CN217923510U - Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even - Google Patents
Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even Download PDFInfo
- Publication number
- CN217923510U CN217923510U CN202222084019.1U CN202222084019U CN217923510U CN 217923510 U CN217923510 U CN 217923510U CN 202222084019 U CN202222084019 U CN 202222084019U CN 217923510 U CN217923510 U CN 217923510U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- hoisting
- deep foundation
- reinforcement
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 117
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 239000011150 reinforced concrete Substances 0.000 title 1
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 51
- 238000003466 welding Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 abstract description 9
- 238000010276 construction Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000003351 stiffener Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型公开了一种深基坑地连墙钢筋笼的加固吊装结构,包括深基坑地连墙钢筋笼本体,所述深基坑地连墙钢筋笼本体通过多个纵向钢筋、横向钢筋和侧部钢筋焊接组成,所述深基坑地连墙钢筋笼本体内焊接有多个吊装板,所述吊装板在横向和纵向上均呈间隔均匀分布,所述吊装板的下方与深基坑地连墙钢筋笼本体的底部对齐,上方伸出于深基坑地连墙钢筋笼本体,所述吊装板的上方开设有位于深基坑地连墙钢筋笼本体外侧的吊装孔,所述吊装孔连接吊装设备将深基坑地连墙钢筋笼本体抬升。通过上述方式,本实用新型深基坑地连墙钢筋笼的加固吊装结构,能够方便深基坑地连墙钢筋笼吊装,在吊装时确保深基坑地连墙钢筋笼受力均匀,避免深基坑地连墙钢筋笼出现变形或散架的情况。
The utility model discloses a reinforcement and hoisting structure for a deep foundation pit connecting wall reinforcement cage, which comprises a deep foundation pit connecting wall reinforcement cage body, and the deep foundation pit connecting wall reinforcement cage body passes through a plurality of longitudinal steel bars and transverse steel bars It is composed of welding with side steel bars, and a plurality of hoisting plates are welded in the steel cage body of the deep foundation pit wall, and the hoisting plates are uniformly distributed in the horizontal and vertical directions. The bottom of the reinforcement cage body connecting the wall to the pit is aligned, and the top protrudes from the reinforcement cage body connecting the wall to the deep foundation pit, and the upper part of the lifting plate is provided with a hoisting hole located on the outside of the reinforcement cage body connecting the wall to the deep foundation pit. The hoisting hole is connected with the hoisting equipment to lift the main body of the reinforcement cage connecting the wall of the deep foundation pit. Through the above-mentioned method, the reinforced hoisting structure of the reinforcement cage of the connecting wall of the deep foundation pit of the utility model can facilitate the hoisting of the reinforcing cage of the connecting wall of the deep foundation pit, and ensure that the reinforcing cage of the connecting wall of the deep foundation pit is evenly stressed during hoisting, avoiding deep The reinforcement cages connecting the walls of the foundation pit are deformed or falling apart.
Description
技术领域technical field
本实用新型涉及建筑领域,特别是涉及一种深基坑地连墙钢筋笼的加固吊装结构。The utility model relates to the field of construction, in particular to a reinforcing and hoisting structure for a deep foundation pit connecting wall reinforcement cage.
背景技术Background technique
吊放深基坑地连墙钢筋笼的方式包括三种。第一种方式将深基坑地连墙钢筋笼分为多层安装,利用扁担梁卡住深基坑地连墙钢筋笼,安装完一节钢筋下放一层深基坑地连墙钢筋笼,直至深基坑地连墙钢筋笼安装完成;第二种方式是在地胎上安装完成,然后将深基坑地连墙钢筋笼吊装到位后整体下放;第三种是通过副吊和主吊起吊,保持副吊滑轮高度不变,提升主吊滑轮,翻转深基坑地连墙钢筋笼,直至钢筋竖直设置。There are three methods for hoisting the reinforcement cage connected to the wall of the deep foundation pit. The first method divides the reinforcement cages of the connecting walls of deep foundation pits into multi-layer installations, and uses the pole beams to clamp the reinforcing cages of connecting walls of deep foundation pits. Until the installation of the reinforcement cage for the connecting wall of the deep foundation pit is completed; the second method is to complete the installation on the ground tire, and then the reinforcing cage for the connecting wall of the deep foundation pit is hoisted in place and lowered as a whole; the third method is to use the auxiliary crane and the main crane For lifting, keep the height of the pulley of the auxiliary crane unchanged, lift the pulley of the main crane, and turn over the reinforcement cage on the wall of the deep foundation pit until the reinforcement is set vertically.
第一种方式吊放深基坑地连墙钢筋笼时,深基坑地连墙钢筋笼安装时间过长,增大了塌孔风险,而且施工慢,影响进度;采用第二种方式在地胎上安装完成深基坑地连墙钢筋笼,再将深基坑地连墙钢筋笼整体下放,容易导致深基坑地连墙钢筋笼变形,无法下放,将影响深基坑地连墙施工质量;采用第三种吊装方式时吊装易产生较大挠曲变形,使焊缝开裂,整体散架,存在较大的安全隐患,加上吊点不明确,受力不均匀,主吊放吊用扁担梁直接承载深基坑地连墙钢筋笼时,会使得钢筋变形,影响深基坑地连墙钢筋笼质量。When the first method is used to hoist the reinforcement cage for the ground connection wall of the deep foundation pit, the installation time of the reinforcement cage for the connection wall of the deep foundation pit is too long, which increases the risk of hole collapse, and the construction is slow, which affects the progress; After installing the reinforcement cage for the deep foundation pit wall on the tire, and then lowering the reinforcement cage for the deep foundation pit wall as a whole, it is easy to cause the deformation of the reinforcement cage for the connection wall of the deep foundation pit and cannot be lowered, which will affect the construction of the connection wall of the deep foundation pit Quality: When the third hoisting method is adopted, the hoisting is prone to large deflection deformation, which will crack the weld seam and the whole frame will fall apart, which will cause great safety hazards. In addition, the hoisting point is not clear and the force is uneven. When the beam directly bears the reinforcement cage of the connecting wall of the deep foundation pit, it will deform the steel bar and affect the quality of the reinforcing cage of the connecting wall of the deep foundation pit.
发明内容Contents of the invention
本实用新型主要解决的技术问题是提供一种深基坑地连墙钢筋笼的加固吊装结构,能够方便深基坑地连墙钢筋笼吊装,在吊装时确保深基坑地连墙钢筋笼受力均匀,避免深基坑地连墙钢筋笼出现变形或散架的情况。The technical problem mainly solved by the utility model is to provide a reinforced hoisting structure for the reinforcement cage of the wall connecting the deep foundation pit, which can facilitate the hoisting of the reinforcement cage connecting the wall of the deep foundation pit, and ensure that the reinforcement cage connecting the wall of the deep foundation pit is protected The force is uniform to avoid deformation or falling apart of the reinforcement cage on the wall of the deep foundation pit.
为解决上述技术问题,本实用新型采用的一个技术方案是:提供一种深基坑地连墙钢筋笼的加固吊装结构,包括深基坑地连墙钢筋笼本体,所述深基坑地连墙钢筋笼本体通过多个纵向钢筋、横向钢筋和侧部钢筋焊接组成,所述深基坑地连墙钢筋笼本体内焊接有多个吊装板,所述吊装板在横向和纵向上均呈间隔均匀分布,所述吊装板的下方与深基坑地连墙钢筋笼本体的底部对齐,上方伸出于深基坑地连墙钢筋笼本体,所述吊装板的上方开设有位于深基坑地连墙钢筋笼本体外侧的吊装孔,所述吊装孔连接吊装设备将深基坑地连墙钢筋笼本体抬升。In order to solve the above technical problems, a technical solution adopted by the utility model is to provide a reinforced hoisting structure for a deep foundation pit ground connection wall reinforcement cage, including a deep foundation pit ground connection wall reinforcement cage body, and the deep foundation pit connection wall reinforcement cage body. The wall reinforcement cage body is composed of multiple longitudinal reinforcement bars, transverse reinforcement bars and side reinforcement bars welded together. The deep foundation pit ground connecting wall reinforcement cage body is welded with multiple hoisting plates, and the hoisting plates are spaced horizontally and vertically. Evenly distributed, the lower part of the lifting plate is aligned with the bottom of the deep foundation pit ground wall reinforcement cage body, and the upper part protrudes from the deep foundation pit ground wall reinforcement cage body. The hoisting hole on the outer side of the wall reinforcement cage body, the hoisting hole is connected with hoisting equipment to lift the wall reinforcement cage body of the deep foundation pit.
在本实用新型一个较佳实施例中,所述吊装板位于两个相邻的纵向钢筋之间,所述吊装板的左右侧面和纵向钢筋之间通过辅助钢筋焊接连接。In a preferred embodiment of the present invention, the hoisting plate is located between two adjacent longitudinal reinforcements, and the left and right sides of the hoisting plate are connected to the longitudinal reinforcements through welding of auxiliary reinforcements.
在本实用新型一个较佳实施例中,所述辅助钢筋与纵向钢筋呈平行设置。In a preferred embodiment of the utility model, the auxiliary reinforcement is arranged parallel to the longitudinal reinforcement.
在本实用新型一个较佳实施例中,所述纵向钢筋包括上纵向钢筋和下纵向钢筋,所述上纵向钢筋的上方焊接有横向钢筋,所述下纵向钢筋的下方焊接有横向钢筋,所述上纵向钢筋和下纵向钢筋的左右两侧通过侧部钢筋焊接。In a preferred embodiment of the present invention, the longitudinal reinforcement includes an upper longitudinal reinforcement and a lower longitudinal reinforcement, a transverse reinforcement is welded above the upper longitudinal reinforcement, and a transverse reinforcement is welded below the lower longitudinal reinforcement. The left and right sides of the upper longitudinal reinforcement and the lower longitudinal reinforcement are welded by side reinforcement.
在本实用新型一个较佳实施例中,所述上纵向钢筋和下纵向钢筋之间设有倾斜设置的加强筋,所述加强筋位于两个吊装板之间,所述加强筋上下两端分别与两个吊装板之间通过补强筋焊接。In a preferred embodiment of the present invention, an obliquely arranged stiffener is provided between the upper longitudinal steel bar and the lower longitudinal steel bar, and the stiffener is located between two hoisting plates, and the upper and lower ends of the stiffener are respectively It is welded with reinforcing ribs between the two lifting plates.
在本实用新型一个较佳实施例中,所述加强筋的上下呈水平设置,且位于横向钢筋一侧并与横向钢筋焊接。In a preferred embodiment of the present invention, the upper and lower sides of the reinforcing ribs are arranged horizontally, and are located on one side of the transverse reinforcing bars and welded with the transverse reinforcing bars.
在本实用新型一个较佳实施例中,所述吊装板的下端具有下吊装孔,所述下吊装孔位于下纵向钢筋的上端。In a preferred embodiment of the present invention, the lower end of the hoisting plate has a lower hoisting hole, and the lower hoisting hole is located at the upper end of the lower longitudinal steel bar.
本实用新型的有益效果是:本实用新型深基坑地连墙钢筋笼的加固吊装结构,通过焊接在深基坑地连墙钢筋笼本体内的吊装板和吊装孔来连接外部吊装设备,吊装板均匀受力,避免深基坑地连墙钢筋笼本体局部受力导致深基坑地连墙钢筋笼出现挠曲变形。The beneficial effects of the utility model are: the reinforced hoisting structure of the deep foundation pit ground connecting wall reinforcement cage of the utility model connects the external hoisting equipment through the hoisting plate and the hoisting hole welded in the deep foundation pit ground connecting wall reinforcement cage body. The slab is evenly stressed, avoiding the local stress on the body of the deep foundation pit's connecting wall reinforcement cage, resulting in deflection and deformation of the deep foundation pit's connecting wall reinforcement cage.
本实用新型深基坑地连墙钢筋笼的加固吊装结构,吊装板通过辅助钢筋焊接在纵向钢筋钢筋之间,确保吊装板和纵向钢筋之间的连接强度,可以将深基坑地连墙钢筋笼的重量有效均匀分散,确保深基坑地连墙钢筋笼整体受力均匀。The utility model is a reinforced hoisting structure for the reinforcement cage of the ground connecting wall of the deep foundation pit. The weight of the cage is effectively and evenly distributed to ensure that the overall force of the reinforcement cage on the wall of the deep foundation pit is uniform.
本实用新型深基坑地连墙钢筋笼的加固吊装结构,吊装板之间通过补强筋和加强筋焊接,加强筋进一步分散重力,还能保证吊装板的连接强度,避免吊装板吊装过程中脱落。The utility model is a reinforced hoisting structure for the ground connecting wall reinforcement cage of a deep foundation pit. The reinforcing ribs and reinforcing ribs are welded between the hoisting plates, and the reinforcing ribs further disperse the gravity, which can also ensure the connection strength of the hoisting plates and prevent the fall off.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图,其中:In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the present invention. For example, for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative work, wherein:
图1是本实用新型深基坑地连墙钢筋笼的加固吊装结构一较佳实施例的结构示意图;Fig. 1 is the structure schematic diagram of a preferred embodiment of the reinforced hoisting structure of the ground connecting wall reinforcement cage of the deep foundation pit of the present invention;
图2是图1的左视图;Fig. 2 is the left view of Fig. 1;
图3是图1的局部结构示意图;Fig. 3 is a partial structural schematic diagram of Fig. 1;
图4是图3的俯视图;Fig. 4 is the top view of Fig. 3;
附图中各部件的标记如下:1、深基坑地连墙钢筋笼本体,11、纵向钢筋,12、横向钢筋,13、侧部钢筋,14、加强筋,2、吊装板,21、吊装孔,22、下吊装孔,3、辅助钢筋,4、补强筋。The markings of the components in the accompanying drawings are as follows: 1. The body of the reinforcement cage for the ground connection wall of the deep foundation pit, 11. The longitudinal reinforcement, 12. The transverse reinforcement, 13. The side reinforcement, 14. The reinforcing rib, 2. The hoisting plate, 21. Hole, 22, lower hoisting hole, 3, auxiliary steel bar, 4, reinforcing bar.
具体实施方式Detailed ways
下面将对本实用新型实施例中的技术方案进行清楚、完整地描述。本说明书附图所绘示的结构、比例、大小等,均仅用以配合说明书所揭示的内容,以供熟悉此技术的人士了解与阅读,并非用以限定本实用新型可实施的限定条件,故不具技术上的实质意义,任何结构的修饰、比例关系的改变或大小的调整,在不影响本实用新型所能产生的功效及所能达成的目的下,均应仍落在本实用新型所揭示的技术内容得能涵盖的范围内。同时,本说明书中所引用的如“上”、“下”、“左”、“右”、“中间”等用语,亦仅为便于叙述的明了,而非用以限定可实施的范围,其相对关系的改变或调整,在无实质变更技术内容下,当亦视为本实用新型可实施的范畴。The technical solutions in the embodiments of the present invention will be clearly and completely described below. The structures, proportions, sizes, etc. shown in the drawings of this specification are only used to cooperate with the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the limited conditions that the utility model can be implemented. Therefore, there is no technical substantive meaning, and any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope of the utility model without affecting the effect and the purpose of the utility model. The disclosed technical content must be within the scope covered. At the same time, terms such as "upper", "lower", "left", "right", and "middle" quoted in this specification are only for the convenience of description and are not used to limit the scope of implementation. The change or adjustment of the relative relationship should also be regarded as the applicable scope of the utility model without substantively changing the technical content.
请参阅图1至图3,一种深基坑地连墙钢筋笼的加固吊装结构,包括深基坑地连墙钢筋笼本体1,深基坑地连墙钢筋笼本体1通过多个纵向钢筋11、横向钢筋12和侧部钢筋13焊接组成。纵向钢筋11包括上纵向钢筋和下纵向钢筋,上纵向钢筋的上方焊接有横向钢筋12,下纵向钢筋的下方焊接有横向钢筋12,上纵向钢筋和下纵向钢筋的左右两侧通过侧部钢筋13焊接。深基坑地连墙钢筋笼本体1为建筑领域常见的深基坑地连墙钢筋笼,采用常规焊接方式,其形状也可以为其他常见的深基坑地连墙钢筋笼。Please refer to Fig. 1 to Fig. 3, a reinforced hoisting structure of a deep foundation pit ground connection wall reinforcement cage, including a deep foundation pit ground connection wall
深基坑地连墙钢筋笼本体1内焊接有多个吊装板2,吊装板2在横向和纵向上均呈间隔均匀分布。吊装板2的下方与深基坑地连墙钢筋笼本体1的底部对齐,上方伸出于深基坑地连墙钢筋笼本体1。吊装板2的上方开设有位于深基坑地连墙钢筋笼本体1外侧的吊装孔21,吊装孔21连接吊装设备将深基坑地连墙钢筋笼本体1抬升。吊装板2位于两个相邻的纵向钢筋11之间,吊装板2的左右侧面和纵向钢筋11之间通过辅助钢筋3焊接连接。辅助钢筋3与纵向钢筋11呈平行设置。吊装板2在纵向和横向上间隔设置,横向一排的数量为4个,纵向一排的数量为5个,具体数量可以根据深基坑地连墙钢筋笼的大小而定。需要吊装时,将吊装工件(钢筋)沿横向一排的吊装板2,然后将深基坑地连墙钢筋笼整体吊起。深基坑地连墙钢筋笼的重量通过辅助焊接传递至吊装板2,通过吊装板2来承受深基坑地连墙钢筋笼本体1的重量,避免深基坑地连墙钢筋笼本体1受力过大,只需要确保吊装板2的焊接强度,即可稳定的起吊深基坑地连墙钢筋笼本体1。深基坑地连墙钢筋笼本体1不会因为受力过大或者不均匀而产生较大挠曲变形。A plurality of hoisting
吊装板2的下端具有下吊装孔22,下吊装孔22位于下纵向钢筋的上端。下吊装孔22与吊装孔21同样承担相同的作用,同时受力便于稳定起吊。The lower end of the
上纵向钢筋和下纵向钢筋之间设有倾斜设置的加强筋14,加强筋14位于两个吊装板2之间,加强筋14上下两端分别与两个吊装板2之间通过补强筋4焊接。加强筋14的上下呈水平设置,且位于横向钢筋12一侧并与横向钢筋12焊接。加强筋14、补强筋4、吊装板2、上纵向钢筋和下纵向钢筋通过焊接连接成一体,进一步保证受力分散和结构稳定,保证吊装过程中深基坑地连墙钢筋笼本体1结构不变形。Between the upper longitudinal steel bar and the lower longitudinal steel bar, there is a reinforcing
区别于现有技术,本实用新型深基坑地连墙钢筋笼的加固吊装结构,能够方便深基坑地连墙钢筋笼吊装,在吊装时确保深基坑地连墙钢筋笼受力均匀,避免深基坑地连墙钢筋笼出现变形或散架的情况。Different from the prior art, the reinforced hoisting structure of the reinforcement cage of the connecting wall of the deep foundation pit can facilitate the hoisting of the reinforcing cage of the connecting wall of the deep foundation pit, and ensure that the reinforcing cage of the connecting wall of the deep foundation pit is evenly stressed during hoisting. Avoid deformation or falling apart of the reinforcement cage connecting the wall of the deep foundation pit.
以上示意性的对本实用新型及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本实用新型的实施方式之一,实际的结构并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本实用新型创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本实用新型的保护范围。The above schematically describes the utility model and its implementation, which is not restrictive, and what is shown in the accompanying drawings is only one implementation of the utility model, and the actual structure is not limited thereto. Therefore, if a person of ordinary skill in the art is inspired by it, and without departing from the purpose of the invention of the utility model, without creatively designing a structural mode and an embodiment similar to the technical solution, it shall belong to the utility model. protected range.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222084019.1U CN217923510U (en) | 2022-08-09 | 2022-08-09 | Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222084019.1U CN217923510U (en) | 2022-08-09 | 2022-08-09 | Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217923510U true CN217923510U (en) | 2022-11-29 |
Family
ID=84153772
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222084019.1U Active CN217923510U (en) | 2022-08-09 | 2022-08-09 | Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217923510U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119190626A (en) * | 2024-09-09 | 2024-12-27 | 沪东中华造船(集团)有限公司 | A method for stacking and hoisting thin plate structures to prevent deformation of the hull |
-
2022
- 2022-08-09 CN CN202222084019.1U patent/CN217923510U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119190626A (en) * | 2024-09-09 | 2024-12-27 | 沪东中华造船(集团)有限公司 | A method for stacking and hoisting thin plate structures to prevent deformation of the hull |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114229695B (en) | Hoisting method of special-shaped reinforcement cage of underground diaphragm wall | |
| CN106276577A (en) | The suspension bracket of a kind of framework isolated footing and operational approach | |
| CN116332057A (en) | A construction method for steel cage hoisting points of the enclosure structure of subway open excavation stations | |
| CN217923510U (en) | Deep basal pit ground is reinforced concrete structure of wall steel reinforcement cage even | |
| CN110329906A (en) | A kind of easy device solving lifting center of gravity deviation | |
| CN210438260U (en) | Major diameter steel protects a hoisting structure | |
| CN206215824U (en) | Filling pile cage of reinforcement processing unit (plant) | |
| CN208009635U (en) | The prefabricated stirrup cage of frame structure bean column node of U-shaped fixing muscle is set | |
| CN214783820U (en) | A suspension point reinforced overweight underground diaphragm wall steel cage | |
| CN210853369U (en) | A protection device for vertical transport of blocks by tower crane | |
| CN113401782A (en) | Hoisting deformation control method for large-opening straight cavity structure block | |
| CN219823408U (en) | Fast and accurate hoisting structure of limited-height buckling-constrained support members | |
| CN212893471U (en) | Lifting appliance for T-shaped beam template | |
| CN219296937U (en) | Bent cap steel reinforcement cage lifting device | |
| CN217211450U (en) | A large bridge crane load test device | |
| CN218264865U (en) | A triangular hanging basket support structure | |
| CN218860132U (en) | Steel reinforcement cage hoisting accessory | |
| CN106121252B (en) | A kind of hydraulic stepping is from climbing material transfering device and method | |
| CN206108705U (en) | Gallows of frame isolated footing | |
| CN116005646A (en) | Abnormal-shaped underground diaphragm wall reinforcement cage and hoisting construction method thereof | |
| CN111422577A (en) | Transportation device and installation method for solving the difficulty of hoisting large steel funnel | |
| CN219489341U (en) | Segment beam reinforcement cage lifting appliance | |
| CN221876292U (en) | A new type of Y-shaped pier column reinforcement cage integral lifting device | |
| CN220642173U (en) | Hoistway construction lift platform | |
| CN217804520U (en) | Bracket for transporting extra-long steel bar semi-finished products |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |