CN218000674U - Municipal works pipeline construction fixing device - Google Patents

Municipal works pipeline construction fixing device Download PDF

Info

Publication number
CN218000674U
CN218000674U CN202222030009.XU CN202222030009U CN218000674U CN 218000674 U CN218000674 U CN 218000674U CN 202222030009 U CN202222030009 U CN 202222030009U CN 218000674 U CN218000674 U CN 218000674U
Authority
CN
China
Prior art keywords
fixing device
mounting
pipeline construction
spacing hole
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222030009.XU
Other languages
Chinese (zh)
Inventor
郑少彬
洪雅芳
高彦光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Zhenghong Construction Co ltd
Original Assignee
Yunnan Zhenghong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Zhenghong Construction Co ltd filed Critical Yunnan Zhenghong Construction Co ltd
Priority to CN202222030009.XU priority Critical patent/CN218000674U/en
Application granted granted Critical
Publication of CN218000674U publication Critical patent/CN218000674U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a municipal works pipeline construction fixing device, including two mounting panels, the upper surface of movable block is provided with clamping piece and two inserting grooves, and every inserting groove all communicates between the spacing hole, and the lower surface symmetry fixed mounting of clamping piece has the elasticity insertion piece of pegging graft with the inserting groove, and the equal fixed mounting in back of the body of two elasticity insertion pieces has the stopper with spacing hole block. The utility model provides an adopt elasticity inserted sheet and inserting groove to be connected between clamping spare and the connecting block, through with the ejecting spacing hole of stopper, make elasticity inserted sheet take place elastic bending, the inside of inserting groove is taken elasticity inserted sheet and stopper out to the convenience is changed unidimensional clamping spare according to the demand, it is fixed to have solved the clamping structure size that current municipal works pipeline construction fixing device set up, it is fixed to going into the family guide pipeline with the gas of diameter, lead to the adaptability relatively poor, the not strong problem of practicality.

Description

Municipal works pipeline construction fixing device
Technical Field
The utility model belongs to the technical field of the municipal works device, concretely relates to municipal works pipeline construction fixing device.
Background
The municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in the planning and construction range of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction matched with urban life belongs to the municipal engineering category, such as common urban roads, bridges, subways, underground pipelines, tunnels, river channels, rail transit, sewage treatment, garbage treatment and disposal and other projects.
The gas guide pipe that registers one's residence is as a part of municipal pipeline, and the gas guide pipe that registers one's residence is laid along the building outer wall, adopts the installed part to fix on the wall usually. However, the clamping structure of the fixing device for municipal engineering pipeline construction is fixed in size, so that the gas inlet guide pipelines with different diameters are difficult to fix, the adaptation capability is poor, and the practicability is not high. Therefore, the municipal engineering pipeline construction fixing device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal works pipeline construction fixing device to it is fixed to solve the clamping structure size that provides current municipal works pipeline construction fixing device and set up among the above-mentioned background art, is difficult to lead to the adaptation ability relatively poor to the gas guide pipeline of registering one's residence without the diameter fixed, problem that the practicality is not strong.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a municipal works pipeline construction fixing device, includes two mounting panels, every the activity groove has all been seted up to the upper surface of mounting panel, the inboard rotation of activity groove is connected with two-way lead screw, the outside symmetry spiro union of two-way lead screw have with activity groove sliding connection's movable block, every spacing hole has all been seted up to the both sides of movable block, just the upper surface of movable block is provided with clamping piece and two inserting grooves, every the inserting groove all with spacing hole between communicate, the lower surface symmetry fixed mounting of clamping piece has the elasticity inserted sheet of pegging graft with the inserting groove, two the equal fixed mounting in back of the body face of elasticity inserted sheet has the stopper with spacing hole block.
Preferably, the limiting block is of a triangular structure, the limiting block and the elastic insertion piece are of an integrally formed structure, and the elastic insertion piece is made of an elastic steel sheet.
Preferably, one end of the bidirectional screw rod is connected with the mounting plate through a bearing, and the other end of the bidirectional screw rod penetrates through the mounting plate and is fixedly connected with an adjusting knob.
Preferably, the movable block and the connecting block are of an integrally formed structure, and a hinge shaft is arranged between the mounting plates.
Preferably, the mounting plate is of a convex structure, and the upper surface of the mounting plate is provided with the clamping member.
Preferably, the rear surface of the mounting plate is fixedly provided with a fixed seat, and the front surface of the fixed seat is provided with a fixed hole.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model provides an adopt elasticity inserted sheet and inserting groove to be connected between clamping spare and the connecting block, through with the ejecting spacing hole of stopper, make elasticity inserted sheet take place elastic bending, the inside of inserting groove is taken elasticity inserted sheet and stopper out to the convenience is changed unidimensional clamping spare according to the demand, it is fixed to have solved the clamping structure size that current municipal works pipeline construction fixing device set up, it is fixed to going into the family guide pipeline with the gas of diameter, lead to the adaptability relatively poor, the not strong problem of practicality.
2. The utility model provides an it is articulated to adopt the hinge between two mounting panels, is the straight line form through changing two mounting panels to adopt the mounting hole fixed, it is fixed to make things convenient for the direct line type gas guide pipe that registers one's residence to change and be perpendicular form through changing two mounting panels, and adopt the fixed orifices fixed, it is fixed that the convenience is registered one's residence to L type gas guide pipe, and the variety that the reinforcing was used is fit for extensively promoting.
Drawings
Fig. 1 is a first form perspective view of the present invention;
FIG. 2 is a schematic view of the connection between the clamping member and the connecting block;
FIG. 3 is a perspective view of a second embodiment of the present invention;
in the figure: 1. a fixing hole; 2. a fixed seat; 3. mounting a plate; 4. a bidirectional screw rod; 5. a movable block; 6. adjusting a knob; 7. a hinge shaft; 8. a movable groove; 9. connecting blocks; 10. a clamping member; 11. mounting holes; 12. inserting grooves; 13. a limiting hole; 14. an elastic insertion piece; 15. and a limiting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a municipal works pipeline construction fixing device, including two mounting panels 3, movable groove 8 has all been seted up to the upper surface of every mounting panel 3, the inboard rotation of movable groove 8 is connected with two-way lead screw 4, the outside symmetry spiro union of two-way lead screw 4 has movable block 5 with 8 sliding connection of movable groove, spacing hole 13 has all been seted up to the both sides of every movable block 5, and the upper surface of movable block 5 is provided with clamping piece 10 and two inserting groove 12, communicate between every inserting groove 12 and the spacing hole 13, the lower surface symmetry fixed mounting of clamping piece 10 has the elasticity inserted sheet 14 of pegging graft with inserting groove 12, two equal fixed mounting in the back of the face of elasticity inserted sheet 14 have with the stopper 15 of spacing hole 13 block, stopper 15 is the triangle-shaped structure, and stopper 15 and elasticity inserted sheet 14 be the integrated into one piece structure, elasticity inserted sheet 14 is made by elasticity, be connected through the bearing steel sheet between the one end of two-way lead screw 4 and the mounting panel 3, and the other end of two-way lead screw 4 runs through 3 fixedly connected with adjust knob 6, be convenient for rotate two-way lead screw 4.
As can be seen from the above description, the present invention has the following advantages: adopt elasticity inserted sheet 14 and inserting groove 12 to be connected between clamping spare 10 and connecting block 9, through with the ejecting spacing hole 13 of stopper 15, make elasticity inserted sheet 14 take place elastic bending, realize taking elasticity inserted sheet 14 and stopper 15 out the inside of inserting groove 12, thereby convenient not unidimensional clamping spare 10 of change according to the demand, it is fixed to have solved the clamping structure size that current municipal works pipeline construction fixing device set up, it is fixed to the gas guide pipe that enters the household without the diameter to be difficult to, lead to the adaptability relatively poor, the problem that the practicality is not strong
Example two:
referring to fig. 1-3, based on the first embodiment, the present invention provides a technical solution: the movable block 5 is the integrated into one piece structure with connecting block 9, is provided with hinge 7 between two mounting panels 3, and mounting panel 3 is type of calligraphy structure, and mounting panel 3's upper surface has seted up clamping piece 10, and mounting panel 3's rear surface fixed mounting has fixing base 2, and fixed orifices 1 has been seted up to fixing base 2's front surface.
The utility model provides an it is articulated to adopt hinge 7 between two mounting panels 3, is the straight line form through changing two mounting panels 3 to adopt mounting hole 11 fixed, it is fixed to make things convenient for the straight line type gas guide pipe that registers one's residence, and be perpendicular form through changing two mounting panels 3, and adopt fixed orifices 1 fixed, it is fixed to L type gas guide pipe that registers one's residence conveniently, and the variety that the reinforcing was used is fit for extensively promoting.
The utility model discloses a theory of operation and use flow:
when the straight-line type gas home-entry guide pipeline needs to be fixed, firstly, the two mounting plates 3 are changed into a straight-line shape, then the two mounting plates 3 are fixed on the wall surface through the mounting holes 11 by screws, then the gas home-entry guide pipeline penetrates through the four clamping pieces 10, finally, the adjusting knob 6 is rotated to drive the two-way screw rod 4 connected with the gas home-entry guide pipeline to rotate, the two connecting blocks 9 on the outer side are driven to be brought to the clamping pieces 10 to move towards opposite directions, and the straight-line type gas home-entry guide pipeline is clamped. When the L-shaped gas in-house guide pipeline needs to be fixed, the two mounting plates 3 are firstly changed into a vertical shape, then the fixing seat 2 is fixed on the wall surface through the fixing hole 1 by adopting a screw, then the gas in-house guide pipeline penetrates through the four clamping pieces 10, finally the adjusting knob 6 is rotated to drive the two-way screw rod 4 connected with the gas in-house guide pipeline to rotate, and the two connecting blocks 9 on the outer side are driven to be driven to the clamping pieces 10 to move towards opposite directions so as to clamp the L-shaped gas in-house guide pipeline. When the clamping member 10 needs to be detached, the limiting block 15 is firstly ejected out of the limiting hole 13, so that the elastic insertion piece 14 is elastically bent, and then the elastic insertion piece 14 and the limiting block 15 are pulled out of the insertion groove 12, so that the clamping member 10 is separated from the connecting block 9.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising one of 8230; \8230;" 8230; "does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
The above description is only for the purpose of illustrating the technical solutions of the present invention and not for the purpose of limiting the same, and other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solutions of the present invention should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.

Claims (6)

1. The utility model provides a municipal works pipeline construction fixing device, includes two mounting panels (3), its characterized in that: every movable groove (8) have all been seted up to the upper surface of mounting panel (3), the inboard rotation of movable groove (8) is connected with two-way lead screw (4), the outside symmetry spiro union of two-way lead screw (4) have with movable groove (8) sliding connection's movable block (5), every spacing hole (13) have all been seted up to the both sides of movable block (5), just the upper surface of movable block (5) is provided with clamping piece (10) and two inserting grooves (12), every inserting groove (12) all communicate between spacing hole (13), the lower surface symmetry fixed mounting of clamping piece (10) has elasticity inserted sheet (14) of pegging graft with inserting groove (12), two equal fixed mounting in the back of the body of elasticity inserted sheet (14) has stopper (15) with spacing hole (13) block.
2. The municipal engineering pipeline construction fixing device of claim 1, wherein: the limiting block (15) is of a triangular structure, the limiting block (15) and the elastic insertion piece (14) are of an integrally formed structure, and the elastic insertion piece (14) is made of an elastic steel sheet.
3. The municipal engineering pipeline construction fixing device of claim 1, wherein: the one end of two-way lead screw (4) is connected with mounting panel (3) through the bearing, just the other end of two-way lead screw (4) runs through mounting panel (3) fixedly connected with adjust knob (6).
4. The municipal engineering pipeline construction fixing device according to claim 1, wherein: the movable block (5) and the connecting block (9) are of an integrated structure, and a hinge shaft (7) is arranged between the mounting plates (3).
5. The municipal engineering pipeline construction fixing device according to claim 1, wherein: the mounting plate (3) is of a convex structure, and the upper surface of the mounting plate (3) is provided with a clamping piece (10).
6. The municipal engineering pipeline construction fixing device of claim 1, wherein: the rear surface fixed mounting of mounting panel (3) has fixing base (2), fixed orifices (1) have been seted up to the front surface of fixing base (2).
CN202222030009.XU 2022-08-03 2022-08-03 Municipal works pipeline construction fixing device Active CN218000674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222030009.XU CN218000674U (en) 2022-08-03 2022-08-03 Municipal works pipeline construction fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222030009.XU CN218000674U (en) 2022-08-03 2022-08-03 Municipal works pipeline construction fixing device

Publications (1)

Publication Number Publication Date
CN218000674U true CN218000674U (en) 2022-12-09

Family

ID=84319645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222030009.XU Active CN218000674U (en) 2022-08-03 2022-08-03 Municipal works pipeline construction fixing device

Country Status (1)

Country Link
CN (1) CN218000674U (en)

Similar Documents

Publication Publication Date Title
CN113124293B (en) Municipal engineering surveying and mapping system and adjusting method thereof
CN218914065U (en) Water supply and drainage pipeline connection structure
CN218000674U (en) Municipal works pipeline construction fixing device
CN212300461U (en) Ultrasonic flowmeter transducer support
CN211877492U (en) Sampling device for municipal works quality testing
CN214153917U (en) Cable fixing device for municipal works
CN205166914U (en) Center of pipe line portrayal frock
CN220303032U (en) Ventilating duct structure capable of being quickly abutted
CN220874147U (en) Spool fixer
CN220036010U (en) Municipal construction marking device
CN216306924U (en) Municipal administration is with joining in marriage dress formula push pipe of installation of being convenient for
CN217637058U (en) Combined checking fixture for automobile skylight guide rail
CN214994476U (en) Municipal administration road water supply and drainage pipeline connecting piece
CN212534397U (en) Double-deck drainage canal of reposition of redundant personnel of rain and sewage
CN208845863U (en) A kind of mounting structure of push pipe
CN218031926U (en) Make things convenient for municipal drainage pipe of dismouting
CN215105605U (en) Sewage treatment ditching pipe burying machine
CN212801858U (en) Municipal administration water supply and drainage pipeline connection structure
CN220037669U (en) Pipeline positioning bracket for water supply and drainage engineering
CN219571175U (en) Pipeline butt joint structure for municipal water supply and drainage construction
CN215563156U (en) Drainage pipe of municipal works supports connecting device
CN217208185U (en) Water supply and drainage engineering sewage pipes of convenient construction
CN213089282U (en) Sewage monitoring system based on internet of things
CN211816785U (en) Municipal administration road drain pipe fixed mounting device
CN215369012U (en) But height-adjusting's electric wire support for municipal works

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant