CN217896247U - A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile - Google Patents

A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile Download PDF

Info

Publication number
CN217896247U
CN217896247U CN202221699365.4U CN202221699365U CN217896247U CN 217896247 U CN217896247 U CN 217896247U CN 202221699365 U CN202221699365 U CN 202221699365U CN 217896247 U CN217896247 U CN 217896247U
Authority
CN
China
Prior art keywords
steel
frame
pair
pipe pile
square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221699365.4U
Other languages
Chinese (zh)
Inventor
张少飞
卢方卿
卢国庆
夏峰
余秀平
胡立锋
李勇海
孟晓东
王向锋
盛明宏
陈莘
李健
汪亦显
李娴
郭盼盼
钟剑
丁飞
张鲁鲁
李远荣
郭佳栋
丁超
张超
杨嘉怡
施炎坤
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
China Coal No 3 Construction Group Co Ltd
Second Engineering Co Ltd of CTCE Group
Anhui Road and Bridge Engineering Group Co Ltd
Original Assignee
Hefei University of Technology
China Coal No 3 Construction Group Co Ltd
Second Engineering Co Ltd of CTCE Group
Anhui Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology, China Coal No 3 Construction Group Co Ltd, Second Engineering Co Ltd of CTCE Group, Anhui Road and Bridge Engineering Group Co Ltd filed Critical Hefei University of Technology
Priority to CN202221699365.4U priority Critical patent/CN217896247U/en
Application granted granted Critical
Publication of CN217896247U publication Critical patent/CN217896247U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a technical field of steel trestle steel-pipe pile construction particularly relates to a liftable formula cantilever positioning guide frame for steel trestle steel-pipe pile construction. The device comprises a cantilever steel frame, a guide rail fixing frame and a construction platform frame which are horizontally arranged; the cantilever steel frame comprises a horizontally arranged Bailey truss, the guide rail fixing frame comprises a pair of rectangular steel frames, the construction platform frame comprises a horizontally arranged square steel frame, two ends of the rear side of the square steel frame are correspondingly and movably connected with the front sides of the pair of steel frames through a pair of transmission mechanisms, and when the double-shaft motor drives the pair of transmission mechanisms to work, the horizontal installation height of the square steel frame on the pair of steel frames can be adjusted; therefore the utility model discloses workman's vertical climbing when can avoiding steel trestle steel-pipe pile to construct, constructor has been avoided constructor to beat in aqueous and has established the steel-pipe pile in the operation on construction platform frame, guarantees constructor's safety to the construction platform liftable facilitates for the construction.

Description

A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile
Technical Field
The utility model relates to a technical field of steel trestle steel-pipe pile construction particularly relates to a liftable formula cantilever positioning guide frame for steel trestle steel-pipe pile construction.
Background
In the process of constructing the river-crossing bridge, a temporary bridge structure for loading and unloading goods or passengers or specially used for construction site traffic, mechanical arrangement and overhead operation is generally required to be constructed nearby, the bridge is called as a trestle, and the steel trestle is most widely applied.
The steel pipe pile needs to be arranged in a construction steel trestle, the steel pipe pile needs to be positioned before the construction process of the steel pipe pile is arranged, meanwhile, welding operation needs to be carried out on a pile head and among piles after the steel pipe pile is arranged, a construction platform needs to be arranged in the positioning process of the steel pipe pile and the welding construction process among the piles, and the steel pipe pile is generally arranged in water, so that certain difficulty exists in the arrangement of the construction platform.
At present, for solving the problem of positioning the steel pipe pile, the method for setting up the cantilever positioning guide frame is a method which is widely applied, the cantilever positioning guide frame is connected with a Bailey beam of a bridge span which is already constructed to form an overhang, a steel pipe pile guide hole is arranged at the far end to realize the positioning of the steel pipe pile, but the height of the guide frame is fixed, a good working face cannot be provided for the welding work with different heights, the welding work between the piles is often finished by depending on the setting of corresponding facilities after the steel pipe pile is arranged, the construction is complex, the construction progress is influenced, and the safety problem of auxiliary constructors is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a liftable cantilever positioning guide frame for steel trestle steel pipe pile construction, which avoids the vertical climbing of workers during the steel trestle steel pipe pile construction to ensure the safety of constructors,
the concrete technical scheme of utility model as follows: a liftable cantilever positioning guide frame for steel trestle steel pipe pile construction comprises a horizontally arranged cantilever steel frame 1, a vertically arranged guide rail fixing frame 2 and a horizontally arranged construction platform frame 3;
the cantilever steel frame 1 comprises a Bailey truss 11 which is horizontally arranged and a first manway steel plate 12 which is laid at the upper end of the Bailey truss 11,
the guide rail fixing frame 2 comprises a pair of cuboid steel frames 21, the pair of steel frames 21 are upright and are arranged at intervals correspondingly, the middle parts of the rear sides of the pair of steel frames 21 are fixedly connected with the Bailey truss 11, the upper ends of the pair of steel frames 21 are horizontally provided with connecting steel plates 22, and the connecting steel plates 22 are fixedly provided with double-shaft motors 4;
the construction platform frame 3 comprises a horizontally arranged square steel frame 31, a second steel plate 32 is horizontally laid in the square steel frame 31, so that a rectangular notch formed at the front part of the square steel frame 31 is an installation guide area of the steel pipe pile,
the two ends of the rear side of the square steel frame 31 are correspondingly and movably connected with the front sides of the pair of steel frames 21 through a pair of transmission mechanisms, and when the double-shaft motor 4 drives the pair of transmission mechanisms to work, the horizontal installation height of the square steel frame 31 on the pair of steel frames 21 can be adjusted;
when the positioning guide frame is installed and used, one end of the Bailey truss 11 is in pin joint with the Bailey beam at the front end of the laid trestle, and the Bailey beam is used for fixing the positioning guide frame.
Further, each transmission mechanism comprises a vertically arranged C-shaped slide block 51, a slide rail 52, a winding drum 53, a fixed pulley 54 and a transmission shaft 55,
the reel 53 is mounted on the connecting steel plate 22 at the upper end of the steel frame through a reel bracket 531,
one end of the transmission shaft 55 is connected with the output shaft of the double-shaft motor 4, the other end is connected with the drum shaft of the winding drum 53,
the slide rail 52 is vertically and fixedly arranged at the front side of the steel frame, the fixed pulley 54 is arranged at the upper end of the slide rail 52 through a pulley bracket,
a rope 56 is wound on the winding drum 53, the free end of the rope 56 is wound around the fixed pulley 54 and is fixedly connected with the upper end of the C-shaped sliding block 51, so that the C-shaped sliding block 51 is arranged on the sliding rail 52 through the sliding fit of the sliding block sliding rail;
the lower end of the C-shaped sliding block 51 is correspondingly and fixedly connected with the rear end part of the square steel frame 31,
when a pair of C-shaped sliding blocks on the pair of transmission mechanisms are arranged on the pair of sliding rails in a sliding fit manner and move synchronously, the horizontal installation height of the square steel frame 31 on the pair of steel frames 21 can be adjusted.
Further, each slide rail 52 is uniformly provided with a bolt hole, and a bolt penetrates through the bolt hole to fix the C-shaped slider 51 on the slide rail 52, so that the mounting height of the square steel frame 31 is fixed.
Further, a horizontal boss 33 is arranged between the pair of steel frames 21 corresponding to the rear side of the square steel frame 31, so that when the square steel frame 31 and the bailey truss 11 are located at the same horizontal position, the horizontal boss 33 corresponds to the bailey truss 11.
Further, a guardrail 311 is arranged on the outer edge of the upper end of the square steel frame 31.
Furthermore, the fixed connection positions of the Bailey truss 11 and the pair of steel frames 21 are respectively provided with an L-shaped welding angle steel 6.
Further, the pulley bracket 541 is a square frame horizontally arranged at the upper end of the slide rail 52, the axle of the fixed pulley 54 is horizontally installed in the square frame, so that the fixed pulley 54 is installed at the upper end of the slide rail 52,
the free end of the rope 56 passes through the fixed pulley 54 and extends vertically and downwards, and is fixed by passing through the upper end part of the C-shaped sliding block 51, and an anchor block is arranged on the rope 56 corresponding to the upper end of the C-shaped sliding block 51.
The utility model discloses an intentional technological effect:
(1) The utility model discloses a liftable cantilever positioning guide frame for steel trestle steel pipe pile construction, which comprises a cantilever steel frame, a guide rail fixing frame and a construction platform frame which are horizontally arranged;
the cantilever steel frame comprises a Bailey truss which is horizontally arranged, the guide rail fixing frame comprises a pair of rectangular steel frames which are vertically arranged and correspondingly arranged at intervals, the middle parts of the rear sides of the pair of steel frames are fixedly connected with the Bailey truss,
the construction platform frame comprises a square steel frame which is horizontally arranged, two ends of the rear side of the square steel frame are correspondingly and movably connected with the front sides of a pair of steel frames through a pair of transmission mechanisms, and when the double-shaft motor drives the pair of transmission mechanisms to work, the horizontal installation height of the square steel frame on the pair of steel frames can be adjusted; consequently can avoid workman's vertical climbing when steel trestle steel-pipe pile is under construction, constructor works on construction platform frame, avoided constructor to beat in aqueous and establish steel-pipe pile, guarantee constructor's safety, and the construction platform liftable can also be for the parallel connection between the stake, parts such as scissors antithetical couplet and pile bolck crossbeam bracket facilitate at not co-altitude's construction such as welding, need not again to transfer other construction machines for welding construction between the stake, manpower and material cost have been saved, convenient construction, simplify construction steps, accelerate the construction progress.
(2) The utility model discloses utilize the principle of frame bridge machine, adopt bailey truss and shaped steel processing to form a whole liftable formula cantilever location leading truck, the leading truck end is with the landing stage front end bailey roof beam pin joint of having laid the completion, the leading truck front end is the installation guide area of steel-pipe pile, consequently, can utilize the landing stage that has formed earlier as the thick location direction of waiting to construct the steel-pipe pile, recycle the accurate positioning of a pair of drive mechanism completion steel-pipe pile, simultaneously at installation guide area mountable guide system, consequently, can change the subaerial location into land location through this leading truck system, the influence of rivers to steel-pipe pile location has been avoided, construction operations's safety has been guaranteed.
Drawings
Fig. 1 is the utility model relates to a structural schematic diagram of a liftable formula cantilever positioning leading truck for steel trestle steel-pipe pile construction.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is a top view of fig. 1.
Wherein: cantilever steelframe 1, guide rail mount 2, construction platform frame 3, bailey truss 11, first running steel 12, a pair of steelframe 21, connecting steel plate 22, biaxial motor 4, square steelframe frame 31, guardrail 311, second steel sheet 32, horizontal boss 33, C-shaped slider 51, slide rail 52, reel 53, fixed pulley 54, pulley holder 541, transmission shaft 55, reel holder 531, rope 56, welding angle steel 6.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the detailed description and specific examples, while indicating the invention, are given by way of illustration only.
Example 1
A liftable cantilever positioning guide frame for steel trestle steel pipe pile construction comprises a horizontally arranged cantilever steel frame 1, a vertically arranged guide rail fixing frame 2 and a horizontally arranged construction platform frame 3;
the cantilever steel frame 1 comprises a Bailey truss 11 which is horizontally arranged and a first manway steel plate 12 which is laid at the upper end of the Bailey truss 11,
the guide rail fixing frame 2 comprises a pair of rectangular steel frames 21, the pair of steel frames 21 are upright and are correspondingly arranged at intervals, the middle parts of the rear sides of the pair of steel frames 21 are fixedly connected with the Bailey truss 11, the upper ends of the pair of steel frames 21 are horizontally provided with connecting steel plates 22, and the connecting steel plates 22 are fixedly provided with double-shaft motors 4;
the construction platform frame 3 comprises a horizontally arranged square steel frame 31, a second steel plate 32 is horizontally laid in the square steel frame 31, so that a rectangular notch formed at the front part of the square steel frame 31 is an installation guide area of the steel pipe pile,
the two ends of the rear side of the square steel frame 31 are correspondingly and movably connected with the front sides of the pair of steel frames 21 through a pair of transmission mechanisms, and when the double-shaft motor 4 drives the pair of transmission mechanisms to work, the horizontal installation height of the square steel frame 31 on the pair of steel frames 21 can be adjusted;
when the positioning guide frame is installed and used, one end of the Bailey truss 11 is in pin joint with the Bailey beam at the front end of the laid trestle, and the Bailey beam is used for fixing the positioning guide frame.
Further, each transmission mechanism comprises a vertically arranged C-shaped slide block 51, a slide rail 52, a winding drum 53, a fixed pulley 54 and a transmission shaft 55,
the reel 53 is mounted on the connecting steel plate 22 at the upper end of the steel frame through a reel bracket 531,
one end of the transmission shaft 55 is connected with the output shaft of the double-shaft motor 4, the other end is connected with the drum shaft of the winding drum 53,
the slide rail 52 is vertically and fixedly arranged at the front side of the steel frame, the fixed pulley 54 is arranged at the upper end of the slide rail 52 through a pulley bracket,
a rope 56 is wound on the winding drum 53, the free end of the rope 56 is wound around the fixed pulley 54 and is fixedly connected with the upper end of the C-shaped sliding block 51, so that the C-shaped sliding block 51 is arranged on the sliding rail 52 through the sliding fit of the sliding block sliding rail;
the lower end of the C-shaped sliding block 51 is correspondingly and fixedly connected with the rear end part of the square steel frame 31,
when a pair of C-shaped sliding blocks on the pair of transmission mechanisms are arranged on the pair of sliding rails in a sliding fit manner and move synchronously, the horizontal installation height of the square steel frame 31 on the pair of steel frames 21 can be adjusted.
Further, each slide rail 52 is uniformly provided with a bolt hole, and a bolt penetrates through the bolt hole to fix the C-shaped slider 51 on the slide rail 52, so that the mounting height of the square steel frame 31 is fixed.
Further, a horizontal boss 33 is arranged between the pair of steel frames 21 corresponding to the rear side of the square steel frame 31, so that when the square steel frame 31 and the bailey truss 11 are located at the same horizontal position, the horizontal boss 33 corresponds to the bailey truss 11.
Further, a guardrail 311 is arranged on the outer edge of the upper end of the square steel frame 31.
Furthermore, the fixed connection positions of the Bailey truss 11 and the pair of steel frames 21 are respectively provided with an L-shaped welding angle steel 6.
Further, the pulley bracket 541 is a square frame, and the square frame is horizontally arranged at the upper end of the slide rail 52, and the wheel axle of the fixed pulley 54 is horizontally installed in the square frame, so that the fixed pulley 54 is installed at the upper end of the slide rail 52,
the free end of the rope 56 passes through the fixed pulley 54 and extends vertically and downwards, and is fixed by penetrating through the upper end part of the C-shaped sliding block 51, and an anchor block is arranged on the rope 56 corresponding to the upper end penetrating through the C-shaped sliding block 51.
Example 2
A construction method for constructing a steel trestle steel pipe pile by adopting the liftable cantilever positioning guide frame,
the method specifically comprises the following steps:
s1: and connecting one end of the Bailey truss 11 with the Bailey beam at the front end of the laid trestle by a pin, and fixing the positioning guide frame.
S2: and lifting the construction platform frame 3 to be in the same horizontal position with the Bailey beam at the front end of the laid trestle, and moving the constructor and the construction machine to the construction platform frame 3.
S3: the steel pipe pile is lifted to a pile driving position by a crane, the steel pipe pile is manually assisted to be in place and is driven by a vibration pile driving hammer, and the pile tops of the steel pipe piles spanning the same horizontal line are sequentially driven to the designed horizontal height.
S4: after the completion is beaten to the steel-pipe pile, demolish the stop device of installation, construction platform frame 3 drops to suitable position, and second steel sheet 32 provides constructor's working face, and the steel-pipe pile is located the installation guide area, and constructor can be for the welding construction of the parallel connection between the stake of steel-pipe pile and scissors antithetical couplet and pile bolck department bracket, still can carry out the welding work of the not co-altitude department of steel-pipe pile.
S5: after the steel pipe piles are constructed and the welding operation among the piles is finished, the liftable cantilever positioning guide frame is detached and lifted away by the cooperation of a crane, the Bailey beam and the bridge floor of the next bridge span of the steel trestle are erected, and the following bridge spans are erected to complete the erection of the whole steel trestle by the same construction method.
Therefore the utility model discloses processing the leading truck into overall structure in the construction, after having been under construction and striding the landing stage, utilize the crawler crane to be connected leading truck integral hoisting and landing stage girder, the pile position is emitted to the accuracy, behind the adjustment leading wheel position control pile position, crawler crane cooperation vibratory hammer along survey hole site pile driving, one row of steel-pipe pile is executed and is sunk the back of finishing and put aside the guide frame, lay distribution roof beam, girder and bridge floor system, then change over to next hole landing stage construction. And the construction efficiency is improved.
It will be understood by those skilled in the art that the foregoing is merely a preferred embodiment of the present invention, and is not intended to limit the invention to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

Claims (7)

1. A liftable formula cantilever location leading truck for steel trestle steel-pipe pile construction, its characterized in that:
the device comprises a cantilever steel frame (1) which is horizontally arranged, a guide rail fixing frame (2) which is vertically arranged and a construction platform frame (3) which is horizontally arranged;
the cantilever steel frame (1) comprises a Bailey truss (11) which is horizontally arranged and a first pedestrian steel plate (12) which is laid at the upper end of the Bailey truss (11),
the guide rail fixing frame (2) comprises a pair of rectangular steel frames (21), the pair of steel frames (21) are upright and are arranged at intervals correspondingly, the middle parts of the rear sides of the pair of steel frames (21) are fixedly connected with the Bailey truss (11), the upper ends of the pair of steel frames (21) are horizontally provided with connecting steel plates (22), and the connecting steel plates (22) are fixedly provided with double-shaft motors (4);
the construction platform frame (3) comprises a horizontally arranged square steel frame (31), a second steel plate (32) is horizontally laid in the square steel frame (31) to enable a rectangular notch formed at the front part of the square steel frame (31) to be an installation guide area (312) of the steel pipe pile,
the two ends of the rear side of the square steel frame (31) are correspondingly and movably connected with the front sides of the pair of steel frames (21) through a pair of transmission mechanisms, and when the double-shaft motor (4) drives the pair of transmission mechanisms to work, the horizontal installation height of the square steel frame (31) on the pair of steel frames (21) can be adjusted;
when the positioning guide frame is installed and used, the rear end of the Bailey truss (11) is in pin joint with the Bailey beam at the front end of the laid trestle.
2. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 1, which is characterized in that:
each transmission mechanism comprises a C-shaped sliding block (51), a sliding rail (52), a winding drum (53), a fixed pulley (54) and a transmission shaft (55) which are vertically arranged,
the reel (53) is arranged on a connecting steel plate (22) at the upper end of the steel frame through a reel bracket (531),
one end of the transmission shaft (55) is connected with an output shaft of the double-shaft motor (4), the other end is connected with a drum shaft of the winding drum (53),
the sliding rail (52) is vertically and fixedly arranged at the front side of the steel frame, the fixed pulley (54) is arranged at the upper end of the sliding rail (52) through a pulley bracket (541),
a rope (56) is wound on the winding drum (53), the free end of the rope (56) is wound around the fixed pulley (54) and is fixedly connected with the upper end of the C-shaped sliding block (51), so that the C-shaped sliding block (51) is arranged on the sliding rail (52) through the sliding fit of the sliding block sliding rail;
the lower end of the C-shaped sliding block (51) is correspondingly and fixedly connected with the rear side end part of the square steel frame (31),
when a pair of C-shaped sliding blocks on the pair of transmission mechanisms are arranged on the pair of sliding rails in a sliding fit mode and move synchronously, the horizontal installation height of the square steel frame (31) on the pair of steel frames (21) can be adjusted.
3. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 2, characterized in that: bolt holes are uniformly formed in each sliding rail (52), and bolts penetrate through the bolt holes to fix the C-shaped sliding blocks (51) on the sliding rails (52), so that the mounting height of the square steel frame (31) is fixed.
4. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 1, which is characterized in that: a horizontal boss (33) is arranged between the pair of steel frames (21) corresponding to the rear side of the square steel frame (31), so that when the square steel frame (31) and the Bailey truss (11) are located at the same horizontal position, the horizontal boss (33) corresponds to the Bailey truss (11).
5. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 1, which is characterized in that: the outer edge of the upper end of the square steel frame (31) is provided with a guardrail (311).
6. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 1, which is characterized in that: and L-shaped welding angle steels (6) are arranged at the fixed connection parts of the Bailey truss (11) and the pair of steel frames (21).
7. The liftable cantilever positioning guide frame for steel trestle steel pipe pile construction according to claim 2, characterized in that: the pulley bracket (541) is a square frame, the square frame is horizontally arranged at the upper end of the sliding rail (52), the wheel shaft of the fixed pulley (54) is horizontally arranged in the square frame, so that the fixed pulley (54) is arranged at the upper end of the sliding rail (52),
the free end of the rope (56) passes through the fixed pulley (54) and extends vertically downwards, and passes through the upper end part of the C-shaped sliding block (51) to be fixed, and an anchor block is arranged on the rope (56) and correspondingly passes through the upper end of the C-shaped sliding block (51).
CN202221699365.4U 2022-07-04 2022-07-04 A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile Active CN217896247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221699365.4U CN217896247U (en) 2022-07-04 2022-07-04 A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221699365.4U CN217896247U (en) 2022-07-04 2022-07-04 A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile

Publications (1)

Publication Number Publication Date
CN217896247U true CN217896247U (en) 2022-11-25

Family

ID=84132074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221699365.4U Active CN217896247U (en) 2022-07-04 2022-07-04 A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile

Country Status (1)

Country Link
CN (1) CN217896247U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526359A (en) * 2023-06-09 2023-08-01 江苏科能电力工程咨询有限公司 Framework for outgoing line of transformer substation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116526359A (en) * 2023-06-09 2023-08-01 江苏科能电力工程咨询有限公司 Framework for outgoing line of transformer substation
CN116526359B (en) * 2023-06-09 2023-10-20 江苏科能电力工程咨询有限公司 Framework for outgoing line of transformer substation

Similar Documents

Publication Publication Date Title
CN217896247U (en) A liftable formula cantilever positioning leading truck for construction of steel trestle steel-pipe pile
CN109279480B (en) Steel structure elevator hoistway splicing device and method
CN115094765A (en) A liftable formula cantilever location leading truck for construction of steel trestle steel-pipe pile
JPH08296210A (en) Stud constructing method, stud demolishing method and lift-up and rotating device
CN112695760B (en) Erect wall and pour platform truck
CN109537466B (en) Positioning method for suspending steel structure beam in air
KR20020061651A (en) The structure and method for checking bridge
CN116856389A (en) Construction method of large-diameter and ultra-long filling pile in limited space
CN216809617U (en) Detachable self-propelled operating platform for steel beam flange plate construction
CN114575251B (en) Large-span steel truss arch bridge construction system and construction method
CN214644551U (en) Side form device for precast beam
CN214362897U (en) Reusable girder lattice system bridge girder installation and adjustment platform structure
JP2001082070A (en) Suspension type lift device and its installation method
CN113977178B (en) Crane main beam and end beam grinding and welding device
KR100526579B1 (en) Fit-up Equipment for Panel Rib applied to Bridge and Off shore Steel structure components
CN111139742A (en) Method for mounting and dismounting highway bridge girder erection machine
KR20090050548A (en) A method of manufacturing crane double girder
CN215666814U (en) Light reactor hoisting device
CN220431975U (en) Super-high adhesion structure of construction elevator
CN220953402U (en) Pile verticality adjusting structure
CN114016422B (en) Steel girder erection method
CN211679813U (en) Electric walking trolley for binding steel bars of top plate of precast beam
CN220301335U (en) Auxiliary device for disassembling reinforced concrete support
CN219990876U (en) Device convenient to elevator installation
CN220705161U (en) Concrete floor post-cast strip hanging walking template system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant