CN217897278U - House building engineering construction is with hanging mould device - Google Patents

House building engineering construction is with hanging mould device Download PDF

Info

Publication number
CN217897278U
CN217897278U CN202220942655.0U CN202220942655U CN217897278U CN 217897278 U CN217897278 U CN 217897278U CN 202220942655 U CN202220942655 U CN 202220942655U CN 217897278 U CN217897278 U CN 217897278U
Authority
CN
China
Prior art keywords
template
longitudinal
screw rod
engineering construction
lead screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220942655.0U
Other languages
Chinese (zh)
Inventor
王乐平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220942655.0U priority Critical patent/CN217897278U/en
Application granted granted Critical
Publication of CN217897278U publication Critical patent/CN217897278U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a house building engineering construction is with hanging mould device, including longitudinal formwork, horizontal template, lead screw adjustment mechanism and folding link mechanism, the utility model discloses a set up the mount, lead screw adjustment mechanism and baffle, lead screw adjustment mechanism installs in the front of mount, back, a left side, four directions on the right side, can drive through lead screw adjustment mechanism and install the baffle at end separately and remove along lead screw length direction, and then can adapt to not unidimensional mould that hangs reinforced needs, make this device application scope wider, the practicality is stronger, the utility model discloses a set up folding link mechanism, folding link mechanism is the diagonal angle and installs between adjacent longitudinal formwork and horizontal template, after the template uses, the adjacent longitudinal formwork that the centre was provided with folding link mechanism and horizontal template accessible folding link mechanism fold, conveniently carry, directly expand when using 90 can, use convenient and fast more.

Description

House building engineering construction is with hanging mould device
Technical Field
The utility model relates to a building engineering technical field specifically is a house building engineering construction is with hanging mould device.
Background
The suspended formwork is a formwork suspended in the air without lower support, and can be fixed in various ways, such as being supported by a water stop pull rod, the suspended formwork construction is widely applied to various civil engineering, such as large-scale equipment foundation, valve well pouring and the like, when the suspended formwork is installed, the suspended formwork is mostly made of wood boards, is used for scattered assembly and disassembly, and is fixed by iron wires, but the bending rigidity of the wood boards is lower, the overall stability of the suspended formwork is poor, and the suspended formwork is easy to deform, and in order to solve the problem, a connecting or reinforcing component is usually installed between adjacent formworks or between symmetrical formworks so as to improve the overall stability of the suspended formwork.
However, the existing mold hanging device has poor flexibility in connection or supporting structure, which is inconvenient for size adjustment and folding of the template, and further difficult to adapt to installation and reinforcement of the mold hanging of different sizes, and is inconvenient for folding, storage and carrying of the template.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a house building engineering construction is with hanging mould device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a house building engineering construction is with hanging mould device, includes vertical template, horizontal template, lead screw adjustment mechanism and folding link mechanism, vertical template and horizontal template all are provided with two, two relative setting about the vertical template, two relative setting around the horizontal template, adjacent setting vertical template and horizontal template vertical end to end relatively, two be provided with the mount between vertical template and two horizontal templates, all install lead screw adjustment mechanism towards four directions about turning to on the mount, the overhead baffle of installing of lead screw adjustment mechanism's outer end, the baffle butt is on vertical template and horizontal template, be provided with folding link mechanism and right angle board on two sets of diagonal angles of the cuboid that vertical template and horizontal template enclose respectively, folding link mechanism's both ends are connected with two adjacent templates.
As a further aspect of the present invention: the screw rod adjusting mechanism comprises a screw rod, nuts, screw rod bearings and adjusting handles, the screw rod is in threaded connection with the nuts embedded on the four outer end heads of the fixing frame, the adjusting handles are installed at one ends of the screw rod, and the other ends of the screw rod are in rotating connection with the screw rod bearings correspondingly installed on the longitudinal template or the transverse template.
As a further aspect of the present invention: the two sides of the screw rod are provided with slide bars, one ends of the slide bars are fixedly connected with the longitudinal template or the transverse template which are correspondingly arranged, the other ends of the slide bars are provided with limiting bar heads, and the outer end of the fixing frame is provided with bar holes matched with the slide bars.
As the utility model discloses further scheme again: the folding connecting rod mechanism comprises a first connecting rod, a second connecting rod, a locking knob, a connecting plate and an articulated piece, one end of the first connecting rod and one end of the second connecting rod are arranged in a crossed mode, the locking knob is arranged at the position where the first connecting rod and the second connecting rod are crossed, and the other end of the first connecting rod and the other end of the second connecting rod are respectively hinged to the corresponding connecting plate arranged on the adjacent template through the articulated piece in a movable mode.
As the utility model discloses further scheme again: the right-angle plates are clamped on the oblique symmetrical inner angles of a rectangular body formed by the longitudinal template and the transverse template in a surrounding mode.
As a further aspect of the present invention: the baffle is L-shaped as a whole.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up mount, lead screw adjustment mechanism and baffle, lead screw adjustment mechanism installs in four directions in the front, back, left and right of mount, can drive through lead screw adjustment mechanism and install the baffle at each end and remove along lead screw length direction, and then can adapt to not unidimensional mould reinforcement's needs of hanging for this device application scope is wider, and the practicality is stronger.
2. The utility model discloses a set up folding link mechanism, folding link mechanism is the diagonal angle and installs between adjacent vertical template and horizontal template, after the template use, the middle adjacent vertical template and horizontal template accessible folding link mechanism that is provided with folding link mechanism folds, conveniently carries, directly expand when the reuse be 90 can, use convenient and fast more.
Drawings
Fig. 1 is a plan view of a formwork hanging device for building construction.
Fig. 2 is an enlarged view of a structure a in fig. 1 of a formwork hanger for house construction work.
Fig. 3 is an enlarged view of a structure at B in fig. 1 of the form hanging device for housing construction engineering construction.
Fig. 4 is a schematic structural view of a mold hanging device for building construction engineering construction, namely a baffle plate in fig. 1.
1. A longitudinal template; 2. a transverse template; 3. a fixed mount; 4. a screw rod adjusting mechanism; 401. a screw rod; 402. a nut; 403. a screw bearing; 404. adjusting the handle; 405. a slide bar; 406. a limiting rod head; 5. a baffle plate; 6. a folding linkage mechanism; 601. a first link; 602. a second link; 603. locking the knob; 604. a connecting plate; 605. an articulation member; 7. a right-angle plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-4, in the embodiment of the present invention, a hanging mold device for house building engineering construction, including longitudinal formwork 1, horizontal formwork 2, lead screw adjusting mechanism 4 and folding link mechanism 6, longitudinal formwork 1 and horizontal formwork 2 are both provided with two, two longitudinal formworks 1 are arranged relatively from left to right, two horizontal formworks 2 are arranged relatively from front to back, the longitudinal formworks 1 and the horizontal formworks 2 that are adjacently arranged are connected from head to tail relatively perpendicularly, be provided with mount 3 between two longitudinal formworks 1 and two horizontal formworks 2, lead screw adjusting mechanism 4 is all installed to four directions around turning towards on mount 3, baffle 5 is installed on the outer end of lead screw adjusting mechanism 4, baffle 5 butt is on longitudinal formwork 1 and horizontal formwork 2, be provided with folding link mechanism 6 and right angle board 7 on two sets of diagonal angles of the cuboid that longitudinal formwork 1 and horizontal formwork 2 enclose respectively, the both ends of folding link mechanism 6 are connected with two adjacent formworks.
The screw rod adjusting mechanism 4 comprises a screw rod 401, a nut 402, a screw rod bearing 403 and an adjusting handle 404, the screw rod 401 is in threaded connection with the nuts 402 embedded on the four outer end heads of the fixed frame 3, the adjusting handle 404 is installed at one end of the screw rod 401, and the other end of the screw rod 401 is in rotating connection with the screw rod bearing 403 correspondingly installed on the longitudinal template 1 or the transverse template 2.
The both sides of lead screw 401 are provided with slide bar 405, and the one end of slide bar 405 and the longitudinal formwork 1 or horizontal formwork 2 fixed connection that correspond the setting, and spacing pole head 406 is installed to the other end of slide bar 405, and the overhead pole hole of seting up with slide bar 405 looks adaptation of mount 3 outer end, slide bar 405 can be injectd baffle 5's moving direction when lead screw 401 is adjusted for baffle 5 is more stable at the removal in-process.
The folding linkage mechanism 6 comprises a first link 601, a second link 602, a locking knob 603, a connecting plate 604 and a hinge 605, wherein one end of the first link 601 and one end of the second link 602 are arranged in a crossed manner, the locking knob 603 is arranged at the crossed position of the first link 601 and the second link 602, and the other end of the first link 601 and the other end of the second link 602 are respectively and movably hinged with the connecting plate 604 correspondingly arranged on the adjacent template through the hinge 605.
The right-angle plate 7 is connected to the oblique symmetrical inner angle of the rectangular body formed by the longitudinal formwork 1 and the transverse formwork 2 in a clamped mode, the reinforcing effect on the splicing position of the formworks can be achieved through the arrangement, and the longitudinal formwork 1 and the transverse formwork 2 are prevented from being spliced and extruded by external concrete to cause slurry leakage due to dislocation.
Baffle 5 wholly is the L type, sets up like this and can make baffle 5 better to the effect that blocks of template.
The utility model discloses a theory of operation is:
when a hanging die consisting of two transverse templates 2 and two longitudinal templates 1 is reinforced, a person can sequentially rotate four screw rod adjusting mechanisms 4, the baffle plates 5 arranged at respective ends of the screw rod adjusting mechanisms 4 are respectively driven to move towards the corresponding templates until the baffle plates 5 are tightly attached to the corresponding templates, the adjusting handle 404 is rotated when adjustment is carried out, the adjusting handle 404 drives the screw rod 401 to rotate relative to the nut 402, the screw rod 401 can drive the baffle plates 5 to move along the length direction of the screw rod 401, then the right-angle plates 7 are clamped on the inner angles of the longitudinal templates 1 and the transverse templates 2 which are spliced together, the situation that the longitudinal templates 1 and the transverse templates 2 are spliced and are extruded by external concrete to be staggered to cause slurry leakage is avoided, when the hanging die is disassembled, only two adjacent screw rod adjusting mechanisms 4 are required to be adjusted, the screw rod adjusting mechanisms 4 drive the baffle plates 5 to be separated from the corresponding templates, the screw rod adjusting mechanisms 4 and the fixing frames 3 can be integrally taken out of the hanging die, then the right-angle plates 7 are disassembled, the locking knobs 603 on the folding connecting rod mechanisms 6 are loosened, and the adjacent templates are folded so that the hanging die can be conveniently carried.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a house building engineering construction is with hanging mould device, includes longitudinal formwork (1), horizontal template (2), lead screw adjustment mechanism (4) and folding link mechanism (6), its characterized in that: longitudinal template (1) and horizontal template (2) all are provided with two, two relative setting about longitudinal template (1), two relative setting about horizontal template (2), adjacent setting longitudinal template (1) and horizontal template (2) perpendicular end to end, two be provided with mount (3) between longitudinal template (1) and two horizontal templates (2), all install lead screw adjustment mechanism (4) towards four directions about turning around on mount (3), install baffle (5) on the outer end of lead screw adjustment mechanism (4), baffle (5) butt is on longitudinal template (1) and horizontal template (2), be provided with folding link mechanism (6) and right angle board (7) respectively on two sets of diagonal angles of the cuboid that longitudinal template (1) and horizontal template (2) enclose, the both ends of folding link mechanism (6) are connected with two adjacent templates.
2. The form hanging device for house building engineering construction according to claim 1, characterized in that: the screw rod adjusting mechanism (4) comprises a screw rod (401), nuts (402), screw rod bearings (403) and an adjusting handle (404), the screw rod (401) is in threaded connection with the nuts (402) which are embedded and installed on four outer end heads of the fixing frame (3), the adjusting handle (404) is installed at one end of the screw rod (401), and the other end of the screw rod (401) is in rotating connection with the screw rod bearings (403) which are correspondingly installed on the longitudinal template (1) or the transverse template (2).
3. The form hanging device for house building engineering construction according to claim 2, characterized in that: the two sides of the screw rod (401) are provided with slide rods (405), one ends of the slide rods (405) are fixedly connected with the longitudinal templates (1) or the transverse templates (2) which are correspondingly arranged, the other ends of the slide rods (405) are provided with limiting rod heads (406), and rod holes matched with the slide rods (405) are formed in the outer end heads of the fixing frames (3).
4. The form hanging device for house building engineering construction according to claim 1, characterized in that: the folding linkage mechanism (6) comprises a first connecting rod (601), a second connecting rod (602), a locking knob (603), a connecting plate (604) and a hinge piece (605), one end of the first connecting rod (601) and one end of the second connecting rod (602) are arranged in a crossed manner, the locking knob (603) is arranged at the crossed position of the first connecting rod (601) and the second connecting rod (602), and the other end of the first connecting rod (601) and the other end of the second connecting rod (602) are respectively and correspondingly hinged with the connecting plate (604) arranged on the adjacent template through the hinge piece (605) in a movable manner.
5. The form hanging device for house building engineering construction according to claim 1, characterized in that: the right-angle plates (7) are clamped on the oblique symmetrical inner angles of a rectangular body which is formed by enclosing the longitudinal templates (1) and the transverse templates (2).
6. The form hanging device for house building engineering construction according to claim 1, characterized in that: the baffle (5) is L-shaped as a whole.
CN202220942655.0U 2022-04-22 2022-04-22 House building engineering construction is with hanging mould device Active CN217897278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220942655.0U CN217897278U (en) 2022-04-22 2022-04-22 House building engineering construction is with hanging mould device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220942655.0U CN217897278U (en) 2022-04-22 2022-04-22 House building engineering construction is with hanging mould device

Publications (1)

Publication Number Publication Date
CN217897278U true CN217897278U (en) 2022-11-25

Family

ID=84110341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220942655.0U Active CN217897278U (en) 2022-04-22 2022-04-22 House building engineering construction is with hanging mould device

Country Status (1)

Country Link
CN (1) CN217897278U (en)

Similar Documents

Publication Publication Date Title
CN217897278U (en) House building engineering construction is with hanging mould device
CN208473298U (en) Square cross section column type mould reinforcing member
CN216109258U (en) Assembled board house building roof steel construction
TWI617726B (en) Template adjustment unit, template device and system template structure
CN202831624U (en) Template for deformation joint of shear wall
CN210947702U (en) Aluminum formwork device for building
CN214615398U (en) Construction plastic formwork construction structure
CN204510817U (en) Hole to be provided regularization adjustable steel frame template
CN110653323A (en) Compound concatenation riveting frock of electrical cabinet
CN217028106U (en) Concrete placement template connection structure
CN210918222U (en) Civil engineering fundamental mode mounting fixture
CN212919828U (en) Detachable assembly type building mould
CN114109025A (en) Plate lowering and formwork hanging device and construction method
CN217924874U (en) A high formwork angle brace mechanism for construction
CN218176656U (en) Concrete placement template reinforcing apparatus
CN220645202U (en) Template fixing device
CN209780244U (en) Be used for room to build engineering movement joint department template reinforcing apparatus
CN214195571U (en) Right-angle building aluminum alloy template and flat template mounting combination structure
CN218406535U (en) Electric power ditch pouring die
CN218406891U (en) Construction enclosure for precast concrete pouring
CN216551954U (en) Basement long distance concrete wall crack controlling means
CN217175672U (en) Building templates quick detach system
CN112211388A (en) Scaffold frame of easy dismouting
CN216516902U (en) Building engineering construction template device
CN218346819U (en) Concrete formwork clamping frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant