CN217924509U CN202222191441.7U CN202222191441U CN217924509U CN 217924509 U CN217924509 U CN 217924509U CN 202222191441 U CN202222191441 U CN 202222191441U CN 217924509 U CN217924509 U CN 217924509U
Authority
CN
China
Prior art keywords
frame
steel
roof
sleeve
frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222191441.7U
Other languages
Chinese (zh)
Inventor
张鹏
李睿璇
郝力亭
胡亚坤
樊宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Eighth Construction Group Co Ltd
Original Assignee
Shanxi Eighth Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Eighth Construction Group Co Ltd filed Critical Shanxi Eighth Construction Group Co Ltd
Priority to CN202222191441.7U priority Critical patent/CN217924509U/en
Application granted granted Critical
Publication of CN217924509U publication Critical patent/CN217924509U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the field of building construction, in particular to a steel structure metal roof panel feeding cableway device; the plate discharging machine comprises door frames which are respectively fixed at a roof steel frame cornice feeding position and a plate discharging machine table foundation frame body, wherein two parallel stressed steel cables are fixed between the two door frames, a plurality of roller supporting frames are distributed on the two stressed steel cables, each roller supporting frame comprises two parallel U-shaped frames, the two U-shaped frames are fixedly connected through two cross rods, upper sleeves are respectively fixed at the two ends of the top of a vertical rod at the two ends of each U-shaped frame, the upper sleeves are connected with the stressed steel cables, two lower sleeves are respectively fixed at the two ends of the bottom of a horizontal rod of each U-shaped frame, a flexible sleeve is sleeved on the outer side of the horizontal rod of each U-shaped frame, and a traction steel cable is respectively and jointly penetrated in the lower sleeves at the left side and the right side of each roller supporting frame; the utility model greatly shortens the floor of the roof panel and the transporting distance of the roof, and avoids the damage of the formed plate caused by transporting; the construction progress is accelerated.

Description

Steel construction metal roofing roof boarding material loading cableway device
Technical Field
The utility model relates to a construction field, concretely relates to steel construction metal roofing roof boarding material loading cableway device.
Background
The roofing elevation of metal roofing is than higher, and the long general ratio of roofing board is longer, and the long restriction of board and the site condition are suitable hoist and mount generally, and the roofing board is also difficult to realize in roofing production simultaneously, consequently with the quick transportation of roofing board to the roofing relatively difficult.
Disclosure of Invention
The utility model overcomes prior art's is not enough, for making quick transportation to the roofing of roof boarding, makes the construction accelerate the progress, consequently adopts "transmission production technology in scene high altitude", provides a steel construction metal roofing roof boarding material loading cableway device, and this device utilizes the thrust of trigger board motor, through the slant cable of setting up ground to roofing, directly transports the board to the roofing.
For solving the technical problem, the utility model discloses the technical scheme who adopts does: the utility model provides a steel construction metal roofing shingle feeding cableway device, is including being fixed in the portal of roof steelframe eaves mouth material loading department and play trigger board basis support body department respectively, two the portal between be fixed with two atress cable wires that are parallel to each other, it has a plurality of bearing roller framves to distribute on two atress cable wires, and the bearing roller frame includes two U-shaped framves that are parallel to each other, through two horizontal pole rigid couplings between two U-shaped framves, the top both ends of the both ends montant of U-shaped frame are fixed with an upper portion sleeve respectively, and the upper portion sleeve is connected with the atress cable wire, and U-shaped frame horizontal pole bottom both ends are fixed a lower part sleeve respectively, the horizontal pole outside cover of U-shaped frame is equipped with flexible sleeve, wears to be equipped with a traction cable wire in the lower part sleeve of a plurality of bearing roller frame left and right sides respectively jointly, and traction cable wire top is fixed in the portal department of roof steelframe eaves mouth material loading department with the rope card.
During the use, utilize the thrust of a board machine board motor, the roof boarding stretches into the groove of bearing roller frame, relies on the support of bearing roller frame, and the end can directly rely on the thrust of a board machine board motor to stretch into roof steelframe eaves mouth material loading department and extend to the roofing top, and the workman cuts the roof boarding according to the demand to required length can.
Compared with the prior art the utility model discloses following beneficial effect has:
the utility model discloses the device greatly shortens roof boarding ground and roofing fortune distance, avoids causing the shaping panel damaged because of the fortune. The construction progress is accelerated.
Drawings
Fig. 1 is a schematic structural diagram of a gantry at a roof steel frame cornice feeding position.
Fig. 2 is a schematic view of a base frame of a machine table of a board discharging machine.
Fig. 3 is a top view of a base frame of a machine table of a board discharging machine.
FIG. 4 is a schematic view of the connection of a stressed steel cable and a guy cable.
FIG. 5 is a schematic view of the connection of the force cable, the traction cable and the roller frame.
FIG. 6 is a schematic view of the structure of the carrier roller frame.
The figures are labeled as follows:
1-gantry, 2-stress steel cable, 3-roller frame, 301-U-shaped frame, 302-transverse rod, 303-upper sleeve, 304-lower sleeve, 305-flexible sleeve, 4-traction steel cable, 5-wind-pulling rope, 6-reinforced vertical rod, 7-reinforced transverse rod, 8-plate discharging machine and 9-roof plate.
Detailed Description
The present invention will be further described with reference to the following specific examples.
Examples
As shown in fig. 1, 2, 3, 5 and 6, a steel structure metal roof boarding feeding cableway device comprises two door frames 1 fixed at a roof steel frame cornice feeding position and a boarding machine table foundation frame body position respectively, two door frames 1 are fixed with two parallel stressed steel cables 2 between, a plurality of roller frames 3 are distributed on the two stressed steel cables 2, the roller frames 3 are formed by bending phi 12 round steel, the roller frames 3 are distributed at intervals of 2-4 meters along the stressed steel cables, the roller frames 3 comprise two parallel U-shaped frames 301, the two U-shaped frames 301 are fixedly connected through two cross rods 302, an upper sleeve 303 is fixed at two ends of the top of a vertical rod at two ends of each U-shaped frame 301, the upper sleeve 303 is connected with the stressed steel cable 2, a lower sleeve 304 is fixed at two ends of a horizontal rod of each U-shaped frame 301, a flexible sleeve 305 is sleeved on the outer side of the horizontal rod of each U-shaped frame 301, a traction 4 top ends of lower sleeves 304 at the left side and the right side of the plurality of the roller frames 3 penetrate through the same, the traction rope 4 top ends of the traction steel cable is fixed at the roof steel frame cornice, and the portal frame 1 is clamped at the roof steel cable.
Further, as shown in fig. 4, in order to ensure that the stressed steel cables 2 can be used smoothly in windy weather, a guy rope 5 needs to be added, and a guy rope 5 is connected between the middle parts of the two stressed steel cables 2 and the cornice feeding position of the roof steel frame. The wind-pulling rope 5 is arranged in the middle of the stressed steel cable 2 to prevent the guide cable from shaking due to strong wind.
Further, the upper sleeve 303 is connected with the stressed steel cable 2 through a pulley and a hook, the pulley and the hook are connected together, the pulley is slidably arranged on the stressed steel cable 2, and the hook is connected with the upper sleeve 303.
Further, the door frame 1 is a frame formed by connecting square pipes with the side length of 100mm and the thickness of 5mm, the upper side and the lower side of the door frame 1 are rectangular frames, the left side and the right side are trapezoidal frames, and the front side and the rear side are rectangular frames.
Further, the machine table base frame body of the plate discharging machine is hexahedron, the left side surface and the right side surface are trapezoidal, and the other side surfaces are rectangular; the side face of the trapezoid is connected with a plurality of vertically arranged reinforcing vertical rods 6, the distance between every two adjacent reinforcing vertical rods is 1485mm, the upper side face of the trapezoid is connected with a plurality of horizontally arranged reinforcing cross rods 7, the distance between every two adjacent reinforcing cross rods 7 is 1485mm, and the length of each reinforcing cross rod 7 is 2500mm; the upper bottom edge of the trapezoidal side face is 955mm long, and the lower bottom edge of the trapezoidal side face is 1920mm long.
Further, the flexible sleeve 305 is a phi 16 x 2pvc sleeve or a flexible web.
Furthermore, the distance between two stress steel cables 2 is 500mm, and the ends of the phi 12 steel cables are respectively fixed by three cable clamps, wherein the two stress steel cables 2 are phi 12 steel cables.
During operation, through the dead weight of make full use of die mould board, be connected head (roof steelframe eaves mouth material loading department promptly) portal 1 with the die mould board, as the counter weight of cable tensioning, perhaps select other counter weights also can. The two stressed steel cables 2 are pulled flat and straightened by the chain block, warning lines are respectively pulled within the range of 5 meters on two sides of the projection area of the stressed steel cables 2, warning marks and safety notice boards are arranged, and any person is forbidden to enter the roof panel production area and the guide cable transportation area is forbidden to be provided with a safety production area. During the use, utilize the thrust of 6 board motors of trigger of play, roof boarding 9 stretches into the groove of bearing roller frame 3, relies on the support of bearing roller frame 3, and the front end of roof boarding 9 relies on the thrust of 6 board motors of trigger of play can directly stretch into roof steelframe eaves mouth material loading department and continue to extend to the roofing top, then, the workman can according to the required length of demand cutting roof boarding 9 on the roof.

Claims (7)

1. The utility model provides a steel construction metal roofing shingle feeding cableway device, a serial communication port, including portal (1) that is fixed in roof steelframe eaves mouth material loading department respectively and goes out trigger board basis support body department, two portal (1) between be fixed with two atress cable wire (2) that are parallel to each other, it has a plurality of bearing roller frame (3) to distribute on two atress cable wire (2), bearing roller frame (3) are including two U-shaped frame (301) that are parallel to each other, through two horizontal pole (302) rigid couplings between two U-shaped frame (301), the top both ends of the both ends montant of U-shaped frame (301) are fixed with one upper portion sleeve (303) respectively, upper portion sleeve (303) are connected with atress cable wire (2), one lower part sleeve (304) is fixed respectively at U-shaped frame (301) horizontal pole bottom both ends, the horizontal pole outside cover of U-shaped frame (301) is equipped with flexible sleeve (305), wear to be equipped with one in the lower part sleeve (304) of the left and right sides of a plurality of bearing roller frame (3) respectively and pull one and pull (4) top and locate with rope clip and expect on roof steelframe portal (1).
2. The steel structure metal roof and panel feeding cableway device according to claim 1, characterized in that wind-pulling ropes (5) are connected between the middle parts of the two stressed steel cables (2) and the cornice feeding part of the roof steel frame.
3. A steel structural metal roof panel feeding cableway device according to claim 1, characterized in that the upper sleeve (303) is connected to the stressed steel cable (2) by means of a pulley and a hook, the pulley and the hook are connected together, the pulley is slidably mounted on the stressed steel cable (2), and the hook is connected to the upper sleeve (303).
4. The steel structure metal roof and panel feeding cableway device according to claim 1, wherein the portal frame (1) is a frame formed by connecting square pipes with the side length of 100mm and the thickness of 5mm, the upper side and the lower side of the portal frame (1) are rectangular frames, the left side and the right side are trapezoidal frames, and the front side and the rear side are rectangular frames.
5. The steel structure metal roofing and roofing board feeding cableway device according to claim 1, wherein the machine platform foundation frame body of the board discharging machine is hexahedron, the left and right side surfaces are trapezoidal, and the other side surfaces are rectangular; the side face of the trapezoid is connected with a plurality of vertically arranged reinforcing vertical rods (6), the distance between every two adjacent reinforcing vertical rods is 1485mm, the upper side face of the trapezoid is connected with a plurality of horizontally arranged reinforcing cross rods (7), the distance between every two adjacent reinforcing cross rods (7) is 1485mm, and the length of each reinforcing cross rod (7) is 2500mm; the length of the upper bottom edge of the trapezoidal side face is 955mm, and the length of the lower bottom edge is 1920mm.
6. The steel structural metal roofing shingle feed cableway device according to claim 1, wherein the flexible sleeve (305) is a phi 16 x 2pvc sleeve or a flexible coil.
7. The steel structure metal roofing and roofing plate feeding cableway device according to claim 1, wherein the stressed steel cables (2) are phi 12 steel cables, the distance between the two stressed steel cables (2) is 500mm, and the ends of the phi 12 steel cables are respectively fixed by three cable clamps.
CN202222191441.7U 2022-08-19 2022-08-19 Steel construction metal roofing roof boarding material loading cableway device Active CN217924509U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222191441.7U CN217924509U (en) 2022-08-19 2022-08-19 Steel construction metal roofing roof boarding material loading cableway device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222191441.7U CN217924509U (en) 2022-08-19 2022-08-19 Steel construction metal roofing roof boarding material loading cableway device

Publications (1)

Publication Number Publication Date
CN217924509U true CN217924509U (en) 2022-11-29

Family

ID=84171275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222191441.7U Active CN217924509U (en) 2022-08-19 2022-08-19 Steel construction metal roofing roof boarding material loading cableway device

Country Status (1)

Country Link
CN (1) CN217924509U (en)

Similar Documents

Publication Publication Date Title
CN111576243A (en) Bridge tensioning trolley with simple support and continuous negative moment
CN112952661B (en) Installation structure and construction method for laying cable in narrow space
CN210558742U (en) Wall attaching frame for installing standard joints in construction elevator
CN217924509U (en) Steel construction metal roofing roof boarding material loading cableway device
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN112252741A (en) Full-rail crane for super high-rise unit curtain wall and installation and use method thereof
CN210713755U (en) High-altitude combined type steel beam component mounting and operating platform
CN207177305U (en) Prefabricated beam stretching jack suspension door frame
CN213475219U (en) Roof concrete lifting and sliding conveying system
CN210217182U (en) Outer roofing tarpaulin installation tractive auxiliary device
CN217252316U (en) Contour plate inclined conveying device for large-scale grid structure
CN210710588U (en) Hoisting system for prefabricating pipe trench in highly-limited narrow space
CN207844790U (en) Elevator wire rope vertical distraction device
CN111392667A (en) Operation trolley for installing reinforcing steel bars on dam panel and using method
CN108457476A (en) Scalable wind resistance cableway system and construction method for metal roofing board transmission
CN219638365U (en) Be used for hyperboloid net rack roofing waterproof construction operation platform
CN212608991U (en) Rear-mounted slideway slot hoisting device
CN217992927U (en) Energy-saving emission-reducing type non-autoclaved precast pile curing device
CN2825591Y (en) Metal pressing plate lifter
CN218933796U (en) Installation device for roof color steel plate bottom plate
CN218114849U (en) Curtain wall material hoisting device
CN217297087U (en) Lifting machine for building engineering is with longer article balance of being convenient for
CN221216935U (en) Assembled curtain wall unit body lifting device for super high-rise building reconstruction
CN216687013U (en) Rope end combination transverse fixing device
CN217046914U (en) Prefabricated T roof beam prestressing force stretch-draw construction protection platform

Legal Events

Date Code Title Description
GR01 Patent grant