CN218027202U - Pier column hoop device for double-layer gate type pier capping beam construction - Google Patents

Pier column hoop device for double-layer gate type pier capping beam construction Download PDF

Info

Publication number
CN218027202U
CN218027202U CN202221622872.8U CN202221622872U CN218027202U CN 218027202 U CN218027202 U CN 218027202U CN 202221622872 U CN202221622872 U CN 202221622872U CN 218027202 U CN218027202 U CN 218027202U
Authority
CN
China
Prior art keywords
clamp
link
pier
double
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221622872.8U
Other languages
Chinese (zh)
Inventor
邹敏
李凯
廖宏斌
付德伟
林高山
刘锋
李国辉
何磊
孟庆垚
袁荣旺
黄昌辉
李超祥
胡金石
揭木雄
劳业亮
朱葛
汪杰
贺洋
邹嘉辉
黄煌志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN202221622872.8U priority Critical patent/CN218027202U/en
Application granted granted Critical
Publication of CN218027202U publication Critical patent/CN218027202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application discloses pier stud staple bolt device of double-deck gate-type mound bent cap construction, including clamp one, link one and link two, the clamp one side is provided with clamp two, install both sides on the clamp one the link one, install both sides on the clamp two link two, be provided with connecting hole one on the link. The beneficial effects are that: through setting up the mounting groove and adsorbing the magnetite, can make and adsorb the magnetite and fix respectively on clamp one and clamp two through the mounting groove, then after staff separation clamp one and clamp two, clamp one and clamp two are through adsorbing magnetite interconnect for clamp one and clamp two can not the separation scatter on work platform, need not to occupy the work platform position, the staff of being convenient for carries out follow-up operation, and when the staff need be collected clamp one and clamp two, can stimulate clamp one and clamp two and separate fast.

Description

Pier column hoop device for double-layer gate type pier capping beam construction
Technical Field
The application relates to pier stud hoop device technical field, and more specifically relates to a pier stud hoop device of double-deck gate-type pier capping beam construction.
Background
The anchor ear is a component for holding or hooping another material by one material, belongs to fastening, and is used for fixing and limiting the anchor ear at the pier column in the existing bridge construction process.
Current pier stud staple bolt device carries out the staple bolt through clamp one and two pairs of pier studs of clamp and handles in the use, and after dismantling the completion, clamp one and clamp two can follow the pier stud and separate and scatter in work platform department, occupy the great position of work platform, the staff of being not convenient for carries out follow-up operation.
SUMMERY OF THE UTILITY MODEL
The utility model provides an advantage lies in providing a pier stud staple bolt device of double-deck gate-type pier bent cap construction, for prior art, has following beneficial effect:
for solving current pier stud staple bolt device in the use, carry out the staple bolt through two pairs of pier studs of clamp one and clamp and handle, and after dismantling the completion, clamp one and clamp two can follow the pier stud and separate and scatter in work platform department, occupy the great position of work platform, the problem that the staff of being not convenient for carries out follow-up operation, the utility model discloses a set up the mounting groove and adsorb the magnetite, can make and adsorb the magnetite and fix respectively on clamp one and clamp two through the mounting groove, then after staff separation clamp one and clamp two, clamp one and clamp two cross and adsorb magnetite interconnect for clamp one and clamp two can not separate and scatter on work platform, need not to occupy the work platform position, and the staff of being convenient for carries out follow-up operation, and when the staff need collect clamp one and clamp two, can stimulate clamp one and clamp two and separate fast.
Additional advantages and features of the present application will become apparent from the description which follows, and may be realized by means of the instrumentalities and combinations particularly pointed out in the specification.
For realizing an above-mentioned at least advantage, this application provides a pier stud staple bolt device of double-deck gate-type mound bent cap construction, including clamp one, link one and link two, the clamp one side is provided with clamp two, install both sides on the clamp one the link one, install both sides on the clamp two link two, be provided with connecting hole one on the link one, be provided with connecting hole two on the link two, strengthening rib one is installed to the link one, strengthening rib two is installed to link two one sides, connecting hole one with connecting hole two one side all is provided with the mounting groove, the mounting groove internal fixation has the absorption magnetite.
Further, the first clamp is connected with the second clamp through bolts, and the first clamp and the second clamp are identical in structure.
Through adopting above-mentioned technical scheme, can pass through clamp one with the clamp is to two pairs of pier studs carrying out the staple bolt and is handled.
Furthermore, the first connecting frame is formed on the first clamp, and the second connecting frame is formed on the second clamp.
By adopting the technical scheme, the butt joint device is convenient to use.
Furthermore, the first connecting hole is formed in the first connecting frame, and the second connecting hole is formed in the second connecting frame.
Through adopting above-mentioned technical scheme, can make the staff use the screw bolt and nut pass through connecting hole one with the connecting hole is two pairs clamp one with clamp two is connected fixedly.
Furthermore, the first reinforcing rib is welded with the first connecting frame, and the first reinforcing rib is welded with the first hoop.
Through adopting above-mentioned technical scheme, can pass through strengthening rib one improves clamp one with the intensity of link junction.
Furthermore, the second reinforcing rib is welded with the second connecting frame, and the second reinforcing rib is welded with the second hoop.
Through adopting above-mentioned technical scheme, can pass through two improvements of strengthening rib the clamp two with the intensity of two junctions of link.
Furthermore, the mounting groove is formed in the first connecting frame, the mounting groove is formed in the second connecting frame, the adsorption magnet is connected with the first clamping hoop through bolts, and the adsorption magnet is connected with the second clamping hoop through bolts.
Through adopting above-mentioned technical scheme, can make the absorption magnetite passes through the mounting groove is fixed respectively clamp one with on the clamp two, then at the staff separation clamp one with behind clamp two, clamp one with clamp two passes through absorption magnetite interconnect makes clamp one with clamp two can not the separation scatter on work platform, need not to occupy the work platform position, and the staff of being convenient for carries out follow-up operation.
These and other objects, features and advantages of the present application will become more fully apparent from the following detailed description, the accompanying drawings and the examples.
Drawings
The above and other objects, features and advantages of the present application will become more apparent by describing in more detail embodiments of the present application with reference to the attached drawings. The accompanying drawings are included to provide a further understanding of the embodiments of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the principles of the application. In the drawings, like reference numbers generally indicate like parts or steps.
Fig. 1 is a schematic structural view illustrating a pier stud hoop device for double-layer gate type pier capping beam construction according to the present invention;
fig. 2 is a top view of the pier stud hoop device for double-layer gate type pier capping beam construction according to the present invention;
fig. 3 shows a left cross-sectional view of a pier stud hoop device for double-layer gate-type pier capping beam construction.
In the figure:
1 is a first hoop; 2 is a clamp II; 3 is a first connecting frame; 4 is a second connecting frame; 5 is a connecting hole I; 6 is a connecting hole II; 7 is a reinforcing rib I; 8 is a second reinforcing rib; 9 is a mounting groove; and 10 is an absorption magnet.
Detailed Description
Hereinafter, example embodiments according to the present application will be described in detail with reference to the accompanying drawings. It should be understood that the described embodiments are only some embodiments of the present application and not all embodiments of the present application, and that the present application is not limited by the example embodiments described herein.
It is understood that the terms "a" and "an" should be interpreted as meaning that a number of one element or element is one in one embodiment, while a number of other elements is one in another embodiment, and the terms "a" and "an" should not be interpreted as limiting the number.
In the disclosure of the present invention, the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are merely for convenience of description and simplification of the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore the above terms are not to be construed as limiting the present invention.
As shown in fig. 1-3, a pier stud hoop device of double-deck gate-type pier capping beam construction in this embodiment, including clamp 1, link 3 and link two 4, clamp 1 one side is provided with clamp two 2, clamp two 2 can carry out the staple bolt processing with clamp 1 butt joint to the pier stud, link one 3 is installed to both sides on clamp 1, clamp 1 and clamp two 2 dock through link one 3 and link two 4, link two 4 is installed to both sides on clamp two 2, be provided with connecting hole one 5 on link one 3, be provided with connecting hole two 6 on link two 4, the staff uses the bolt and nut to connect fixedly clamp 1 and clamp two 2 through connecting hole one 5 and connecting hole two 6, link one 3 one side is installed strengthening rib one 7, strengthening rib one 7 can improve the intensity of clamp 1 and link one 3 junction, link two 4 one side is installed strengthening rib two 8, strengthening rib two 8 can improve the intensity of clamp two 2 and link two 4 junctions, connecting hole one 5 and two 6 are all provided with magnetite mounting groove 9, the magnetite 10 is installed through magnetite 10 and adsorption mounting groove 10 each other in the clamp.
As shown in fig. 1-3, in the present embodiment, the first clamp 1 is bolted to the second clamp 2, the first clamp 1 and the second clamp 2 have the same structure, the first connection frame 3 is formed on the first clamp 1, and the second connection frame 4 is formed on the second clamp 2.
As shown in fig. 1-3, in the present embodiment, the first connecting hole 5 is formed on the first connecting frame 3, the second connecting hole 6 is formed on the second connecting frame 4, the first reinforcing rib 7 is welded to the first connecting frame 3, and the first reinforcing rib 7 is welded to the first clip 1.
As shown in fig. 1-3, in this embodiment, the second reinforcing rib 8 is welded to the second connecting frame 4, the second reinforcing rib 8 is welded to the second clamping band 2, the mounting groove 9 is formed on the first connecting frame 3, the mounting groove 9 is formed on the second connecting frame 4, the first magnetic absorption magnet 10 is bolted to the first clamping band 1, and the second magnetic absorption magnet 10 is bolted to the second clamping band 2.
The specific implementation process of this embodiment is as follows: when using, the staff places clamp 1 and clamp two 2 respectively in the both sides of pier stud, then with clamp 1 and clamp two 2 through link one 3 and link two 4 butt joint, after the butt joint is accomplished, the staff uses screw bolt and nut to connect fixedly through connecting hole one 5 and connecting hole two 6 clamp 1 and clamp two 2, carry out the staple bolt processing to the pier stud through the clamp, in the use, strengthening rib one 7 can improve the intensity of clamp 1 and link one 3 junction, strengthening rib two 8 can improve the intensity of clamp two 2 and link two 4 junction, and adsorb magnetite 10 and fix respectively on clamp 1 and clamp two 2 through mounting groove 9, after staff separation clamp 1 and clamp two 2, clamp 1 and clamp two 2 are through adsorbing magnetite 10 interconnect, make clamp 1 and clamp two 2 can not the separation scatter on work platform, need not to occupy the work platform position, be convenient for the staff carries out follow-up operation, and when the staff needs to collect clamp 1 and clamp two 2, can stimulate clamp 1 and two clamp 2 to carry out quick separation clamp 1 and two.
It will be understood by those skilled in the art that the embodiments of the present invention as described above and shown in the drawings are given by way of example only and are not limiting of the present invention. The objects of the present invention have been fully and effectively accomplished. The functional and structural principles of the present invention have been shown and described in the embodiments without departing from the principles, embodiments of the present invention may have any deformation or modification.

Claims (7)

1. The utility model provides a pier stud staple bolt device of double-deck gate-type pier bent cap construction which characterized in that: including clamp (1), link (3) and link two (4), clamp (1) one side is provided with clamp two (2), install both sides on clamp (1) link (3), install both sides on clamp two (2) link two (4), be provided with connecting hole (5) on link (3), be provided with connecting hole two (6) on link two (4), strengthening rib (7) are installed to link one (3) one side, strengthening rib two (8) are installed to link two (4) one side, connecting hole one (5) with connecting hole two (6) one side all is provided with mounting groove (9), mounting groove (9) internal fixation has absorption magnetite (10).
2. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, wherein: the clamp I (1) is connected with the clamp II (2) through bolts, and the clamp I (1) is identical to the clamp II (2) in structure.
3. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, wherein: the first connecting frame (3) is formed on the first hoop (1), and the second connecting frame (4) is formed on the second hoop (2).
4. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, wherein: the first connecting hole (5) is formed in the first connecting frame (3), and the second connecting hole (6) is formed in the second connecting frame (4).
5. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, wherein: the first reinforcing rib (7) is welded with the first connecting frame (3), and the first reinforcing rib (7) is welded with the first hoop (1).
6. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, characterized in that: the strengthening rib two (8) with link two (4) welding, strengthening rib two (8) with clamp two (2) welding.
7. The pier column hoop device for double-layer gate-type pier capping beam construction according to claim 1, wherein: mounting groove (9) shaping in on link (3), mounting groove (9) shaping in on link two (4), adsorb magnetite (10) with clamp (1) bolted connection, adsorb magnetite (10) with clamp two (2) bolted connection.
CN202221622872.8U 2022-06-24 2022-06-24 Pier column hoop device for double-layer gate type pier capping beam construction Active CN218027202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221622872.8U CN218027202U (en) 2022-06-24 2022-06-24 Pier column hoop device for double-layer gate type pier capping beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221622872.8U CN218027202U (en) 2022-06-24 2022-06-24 Pier column hoop device for double-layer gate type pier capping beam construction

Publications (1)

Publication Number Publication Date
CN218027202U true CN218027202U (en) 2022-12-13

Family

ID=84377880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221622872.8U Active CN218027202U (en) 2022-06-24 2022-06-24 Pier column hoop device for double-layer gate type pier capping beam construction

Country Status (1)

Country Link
CN (1) CN218027202U (en)

Similar Documents

Publication Publication Date Title
CN108274182A (en) A kind of overturning tooling for the weldering of vehicle body bottom frame group
CN103817475A (en) Bulletproof and load-bearing type vehicle floor welding and tooling method and tooling clamp thereof
CN218027202U (en) Pier column hoop device for double-layer gate type pier capping beam construction
CN111576982A (en) Device and method for reinforcing angle steel of power transmission tower
CN214402149U (en) Steel structure truss for building engineering
CN212219897U (en) Installation frame of hydrogen supply system
CN206598890U (en) A kind of new diagonal brace connection component of urban bus vehicle body aluminium skeleton
CN101408483B (en) Gantry type frame for detecting white body performance of automobile
CN215967076U (en) Auxiliary installation mechanism for side direction reinforcing pipe of front shell of automobile battery shell
CN206635950U (en) A kind of square beam column steel construction
CN205930896U (en) Preceding auxiliary car frame assembly mounting structure
CN214054222U (en) Adjustable welding tool rack for steel pipe pole cross arm
CN211761027U (en) Water tank front beam installation auxiliary fixtures
CN210888261U (en) Firm transformer structure support of installation
CN103384047A (en) Power distribution cabinet framework
CN208293751U (en) A kind of steel construction with anti-seismic performance
CN216097199U (en) Welding white automobile body hair cover supporting tool
CN218667887U (en) Steel structure connecting piece
KR100319508B1 (en) Temporary supporting machinery of electric wire
CN219013092U (en) Clamping structure and frame of pipe fitting
CN219584294U (en) B-pillar upper joint structure
CN219150757U (en) Screen plate installation fixing structure
CN203434444U (en) Power distribution cabinet frame
CN202388171U (en) Truss welding clamp
CN219952386U (en) Assembled steel structure fixing device