CN217942261U - Pipeline installation equipment for boiler installation - Google Patents

Pipeline installation equipment for boiler installation Download PDF

Info

Publication number
CN217942261U
CN217942261U CN202222299652.2U CN202222299652U CN217942261U CN 217942261 U CN217942261 U CN 217942261U CN 202222299652 U CN202222299652 U CN 202222299652U CN 217942261 U CN217942261 U CN 217942261U
Authority
CN
China
Prior art keywords
pipeline
boiler
fixedly connected
mounting bracket
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222299652.2U
Other languages
Chinese (zh)
Inventor
李放军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Dali Energy Technology Co ltd
Original Assignee
Hunan Dali Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Dali Energy Technology Co ltd filed Critical Hunan Dali Energy Technology Co ltd
Priority to CN202222299652.2U priority Critical patent/CN217942261U/en
Application granted granted Critical
Publication of CN217942261U publication Critical patent/CN217942261U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a boiler pipeline installation auxiliary device technical field specifically is a pipeline installation equipment for boiler installation, which comprises a mounting bas, the top fixedly connected with mounting bracket of mounting bracket, the inside of mounting bracket is rotated and is connected with the bull stick, the fixed surface of mounting bracket is connected with servo motor, servo motor's output and bull stick fixed connection, the erection equipment after the improvement, through the cooperation between regulating part, regulation pole and anchor clamps isotructure, also can adjust the position of horizontal direction when adjusting the vertical height, realized that the staff can hoist the pipeline to the boiler directly over, make things convenient for the staff to install the pipeline at the boiler top, through master gear, rotating turret and the cooperation between the isostructure from driving wheel, can adjust the orientation angle of pipeline when making things convenient for the pipeline to transport to mounted position, make things convenient for the staff to weld the pipeline and install, the installation degree of difficulty of reduction pipeline that can be by a wide margin.

Description

Pipeline installation equipment for boiler installation
Technical Field
The utility model relates to a boiler piping erection auxiliary device technical field specifically is a piping erection equipment for boiler erection.
Background
The boiler is an energy conversion device, the energy input to the boiler comprises chemical energy and electric energy in fuel, the boiler outputs steam, high-temperature water or an organic heat carrier with certain heat energy, the hot water or the steam generated in the boiler can directly provide heat energy for industrial production and people life, and can also be converted into mechanical energy through a steam power device or be converted into the electric energy through a generator.
The prior patent (publication number: CN 216180374U) discloses a boiler pipeline mounting rack, which mainly relates to the field of boiler mounting auxiliary devices. The telescopic lifting rod type lifting device is characterized by comprising a bottom supporting plate, wherein a supporting pipe is arranged on the top surface of the bottom supporting plate, a lifting rod is connected into the supporting pipe, and a first telescopic rod is fixedly arranged in the supporting pipe. The inventor finds that the prior art has the following problems in the process of realizing the utility model: 1. in the process of installing pipelines by using the existing installation equipment to assist workers, most of the equipment can only be vertically lifted up and down, and cannot reach the position right above a boiler in the actual operation process, so that troubles are brought to the installation of the workers; 2. when the existing installation equipment conveys the pipeline to an installation site, the orientation angle of the pipeline is inconvenient to change, and the installation difficulty of workers is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline erection equipment is used in boiler installation to solve the problem that proposes among the above-mentioned background art. In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a pipeline erection equipment is used in boiler installation, includes the mount pad, the top fixedly connected with mounting bracket of mount pad, the inside of mounting bracket is rotated and is connected with the bull stick, the fixed surface of mounting bracket is connected with servo motor, servo motor's output and bull stick fixed connection, the fixed surface that has cup jointed the regulation pole of bull stick, there is anchor clamps inside through regulating part swing joint of regulation pole.
Further preferably, the adjusting part comprises a bevel gear disc, the bevel gear disc is fixedly connected inside the mounting frame, a telescopic slider is slidably connected inside the adjusting rod, a transmission rod is rotatably connected inside the telescopic slider, one end of the transmission rod is fixedly connected with a bevel gear, the bevel gear disc is meshed with the bevel gear, a slide rod is fixedly connected to the other end of the transmission rod, a spiral chute is formed inside the telescopic slider, the slide rod is slidably connected inside the spiral chute, and one end of the telescopic slider is fixedly connected with a clamp.
Further preferably, anchor clamps include the rotating turret, the rotating turret rotates to be connected on flexible slider, the surface of rotating turret just is located flexible slider's inside fixedly connected with from the driving wheel, flexible slider's fixed surface is connected with the motor, the output fixedly connected with master gear of motor, the master gear meshes with from the driving wheel mutually, the fixed surface of rotating turret is connected with the clamping jaw that quantity is two.
Further preferably, the bottom of mount pad is installed the universal wheel, the inside threaded connection of mount pad has fixing bolt.
Further preferably, a limiting sliding groove is formed in the adjusting rod, a limiting sliding block is fixedly connected to the surface of one end of the telescopic sliding block, and the limiting sliding block is connected to the inside of the limiting sliding rail in a sliding mode.
Further preferably, one clamping side of the clamping jaw is arc-shaped, and anti-skid grains are arranged on the surface of the arc-shaped surface of the clamping jaw.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in, through the cooperation between regulating part, regulation pole and the anchor clamps isotructure, can be through the tensile anchor clamps of regulating part and the length of adjusting between the pole when the angle of pole is adjusted in the adjustment, also can adjust the position of horizontal direction when adjusting the vertical height, realized that the staff can hoist the pipeline to the boiler directly over, make things convenient for the staff to install the pipe-line at the boiler top.
The utility model discloses in, through master gear, rotating turret and from the cooperation between the driving wheel isotructure, can adjust the orientation angle of pipeline when making things convenient for the pipeline to transport to mounted position, make things convenient for the staff to weld the pipeline and install, the installation degree of difficulty of reduction pipeline that can be by a wide margin.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the top-down structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a of fig. 2 according to the present invention.
In the figure: 1. a mounting frame; 2. adjusting a rod; 3. an adjustment member; 31. a conical fluted disc; 32. a bevel gear; 33. a transmission rod; 34. a telescopic slide block; 35. a spiral chute; 36. a slide bar; 4. a rotating rod; 5. a mounting seat; 6. a clamp; 61. a motor; 62. a main gear; 63. a rotating frame; 64. a driven wheel; 65. a clamping jaw; 7. a servo motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by the staff of ordinary skill in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a pipeline erection equipment is used in boiler installation, includes mount pad 5, and the top fixedly connected with mounting bracket 1 of mount pad 5, the inside rotation of mounting bracket 1 are connected with bull stick 4, and the fixed surface of mounting bracket 1 is connected with servo motor 7, and servo motor 7's output and 4 fixed connection of bull stick, the fixed surface of bull stick 4 has cup jointed regulation pole 2, and the inside of adjusting pole 2 has anchor clamps 6 through 3 swing joint of regulating part.
In this embodiment, as shown in fig. 1, fig. 2 and fig. 3, the adjusting member 3 includes a bevel gear disc 31, the bevel gear disc 31 is fixedly connected inside the mounting frame 1, the inside of the adjusting rod 2 is slidably connected with a telescopic slider 34, the inside of the telescopic slider 34 is rotatably connected with a transmission rod 33, one end of the transmission rod 33 is fixedly connected with a bevel gear 32, the bevel gear disc 31 is meshed with the bevel gear 32, the other end of the transmission rod 33 is fixedly connected with a slide bar 36, a spiral chute 35 is formed inside the telescopic slider 34, the slide bar 36 is slidably connected inside the spiral chute 35, and one end of the telescopic slider 34 is fixedly connected with the clamp 6.
In this embodiment, as shown in fig. 1, fig. 2 and fig. 3, the fixture 6 includes a rotating frame 63, the rotating frame 63 is rotatably connected to the telescopic sliding block 34, a driven wheel 64 is fixedly connected to the surface of the rotating frame 63 and inside the telescopic sliding block 34, a motor 61 is fixedly connected to the surface of the telescopic sliding block 34, a main gear 62 is fixedly connected to an output end of the motor 61, the main gear 62 is engaged with the driven wheel 64, and two clamping jaws 65 are fixedly connected to the surface of the rotating frame 63.
In this embodiment, as shown in fig. 1, fig. 2 and fig. 3, the universal wheel is installed to the bottom of mount pad 5, and the internal thread of mount pad 5 is connected with fixing bolt, makes the device have the power of going through the universal wheel, makes things convenient for the staff to remove to the workplace, through fixing bolt, conveniently guarantees the stability of device at the during operation.
In this embodiment, as shown in fig. 1, fig. 2 and fig. 3, a limiting sliding groove is formed in the adjusting rod 2, a limiting sliding block is fixedly connected to the surface of one end of the telescopic sliding block 34, the limiting sliding block is slidably connected to the inside of the limiting sliding rail, the movement track of the telescopic sliding block 34 is limited by the limiting sliding groove, and the telescopic sliding block 34 is prevented from rotating inside the adjusting rod 2.
In this embodiment, as shown in fig. 1, fig. 2 and fig. 3, centre gripping one side of clamping jaw 65 sets up to the arc, and the surface of the arcwall face of clamping jaw 65 has seted up anti-skidding line, can increase the clamping force that the stress surface between clamping jaw 65 and the pipeline improves clamping jaw 65 through the arcwall face, can increase the frictional force between clamping jaw 65 and the pipeline through anti-skidding line, prevents that the pipeline can follow and drop between two clamping jaws 65.
The utility model discloses a use method and advantage: this kind of pipeline erection equipment for boiler installation is when the rolling, and the working process is as follows:
as shown in fig. 1, 2 and 3, when a pipeline needs to be installed at the top of a boiler, a pipeline installation device needs to be used to assist a worker to install the pipeline at the top of the boiler, the pipeline to be installed is firstly clamped by a clamping jaw 65, the servo motor 7 rotates to drive the adjusting rod 2 to deflect, meanwhile, the transmission rod 33 is driven to rotate through meshing between the bevel gear 32 and the bevel gear disc 31, meanwhile, the transmission rod 33 rotates to drive the sliding rod 36 to slide inside the spiral chute 35 to push the telescopic sliding block 34 to slide outwards, the length between the clamp 6 and the adjusting rod 2 can be stretched while adjusting the angle of the adjusting rod 2, the horizontal position can be adjusted while adjusting the vertical height of pipeline transportation, the pipeline can be hoisted to the position right above the boiler by the worker, the worker can install the pipeline at the top of the boiler conveniently, the main gear 62 rotates through the motor 61 when the pipeline is transported to the right above the boiler, the main gear 62 drives the rotating bracket 63 to rotate through the driven wheel 64, the rotating bracket 63, the pipeline can be adjusted by the worker when the pipeline is transported to the pipeline to the installation position, the pipeline can be welded at a large angle can be conveniently, and the installation difficulty of the pipeline installation of the worker can be reduced.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. The skilled worker in this industry should understand that the present invention is not limited by the above embodiments, and what is described in the above embodiments and the specification is only the preferred embodiments of the present invention, and does not limit the present invention, without departing from the spirit and scope of the present invention, the present invention can also have various changes and improvements, and these changes and improvements all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a pipeline erection equipment is used in boiler installation, includes mount pad (5), its characterized in that: the top fixedly connected with mounting bracket (1) of mount pad (5), the inside of mounting bracket (1) is rotated and is connected with bull stick (4), the fixed surface of mounting bracket (1) is connected with servo motor (7), the output and bull stick (4) fixed connection of servo motor (7), the fixed surface of bull stick (4) has cup jointed regulation pole (2), there is anchor clamps (6) inside through regulating part (3) swing joint of adjusting pole (2).
2. The pipe installation apparatus for boiler installation according to claim 1, wherein: adjusting part (3) are including awl fluted disc (31), awl fluted disc (31) fixed connection is in the inside of mounting bracket (1), the inside sliding connection who adjusts pole (2) has flexible slider (34), the inside rotation of flexible slider (34) is connected with transfer line (33), the one end fixedly connected with bevel gear (32) of transfer line (33), awl fluted disc (31) and bevel gear (32) mesh mutually, the other end fixedly connected with slide bar (36) of transfer line (33), spiral spout (35) have been seted up to the inside of flexible slider (34), slide bar (36) sliding connection is in the inside of spiral spout (35), the one end fixedly connected with anchor clamps (6) of flexible slider (34).
3. The pipe installation apparatus for boiler installation according to claim 2, wherein: anchor clamps (6) include rotating turret (63), rotating turret (63) rotate to be connected on flexible slider (34), the inside fixedly connected with who just is located flexible slider (34) on the surface of rotating turret (63) follows driving wheel (64), the fixed surface of flexible slider (34) is connected with motor (61), the output fixedly connected with master gear (62) of motor (61), master gear (62) mesh mutually with follow driving wheel (64), the fixed surface of rotating turret (63) is connected with clamping jaw (65) that quantity is two.
4. The pipe installation apparatus for boiler installation according to claim 1, wherein: the universal wheel is installed to the bottom of mount pad (5), the inside threaded connection of mount pad (5) has fixing bolt.
5. The pipe installation apparatus for boiler installation according to claim 2, wherein: the adjusting rod (2) is internally provided with a limiting sliding groove, the surface of one end of the telescopic sliding block (34) is fixedly connected with a limiting sliding block, and the limiting sliding block is connected to the inside of the limiting sliding rail in a sliding mode.
6. The pipe installation apparatus for boiler installation according to claim 3, wherein: clamping one side of the clamping jaw (65) is arc-shaped, and anti-skid lines are arranged on the surface of the arc-shaped surface of the clamping jaw (65).
CN202222299652.2U 2022-08-31 2022-08-31 Pipeline installation equipment for boiler installation Active CN217942261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222299652.2U CN217942261U (en) 2022-08-31 2022-08-31 Pipeline installation equipment for boiler installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222299652.2U CN217942261U (en) 2022-08-31 2022-08-31 Pipeline installation equipment for boiler installation

Publications (1)

Publication Number Publication Date
CN217942261U true CN217942261U (en) 2022-12-02

Family

ID=84211878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222299652.2U Active CN217942261U (en) 2022-08-31 2022-08-31 Pipeline installation equipment for boiler installation

Country Status (1)

Country Link
CN (1) CN217942261U (en)

Similar Documents

Publication Publication Date Title
CN217942261U (en) Pipeline installation equipment for boiler installation
CN208132327U (en) A kind of round steel pipe welding fixture of angle adjustable
CN111362129A (en) Hoisting device for H-shaped steel
CN220317114U (en) Power equipment suspension support device
CN206928916U (en) Stacking tubing string manipulator
CN208528436U (en) A kind of automatic turning platform of manual welding elbow
CN208637950U (en) A kind of power engineering mounting assist support
CN207660262U (en) A kind of plug-in type steel pipe scaffold installation supporting rack
CN216471581U (en) Can prevent pay-off is used in installation of moving line
CN214495547U (en) Optical cable lifter
CN213622895U (en) Major diameter reinforced concrete pipe hoist
CN108393839A (en) A kind of flange rectifier
CN209792335U (en) Folder clamping device
CN219195029U (en) Heat treatment positioning clamping tool
CN111977526A (en) Water supply energy-saving pipeline alternating device
CN215789331U (en) Locator included angle assistor for replacing lead locator
CN219362860U (en) Automatic coil device for anchor cable
CN219429508U (en) Construction hoisting equipment
CN219113307U (en) Welding fixture for radiator frame
CN217942409U (en) Automatic steel pipe splicing device for tower crane ladder stand
CN212977807U (en) Clamping device is used in processing of quartzy centrum convenient to adjust
CN217750096U (en) Steel structure welding device for building
CN214618188U (en) Strutting arrangement is used in water supply and drainage pipe construction
CN216615929U (en) Open caisson construction and carrying device for urban sewage zero-direct-drainage project
CN211456484U (en) Electric wire erection device for high-voltage power transmission and transformation construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant