CN217948780U - Bridge frame is dismantled with device that unloads - Google Patents

Bridge frame is dismantled with device that unloads Download PDF

Info

Publication number
CN217948780U
CN217948780U CN202220405606.3U CN202220405606U CN217948780U CN 217948780 U CN217948780 U CN 217948780U CN 202220405606 U CN202220405606 U CN 202220405606U CN 217948780 U CN217948780 U CN 217948780U
Authority
CN
China
Prior art keywords
plate
bridge frame
supporting plate
upright post
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220405606.3U
Other languages
Chinese (zh)
Inventor
张让林
王域光
张伟
康浩
马福
孙满
郭聪
王静
赵永伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Wuma North Expressway Management Co ltd
Ningxia Communications Constructions Co Ltd
Original Assignee
Ningxia Wuma North Expressway Management Co ltd
Ningxia Communications Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Wuma North Expressway Management Co ltd, Ningxia Communications Constructions Co Ltd filed Critical Ningxia Wuma North Expressway Management Co ltd
Priority to CN202220405606.3U priority Critical patent/CN217948780U/en
Application granted granted Critical
Publication of CN217948780U publication Critical patent/CN217948780U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application discloses bridge frame dismantles with device that unloads includes: bridge, upright and upright anchor ear; the upright post hoop is arranged on the upright post, and the unloading device is arranged between the bridge frame and the upright post hoop; the unloading device comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate is arranged between the top plate and the bottom plate; the top plate comprises a first supporting plate, first baffle plates are arranged at the front end and the rear end of the first supporting plate, and first inclined surfaces are arranged at the two sides of the first supporting plate; the bottom plate comprises a second supporting plate, second baffle plates are arranged at the front end and the rear end of the second supporting plate, and second inclined planes are arranged at the two sides of the second supporting plate; the vertical plate is installed between the first inclined plane and the second inclined plane, and a fastening device is arranged between the vertical plates. The device has solved and has used a plurality of large-scale jacking equipment (like jack etc.) to install and support the bridge frame on the stand staple bolt now, and this kind of operating procedure is more loaded down with trivial details to the too big problem that influences the dismantlement effect of atress of easy bridge frame.

Description

Bridge frame is dismantled with device that unloads
Technical Field
The application relates to the field of bridge construction equipment, in particular to a bridge frame dismounting and discharging device.
Background
The bridge generally refers to a structure which is erected on rivers, lakes and seas and enables vehicles, pedestrians and the like to smoothly pass through. The properties of the installed bridge can be divided into a girder bridge, an arch bridge, a cable-stayed bridge, a suspension bridge, a viaduct and a combined system bridge. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment. The girder often need be with bridge frame (template) to pour, need demolish bridge frame after pouring. The existing bridge frame is supported by a plurality of large jacking devices (such as jacks and the like) arranged on the upright post hoop in the dismounting process, the operation procedure is more complicated, and the dismounting effect is easily influenced by the overlarge stress of the bridge frame.
Therefore, the application provides a bridge frame dismantles with unloading device and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The application provides a bridge frame is dismantled with device that unloads has solved current bridge frame and has used a plurality of large-scale jacking equipment (like jack etc.) to install and support the bridge frame on the stand staple bolt in dismantling the process, and this kind of operating procedure is more loaded down with trivial details to the too big problem of effect is dismantled in influence of atress of easy bridge frame.
In order to solve the technical problem, the application provides a bridge frame is dismantled with device that unloads, includes: bridge, upright and upright anchor ear; the upright post hoop is arranged on the upright post, and a unloading device is arranged between the bridge frame and the upright post hoop;
the unloading device comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate is arranged between the top plate and the bottom plate;
the top plate comprises a first supporting plate, first baffle plates are arranged at the front end and the rear end of the first supporting plate, and first inclined planes are arranged at the two sides of the first supporting plate; the bottom plate comprises a second supporting plate, second baffle plates are arranged at the front end and the rear end of the second supporting plate, and second inclined planes are arranged at the two sides of the second supporting plate;
the vertical plate is installed between the first inclined surface and the second inclined surface, and a fastening device is arranged between the vertical plates.
Furthermore, wear pads are arranged at the upper end of the first supporting plate and the bottom of the second supporting plate.
Furthermore, the fastening device comprises threaded holes arranged on each vertical plate, and threaded rods are installed between the threaded holes in a penetrating mode.
Furthermore, a base plate is arranged at the position where the threaded rod and the threaded hole are installed.
Further, each first baffle extends to the outer side of the first supporting plate.
Compare in prior art, the bridge frame dismantles with device that unloads that provides of this application includes: the bridge frame, the upright post and the upright post hoop are arranged on the bridge frame; the upright post hoop is arranged on the upright post, and a unloading device is arranged between the bridge frame and the upright post hoop; the unloading device comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate is arranged between the top plate and the bottom plate; the top plate comprises a first supporting plate, first baffle plates are arranged at the front end and the rear end of the first supporting plate, and first inclined surfaces are arranged at the two sides of the first supporting plate; the bottom plate comprises a second supporting plate, second baffle plates are arranged at the front end and the rear end of the second supporting plate, and second inclined planes are arranged at the two sides of the second supporting plate;
the riser is installed between first inclined plane and second inclined plane, is provided with fastener between the riser.
When the bridge frame is disassembled, the unloading device is installed between the bridge frame and the upright post hoops, the top plate is in contact with the bridge frame, and the bottom plate is in contact with the upright post hoops. Carry out position adjustment with the riser on the inclined plane, make the interval between the riser change, and then the roof changes the height that the bridge erects to can fix two risers through fastener. Therefore, the discharging device is convenient to operate, force transmission is uniform, and the dismounting effect is good.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments are briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without making any inventive changes.
Fig. 1 is a schematic structural view of a discharge device according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a first supporting plate according to an embodiment of the present invention;
fig. 3 is a schematic view of a structure of a backing plate according to an embodiment of the present invention.
In the figure: 11 bridge girder frame, 2 stands, 3 stand staple bolts, 4 risers, 51 first backup pad, 52 first baffle, 511 first inclined plane, 61 second backup pad, 62 second baffle, 611 second inclined plane, 45 threaded rod, 451 backing plate.
Detailed Description
In order to make those skilled in the art better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are only some embodiments of the present invention, and not all embodiments.
Fig. 1 is a schematic structural view of a discharge device according to an embodiment of the present invention; fig. 2 is a schematic structural diagram of a first supporting plate according to an embodiment of the present invention; fig. 3 is a schematic view of a structure of a backing plate according to an embodiment of the present invention. As shown in fig. 1-3, comprising: the bridge 11, the upright post 2 and the upright post hoop 3; the upright post hoop 3 is arranged on the upright post 2, and a discharging device is arranged between the bridge frame 1 and the upright post hoop 3;
the unloading device comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate 4 is arranged between the top plate and the bottom plate;
the top plate comprises a first supporting plate 51, the front end and the rear end of the first supporting plate 51 are provided with first baffle plates 52, and two sides of the first supporting plate 51 are provided with first inclined surfaces 511; the bottom plate comprises a second supporting plate 61, the front end and the rear end of the second supporting plate 61 are provided with second baffles 62, and the two sides of the second supporting plate 61 are provided with second inclined surfaces 611;
the vertical plates 4 are arranged between the first inclined surface 511 and the second inclined surface 611 and are positioned on the inclined surfaces, and fastening devices are arranged between the vertical plates 4.
In detail, the existing upright post 2 is used for supporting the upper structure of the bridge, and the upright post hoop 3 is arranged above the upright post 2, so that a constructor can conveniently construct and operate on the upright post 2. The bridge frame 1 is used for the construction of the upper structure of the bridge and needs to be disassembled after the construction. Conventionally, a jack or other jacking equipment is directly mounted on the bridge frame 1 and the upright post hoop 3 to jack up the bridge frame 1, so as to adjust the height of the bridge frame 1, and then the disassembly process is completed. Great power equipment such as jack, there is error nature and uncertainty in manual operation when the dynamics of control jacking, leads to bridge frame 1 to appear the too big phenomenon of atress easily, influences the dismantlement effect.
The unloading device arranged between the bridge frame 1 and the upright post hoop 3 comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate 4 is arranged between the top plate and the bottom plate. The top plate comprises a first supporting plate 51, the front end and the rear end of the first supporting plate 51 are provided with first baffle plates 52, and two sides of the first supporting plate 51 are provided with first inclined surfaces 511; the bottom plate comprises a second supporting plate 61, the front end and the rear end of the second supporting plate 61 are provided with second baffles 62, and the two sides of the second supporting plate 61 are provided with second inclined surfaces 611; the riser 4 is mounted on the inclined surface between the first inclined surface 511 and the second inclined surface 611. In order to improve stability, inclined surfaces (not shown in the figures) matched with the inclinations of the first inclined surface 511 and the second inclined surface 611 are arranged at the positions where the two ends of the vertical plate 4 are contacted with the first inclined surface 511 and the second inclined surface 611, so that the installation is more stable, and the adjustment is more convenient. The first baffle 52 limits the riser 4 at both ends of the first support plate 51, and the second baffle 62 limits the riser 4 at both ends of the second support plate 61. The riser 4 can be adjusted in position manually on the first inclined surface 511 and the second inclined surface 611, that is, upward or downward along the inclined surfaces. It is of course also possible to provide ramps on the first and second inclined surfaces 511, 611, which makes the movement more labour-saving. Meanwhile, the vertical plate 4 is respectively inclined with the contact surfaces of the first inclined surface 511 and the second inclined surface 611 in a matched manner, so that gapless fit can be guaranteed. The inclination angles of the first inclined surface 511 and the second inclined surface 611 are set according to actual conditions. As shown in fig. 2, in order to have a better spacing effect, each first baffle 52 further extends to the outer side of the first supporting plate 51.
In detail, a fastening device is arranged between the vertical plates 4 and used for fixing the vertical plates 4 after the positions are adjusted. For convenient operation, the fastening device further comprises threaded holes provided on each riser 4, and threaded rods 45 are installed through the threaded holes. Of course the fastening means may be of other configurations. Meanwhile, in consideration of the fact that the use effect of the threaded rod 45 can be increased, further, a base plate 451 is arranged at the position where the threaded rod 45 is installed with the threaded hole. In order to reduce the wear on the first support plate 51 and the second support plate 61, further, the upper end of the first support plate 51 and the bottom of the second support plate 61 are provided with wear pads.
Compare in prior art, when using the bridge frame dismantlement that this application provided to dismantle with device of unloading to dismantle the bridge frame, will unload the device and install between bridge frame and stand staple bolt, roof and bridge frame contact, bottom plate and stand staple bolt contact. Carry out position adjustment with the riser on the inclined plane, make the interval between the riser change, and then the roof changes the height of bridge beam jack-up to can fix two risers through fastener. Therefore, the discharging device is convenient to operate, force is transmitted uniformly, and the dismounting effect is good.
In the description of the application, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on those shown in the drawings, merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and therefore, are not to be construed as limiting the application. Unless expressly stated or limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and encompass, for example, both fixed and removable connections as well as integral connections; may be a mechanical connection. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The present application is not limited to the precise arrangements described above and shown in the drawings, and various modifications and changes may be made without departing from the scope thereof. The above-described embodiments of the present application do not limit the scope of the present application.

Claims (5)

1. The utility model provides a bridge frame is dismantled with device that unloads which characterized in that includes: the bridge frame, the upright post and the upright post hoop are arranged on the bridge frame; the upright post hoop is arranged on the upright post, and a unloading device is arranged between the bridge frame and the upright post hoop;
the unloading device comprises a top plate positioned at the upper end and a bottom plate positioned at the lower end; a vertical plate is arranged between the top plate and the bottom plate;
the top plate comprises a first supporting plate, first baffle plates are arranged at the front end and the rear end of the first supporting plate, and first inclined planes are arranged at the two sides of the first supporting plate; the bottom plate comprises a second support plate, second baffles are arranged at the front end and the rear end of the second support plate, and second inclined planes are arranged at the two sides of the second support plate;
the vertical plate is installed between the first inclined surface and the second inclined surface, and a fastening device is arranged between the vertical plates.
2. A drop-off device for disassembling a bridge frame according to claim 1, wherein a wear pad is disposed on each of the upper end of the first support plate and the bottom of the second support plate.
3. The bridge frame is dismantled with device that unloads of claim 1, characterized in that, the fastener includes the screw hole that sets up on every riser, the threaded rod is installed with the screw rod between running through the screw hole.
4. The bridge frame disassembly unloading device of claim 3, wherein a backing plate is arranged at the position where the threaded rod and the threaded hole are installed.
5. The bridge frame disassembly drop device of claim 1, wherein each of the first baffles extends to an outside of the first support plate.
CN202220405606.3U 2022-02-25 2022-02-25 Bridge frame is dismantled with device that unloads Active CN217948780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220405606.3U CN217948780U (en) 2022-02-25 2022-02-25 Bridge frame is dismantled with device that unloads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220405606.3U CN217948780U (en) 2022-02-25 2022-02-25 Bridge frame is dismantled with device that unloads

Publications (1)

Publication Number Publication Date
CN217948780U true CN217948780U (en) 2022-12-02

Family

ID=84209080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220405606.3U Active CN217948780U (en) 2022-02-25 2022-02-25 Bridge frame is dismantled with device that unloads

Country Status (1)

Country Link
CN (1) CN217948780U (en)

Similar Documents

Publication Publication Date Title
CN217948780U (en) Bridge frame is dismantled with device that unloads
CN212533752U (en) Bridge construction support
CN212897757U (en) Fully-prefabricated modular support frame
CN210086491U (en) Supporting device is strengthened in building jacking control
CN111188278A (en) Jig frame structure, jig frame assembly and construction method
CN208845309U (en) The support platform and wind power generating set of tower
JP3232365U (en) Temporary binding and verticality fine adjustment equipment for the pivot buckle tower
CN214459664U (en) Floor-free pier column bent cap template dismounting device
CN212561172U (en) Jig frame structure, jig frame assembly and assembling structure
CN110144927B (en) Device for embedding foundation bolt group
CN218621841U (en) Assembled pier roof beam concreties support
CN216379176U (en) Operation platform is set up to cast-in-place die block in high pier stud mound top
CN219952825U (en) Adjustable temporary supporting device for steel bar truss floor support plate
CN220099676U (en) High pier large cantilever bent cap construction support
CN217629455U (en) Dismantling device and system for box girder template supporting system
CN220059026U (en) A can assemble, adjustable interim fixed stay device for steel construction hoist and mount
CN219972959U (en) Accurate mounting structure that takes one's place of steel case roof beam
CN211037934U (en) Steel cat ladder that can have enough to meet need use
CN211545597U (en) Install in steel construction buffer installation base and subassembly of elevator well pit
CN217948814U (en) Single-column pier double-hoop bent cap support
CN213681744U (en) Assembled case roof beam support
CN218712216U (en) Utilize two staple bolts of rectangle fine tuning and gim peg to connect box-shaped steel stand posture structure
CN216444913U (en) Pass power in existing post and set up tower crane structure between floor
CN220565067U (en) Suspended bracket for pouring top plate of upper beam of cable tower
CN213142800U (en) Single-column pier capping beam erecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant