CN218019129U - Concrete pouring device - Google Patents
Concrete pouring device Download PDFInfo
- Publication number
- CN218019129U CN218019129U CN202221867609.5U CN202221867609U CN218019129U CN 218019129 U CN218019129 U CN 218019129U CN 202221867609 U CN202221867609 U CN 202221867609U CN 218019129 U CN218019129 U CN 218019129U
- Authority
- CN
- China
- Prior art keywords
- pouring
- concrete
- pipe
- sliding frame
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims abstract description 8
- 238000005266 casting Methods 0.000 claims abstract 5
- 238000007790 scraping Methods 0.000 claims description 16
- 230000000670 limiting effect Effects 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 238000009415 formwork Methods 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a concrete placement device, including the bracing piece: the utility model discloses a concrete material pipeline casting device, including bracing piece, horizontal balladeur train, and the driving is pour a pipe lifting movement, be provided with the horizontal balladeur train on the bracing piece, and swing joint has vertical balladeur train on the horizontal balladeur train, swing joint has the centre gripping subassembly on the vertical balladeur train, and is provided with the pipe of pouring of being connected with concrete material pipeline on the centre gripping subassembly to the drive is pour a pipe lifting movement, the bottom of centre gripping subassembly is provided with the direction of pouring that is on a parallel with the pipe of pouring, and the subassembly of strickleing off of liftable removal. The utility model discloses in, this pouring device adopts the drive structure of combination formula, can realize pouring the pipe in horizontal, vertical and the high position on the multidimension regulation effect, need not artifical manual gripping and pour the pipe to through the subassembly of strickleing off that sets up, can carry out the flattening to the concrete in the template and scrape the material operation when concrete pouring is inside to the prefabricated plate template, make in the prefabricated plate template pour the back accumulational concrete can be fast and automatic strickleed off, thereby be convenient for subsequent operation construction.
Description
Technical Field
The utility model relates to a concrete placement technical field especially relates to a concrete placement device.
Background
The precast slab is a concrete slab prepared by pouring concrete in a formwork box, and is mainly used for building construction.
Chinese patent publication No.: CN216181548U discloses "a concrete placement device evenly paves", including the workstation, set up type die box on the workstation, set up at the outside pump body of workstation and set up the conveying pipe in the pump body outside, the outside of workstation is provided with electric putter, electric putter's bottom is provided with the locating rack, the bottom of locating rack is provided with first spring, the bottom of first spring is provided with the fly leaf, the outside of fly leaf is provided with the locating lever, the outside of locating lever is provided with the current conducting plate, the medial surface of locating rack is provided with the power strip, the medial surface of workstation is provided with the pivot, the outside of pivot is provided with the sprocket, the surface meshing of sprocket has the chain, the surface of chain is provided with the magnetic path, the medial surface of workstation is provided with the second spring, the top of second spring is provided with the striker, the top of striker is provided with the silence pad, the bottom of striker is provided with the stay cord, the bottom of stay cord is provided with the iron plate.
When concrete pouring is carried out on a precast slab by the conventional pouring device, a mode of manually grabbing a pouring pipe is generally adopted, and the pouring pipe has certain impact force during pouring, so that the mode of manually grabbing is not stable enough, the pouring position cannot be adjusted quickly and flexibly, and the pouring efficiency of the precast slab is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an adopt the combination formula to remove the mode of pouring, realize the concrete placement device of effect is pour in a flexible way fast to multidimension.
In order to achieve the above object, the present invention provides the following technical solutions: a concrete pouring device comprises a support rod:
a transverse sliding frame is arranged on the supporting rod, and a longitudinal sliding frame is movably connected to the transverse sliding frame;
the longitudinal sliding frame is movably connected with a clamping assembly, a pouring pipe connected with a concrete material pipeline is arranged on the clamping assembly, and the pouring pipe is driven to move up and down;
the bottom of centre gripping subassembly is provided with the direction of pouring that is on a parallel with the pipe of pouring, and the subassembly of strickleing off of liftable removal.
As a further description of the above technical solution:
and a first electric lead screw for driving the longitudinal sliding frame to move is arranged on the transverse sliding frame.
As a further description of the above technical solution:
and a second electric lead screw for driving the clamping assembly to move is arranged on the longitudinal sliding frame.
As a further description of the above technical solution:
the clamping assembly comprises an upper plate connected with the second electric screw rod, the bottom of the upper plate is connected with a lower plate through connecting rods distributed in an array mode, clamping holes are formed in the upper plate, and supporting holes are formed in the lower plate.
As a further description of the above technical solution:
the inner wall of the inclined end of the support hole is provided with a positioning groove, and the positioning groove is matched with a positioning head on the pouring pipe.
As a further description of the above technical solution:
and the lower plate is spirally connected with a locking pin, and the locking pin is matched with a locking groove formed in the connecting rod.
As a further description of the above technical solution:
the scraping component comprises a scraping plate, a bearing is arranged at the top of the scraping plate, a screw rod in spiral connection with the connecting rod is arranged in the bearing, and a limiting rod extending into the connecting rod is arranged on the scraping plate.
As a further description of the above technical solution:
one side wall of the scraping plate is provided with an assembling block, and the other side wall of the scraping plate is provided with an assembling groove matched with the assembling block.
In the technical scheme, the utility model provides a pair of concrete placement device has following beneficial effect:
(1) The pouring device adopts a combined driving structure, and can realize the multi-dimensional adjusting effect of the pouring pipe on the transverse, longitudinal and height positions, so that concrete can be efficiently and flexibly poured to the pouring prefabricated plate, the pouring pipe does not need to be manually grasped, and the stability of concrete pouring operation is also improved.
(2) The scraping component is arranged, so that concrete in the template can be leveled and scraped when the concrete is poured into the prefabricated plate template, the concrete accumulated in the prefabricated plate template after pouring can be quickly and automatically scraped, the concrete pouring amount can be conveniently observed, and subsequent operation and construction are facilitated.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to these drawings.
Fig. 1 is a schematic structural diagram of a concrete pouring device according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a clamping assembly according to an embodiment of the present invention;
fig. 3 is a schematic view of a partial structure of a joint between a lower plate and a pouring pipe according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a joint between the connecting rod and the scraping component according to the embodiment of the present invention.
Description of reference numerals:
1. a support bar; 2. a transverse carriage; 3. a first electric lead screw; 4. a longitudinal carriage; 5. a second electric lead screw; 6. a clamping assembly; 61. an upper plate; 611. a clamping hole; 62. a lower plate; 621. a support hole; 622. positioning a groove; 63. a connecting rod; 64. a locking groove; 65. a locking pin; 7. pouring a pipe; 71. positioning the head; 8. a strike-off assembly; 81. scraping the plate; 82. assembling the block; 83. assembling a groove; 84. a screw; 85. a bearing; 86. a limiting rod.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the present invention will be further described in detail with reference to the attached drawings.
As shown in fig. 1 to 4, a concrete pouring device includes a support rod 1:
the transverse sliding frame 2 is arranged on the supporting rod 1, the transverse sliding frame 2 is movably connected with a longitudinal sliding frame 4, a first electric lead screw 3 for driving the longitudinal sliding frame 4 to move is arranged on the transverse sliding frame 2, a second electric lead screw 5 for driving the clamping assembly 6 to move is arranged on the longitudinal sliding frame 4, the supporting rod 1 is fixed at two ends of the precast slab formwork, the position of the pouring device is integrally fixed, the longitudinal sliding frame 4 can be driven to move on the transverse sliding frame 2 under the action of the first electric lead screw 3, the poured transverse position can be adjusted, the clamping assembly 6 can be driven to move on the longitudinal sliding frame 4 under the drive of the second electric lead screw 5, the poured transverse position can be adjusted, and therefore concrete can be used for efficiently and flexibly pouring precast slabs without manual grasping;
the longitudinal sliding frame 4 is movably connected with a clamping assembly 6, the clamping assembly 6 is provided with a pouring pipe 7 connected with a concrete material pipeline, and the pouring pipe 7 is driven to move up and down, so that under the action of the clamping assembly 6, the position of the pouring pipe 7 can be fixed, the stability of the position of the pouring pipe 7 is ensured, the phenomenon that the pouring pipe 7 shakes during pouring is prevented, meanwhile, the angle height of the pouring pipe 7 can be adjusted, and concrete can be accurately poured into a precast slab formwork;
the bottom of centre gripping subassembly 6 is provided with the direction of pouring that is on a parallel with pipe 7 pours, and liftable removal scrape flat subassembly 8, can carry out the flattening to the concrete in the template when concrete placement is inside the prefabricated plate template, scrapes the material operation for the accumulational concrete can be fast and automatic strickleed off after pouring in the prefabricated plate template, so that observe what of concrete placement volume, the follow-up operation construction of being convenient for.
The clamping assembly 6 comprises an upper plate 61 connected with the second electric screw rod 5, the bottom of the upper plate 61 is connected with a lower plate 62 through connecting rods 63 distributed in an array manner, clamping holes 611 are formed in the upper plate 61, supporting holes 621 are formed in the lower plate 62, the supporting holes 621 are of a funnel structure, the inner diameter of the upper end opening is larger than that of the lower end opening, the pouring pipe 7 can be supported and abutted, locking pins 65 are spirally connected to the lower plate 62, the locking pins 65 are matched with locking grooves 64 formed in the connecting rods 63, after the pouring pipe 7 sequentially penetrates through the clamping holes 611 and the supporting holes 621, the position of the pouring pipe 7 is fixed, the positions of the lower plate 62 and the connecting rods 63 are adjusted, the height of the lower plate 62 can be adjusted, the pouring height of the pouring pipe 7 is adjusted, the size of the distance between the bottom of the pouring pipe 7 and a prefabricated plate formwork is changed, and the pouring pipe 7 can enter the locking grooves 64 by rotating the locking pins 65, and the position between the lower plate 62 and the connecting rods 63 can be locked and fixed, and the position of the pouring pipe 7 is further improved.
The strickle assembly 8 comprises a strickle 81, a bearing 85 is arranged at the top of the strickle 81, a screw 84 in threaded connection with the connecting rod 63 is arranged in the bearing 85, a limiting rod 86 extending into the connecting rod 63 is arranged on the strickle 81, the screw 84 is rotated on the connecting rod 63 by rotating, the height of the strickle 81 can be adjusted under the action of the bearing 85, the strickle 81 can be ensured to be lifted in a linear state by combining the limiting action of the limiting rod 86, so that the bottom of the strickle 81 is in contact with the upper surface of the precast slab formwork, and when the pouring pipe 7 moves transversely, the strickle 81 is used for strickleing off the concrete material poured in the precast slab formwork, so as to observe the concrete amount and facilitate subsequent operation and construction.
One side wall of the scraping plate 81 is provided with an assembling block 82, the other side wall is provided with an assembling groove 83 matched with the assembling block 82, the two scraping plates 81 with the same specification can be spliced through the corresponding connection of the assembling block 82 and the assembling groove 83, so that the scraping width of the scraping assembly 8 is adjusted, and the scraping requirements of prefabricated plate templates with different specifications and sizes are met.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive on the scope of the appended claims.
Claims (8)
1. The utility model provides a concrete placement device, includes bracing piece (1), its characterized in that:
a transverse sliding frame (2) is arranged on the support rod (1), and a longitudinal sliding frame (4) is movably connected to the transverse sliding frame (2);
the longitudinal sliding frame (4) is movably connected with a clamping assembly (6), a pouring pipe (7) connected with a concrete material pipeline is arranged on the clamping assembly (6), and the pouring pipe (7) is driven to move up and down;
the bottom of the clamping assembly (6) is provided with a scraping assembly (8) which is parallel to the pouring direction of the pouring pipe (7) and can move up and down.
2. A concrete pouring device according to claim 1, wherein: the transverse sliding frame (2) is provided with a first electric lead screw (3) for driving the longitudinal sliding frame (4) to move.
3. A concrete casting apparatus according to claim 1, wherein: and a second electric lead screw (5) for driving the clamping assembly (6) to move is arranged on the longitudinal sliding frame (4).
4. A concrete casting apparatus according to claim 1, wherein: the clamping assembly (6) comprises an upper plate (61) connected with the second electric lead screw (5), the bottom of the upper plate (61) is connected with a lower plate (62) through connecting rods (63) distributed in an array mode, clamping holes (611) are formed in the upper plate (61), and supporting holes (621) are formed in the lower plate (62).
5. A concrete pouring device according to claim 4, characterized in that: the inner wall of the inclined end of the support hole (621) is provided with a positioning groove (622), and the positioning groove (622) is matched with a positioning head (71) on the pouring pipe (7).
6. A concrete casting apparatus according to claim 4, wherein: the lower plate (62) is spirally connected with a locking pin (65), and the locking pin (65) is matched with a locking groove (64) formed in the connecting rod (63).
7. A concrete casting apparatus according to claim 1, wherein: the strickle component (8) comprises a strickle plate (81), a bearing (85) is arranged at the top of the strickle plate (81), a screw (84) which is in screw connection with the connecting rod (63) is arranged in the bearing (85), and a limiting rod (86) which extends into the connecting rod (63) is arranged on the strickle plate (81).
8. A concrete pouring device according to claim 7, wherein: one side wall of the scraping plate (81) is provided with an assembling block (82), and the other side wall is provided with an assembling groove (83) matched with the assembling block (82).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221867609.5U CN218019129U (en) | 2022-07-19 | 2022-07-19 | Concrete pouring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221867609.5U CN218019129U (en) | 2022-07-19 | 2022-07-19 | Concrete pouring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218019129U true CN218019129U (en) | 2022-12-13 |
Family
ID=84384852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221867609.5U Expired - Fee Related CN218019129U (en) | 2022-07-19 | 2022-07-19 | Concrete pouring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218019129U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106926345A (en) * | 2017-03-23 | 2017-07-07 | 柳州欧维姆机械股份有限公司 | The mobile shock platforms of HiAm anchorage grouting and its method for HiAm anchorage grouting |
-
2022
- 2022-07-19 CN CN202221867609.5U patent/CN218019129U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106926345A (en) * | 2017-03-23 | 2017-07-07 | 柳州欧维姆机械股份有限公司 | The mobile shock platforms of HiAm anchorage grouting and its method for HiAm anchorage grouting |
CN106926345B (en) * | 2017-03-23 | 2023-04-25 | 柳州欧维姆机械股份有限公司 | Cold cast anchor grouting movable vibration platform and method for cold cast anchor grouting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218019129U (en) | Concrete pouring device | |
CN213797169U (en) | A mould for bridge construction | |
CN211396737U (en) | Template strutting arrangement for building engineering | |
CN209633297U (en) | A kind of mold of precast concrete wall panel | |
CN115142796B (en) | Spiral perforating device for water plant engineering | |
CN217557675U (en) | Building construction girder form removal device | |
CN209469442U (en) | A kind of formwork erection dismoulding system and the ditch cable trench trolley with the system | |
CN208183726U (en) | It can be to the architecture storey construction equipment of cast-in-place pile concrete formwork for placing Intelligent Installation | |
CN214531092U (en) | Concrete crack control construction device for storage tank | |
CN210238516U (en) | Automatic concrete buffering string barrel | |
CN210658360U (en) | Soil sampling device | |
CN218373404U (en) | Road and bridge crack reinforced structure | |
CN207812455U (en) | Municipal road construction places machine automatically with digging hole filling pile concrete-pouring template | |
CN218109339U (en) | Collecting frame for dumping metal ingot casting furnace | |
CN215978458U (en) | Pouring structure for constructional column dustpan opening | |
CN216324780U (en) | Construction steel bar straightening device | |
CN221818978U (en) | Leveling mechanism is used in concrete prefab production | |
CN219794550U (en) | Insulation board slurry layer strickling device | |
CN220468863U (en) | Concrete roughness and drainage slope receive face device | |
CN212866900U (en) | Lifting shifting fork | |
CN220364829U (en) | Concrete vibrating device for municipal highway engineering | |
CN112030973B (en) | Pile top grouting system for rigid pile composite foundation and construction method thereof | |
CN219528415U (en) | Spliced concrete pouring template | |
CN211058815U (en) | Device capable of efficiently pouring mold-built concrete | |
CN221442133U (en) | Construction concrete placement device is built in room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221213 |
|
CF01 | Termination of patent right due to non-payment of annual fee |