CN217903983U - Temporary cable trench structure for construction transition stage - Google Patents

Temporary cable trench structure for construction transition stage Download PDF

Info

Publication number
CN217903983U
CN217903983U CN202221695723.4U CN202221695723U CN217903983U CN 217903983 U CN217903983 U CN 217903983U CN 202221695723 U CN202221695723 U CN 202221695723U CN 217903983 U CN217903983 U CN 217903983U
Authority
CN
China
Prior art keywords
cable
cross arm
slope
channel side
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221695723.4U
Other languages
Chinese (zh)
Inventor
华坤
沙少川
刘伟亮
吴尚志
吴波
徐静
肖鑫鑫
王熙骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Electric Power Design Institute Co Ltd
Priority to CN202221695723.4U priority Critical patent/CN217903983U/en
Application granted granted Critical
Publication of CN217903983U publication Critical patent/CN217903983U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to the technical field of cable construction, a temporary cable trench structure for a construction transition stage is disclosed, the temporary cable trench structure comprises a channel side slope, a channel pit bottom, a cross arm, a cable clamp, a grounding flat iron and a reinforced concrete cover plate, and the tops of the channel side slopes at two sides are inclined towards directions away from each other; the surfaces of the side slope of the trench and the bottom of the trench pit need to be repaired to be smooth; the cross arm is clamped between the side slopes of the channels at the two sides and used for supporting the cable; one end of the grounding flat iron is connected with the cross arm, and the other end of the grounding flat iron penetrates through the channel slope and extends into the soil body; the reinforced concrete cover plate is erected at the tops of the side slopes of the channels on the two sides. The utility model discloses combine the soil body side slope among the interim cable pit excavation process to set up, both possessed conventional operation requirements such as general cable pit cabling, electrical grounding, drainage, also show the convenience that has increased the construction, reduced newly-built and later stage demolish the engineering volume, shortened construction cycle.

Description

Temporary cable trench structure for construction transition stage
Technical Field
The utility model relates to a cable construction technical field especially relates to an interim cable pit structure for constructing transition phase.
Background
The cable trench is an underground pipeline for laying and replacing electric power or telecommunication cable facilities, is also an enclosure structure of laid cable facilities, and has pipeline structure forms of rectangle, circle, arch and the like. Generally, a cable trench is a trench with a cover plate, and a cable holder is installed in the trench and fixed on a trench wall for holding a cable. When cables are laid and maintained, the cover plate needs to be uncovered, the operation is complicated and inconvenient, and dirt and accumulated water are easy to deposit in the ditch. In some power transformation projects, temporary cable ducts for construction transition stages need to be arranged, the service life of the cable ducts is about several months to one year, the requirements on service life and daily operation and maintenance are not high, and only the normal use in the construction transition stages needs to be guaranteed. At this time, if the construction is still performed according to the standard of the general reinforced concrete cast-in-place cable trench, unnecessary construction investment and construction period are increased, and a large dismantling amount is also existed in the later period. Therefore, the temporary cable trench used in the construction transition stage should have basic functional requirements for cabling, electrical grounding, drainage and the like when in use, but a structural form which is more convenient to construct, smaller in engineering quantity, quicker to dismantle and shorter in construction period should be sought.
The person skilled in the art is dedicated to solving the above technical drawbacks.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a interim cable pit structure for constructing transition phase, it is little with demolising the engineering volume to build, and construction cycle is short.
To achieve the purpose, the utility model adopts the following technical proposal:
a temporary cable trench structure for a construction transition stage comprises trench side slopes, trench pit bottoms, cross arms, cable clamps, grounding flat irons and reinforced concrete cover plates, wherein the tops of the trench side slopes on two sides are inclined in a direction away from each other; the surfaces of the channel side slope and the channel pit bottom need to be repaired to be smooth; the cross arm is clamped between the channel side slopes on the two sides and used for supporting cables; one end of the grounding flat iron is connected with the cross arm, and the other end of the grounding flat iron penetrates through the channel side slope and extends into a soil body; the reinforced concrete cover plates are erected at the tops of the channel side slopes on the two sides.
Preferably, the slope rate of the channel side slopes on both sides is not more than 1.75, and each the surface of channel side slope is provided with 5 centimetres of thickness plain concrete surface course, and inserts a plurality of bank protection short reinforcement, the diameter of bank protection short reinforcement is 6-8 millimeters, and single length is not less than 10 centimetres, and a plurality of bank protection short reinforcement is along the slope body plane of channel side slope is quincunx and is arranged, and level, vertical interval are not more than 200 millimeters.
Preferably, a plain concrete cushion layer with the thickness not less than 10 cm is arranged on the surface of the bottom of the trench pit, a fine sand permeable layer with the thickness not less than 10 cm is arranged at the position close to one side of the trench slope, and the plain concrete cushion layer is used for one-way slope finding towards the fine sand permeable layer according to the slope rate of 2 per thousand.
Preferably, the cross arm is angle steel, two ends of the cross arm are processed into shapes fitting the channel side slopes, and the cross arm is clamped and limited in the middles of the channel side slopes on two sides.
Preferably, the cable clamp is fixed on the cross arm through a bolt connecting piece; and the grounding flat iron is welded with the cross arm.
Preferably, a plurality of pull rings are arranged on the reinforced concrete cover plate.
The utility model has the advantages that:
the utility model discloses the soil body side slope of excavation sets up when combining interim cable pit to build, directly sets up the channel side slope of slope in the soil pit after the excavation, forms the opening section of "big-end-up. Thus, when the cross arm bearing the cable is placed later, the cross arm can be stably clamped on the side slopes of the two side channels without falling. Similar to the cross-arm, the reinforced concrete cover plate does not fall down, thereby protecting the cables inside. The cross arm and the reinforced concrete cover plate are installed without using embedded parts. And then, when the temporary cable trench is dismantled, the reinforced concrete cover plate is directly uncovered, and then the cross arm is upwards taken up. The whole building and dismantling process is convenient and fast. Besides, the fine sand permeable layer at the bottom of the cable trench discharges rainwater flowing into the cable trench, so that water is not accumulated easily in the trench. The grounding flat iron is connected with the cross arm of the supporting cable to realize electrical grounding. The temporary cable trench is used in the construction transition stage, not only has the conventional use requirements of common cable trench for cable laying, electrical grounding, drainage and the like, but also obviously increases the convenience of construction, reduces the engineering quantity of new construction and later-stage demolition, and shortens the construction period.
Drawings
Fig. 1 is a schematic structural diagram of a temporary cable trench provided in an embodiment of the present invention.
In the figure:
1. a trench side slope; 11. plain concrete surface course; 12. slope protection short steel bars; 2. a trench pit bottom; 21. a plain concrete cushion; 22. a fine sand permeable layer; 3. a cross arm; 4. a cable clamp; 41. a bolt connection; 5. grounding flat iron; 6. a reinforced concrete cover plate; 61. and (4) a pull ring.
Detailed Description
Reference will now be made in detail to the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar parts throughout, or parts having the same or similar functions. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "connected," "connected," and "fixed" are to be construed broadly and can include, for example, fixed or removable connections, mechanical or electrical connections, direct connections, indirect connections through an intermediary, communication between two elements, or an interaction between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the description of the present invention, unless otherwise expressly specified or limited, the first feature "on" or "under" the second feature may include both the first and second features being in direct contact, and may also include the first and second features being in contact, not in direct contact, but with another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
The embodiment provides a temporary cable trench structure for a construction transition stage, which comprises a trench side slope 1, a trench pit bottom 2, a cross arm 3, a cable clamp 4, a grounding flat iron 5 and a reinforced concrete cover plate 6, as shown in fig. 1. The tops of the channel side slopes 1 on the two sides incline to the direction away from each other; the surfaces of the channel side slope 1 and the channel pit bottom 2 are required to be repaired to be smooth; the cross arm 3 is clamped between the channel side slopes 1 on the two sides and used for supporting cables; one end of the grounding flat iron 5 is connected with the cross arm 3, and the other end of the grounding flat iron penetrates through the channel side slope 1 and extends into the soil body; the reinforced concrete cover plate 6 is erected on the tops of the side slopes 1 with the channels on the two sides.
Specifically, the slope rate of both sides channel side slope 1 is all not more than 1.75 to guarantee channel side slope 1's stability, make cross arm 3 can block the limit between both sides channel side slope 1 and stabilize, be difficult for dropping. The surface of both sides channel side slope 1 all is provided with 5 centimetres thick plain concrete surface course 11 to insert a plurality of bank protection short reinforcement 12, suitably strengthens the intensity of channel side slope 1, makes channel side slope 1 can be connected firmly with the soil body. The diameter of the slope protection short steel bars 12 is 6-8 mm, the length of each short steel bar is not less than 10 cm, the slope body plane of the plurality of slope protection short steel bars 12 along the channel side slope 1 is in quincunx arrangement, and the horizontal and vertical intervals are not more than 200 mm.
Specifically, a plain concrete cushion layer 21 with the thickness of not less than 10 centimeters is arranged on the surface of the trench bottom 2, and a fine sand permeable layer 22 with the thickness of not less than 10 centimeters is arranged at the position close to the trench side slope 1 on one side. The plain concrete cushion layer 21 unidirectionally finds a slope to the fine sand permeable layer 22 according to the slope rate of 2 per thousand so as to effectively discharge rainwater in the temporary cable trench into a soil layer.
Specifically, the cross arm 3 is an angle steel, two ends of the angle steel are processed into shapes fitting the channel side slopes 1, and the angle steel is clamped and limited in the middles of the channel side slopes 1 on two sides. Because the whole section is large at the top and small at the bottom, the two ends of the angle steel clamped and limited in the middle part can not fall off without measures such as embedded parts and the like.
Specifically, the cable clamp 4 is fixed on the cross arm 3 through a bolt connecting piece 41 for fixing the cable, and the grounding flat iron 5 is welded with the cross arm 3.
Specifically, the reinforced concrete cover plate 6 is provided with a plurality of pull rings 61, and the thickness and the reinforcing bars of the reinforced concrete cover plate 6 are calculated and determined according to the construction load above the reinforced concrete cover plate. When the temporary cable trench is not used, the trench space backfill earthwork can be directly compacted without leaving obvious underground obstacles, and the demolition work amount is small.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (6)

1. A interim cable pit structure for construction transition phase its characterized in that: the temporary cable trench structure comprises trench side slopes (1), trench pit bottoms (2), cross arms (3), cable clamps (4), grounding flat irons (5) and reinforced concrete cover plates (6), wherein the tops of the trench side slopes (1) on two sides are inclined towards directions away from each other; the surfaces of the channel side slope (1) and the channel pit bottom (2) are required to be repaired and leveled; the cross arm (3) is clamped between the channel side slopes (1) at two sides and used for supporting cables; one end of the grounding flat iron (5) is connected with the cross arm (3), and the other end of the grounding flat iron penetrates through the channel side slope (1) and extends into a soil body; the reinforced concrete cover plates (6) are erected at the tops of the channel side slopes (1) on the two sides.
2. The temporary cable trench structure for construction transition stage according to claim 1, wherein: both sides the slope rate of channel side slope (1) all is not more than 1.75, and every the surface of channel side slope (1) is provided with plain concrete surface course (11) that 5 centimetres are thick, and inserts a plurality of bank protection short reinforcement (12), the diameter of bank protection short reinforcement (12) is 6-8 millimeters, and single length is not less than 10 centimetres, and is a plurality of bank protection short reinforcement (12) are followed the slope body plane of channel side slope (1) is the quincunx and arranges, and level, vertical interval all are not more than 200 millimeters.
3. The temporary cable trench structure for construction transition stage according to claim 1, wherein: the surface of the channel pit bottom (2) is provided with a plain concrete cushion layer (21) with the thickness not less than 10 centimeters, a fine sand permeable layer (22) with the thickness not less than 10 centimeters is arranged at the position close to the channel side slope (1), and the plain concrete cushion layer (21) can be used for one-way slope finding of the fine sand permeable layer (22) according to the slope rate of 2 per thousand.
4. The temporary cable trench structure for construction transition stage according to claim 1, wherein: the cross arm (3) is an angle steel, the two ends of the cross arm are processed into shapes which are attached to the channel side slopes (1), and the cross arm is clamped and limited in the middle of the channel side slopes (1).
5. The temporary cable trench structure for construction transition stage according to claim 1, wherein: the cable clamp (4) is fixed on the cross arm (3) through a bolt connecting piece (41); the grounding flat iron (5) is welded with the cross arm (3).
6. The temporary cable trench structure for construction transition stage according to claim 1, wherein: and a plurality of pull rings (61) are arranged on the reinforced concrete cover plate (6).
CN202221695723.4U 2022-07-01 2022-07-01 Temporary cable trench structure for construction transition stage Active CN217903983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221695723.4U CN217903983U (en) 2022-07-01 2022-07-01 Temporary cable trench structure for construction transition stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221695723.4U CN217903983U (en) 2022-07-01 2022-07-01 Temporary cable trench structure for construction transition stage

Publications (1)

Publication Number Publication Date
CN217903983U true CN217903983U (en) 2022-11-25

Family

ID=84131919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221695723.4U Active CN217903983U (en) 2022-07-01 2022-07-01 Temporary cable trench structure for construction transition stage

Country Status (1)

Country Link
CN (1) CN217903983U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116742532A (en) * 2023-06-29 2023-09-12 中建八局第一建设有限公司 Temporary power cable landfill method and auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116742532A (en) * 2023-06-29 2023-09-12 中建八局第一建设有限公司 Temporary power cable landfill method and auxiliary device

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN217903983U (en) Temporary cable trench structure for construction transition stage
CN108457289A (en) A kind of open caisson construction method of complex condition
CN211172000U (en) Foundation pit enclosure system with combination of support piles and concrete main structure
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN110700273B (en) In-situ protection method for parallel masonry trench crossing foundation pit
CN113136854A (en) Separated lock chamber system with double-row pile support and buttress side wall combined
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN110644501A (en) Foundation pit supporting and underpinning bearing platform combined construction method with zero distance from original building
CN214738333U (en) Permanent-faced combined box culvert foundation reinforcing structure
CN213016369U (en) Transverse elliptical deformation resistant shield tunnel reinforcing structure with embedded steel plates
CN109555130B (en) Middle plate of subway main body structure and temporary supporting structure and construction method
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN209277195U (en) A kind of retaining wall
CN209779638U (en) Reinforced concrete blade wall supporting system for deep foundation pit support replacement construction
CN208311644U (en) For the foundation pit flexible pipe line aerial construction across slope structure
CN202402795U (en) Support device for excavating pipeline encountered by tunnel in water-rich quicksand stratum
CN217556976U (en) Water conservancy construction cofferdam device
CN217053424U (en) A cofferdam structure for mountain area hydraulic tunnel export repair works
CN215948218U (en) A construction support frame for narrow and small space
CN104775448A (en) Basement construction method in soft soil area
CN217629966U (en) Face semi-reverse construction method foundation ditch inner support structure of large-span of subway
CN214423356U (en) Opposite clamping type cable-stayed foundation structure
CN111794340B (en) Drainage pipeline structure and construction method thereof
CN217352609U (en) Municipal manhole anti-sedimentation reinforcing structure for soft soil foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant