CN217965535U - Welding shaping tool for steel structure for green building - Google Patents

Welding shaping tool for steel structure for green building Download PDF

Info

Publication number
CN217965535U
CN217965535U CN202221224591.7U CN202221224591U CN217965535U CN 217965535 U CN217965535 U CN 217965535U CN 202221224591 U CN202221224591 U CN 202221224591U CN 217965535 U CN217965535 U CN 217965535U
Authority
CN
China
Prior art keywords
hydraulic oil
oil storage
storage storehouse
steel
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221224591.7U
Other languages
Chinese (zh)
Inventor
焦永硕
谷世兴
张谊
齐晓雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Ruihong Lantian Steel Structure Engineering Co ltd
Original Assignee
Hebei Ruihong Lantian Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Ruihong Lantian Steel Structure Engineering Co ltd filed Critical Hebei Ruihong Lantian Steel Structure Engineering Co ltd
Priority to CN202221224591.7U priority Critical patent/CN217965535U/en
Application granted granted Critical
Publication of CN217965535U publication Critical patent/CN217965535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses a welding design frock of steel construction for green building, comprises a workbench, the supporting shoe is all installed at the both ends at workstation top, and the top of supporting shoe installs the installing frame, the inside bottom reservation of installing frame has the mounting groove, first hydraulic oil storage storehouse is all installed to the bottom of the inside both sides of installing frame. The utility model discloses a second hydraulic oil storage storehouse and the intercommunication that corresponds first hydraulic oil storage storehouse, the sliding connection in installation moving part and activity storehouse for when the installation moving part tentatively suppressed steel and continuously provided the overdraft, the piston rod main part can be carried the hydraulic oil extrusion in the second hydraulic oil storage storehouse to the first hydraulic oil storage storehouse that corresponds in, thereby make two sets of piston supporting rod subassemblies mutually support and further fix it from the lateral wall of steel, thereby can fully guarantee the stability of steel, and convenient operation is swift.

Description

Welding of steel construction for green building design frock
Technical Field
The utility model relates to a construction technical field especially relates to a welding design frock of steel construction for green building.
Background
The steel construction is one of the common raw materials of modern building in-process to ensure the firm degree of building, the steel construction itself when producing, need connect the design through the welded mode with a plurality of component parts, just need use green building steel construction's welding design frock at this in-process.
When using, the welding and shaping tool of the steel structure for the existing green building generally places steel at an appointed position, and then fixes the steel through clamping of two sides, so that the steel is prevented from being easily deviated in the subsequent welding process, but in the actual use process, the steel is only fixed in the mode of clamping of two sides, and the steel is easily deviated in the subsequent welding process to influence the welding precision.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the welding of a green building steel structure design frock that proposes, it is through the intercommunication in second hydraulic oil storage storehouse and the first hydraulic oil storage storehouse of correspondence, the sliding connection in installation moving part and activity storehouse, when making the installation moving part tentatively suppress steel and continuously provide the overdraft, the piston rod main part can carry the hydraulic oil extrusion in the second hydraulic oil storage storehouse to the first hydraulic oil storage storehouse that corresponds in, thereby make two sets of piston supporting rod subassemblies mutually support and further fix it from the lateral wall of steel, thereby can fully guarantee the stability of steel.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a welding design frock of steel construction for green building, includes the workstation, the supporting shoe is all installed at the both ends at workstation top, and the installing frame is installed at the top of supporting shoe, the inside bottom reservation of installing frame has the mounting groove, first hydraulic oil storage storehouse is all installed to the bottom of the inside both sides of installing frame, and the inside one side of being close to the mounting groove of first hydraulic oil storage storehouse runs through there is piston centre gripping pole subassembly to be connected with first spring between piston centre gripping pole subassembly and the first hydraulic oil storage storehouse, the inside top of installing frame runs through there is movable storehouse, and the both sides at the inside top of movable storehouse all install second hydraulic oil storage storehouse to communicate each other through coupling hose between second hydraulic oil storage storehouse and the first hydraulic oil storage storehouse, the inside bottom of movable storehouse runs through there is the installation moving part, and is connected with the second spring between installation moving part and the movable storehouse, the piston rod main part is all installed to the both sides of installation top moving part, and the piston rod main part extends to the inside of second hydraulic oil storage storehouse, the installation storehouse is installed to the bottom of installation, the installation moving part is installed at the top of installation frame, the installation board, be provided with the movable mounting panel on the installation board and be used for the operation mechanism that moves.
Preferably, first fixed shafts are uniformly installed on two sides of the interior of the installation groove, and a first roller is sleeved on the outer side of each first fixed shaft.
Preferably, the inside both ends of installation storehouse are all evenly installed the second fixed axle, and the outside cover of second fixed axle is equipped with the second cylinder.
Preferably, the mounting plate has an L-shaped side cross section, and the mounting plate and the mounting frame are integrally manufactured.
Preferably, operating device includes the threaded rod that runs through at the mounting panel top, the carousel is installed to the bottom of threaded rod, and the bottom and the movable bin of carousel are connected.
Preferably, the central axis of the threaded rod is perpendicular to the transverse central axis of the mounting plate, and the threaded rod is in threaded connection with the mounting plate.
Compared with the prior art, the utility model, its beneficial effect does:
1. through the second hydraulic oil storage storehouse and the intercommunication that corresponds first hydraulic oil storage storehouse, the sliding connection in installation moving part and activity storehouse for when the installation moving part carries out preliminary suppression to steel and continuously provides the overdraft, the piston rod main part can be carried the hydraulic oil extrusion in the second hydraulic oil storage storehouse to the first hydraulic oil storage storehouse that corresponds in, thereby make two sets of piston supporting rod subassemblies mutually support and further fix it from the lateral wall of steel, thereby can fully guarantee the stability of steel.
2. Through the threaded connection of threaded rod and mounting panel, the sliding connection of activity storehouse and installing frame for operating personnel can drive the activity storehouse through continuously rotating the threaded rod and constantly move down, and then accomplish the fixed task of abundant centre gripping to steel, operation process convenient and fast.
Drawings
Fig. 1 is a schematic structural view of a welding and shaping tool for a steel structure for a green building, which is provided by the utility model;
fig. 2 is a schematic view of a front sectional structure of the welding and shaping tool for a steel structure for green building provided by the utility model;
fig. 3 is an enlarged schematic view of a portion a of fig. 2 according to the present invention;
fig. 4 is an enlarged schematic view of fig. 2B according to the present invention;
fig. 5 is an enlarged schematic view of fig. 2 at C according to the present invention;
fig. 6 is the utility model provides a main view structure schematic diagram of the first cylinder of welding design frock of steel construction for green building.
In the figure: the hydraulic cylinder comprises a workbench 1, a support block 2, a mounting frame 3, a mounting groove 4, a first fixing shaft 5, a first roller 6, a first hydraulic oil storage bin 7, a piston clamping rod assembly 8, a first spring 9, a movable bin 10, a second hydraulic oil storage bin 11, a movable piece 12, a second spring 13, a piston rod main body 14, a mounting bin 15, a second fixing shaft 16, a second roller 17, a mounting plate 18, a threaded rod 19, a rotary table 20 and a connecting hose 21.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
Referring to fig. 1-6, the welding and shaping tool for the steel structure for the green building comprises a workbench 1, wherein supporting blocks 2 are mounted at two ends of the top of the workbench 1, an installation frame 3 is mounted at the top of each supporting block 2, an installation groove 4 is reserved at the bottom inside each installation frame 3, first fixing shafts 5 are uniformly mounted at two sides inside each installation groove 4, and a first roller 6 is sleeved on the outer side of each first fixing shaft 5, so that when an operator pushes steel materials to penetrate through the installation frame 3, friction between the first roller 6 and the steel materials is reduced through rotation;
the bottom of two sides in the mounting frame 3 is provided with a first hydraulic oil storage bin 7, one side, close to the mounting groove 4, in the first hydraulic oil storage bin 7 penetrates through a piston clamping rod assembly 8, a first spring 9 is connected between the piston clamping rod assembly 8 and the first hydraulic oil storage bin 7, the top in the mounting frame 3 penetrates through a movable bin 10, two sides of the top in the movable bin 10 are provided with a second hydraulic oil storage bin 11, the second hydraulic oil storage bin 11 is communicated with the first hydraulic oil storage bin 7 through a connecting hose 21, the bottom in the movable bin 10 penetrates through a mounting movable piece 12, a second spring 13 is connected between the mounting movable piece 12 and the movable bin 10, two sides of the top of the mounting movable piece 12 are provided with a piston rod main body 14, the piston rod main body 14 extends into the second hydraulic oil storage bin 11, the bottom of the mounting movable piece 12 is provided with a mounting bin 15, two ends in the mounting bin 15 are provided with second fixing shafts 16 uniformly, and a second roller 17 is sleeved outside the second roller 16, so that the mounting bin 15 can press steel to clamp the piston clamping rod assembly to clamp the steel downwards, and reduce the amplitude of the steel when the steel, and the steel clamping rod assembly 17 is clamped by the second roller 17;
the mounting plate 18 is mounted at the top of the mounting frame 3, the side section of the mounting plate 18 is L-shaped, and the mounting plate 18 and the mounting frame 3 are integrally manufactured, so that the connection strength of the mounting plate 18 and the mounting frame 3 in the use process is ensured;
be provided with the operating device who is used for driving movable bin 10 and removes on mounting panel 18, operating device is including running through threaded rod 19 at mounting panel 18 top, carousel 20 is installed to the bottom of threaded rod 19, and the bottom of carousel 20 is connected with movable bin 10, the central axis of threaded rod 19 and the horizontal central axis mutually perpendicular of mounting panel 18, and threaded rod 19 is threaded connection with mounting panel 18, make operating personnel can drive corresponding movable bin 10 through rotating threaded rod 19 and reciprocate, thereby accomplish the firm task of centre gripping to steel, perhaps remove the firm task of centre gripping to steel.
The utility model discloses during the use, as shown in fig. 1-6, two sets of steel that will need the welded run through a set of installing frame 3 respectively and laminate the butt joint, artificial firm steel, and forward respectively rotate threaded rod 19 on two sets of installing frames 3, through threaded rod 19 and the threaded connection who corresponds mounting panel 18, threaded rod 19 with correspond through carousel 20 between the movable bin 10 and be connected, make movable bin 10 can move down thereupon this moment, after second cylinder 17 and the laminating of steel top on installing bin 15, continue to rotate threaded rod 19, make installation moving part 12 can move up in movable bin 10 relatively this moment, and then make piston rod main part 14 can be therewith carry the second hydraulic oil storage bin 11 in the hydraulic oil extrusion to the first hydraulic oil storage bin 7 that corresponds in, make corresponding two sets of piston centre gripping pole subassemblies 8 can be simultaneously to the direction removal near the centre, thereby the lateral wall that corresponds two sets of piston centre gripping pole subassemblies 8 mutually supports steel carries out the centre gripping fixedly to it, the relative motion of installation moving part 12 and movable bin 10 this moment is restricted, make installation bin 15 can fully suppress steel from the top, and then can guarantee the steel in the whole convenient operation process of follow-up simultaneously, the whole steel operation process.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a welding design frock of steel construction for green building, includes workstation (1), its characterized in that, supporting shoe (2) are all installed at the both ends at workstation (1) top, and the top of supporting shoe (2) installs installing frame (3), the inside bottom reservation of installing frame (3) has mounting groove (4), first hydraulic oil storage storehouse (7) are all installed to the bottom of the inside both sides of installing frame (3), and one side that is close to mounting groove (4) inside first hydraulic oil storage storehouse (7) runs through has piston supporting rod subassembly (8), and is connected with first spring (9) between piston supporting rod subassembly (8) and first hydraulic oil storage storehouse (7), the inside top of installing frame (3) runs through movable bin (10), and the both sides at the inside top of movable bin (10) all install second hydraulic oil storage storehouse (11), and second hydraulic oil storage storehouse (11) and first hydraulic oil storage storehouse (7) all install through connecting hose (21) intercommunication between movable part (12), and movable part (12) are installed to the top of movable part (12), and piston rod (12) are installed to the movable part (12) and piston rod (12) are all installed to the movable part (12), installation storehouse (15) are installed to the bottom of installation moving part (12), mounting panel (18) are installed at the top of installing frame (3), be provided with the operating device who is used for driving movable storehouse (10) to remove on mounting panel (18).
2. The welding and shaping tool for the steel structure for the green building as claimed in claim 1, wherein first fixing shafts (5) are uniformly installed at both sides of the inside of the installation groove (4), and a first drum (6) is sleeved at the outer side of the first fixing shafts (5).
3. The welding and shaping tool for the steel structure for the green building as claimed in claim 1, wherein the second fixing shaft (16) is uniformly installed at both ends of the inside of the installation bin (15), and the second roller (17) is sleeved outside the second fixing shaft (16).
4. The welding and shaping tool for the steel structure for the green building as claimed in claim 1, wherein the mounting plate (18) has an L-shaped side cross-section, and the mounting plate (18) and the mounting frame (3) are integrally manufactured.
5. The welding and shaping tool for the steel structure for the green building as claimed in claim 1, wherein the operating mechanism comprises a threaded rod (19) penetrating through the top of the mounting plate (18), a rotary table (20) is mounted at the bottom end of the threaded rod (19), and the bottom of the rotary table (20) is connected with the movable bin (10).
6. The welding and shaping tool for the steel structure for the green building as claimed in claim 5, wherein a central axis of the threaded rod (19) is perpendicular to a transverse central axis of the mounting plate (18), and the threaded rod (19) is in threaded connection with the mounting plate (18).
CN202221224591.7U 2022-05-20 2022-05-20 Welding shaping tool for steel structure for green building Active CN217965535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221224591.7U CN217965535U (en) 2022-05-20 2022-05-20 Welding shaping tool for steel structure for green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221224591.7U CN217965535U (en) 2022-05-20 2022-05-20 Welding shaping tool for steel structure for green building

Publications (1)

Publication Number Publication Date
CN217965535U true CN217965535U (en) 2022-12-06

Family

ID=84267636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221224591.7U Active CN217965535U (en) 2022-05-20 2022-05-20 Welding shaping tool for steel structure for green building

Country Status (1)

Country Link
CN (1) CN217965535U (en)

Similar Documents

Publication Publication Date Title
CN111255207B (en) Vertical automatic wall tile sticking equipment for building construction
CN111360539B (en) Automatic keyway device of steel pipe for building
CN216680807U (en) Automatic welding device is used in car as a house production
CN201205642Y (en) Automobile hind axle assembly welding clamp
CN217965535U (en) Welding shaping tool for steel structure for green building
CN205869889U (en) Automatic insertion machine bed of EV electric motor rotor magnet steel
CN104117595B (en) A kind of steel pipe is taken the lead with sending upset Traverse Displacement Unit to
CN102363253A (en) Positioning and welding assembly tool for pi-shaped beam of crane
CN107253415B (en) A kind of carving device applied to furniture parts
CN211398171U (en) Press-fit device of filter screen
CN218555900U (en) Rear catalyst converter front nut resistance welding assembly assembling clamp
CN114260611B (en) Welding device and welding method for automobile welding line
CN203830969U (en) Synchronous clamping mechanism for sheet metal part fixture
CN216785673U (en) Medium-sized motor tilter
CN211052939U (en) Curtain metal aluminum plate welding equipment
CN213170477U (en) Oak board conveying device for customized furniture
CN204368873U (en) A kind of gathering-device of composite panel cutting edge processing
CN212330979U (en) Assembly table for bearing machining
CN209681592U (en) A kind of semi-automatic assembling equipment of air outlet
CN208600763U (en) Screw vacuum pump rotor deep hole drilling machine activity feeds complexes
CN113290343A (en) Splicing welding fixing device and method for rear frame of loader
CN202271125U (en) Pi-shaped beam positioned welding assembly tool for crane
CN214263426U (en) Full-automatic grooving machine
CN109079680A (en) A kind of door-window section bar tool for processing
CN217571748U (en) Automatic processing equipment of sash profile for door and window right-angle welding process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant