CN211545597U - Install in steel construction buffer installation base and subassembly of elevator well pit - Google Patents

Install in steel construction buffer installation base and subassembly of elevator well pit Download PDF

Info

Publication number
CN211545597U
CN211545597U CN201922138118.1U CN201922138118U CN211545597U CN 211545597 U CN211545597 U CN 211545597U CN 201922138118 U CN201922138118 U CN 201922138118U CN 211545597 U CN211545597 U CN 211545597U
Authority
CN
China
Prior art keywords
buffer
mounting base
pit
buffer mounting
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922138118.1U
Other languages
Chinese (zh)
Inventor
潘一
彭武福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Alpha Lift Co ltd
Original Assignee
Shanghai Alpha Lift Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Alpha Lift Co ltd filed Critical Shanghai Alpha Lift Co ltd
Priority to CN201922138118.1U priority Critical patent/CN211545597U/en
Application granted granted Critical
Publication of CN211545597U publication Critical patent/CN211545597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a steel structure buffer mounting base and a component mounted on a pit of an elevator shaft in the technical field related to elevator mounting, which comprises a buffer mounting platform, a stand column and a mounting base which are fixedly connected from top to bottom in sequence; a buffer mounting screw hole is formed in the buffer mounting platform; the mounting base is provided with an expansion bolt; at least three buffer mounting platform reinforcing structures are fixedly arranged at the joint of the buffer mounting platform and the upright post, and the buffer mounting platform reinforcing structures are uniformly distributed around the upright post; at least three mounting base reinforcing structures are fixedly arranged at the joint of the mounting base and the upright column, and the mounting base reinforcing structures are uniformly distributed around the upright column; the buffer mounting platform, the upright post, the mounting base, the buffer mounting platform reinforcing structure and the mounting base reinforcing structure are all made of carbon steel plates; the buffer base is fixed in the pit by the expansion bolts, so that the requirement on a well construction side is reduced.

Description

Install in steel construction buffer installation base and subassembly of elevator well pit
Technical Field
The utility model relates to an elevator installation correlation technique field, in particular to install in steel construction buffer installation base and subassembly of elevator well pit.
Background
The buffer is an elevator safety component and is arranged in a shaft pit, and the buffer has the function of buffering and decelerating when the car stalls and hits the pit. The traditional buffer mounting mode is that after the whole elevator is mounted, a buffer is poured in a pit to mount a cement pier according to actual needs, and then the buffer is mounted on the cement pier. Because the installation of the elevator is later than the construction of the building, when the buffer needs to be installed, the field construction team is already withdrawn, and the inconvenience is brought to the pouring of the cement pier installed on the buffer.
SUMMERY OF THE UTILITY MODEL
Pour the inconvenient technical problem of buffer installation cement mound that exists to prior art, the utility model provides an install in steel construction buffer installation base and subassembly of elevator well pit.
In order to achieve the above purpose, the technical scheme of the utility model is that:
a steel structure buffer mounting base arranged in a pit of an elevator shaft comprises a buffer mounting platform, a stand column and a mounting base which are fixedly connected from top to bottom in sequence; a buffer mounting screw hole is formed in the buffer mounting platform; the mounting base is provided with an expansion bolt; at least three buffer mounting platform reinforcing structures are fixedly arranged at the joint of the buffer mounting platform and the upright post, and the buffer mounting platform reinforcing structures are uniformly distributed around the upright post; at least three mounting base reinforcing structures are fixedly arranged at the joint of the mounting base and the upright column, and the mounting base reinforcing structures are uniformly distributed around the upright column; the buffer mounting platform, the upright post, the mounting base, the buffer mounting platform reinforcing structure and the mounting base reinforcing structure are all made of carbon steel plates.
Preferably, the number of bumper mounting platform reinforcing structures is four, six or eight.
Preferably, the number of the mount reinforcing structures is four, six or eight.
A steel structure buffer mounting base assembly installed in an elevator shaft pit comprises a connecting limiting device and at least three steel structure buffer mounting bases installed in the elevator shaft pit according to any one of the connecting limiting device and the steel structure buffer mounting base; the connecting and limiting device comprises a fixed shaft and at least three connecting and limiting rail grooves, and one ends of the connecting and limiting rail grooves are rotatably connected with the fixed shaft; and each connecting limiting rail groove is internally provided with one steel structure buffer mounting base arranged in a pit of the elevator shaft.
Preferably, the number of the connecting limit rail groove and the number of the steel structure buffer mounting bases mounted on the elevator shaft pit are four, six or eight.
Preferably, the connecting limiting rail groove is provided with scales.
The utility model has the advantages that:
during field installation, the buffer position is positioned only by paying off according to a civil engineering layout, the buffer base can be fixed in the pit by the expansion bolts, the installation of the buffer and the installation of other parts of the elevator can be carried out synchronously, the secondary pouring of the pit is avoided, and the requirement on a well construction side is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a steel structure buffer mounting base mounted in a pit of an elevator shaft according to the present invention;
fig. 2 is the utility model discloses install in the structure schematic diagram of the steel construction buffer installation base subassembly of elevator well pit.
In the figure, 1-upright post; 11-bumper mounting platform reinforcement; 12-installing a base reinforcement structure; 2-a buffer mounting platform; 21-installing screw holes on the buffer; 3, mounting a base; 31-expansion bolts; 4-connecting a limiting device; 41-a fixed shaft; and 42-connecting a limit rail groove.
Detailed Description
The following describes the present invention with reference to the accompanying drawings. It should be noted that the description of the embodiments is provided to help understanding of the present invention, but the present invention is not limited thereto. In addition, the technical features related to the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
It should be noted that in the description of the present invention, the terms "upper" and "lower" are used for the purpose of describing the structure of the present invention based on the illustration of fig. 1, and are only used for the convenience of describing the present invention, but not for indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present invention.
In addition, unless expressly stated or limited otherwise, the terms "mounted" and "connected" are to be construed broadly, e.g., the connection may be a fixed connection, a removable connection, or an integral connection; may be a mechanical connection; the two structures can be directly connected or indirectly connected through an intermediate medium, and the two structures can be communicated with each other. To those skilled in the art, the specific meanings of the above terms in the present invention can be understood in relation to the present scheme in specific terms according to the general idea of the present invention.
As shown in fig. 1, a steel structure buffer mounting base mounted in a pit of an elevator shaft comprises a buffer mounting platform 2, a stand column 1 and a mounting base 3 which are fixedly connected in sequence from top to bottom; a buffer mounting screw hole 21 is formed in the buffer mounting platform 2; the mounting base 3 is provided with an expansion bolt 31; at least three buffer mounting platform reinforcing structures 11 are fixedly arranged at the joints of the buffer mounting platforms 2 and the upright posts 1, the buffer mounting platform reinforcing structures 11 are uniformly distributed around the upright posts 1, taking the upright posts 1 as cylindrical structures as an example, if the number of the buffer mounting platform reinforcing structures 11 is three, the included angle between two adjacent buffer mounting platform reinforcing structures is 120 degrees, and the number of the buffer mounting platform reinforcing structures 11 can be deduced and understood according to the description of the positions no matter what the cross section of the upright posts are, and the descriptions of other positions are omitted; at least three mounting base reinforcing structures 12 are fixedly arranged at the joint of the mounting base 3 and the upright post 1, and the mounting base reinforcing structures 12 are uniformly distributed around the upright post 1; the materials of the buffer mounting platform 2, the upright 1, the mounting base 3, the buffer mounting platform reinforcing structure 11 and the mounting base reinforcing structure 12 are all carbon steel plates.
The utility model discloses an install in steel construction buffer installation base in elevator well pit, can be according to the model of the pit degree of depth of difference, buffer, when elevator part production, together processing preparation is accomplished. During field installation, the buffer position is positioned only by paying off according to a civil engineering layout, the buffer base can be fixed in the pit by the expansion bolts, the installation of the buffer and the installation of other parts of the elevator can be carried out synchronously, the secondary pouring of the pit is avoided, and the requirement on a well construction side is reduced.
The above is the basic model of the embodiment of the present invention, and in order to improve the technical effect, the following improvements can be made to the basic model of the embodiment, and the following improvements can be combined together without contradiction.
During specific implementation, the buffer installing platform reinforcing structures 11 are installed in a steel structure buffer installing base of an elevator shaft pit, and the number of the buffer installing platform reinforcing structures 11 is four, six or eight.
During specific implementation, the mounting base reinforcing structures 12 are mounted in a steel structure buffer mounting base of an elevator shaft pit, and the number of the mounting base reinforcing structures 12 is four, six or eight.
As shown in fig. 2, a steel structure buffer mounting base assembly installed in a pit of an elevator shaft comprises a connection limiting device 4 and at least three steel structure buffer mounting bases installed in the pit of the elevator shaft in any one of the above embodiments; the connecting and limiting device 4 comprises a fixed shaft 41 and at least three connecting and limiting rail grooves 42, and one ends of the connecting and limiting rail grooves 42 are rotatably connected with the fixed shaft 41; and a steel structure buffer mounting base arranged at the pit of the elevator shaft is arranged in each connecting limiting rail groove 42.
In some cases, one buffer is difficult to play a good buffering role, a plurality of buffers are required to buffer simultaneously, and at the moment, a plurality of steel structure buffer mounting bases mounted on a bottom pit of an elevator shaft are required. In the base subassembly is installed to a plurality of buffers in this embodiment, a plurality of buffer installation bases link together, can draw in together during the storage, when needing the installation, will connect spacing rail groove 42 and expand from connecting stop device 4, remove buffer installation base to the suitable position installation along connecting spacing rail groove 42 again, and storage and installation are all very convenient.
The connecting limiting rail grooves and the steel structure buffer mounting bases mounted in the elevator shaft pit are four, six or eight in number.
In order to facilitate the buffer mounting base to move to the accurate position mounting along the connecting limiting rail groove 42, the buffer mounting base is mounted in a steel structure buffer mounting base assembly of an elevator shaft pit, and scales are arranged on the connecting limiting rail groove 42.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. It will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides an install in steel construction buffer installation base of elevator well pit which characterized in that: the buffer mounting device comprises a buffer mounting platform, a stand column and a mounting base which are fixedly connected from top to bottom in sequence; a buffer mounting screw hole is formed in the buffer mounting platform; the mounting base is provided with an expansion bolt; at least three buffer mounting platform reinforcing structures are fixedly arranged at the joint of the buffer mounting platform and the upright post, and the buffer mounting platform reinforcing structures are uniformly distributed around the upright post; at least three mounting base reinforcing structures are fixedly arranged at the joint of the mounting base and the upright column, and the mounting base reinforcing structures are uniformly distributed around the upright column; the buffer mounting platform, the upright post, the mounting base, the buffer mounting platform reinforcing structure and the mounting base reinforcing structure are all made of carbon steel plates.
2. The steel structure buffer mounting base mounted to an elevator hoistway pit of claim 1, wherein: the number of the bumper mounting platform reinforcing structures is four, six or eight.
3. The steel structural buffer mounting base mounted to an elevator hoistway pit of claim 1 or 2, wherein: the number of the mounting seat reinforcing structures is four, six or eight.
4. The utility model provides an install in steel construction buffer installation base subassembly of elevator well pit which characterized in that: the buffer mounting device comprises a connecting limiting device and at least three steel structure buffer mounting bases which are arranged in a pit of an elevator shaft and are defined in any one of claims 1-3; the connecting and limiting device comprises a fixed shaft and at least three connecting and limiting rail grooves, and one ends of the connecting and limiting rail grooves are rotatably connected with the fixed shaft; and each connecting limiting rail groove is internally provided with one steel structure buffer mounting base arranged in a pit of the elevator shaft.
5. The steel structural buffer mounting base assembly installed in an elevator hoistway pit of claim 4, wherein: the number of the connecting limiting rail grooves and the number of the steel structure buffer mounting bases mounted in the pit of the elevator shaft are four, six or eight.
6. The steel structural buffer mounting base assembly mounted to an elevator hoistway pit of claim 4 or 5, wherein: and scales are arranged on the connecting limiting rail groove.
CN201922138118.1U 2019-12-03 2019-12-03 Install in steel construction buffer installation base and subassembly of elevator well pit Active CN211545597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922138118.1U CN211545597U (en) 2019-12-03 2019-12-03 Install in steel construction buffer installation base and subassembly of elevator well pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922138118.1U CN211545597U (en) 2019-12-03 2019-12-03 Install in steel construction buffer installation base and subassembly of elevator well pit

Publications (1)

Publication Number Publication Date
CN211545597U true CN211545597U (en) 2020-09-22

Family

ID=72503445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922138118.1U Active CN211545597U (en) 2019-12-03 2019-12-03 Install in steel construction buffer installation base and subassembly of elevator well pit

Country Status (1)

Country Link
CN (1) CN211545597U (en)

Similar Documents

Publication Publication Date Title
KR101391637B1 (en) Constrution methoed for Prestressed Composite Truss girder using steel truss member
JP2001512198A (en) Building panels used for building construction
CN113719032A (en) Construction method for column base joint of multi-limb column
CN113897880A (en) Method for cast-in-place construction of short-span suspended assembly arch center of large-span concrete arch bridge
CN211545597U (en) Install in steel construction buffer installation base and subassembly of elevator well pit
CN110983981B (en) Supporting method for assembled building template
CN115306152B (en) Large-inclination-angle inclined wall folding and separating jacking type steel platform construction device and method
CN108678144B (en) Support system for prefabricated balcony and installation method thereof
CN218912214U (en) Overlength attaches wall conversion support
CN214246565U (en) Scaffold support platform and high-altitude large-span beam formwork support system
CN215329323U (en) Light combined pier hoisted in small tonnage
CN115306136A (en) Inclined wall eversion climbing type steel platform construction device and method
CN114837090A (en) Combined support system for high tower beam construction and construction method
CN212612045U (en) Cushion cap reserved rib positioning frame
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch
CN110206347B (en) Side span structure of assembled electronic factory building and construction method thereof
CN109629454B (en) Bridging equipment and bridging method for lifting segmental beam on single side
CN105525629A (en) Construction method and device of subway station
CN218893398U (en) Tower crane foundation structure for high-altitude tower column construction
CN218203832U (en) Assembled view bridge
CN218373362U (en) Supporting structure for bridge construction
CN115418951B (en) Assembled cantilever bent cap bracket and construction method thereof
CN212866034U (en) Prefabricated assembled underground structure
CN219430545U (en) Operation platform for utilizing stiffness framework for tower column head section
CN219100670U (en) Low-level jacking climbing construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant