CN217998873U - Pipeline installation operation platform - Google Patents
Pipeline installation operation platform Download PDFInfo
- Publication number
- CN217998873U CN217998873U CN202222043663.4U CN202222043663U CN217998873U CN 217998873 U CN217998873 U CN 217998873U CN 202222043663 U CN202222043663 U CN 202222043663U CN 217998873 U CN217998873 U CN 217998873U
- Authority
- CN
- China
- Prior art keywords
- looped guide
- looped
- guide
- pipeline
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a pipeline installation operation platform, operation platform is used for installing in the pipe shaft and the same with the floor elevation, including being used for along the first looped guide that lays in the pipe shaft interior week, the interval is fixed in the inboard second looped guide of this first looped guide, slide and install many horizontal poles between this first looped guide and this second looped guide, and be located second looped guide and floor and enclose and establish the region in and set up the apron on this second looped guide, this apron is formed with and is used for the overlap joint section to this floor, the distance between this first looped guide and this second looped guide is not less than the external diameter of pipeline. The utility model provides a pipeline mounting platform among the prior art can't dodge the technical problem of pipeline. The utility model discloses need not to install the protection in addition again after the installation, when constructor need be under construction, can directly stand and construct on the apron, and need not to demolish the protection in addition and carry out construction operation.
Description
Technical Field
The utility model relates to a construction field especially relates to a pipeline installation operation platform.
Background
Under conventional conditions, the water and electricity piping erection needs to go on after the major structure is accomplished, because high-rise building pipeline is in large quantity, because of functional, safety and pleasing to the eye requirement, generally can arrange the vertical well of vertical equipment pipeline in building inside, the piping shaft has following two kinds of condition in the work progress:
1. and (4) safety protection. In the major structure work progress, the entrance to a cave is in and exposes the state, needs set up rail and level protection around each floor entrance to a cave, when follow-up piping erection, for convenient construction, needs to protect temporarily and demolishs, has artifical extravagant phenomenon, is not conform to green construction theory.
2. Pipeline installation operation problems. When the pipeline is installed, a worker needs to install the pipeline vertically section by section, and when a pipeline interface is constructed, a safe operation platform needs to be arranged. In a limited space, the problem that the pipeline cannot be avoided can occur when the steel pipe is erected to fall to the ground or the operation platform is cantilevered, and the engineering quantity is large. And a rope suspension operation mode is adopted, so that potential safety hazards are easily generated.
SUMMERY OF THE UTILITY MODEL
To the weak point that exists among the above-mentioned prior art, the utility model provides a pipeline installation operation platform has solved the technical problem that pipeline installation platform among the prior art can't dodge the pipeline.
In a first aspect, the utility model discloses a pipeline installation operation platform, be used for installing in the pipe shaft and the same with the floor elevation, including being used for along the first looped rail of the interior week laying of pipe shaft, the interval is fixed in the inboard second looped rail of this first looped rail, slide and install many horizontal poles between this first looped rail and this second looped rail, and be located second looped rail and floor and enclose the district in and set up the apron on this second looped rail, this apron is formed with the overlap joint section that is used for the overlap joint to this floor, distance between this first looped rail and this second looped rail is not less than the external diameter of pipeline, be fixed with the support piece that is used for fixing this second looped rail to this pipe shaft inner wall on this second looped rail.
The utility model discloses pipeline installation operation platform further improves and lies in, and this first ring rail is the channel-section steel with this second ring rail, and this first ring rail sets up with this second ring rail's opening relatively, and the both ends of every this horizontal pole are slided and are installed in this first ring rail and this second ring rail's inslot.
The utility model discloses piping erection operation platform further improves and lies in, and this piping shaft's cross section is the rectangle, and this second ring rail includes that first end is used for fixing two support rails at this floor and is fixed in the mounting rail between two these support rails, and every this support rail's second end extends this mounting rail and forms the extension section and fix to on this first ring rail.
The utility model discloses pipeline installation operation platform further improves and lies in, and this support piece is for being used for fixing the bracing in the bottom of this pipe shaft inner wall and this second ring rail.
The utility model discloses pipeline installation operation platform further improves and lies in, and this apron is the grid board.
In a second aspect, the present invention further provides a method for installing a pipeline installation operation platform, which includes the following steps;
laying a first annular guide rail on the inner periphery of the pipeline well;
fixing a second annular guide rail on the inner wall of the pipe shaft by using a supporting piece, enabling the second annular guide rail to be positioned on the inner side of the first annular guide rail at intervals, and enabling the distance between the first annular guide rail and the second annular guide rail to be not less than the outer diameter of a pipe;
a plurality of cross rods are arranged between the first annular guide rail and the second annular guide rail in a sliding way, and the distance between every two adjacent cross rods is not less than the outer diameter of the pipeline;
and a cover plate is erected in the area surrounded by the floor slab and the second annular guide rail.
Compared with the prior art, the utility model, its effect is positive and obvious. The utility model discloses a distance between the adjustable horizontal pole dodges the pipeline and directly covers the operation platform of establishing in piping shaft inside, has solved the technical problem that the pipeline mounting platform among the prior art can't dodge the pipeline. The utility model discloses need not to install the protection in addition again after the installation, when constructor need be under construction, can directly stand and be under construction on the apron, and need not to demolish the protection in addition and carry out construction operation, and simple structure, simple to operate.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a plan view of the pipeline installation operation platform of the present invention.
Fig. 2 is a sectional view of the first ring rail of the pipe installation operation platform of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
As shown in fig. 1 and 2, the utility model provides a 3 installation operation platforms of pipeline for install in pipe shaft 2 and the same with 6 elevations of floor, including being used for along the first ring rail 4 of interior week laying of pipe shaft 2, the interval is fixed in the inboard second ring rail 7 of this first ring rail 4, slide and install many horizontal poles 1 between this first ring rail 4 and this second ring rail 7, and be located second ring rail and floor and enclose the district in and set up the apron on the second rail, this apron is formed with the overlap joint section that is used for taking over to this floor 6, the distance between this first ring rail 4 and this second ring rail 7 is not less than the external diameter of pipeline 3, be fixed with on this second ring rail 7 and be used for fixing the support piece of this second ring rail 7 to this pipe shaft 2 inner wall. Many horizontal poles 1 can slide between first ring rail 4 and second ring rail 7 to conveniently dodge pipeline 3, and then for operation platform provides effectual support, avoided adopting the mode that the rope suspends in midair to make operation platform, the security is high, and stability is strong.
Preferably, the first annular guide rail 4 and the second annular guide rail 7 are channel steel, the openings of the first annular guide rail 4 and the second annular guide rail 7 are oppositely arranged, and two ends of each cross rod 1 are slidably mounted in the grooves of the first annular guide rail 4 and the second annular guide rail 7. First ring rail 4 adopts the bolt to be fixed in the web of channel-section steel on 2 inner walls of pipe shaft, and the channel-section steel opening sets up then naturally has formed the track that can supply 1 both ends of horizontal pole to slide to install, and need not to make track structure in addition.
Preferably, the piping shaft 2 has a rectangular cross section, and the second ring rail 7 includes two support rails having first ends for being fixed to the floor 6 and a mounting rail fixed between the two support rails, and a second end of each support rail extends out of the mounting rail and forms an extension fixed to the first ring rail 4. The supporting track is fixed with the floor 6 and the pipe shaft 2, the supporting position is increased, and the stability of the whole second track is greatly improved.
Preferably, the support is a brace adapted to be secured to the inside wall of the pipe shaft 2 and to the bottom of the second endless track 7. The diagonal brace is installed avoiding the pipeline 3, so that the stress of the second annular guide rail 7 can be effectively transmitted to the wall of the pipe shaft 2.
Preferably, the cover plate 5 is a grating plate. The grating plate is used as the cover plate 5, so that the quality of the cover plate 5 can be greatly reduced, the stress of the supporting piece is reduced, and the stability of the whole operating platform is improved.
On the other hand, the utility model also provides an installation method of the pipeline 3 installation operation platform, which comprises the following steps;
laying a first annular guide rail 4 on the inner periphery of the pipe shaft 2;
fixing a second annular guide rail 7 on the inner wall of the pipe shaft 2 by using a supporting piece, enabling the second annular guide rail 7 to be positioned on the first annular guide rail 4 at intervals and be horizontally parallel, and enabling the distance between the first annular guide rail 4 and the second annular guide rail 7 to be not less than the outer diameter of the pipe 3;
a plurality of cross rods 1 are slidably arranged between the first annular guide rail 4 and the second annular guide rail 7, and the distance between two adjacent cross rods 1 is not less than the outer diameter of the pipeline 3;
and a cover plate 5 is erected in the area enclosed by the floor slab 6 and the second annular guide rail 7.
Firstly, channel steel guide rails are manufactured according to the size of the pipe shaft 2, and the channel steel is fixed on the inner wall of the pipe shaft 2 through bolts. Determining the length of the cross rod 1 according to the size of the pipeline 3, wherein in the embodiment, the length of the cross rod 1 is 200mm; the cross rod 1 is arranged between the first annular guide rail 4 and the second annular guide rail 7, and the number of the cross rods can be increased or decreased according to the number of the pipelines 3. And a grid cover plate 5 is manufactured in the middle of the second annular guide rail 7 according to the size of the inner keel, and the grid cover plate 5 is placed on the inner keel and the floor slab 6 and is welded and fixed with the floor slab 6.
The utility model discloses a distance between the adjustable horizontal pole dodges the pipeline and directly covers the operation platform of establishing in the piping shaft inside, has solved the technical problem that the pipeline mounting platform among the prior art can't dodge the pipeline. The utility model discloses need not to install the protection in addition again after the installation, when constructor need be under construction, can directly stand and construct on the apron, and need not to demolish the protection in addition and carry out construction operation, and simple structure, simple to operate.
The utility model discloses in not relate to the part all the same with prior art or can adopt prior art to realize. The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and although the present invention has been disclosed with reference to the preferred embodiment, it is not intended to limit the present invention, and any person skilled in the art can make modifications or changes to equivalent embodiments with equivalent changes within the scope of the technical solution of the present invention.
Claims (5)
1. The utility model provides a pipeline installation operation platform, its characterized in that for install in the pipe shaft and the same with the floor elevation, be fixed in including first looped guide, the interval that is used for laying along the pipe shaft interior week first looped guide inboard second looped guide, slide install in first looped guide with many horizontal poles between the second looped guide and be located the second looped guide with the floor encloses and establishes in the region and set up apron on the second looped guide, the apron is formed with and is used for the overlap joint to the overlap joint section of floor, first looped guide with distance between the second looped guide is not less than the external diameter of pipeline, be fixed with on the second looped guide be used for with the second looped guide is fixed to the support piece of pipe shaft inner wall.
2. The pipeline installation and operation platform of claim 1, wherein the first and second annular guide rails are channel steel, the openings of the first and second annular guide rails are disposed opposite to each other, and two ends of each cross bar are slidably mounted in the grooves of the first and second annular guide rails.
3. The pipe installation work platform of claim 2, wherein the cross-section of the pipe shaft is rectangular, the second ring rail comprises two support rails having first ends for being fixed to the floor, and a mounting rail fixed between the two support rails, and a second end of each support rail extends out of the mounting rail and forms an extension fixed to the first ring rail.
4. The pipe installation work platform of claim 1, wherein the support is a brace adapted to be secured to the inner wall of the pipe shaft and to the bottom of the second annular rail.
5. The plumbing installation operating platform of claim 1, wherein the cover plate is a grating plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222043663.4U CN217998873U (en) | 2022-08-04 | 2022-08-04 | Pipeline installation operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222043663.4U CN217998873U (en) | 2022-08-04 | 2022-08-04 | Pipeline installation operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217998873U true CN217998873U (en) | 2022-12-09 |
Family
ID=84319341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222043663.4U Active CN217998873U (en) | 2022-08-04 | 2022-08-04 | Pipeline installation operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217998873U (en) |
-
2022
- 2022-08-04 CN CN202222043663.4U patent/CN217998873U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101608624B1 (en) | Method for lifting the height of tower | |
CN204782031U (en) | Interior climbing tower hangs entrance to a cave from promoting safety protection platform | |
CN112952661B (en) | Installation structure and construction method for laying cable in narrow space | |
CN217998873U (en) | Pipeline installation operation platform | |
CN214883687U (en) | Foundation pit supporting structure | |
KR101664284B1 (en) | Construction method of bridge having unitied structure of cable and bent | |
CN115095126A (en) | Pipeline installation operation platform and installation method thereof | |
CN205443948U (en) | On stride electric Railway steel bearing structure and synthesize and to prevent electric installation | |
CN216655712U (en) | Dustproof canopy support | |
CN110980468A (en) | Indoor construction elevator system and dismounting method | |
CN206220534U (en) | The pump line support meanss of concrete pumping equipment | |
CN215926053U (en) | In-situ water-supply-and-drainage pipe added connection well device without stopping water | |
CN211596720U (en) | Detection apparatus for foundation engineering construction sediment thickness | |
CN211369471U (en) | Shaped steel is encorbelmented and is exempted from to wear wall to increase anchor supporting system | |
CN113756554A (en) | Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold | |
CN219710377U (en) | Box transformer foundation for distributed photovoltaic project | |
CN214900094U (en) | Assembled cable trench cover | |
CN218624052U (en) | Cat ladder for cable pipe jacking well | |
CN110747875A (en) | Construction method for building scaffold for open caisson construction of cyclone tank | |
CN220203355U (en) | Steel construction stand ann tears operation open and current environmental protection pylon of personnel | |
CN211369582U (en) | Novel discharge of encorbelmenting device | |
CN211776077U (en) | Foundation ditch combination formula ladder cage system of encorbelmenting | |
CN214169873U (en) | Hanging basket for mounting loading platform | |
CN220644325U (en) | Precipitation device of pipeline is buried under bed course | |
CN220036560U (en) | Suspension type cage ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |