-shaped hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses inspection well basin mounting bracket. Referring to fig. 1 and 2, the installation frame of the inspection well water flowing channel comprises an installation base 1, a supporting seat 2 for supporting the prefabricated water flowing channel is welded on the installation base 1, an adjusting screw 31 in threaded fit with the supporting seat 2 penetrates through the supporting seat 2, an arc-shaped supporting plate 32 is fixed at one end, away from the supporting seat 2, of the adjusting screw 31, the prefabricated water flowing channel is located on the supporting plate 32, and the installation frame supports the prefabricated water flowing channel through the supporting plate 32; two fixing rods 4 are arranged on the mounting base 1, the fixing rods 4 are positioned at the positions of two ends of the prefabricated launder, the two ends of the prefabricated launder are tightly propped by the fixing rods 4, one end of each fixing rod 4, far away from the mounting base 1, is provided with a pressing rod 5, the pressing rod 5 is perpendicular to the fixing rods 4, and the pressing rod 5 is propped against one side, far away from the supporting base 2, of the prefabricated launder; the prefabricated water flowing grooves are fixed on the mounting frame through the matching of the supporting plates 32, the fixing rods 4 and the pressing rods 5, and then concrete is poured into the area between the prefabricated water flowing grooves and the mounting base 1.
Referring to fig. 2 and 3, the fixed rod 4 includes a supporting rod 42 and a movable rod 41 which are coaxially and slidably connected, the supporting rod 42 is located on the mounting base 1, one end of the movable rod 41 far away from the supporting rod 42 is fixedly connected with the pressing rod 5, and the pressing rod 5 is perpendicular to the movable rod 41; a limit hole 10 is formed in the side wall of the movable rod 41, and a bolt and a nut penetrate through the limit hole 10; the one end welding that the bracing piece 42 kept away from compression bar 5 has guide block 7, and waist shape hole 11 has been seted up to the lateral wall of bracing piece 42, and the length direction in waist shape hole 11 is parallel with bracing piece 42, and bolt and nut wears to locate in waist shape hole 11. The movable rod 41 can slide on the support rod 42, so that the height of the pressing rod 5 can be adjusted, when the pressing rod 5 is adjusted to abut against one side of the prefabricated water flowing channel, which is far away from the support seat 2, the bolt and the nut are screwed until the bolt and the nut abut against the side wall of the support rod 42, so that the position of the pressing rod 5 is fixed; through the adjustment to 5 height of compressing tightly poles for compress tightly the subassembly and can compress tightly fixedly to the prefabricated tye of different specifications.
Referring to fig. 2, a guide groove 6 parallel to the prefabricated water flowing groove is formed in the installation base 1, the guide block 7 is in sliding connection with the guide groove 6, a blocking plate 8 is welded at one end, away from the supporting seat 2, of the guide groove 6, a limiting screw 9 is connected to the blocking plate 8 in a threaded mode, and the limiting screw 9 is parallel to the guide groove 6. Placing the prefabricated water flowing groove on the supporting seat 2, abutting two ends of the prefabricated water flowing groove tightly by moving the guide block 7 to the supporting rod 42, and tightly screwing the limiting screw 9 to one end of the limiting screw 9 to abut the guide block 7 tightly, so that the position of the supporting rod 42 is fixed; through the cooperation of guide block 7, guide way 6 and bracing piece 42 for the mounting bracket can compress tightly fixedly to the prefabricated tye of different length.
The implementation principle of inspection well basin mounting bracket of the embodiment of this application is: the supporting seat 2 supports the prefabricated water flowing channel, the fixing rods 4 are positioned at two ends of the prefabricated water flowing channel, the fixing rods 4 are abutted against two ends of the prefabricated water flowing channel, so that the movement of the prefabricated water flowing channel in the front-back direction is limited, the pressing rods 5 on the fixing rods 4 are abutted against one side of the prefabricated water flowing channel, which is far away from the supporting seat 2, and the movement of the prefabricated water flowing channel in the up-down direction is limited by the cooperation of the pressing rods 5 and the supporting seat 2, so that the prefabricated water flowing channel is pressed and fixed; after the prefabricated launder is fixed, concrete is poured into the area between the prefabricated launder and the mounting base 1, the prefabricated launder is not easy to move in the concrete pouring process, and the stability is strong, so that the poured launder is smooth in surface and consistent in height, and the subsequent normal use of the launder can be met.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides an inspection shaft flowing water groove mounting bracket which characterized in that: the prefabricated water flowing channel installation structure comprises an installation base (1), wherein a supporting seat (2) for supporting a prefabricated water flowing channel is arranged on the installation base (1), and an adjusting component (3) for adjusting the height of the supporting seat (2) is arranged on the supporting seat (2); the mounting base (1) is provided with at least two fixing rods (4), the fixing rods (4) are located at two ends of the prefabricated water flowing channel, one end, away from the mounting base (1), of each fixing rod (4) is provided with a pressing rod (5), and the pressing rods (5) abut against one side, away from the supporting base (2), of the prefabricated water flowing channel.
2. The manhole sink mounting bracket of claim 1, wherein: the dead lever (4) including set up in bracing piece (42) on installation base (1) and with bracing piece (42) coaxial sliding connection's movable rod (41), movable rod (41) are kept away from the one end of bracing piece (42) with compress tightly pole (5) and connect, be provided with on movable rod (41) and be used for fixing the locating part of movable rod (41) position.
3. The manhole sink mounting bracket of claim 2, wherein: the locating part is including offering in spacing hole (10) on movable rod (41) lateral wall, wear to be equipped with fixing bolt in spacing hole (10), set up waist shape hole (11) parallel with bracing piece (42) on bracing piece (42) lateral wall, fixing bolt wears to locate in waist shape hole (11).
4. The manhole sink mounting bracket of claim 1, wherein: the mounting base (1) is provided with a guide groove (6) parallel to the length direction of the prefabricated water flowing groove, a guide block (7) is connected in the guide groove (6) in a sliding mode, and the fixing rod (4) is fixed on the guide block (7).
5. The manhole sink mounting bracket of claim 4, wherein: one end of the guide groove (6) far away from the supporting seat (2) is provided with a blocking plate (8).
6. The manhole sink mounting bracket of claim 5, wherein: the blocking plate (8) is connected with a limiting screw rod (9) in a threaded mode, and one end of the limiting screw rod (9) is abutted to the guide block (7).
7. The manhole sink mounting bracket of claim 1, wherein: the adjusting component (3) comprises an adjusting screw rod (31) which penetrates through the supporting seat (2) and is in threaded fit with the supporting seat (2), and a supporting plate (32) used for supporting the prefabricated water flowing groove is arranged at one end, far away from the supporting seat (2), of the adjusting screw rod (31).
8. The manhole sink mounting bracket of claim 7, wherein: the support plate (32) is an arc-shaped support plate (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222183958.1U CN218028061U (en) | 2022-08-18 | 2022-08-18 | Inspection well flowing water tank mounting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222183958.1U CN218028061U (en) | 2022-08-18 | 2022-08-18 | Inspection well flowing water tank mounting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218028061U true CN218028061U (en) | 2022-12-13 |
Family
ID=84349973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222183958.1U Active CN218028061U (en) | 2022-08-18 | 2022-08-18 | Inspection well flowing water tank mounting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218028061U (en) |
-
2022
- 2022-08-18 CN CN202222183958.1U patent/CN218028061U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111456092B (en) | Concrete pouring encloses fender mould | |
CN104674684A (en) | Movable cast-in-place culvert cover plate framework support | |
CN203583380U (en) | Movable cast-in-situ culvert cover plate template support | |
CN110485713B (en) | Roofing cornice and escape canal once only pour template reinforcing apparatus | |
CN218028061U (en) | Inspection well flowing water tank mounting frame | |
CN113756281B (en) | Micro-disturbance grouting reinforcement construction method for near operation line | |
CN114657905A (en) | Integral box culvert vertical combined prefabricated rack and preparation method thereof | |
CN220377120U (en) | Packing stone pouring die | |
CN220352888U (en) | Underground integrated pipeline support structure | |
CN211816425U (en) | Runner fast-supporting mold | |
CN216238190U (en) | Culvert supports reinforcing apparatus | |
CN220813357U (en) | Highway crack grouting repairing device | |
CN114954836B (en) | Auxiliary device for installing outfitting pipe in finished section and installation method | |
CN214657041U (en) | Adjusting type fixture for cast-in-place concrete pile guide pipe | |
CN221142851U (en) | Inspection well repairing device suitable for arbitrary road surface gradient | |
CN214789589U (en) | Compound drainage pipe fixing device | |
CN213358528U (en) | Trapezoidal concrete ditch slipform construction equipment | |
CN109676753A (en) | A kind of pre-buried hole hole-forming device of prefabricated box -beam | |
CN219753295U (en) | Pipe gallery pouring backplate adjusting bracket | |
CN211145563U (en) | Circular pipeline positioning and fixing device | |
CN220468913U (en) | Pre-buried rag bolt installation appurtenance | |
CN211219446U (en) | Convenient steel pipe welding equipment for building of adjusting | |
CN213062316U (en) | Drainage pipe for municipal works | |
CN216553084U (en) | Building aluminum formwork diagonal bracing device | |
CN220366029U (en) | Pipeline supports connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |