CN217872155U - Building engineering protector - Google Patents

Building engineering protector Download PDF

Info

Publication number
CN217872155U
CN217872155U CN202220186071.5U CN202220186071U CN217872155U CN 217872155 U CN217872155 U CN 217872155U CN 202220186071 U CN202220186071 U CN 202220186071U CN 217872155 U CN217872155 U CN 217872155U
Authority
CN
China
Prior art keywords
pillar
screw rod
spacing
splint
spacing seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220186071.5U
Other languages
Chinese (zh)
Inventor
徐全金
王敏
刘明治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220186071.5U priority Critical patent/CN217872155U/en
Application granted granted Critical
Publication of CN217872155U publication Critical patent/CN217872155U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a building engineering technical field specifically is a building engineering protector, including the rail guard, the pillar is all installed at the both ends of rail guard, and installs spacing seat through coupling mechanism in the upper end of pillar, the upper end fixed mounting of spacing seat has first swivel nut, and installs first screw rod through the screw thread is vertical in the first swivel nut, the fixed welding in upper end of first screw rod has the commentaries on classics handle, splint are installed through the bearing to the lower extreme of first screw rod. The utility model discloses a set up spacing seat and splint, spacing seat and splint can be installed in the upper end of pillar through coupling mechanism selectivity, and the dismouting is very convenient, and spacing seat and splint can carry out the centre gripping with the spraying water pipe in the upper end of pillar spacing, and the locking is all simple quick with the operation of opening, and need not the instrument and assist, also can not cause the damage to water pipe or guardrail, compare current mode through the steel wire winding is convenient and practical more.

Description

Building engineering protector
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering protector.
Background
When building engineering is constructed, protective guards need to be installed around a construction site, so that not only can construction areas be planned, but also external personnel can be prevented from entering the construction site, but the existing protective guards on the market are simple in structure and single in function, when dust fall spraying needs to be arranged on the protective guards, usually, a spraying water pipe is wound on the protective guards through steel wires for positioning, the operation is inconvenient, the steel wires are easy to abrade the paint surfaces of the protective guards, and therefore a building engineering protection device is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering protector to current rail guard simple structure on the market that proposes in solving above-mentioned background art, the function is single, when needs install the dust fall spraying on the rail guard, utilizes the steel wire winding to fix a position on the guardrail with the spray pipe usually, and the operation is not only inconvenient, and the steel wire still wears to the problem of the finish of guardrail very easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering protector, includes the rail guard, the pillar is all installed at the both ends of rail guard, and the upper end of pillar installs spacing seat through coupling mechanism, the upper end fixed mounting of spacing seat has first swivel nut, and vertically installs first screw rod through the screw thread in the first swivel nut, the fixed welding in upper end of first screw rod has changeed the handle, splint are installed through the bearing to the lower extreme of first screw rod, the activity groove has been seted up to the lower extreme of pillar, and vertically inserts in the activity groove and be equipped with the second screw rod, the second swivel nut is installed through the bearing to the opening part in activity groove, and the second swivel nut is connected with the second screw rod through the screw thread, the lower extreme and the base fixed connection of second screw rod.
Preferably, coupling mechanism includes the slot, the slot has been seted up to the upper end of pillar, and the slot interpolation is equipped with the inserted bar, the upper end of inserted bar and the lower extreme fixed connection of spacing seat, it has spacing rubber ring to glue on the inserted bar, the spacing groove with spacing rubber ring looks adaptation is seted up to the inner wall of slot.
Preferably, the cross sections of the slot and the inserted rod are circular, and the longitudinal section of the limiting rubber ring is circular.
Preferably, the inner wall of the upper end of the limiting seat is an arc-shaped concave surface, and anti-skid grains are formed in the inner wall of the upper end of the limiting seat.
Preferably, the lower extreme corner of splint is the fillet, the length of splint is greater than the interval at both ends around the spacing seat.
Preferably, the movable groove is connected with a movable block in a sliding mode, and the cross sections of the movable block and the movable groove are square.
Preferably, a knob is fixedly sleeved on the second threaded sleeve, and the cross section of the knob is hexagonal.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses, through setting up spacing seat and splint, spacing seat and splint can be installed in the upper end of pillar through coupling mechanism selectivity, and the dismouting is very convenient, spacing seat and splint can carry out the centre gripping with the spraying water pipe in the upper end of pillar spacing, the operation of locking and opening is all simple quick, and need not the instrument and assist, also can not cause the damage to water pipe or guardrail, it is convenient and practical more to compare the fixed mode of current through the steel wire winding, simultaneously the lower extreme length of two sets of pillars can freely be adjusted in this device, this device can install and use subaerially comparatively obvious at the difference in height like this, greatly increased the practicality and the application scope of this device.
Description of the drawings:
in order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic front view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
fig. 3 is an enlarged partial view of a in fig. 2 according to the present invention;
fig. 4 is a partially enlarged view of B in fig. 2 according to the present invention.
In the figure: 1. protecting the fence; 2. a pillar; 3. a slot; 4. inserting a rod; 5. a limiting rubber ring; 6. a limiting seat; 7. a first threaded sleeve; 8. a first screw; 9. turning a handle; 10. a splint; 11. a movable groove; 12. a movable block; 13. a second screw; 14. a second thread insert; 15. a knob; 16. a base.
The specific implementation mode is as follows:
the technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a building engineering protection device comprises a protective guard 1, pillars 2 are mounted at two ends of the protective guard 1, a limiting seat 6 is mounted at the upper end of each pillar 2 through a connecting mechanism, a first threaded sleeve 7 is fixedly mounted at the upper end of each limiting seat 6, a first screw 8 is vertically mounted in each first threaded sleeve 7 through threads, a rotating handle 9 is fixedly welded at the upper end of each first screw 8, a clamping plate 10 is mounted at the lower end of each first screw 8 through a bearing, a movable groove 11 is formed in the lower end of each pillar 2, a second screw 13 is vertically inserted in each movable groove 11, a second threaded sleeve 14 is mounted at an opening of each movable groove 11 through a bearing, each second threaded sleeve 14 is connected with each second screw 13 through threads, and the lower end of each second screw 13 is fixedly connected with a base 16;
further, coupling mechanism includes slot 3, and slot 3 has been seted up to the upper end of pillar 2, and the 3 interpolations of slot are equipped with inserted bar 4, the upper end of inserted bar 4 and spacing seat 6's lower extreme fixed connection, and the rubberizing of inserted bar 4 has spacing rubber ring 5, and the spacing groove with spacing rubber ring 5 looks adaptation is seted up to the inner wall of slot 3, like fig. 2 and fig. 3, this structure is used for selecting the dress spacing seat 6 according to the demand, easy dismounting, and need not the instrument cooperation.
Further, the cross section of slot 3, inserted bar 4 is circular, and the longitudinal section of spacing rubber ring 5 is circular, like fig. 3 for spacing seat 6 can rotate after the installation finishes, thereby can adjust and play the direction to the water pipe direction of centre gripping in spacing seat 6 through rotatory spacing seat 6.
Further, the upper end inner wall of spacing seat 6 is convex concave surface, and anti-skidding line has been seted up to the upper end inner wall of spacing seat 6, and the lower extreme corner of splint 10 is the fillet, and the length of splint 10 is greater than the interval at both ends around spacing seat 6, like fig. 3, this structure is used for avoiding the position of splint 10 and spacing seat 6 centre gripping water pipe to have the edges and corners that can cause wearing and tearing to the water pipe.
Further, sliding connection has the movable block 12 in the activity groove 11, and the cross section of movable block 12 and activity groove 11 is square, as fig. 2 and fig. 4, this structure is used for restricting the rotation of second screw rod 13 to when avoiding second swivel nut 14 to rotate, second screw rod 13 follows the rotation, leads to unable screw thread effect of carrying on.
Further, fixed the cup jointing has knob 15 on the second swivel nut 14, and the cross section of knob 15 is the hexagon, and this structure is used for leading to the dry and astringent of being connected with second screw 13 because being stained with mud at second swivel nut 14 when unable rotation through the hand rotation, and instrument such as accessible spanner rotate knob 15 to make the rotatory normal and second screw 13 of second swivel nut 14 carry out the screw thread effect.
The working principle is as follows: during the use, place the device earlier and utilize connecting pieces such as bolts to install on ground through two sets of bases 16, if ground is uneven, lead to the lower extreme nonparallel of two sets of pillars 2, can rotate knob 15 of lower one side pillar 2 lower extreme, make knob 15 drive the rotatory screw sleeve 14 of second screw sleeve and carry out the screw thread effect with second screw rod 13, make second screw rod 13 stretch out down from activity inslot 11 through the screw thread effect, and drive base 16 and keep away from pillar 2, make the lower extreme length of pillar 2 increase, in order to jack-up pillar 2 with lower one side, remedy through this mode because ground is uneven and lead to the difference in height that two sets of pillars 2 produced, thereby make the height of two sets of pillars 2 be in a straight level basically, make things convenient for follow-up multiunit device to make up the concatenation like this, if need install the dust fall spraying on the device simultaneously, can insert in slot 3 with inserted bar 4 earlier, make spacing rubber ring 5 imbed the spacing inslot, put into spacing seat 6 with the spraying water pipe again, will change 9 and rotate again, make it rotate to drive first screw rod 8 rotatory and carry out the screw thread effect and carry out the fastening clamp plate 10 and move down with first screw sleeve 7, make the water pipe 10 fix the upside that the water pipe that the clamping plate is carried out the clamp that the work principle more than the whole practical spraying device.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a building engineering protector, includes rail guard (1), its characterized in that: pillar (2) are all installed at the both ends of rail guard (1), and the upper end of pillar (2) installs spacing seat (6) through coupling mechanism, the upper end fixed mounting of spacing seat (6) has first swivel nut (7), and vertically installs first screw rod (8) through the screw thread in first swivel nut (7), the fixed welding in upper end of first screw rod (8) has changeed handle (9), splint (10) are installed through the bearing to the lower extreme of first screw rod (8), movable groove (11) have been seted up to the lower extreme of pillar (2), and vertically insert in movable groove (11) and be equipped with second screw rod (13), second swivel nut (14) are installed through the bearing to the opening part of movable groove (11), and second swivel nut (14) are connected with second screw rod (13) through the screw thread, the lower extreme and base (16) fixed connection of second screw rod (13).
2. A construction protector as claimed in claim 1 in which: coupling mechanism includes slot (3), slot (3) have been seted up to the upper end of pillar (2), and slot (3) interpolation is equipped with inserted bar (4), the upper end of inserted bar (4) and the lower extreme fixed connection of spacing seat (6), the rubberizing of inserted bar (4) has spacing rubber ring (5), the spacing groove with spacing rubber ring (5) looks adaptation is seted up to the inner wall of slot (3).
3. A construction protection device according to claim 2, wherein: the cross sections of the slot (3) and the inserted rod (4) are circular, and the longitudinal section of the limiting rubber ring (5) is circular.
4. A construction protector as claimed in claim 1 in which: the inner wall of the upper end of the limiting seat (6) is a circular arc concave surface, and anti-skid lines are arranged on the inner wall of the upper end of the limiting seat (6).
5. A construction protector as claimed in claim 1 in which: the lower extreme corner of splint (10) is the fillet, the length of splint (10) is greater than the interval at both ends around spacing seat (6).
6. A construction protection device according to claim 1, wherein: the movable groove (11) is connected with a movable block (12) in a sliding mode, and the cross sections of the movable block (12) and the movable groove (11) are square.
7. A construction protector as claimed in claim 1 in which: the second threaded sleeve (14) is fixedly sleeved with a knob (15), and the cross section of the knob (15) is hexagonal.
CN202220186071.5U 2022-01-24 2022-01-24 Building engineering protector Expired - Fee Related CN217872155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220186071.5U CN217872155U (en) 2022-01-24 2022-01-24 Building engineering protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220186071.5U CN217872155U (en) 2022-01-24 2022-01-24 Building engineering protector

Publications (1)

Publication Number Publication Date
CN217872155U true CN217872155U (en) 2022-11-22

Family

ID=84048401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220186071.5U Expired - Fee Related CN217872155U (en) 2022-01-24 2022-01-24 Building engineering protector

Country Status (1)

Country Link
CN (1) CN217872155U (en)

Similar Documents

Publication Publication Date Title
CN217872155U (en) Building engineering protector
CN210616111U (en) Angle-adjustable point-removing angle grinder
CN112483851B (en) Railway civil engineering mapping equipment
CN212836875U (en) Steel pipe column for stereo garage
CN213710623U (en) Building engineering protective bracket
CN216949785U (en) Safety protection equipment for building engineering construction
CN220747880U (en) Rail guard is used in construction
CN216109665U (en) Scaffold protective fence
CN211201099U (en) Cantilever device for building engineering construction
CN212201399U (en) Locking structure of twisting block
CN219808680U (en) Split-level balcony section steel support frame
CN219327188U (en) Wall post foot connection structure
CN219316344U (en) Engineering site safety construction frame
CN217896768U (en) But rotation regulation's mounting structure
CN211597279U (en) Imitative blue or green brick stone material curtain
CN215889887U (en) Mounting bracket is used in civil engineering construction
CN211639779U (en) Rail guard installation device for highway construction
CN210016357U (en) Hidden motor jackscrew support
CN215291592U (en) Rail guard is used in construction for high-rise building engineering
CN211029779U (en) Sleeve for high-altitude bolt fastening operation
CN220266635U (en) Anti-falling net mounting structure of piping shaft
CN215520325U (en) Face limit guardrail with activity couple
CN210210146U (en) Guardrail installation is with supporting frock
CN213557866U (en) A anticorrosive treatment device for guardrail production
CN218623220U (en) Attached scaffold protection turns over board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221122