CN217871782U - Be used for wall post to pour fashioned frock - Google Patents

Be used for wall post to pour fashioned frock Download PDF

Info

Publication number
CN217871782U
CN217871782U CN202221099755.8U CN202221099755U CN217871782U CN 217871782 U CN217871782 U CN 217871782U CN 202221099755 U CN202221099755 U CN 202221099755U CN 217871782 U CN217871782 U CN 217871782U
Authority
CN
China
Prior art keywords
baffle plate
template
plate
wall column
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221099755.8U
Other languages
Chinese (zh)
Inventor
张周
张晓�
钟清闲
廖远平
何焯兴
文伟灿
陈文泰
卓伟枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jishi Construction Group Co ltd
Original Assignee
Guangzhou Jishi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jishi Construction Group Co ltd filed Critical Guangzhou Jishi Construction Group Co ltd
Priority to CN202221099755.8U priority Critical patent/CN217871782U/en
Application granted granted Critical
Publication of CN217871782U publication Critical patent/CN217871782U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction technical field especially relates to a be used for wall post to pour fashioned frock. This be used for wall post to pour fashioned frock includes a plurality of riser subassemblies, and the riser subassembly includes base and template. The base comprises a first baffle plate, a second baffle plate and a bottom plate, the bottom end of the first baffle plate is connected to one side end of the bottom plate, the bottom end of the second baffle plate is connected to the upper surface of the bottom plate, the first baffle plate and the second baffle plate are oppositely arranged, an inserting groove is formed between the first baffle plate and the second baffle plate, the bottom plate is provided with a plurality of positioning holes, and the positioning holes are positioned on one side, back to the first baffle plate, of the second baffle plate; the template is inserted into the slot, and the height of the template exceeds that of the first baffle; the vertical plate assemblies are arranged pairwise in a mode that the templates are opposite, and a wall column pouring cavity is formed between the vertical plate assemblies and the templates. That is, this a frock for wall post pouring shaping has realized the purpose that uses this frock repeatedly at the process of pouring of a plurality of wall posts.

Description

Be used for wall post to pour fashioned frock
Technical Field
The embodiment of the utility model provides a relate to construction technical field, especially relate to a be used for wall post to pour fashioned frock.
Background
With scientific progress and social development, the requirements of human beings on living and living environments are higher and higher, and the requirements on the quality of buildings are also continuously improved. In the civil residential building engineering of high-rise or super high-rise, the main structure form selects the reinforced concrete shear wall-frame structure more. In the construction stage of the main body structure, the common quality problems of the cast-in-place concrete structure occur frequently. Particularly, when the shear wall and the column template are installed on the structural ground, the lower part of the concrete poured due to the gap between the wall column template and the structural ground has a slurry leakage phenomenon, so that root rot of the root of the wall column is caused, and the quality of the formed wall column is seriously influenced.
The installation of the shear wall and column templates is a necessary process of construction, and the gap between the template at the root and the structural ground is directly related to the effect of the wall and column after concrete pouring and forming. In the prior art, the shear wall template usually adopts the positioning structures arranged at the left side and the right side of the lower part of the template, and the positioning structures and the wall body are integrally formed through concrete pouring, so that the positioning device is a disposable consumable, has higher cost and is not beneficial to environmental protection.
SUMMERY OF THE UTILITY MODEL
The utility model aims at: the utility model provides a be used for wall post to pour fashioned frock to realize using this frock repeatedly at the process of pouring of a plurality of wall posts, save the material cost.
This be used for wall post to pour fashioned frock includes a plurality of riser subassemblies, the riser subassembly includes base and template. The base comprises a first baffle plate, a second baffle plate and a bottom plate, the bottom end of the first baffle plate is connected to one side end of the bottom plate, the bottom end of the second baffle plate is connected to the upper surface of the bottom plate, the first baffle plate and the second baffle plate are arranged oppositely, a slot is formed between the first baffle plate and the second baffle plate, the bottom plate is provided with a plurality of positioning holes, and the positioning holes are located on one side, back to the first baffle plate, of the second baffle plate; the template is inserted into the slot, and the height of the template exceeds that of the first baffle; the vertical plate assemblies are arranged pairwise in a mode that the templates are opposite, and a wall column pouring cavity is formed between the vertical plate assemblies and the templates.
Optionally, the positioning holes are arranged in a double row parallel to the first baffle and the second baffle, and the distance between any two adjacent positioning holes in each row is the same.
Optionally, the two opposite templates are provided with communicating pipes, and the communicating pipes penetrate through the two templates.
Optionally, the split bolt penetrates through the communicating pipe, two ends of the split bolt are respectively provided with a fastener, and a steel pipe is arranged between the fastener and the template.
Optionally, a plurality of wood purlins are arranged between the steel pipe and the template, and the wood purlins and the steel pipe are arranged at a certain angle.
Optionally, be equipped with cement support bar and reinforcing bar in the wall post pouring cavity, the cement support bar erects in the template, the reinforcing bar erects in the cement support bar.
Optionally, the two sets of vertical plate assemblies enclose a columnar wall column pouring cavity, and a fastening member is arranged on the periphery of each vertical plate assembly.
Optionally, a wood purlin is disposed between the hooping and the formwork.
The utility model discloses a be used for wall post to pour fashioned frock compares with prior art, has following beneficial effect:
this be used for wall post to pour fashioned frock includes a plurality of riser subassemblies, and the riser subassembly includes base and template. The base comprises a first baffle plate, a second baffle plate and a bottom plate, the bottom end of the first baffle plate is connected to one side end of the bottom plate, the bottom end of the second baffle plate is connected to the upper surface of the bottom plate, the first baffle plate and the second baffle plate are oppositely arranged, an inserting groove is formed between the first baffle plate and the second baffle plate, the bottom plate is provided with a plurality of positioning holes, and the positioning holes are positioned on one side, back to the first baffle plate, of the second baffle plate; the template is inserted into the slot, and the height of the template exceeds that of the first baffle; the vertical plate assemblies are arranged pairwise in a mode that the templates are opposite, and a wall column pouring cavity is formed between the vertical plate assemblies and the templates.
The nail penetrates through the positioning hole, the bottom plate is fastened with the ground, then an operator inserts the template into the slot of the base, and the front and back surfaces of the root of the template are clamped by the first baffle and the second baffle, so that the template is prevented from shaking. And then, pouring concrete in the pouring cavities of the wall columns, which can be enclosed by a plurality of pedestals and templates. If a higher wall column is needed, the template can be pertinently lifted by a plurality of centimeters in the slot. After the wall post shaping, pull out and penetrate the nail, and demolish base and template, so realized pouring the reuse of frock. That is, this a frock for wall post pouring shaping has realized the purpose that uses this frock repeatedly in the process of pouring of a plurality of wall posts.
Drawings
Fig. 1 is the embodiment of the utility model provides a be used for wall post to pour fashioned frock's schematic diagram.
Fig. 2 is a schematic view of a tool for casting a shear wall.
Figure 3 is a schematic view of the tooling for casting a structural column.
In the figure, 100, base; 110. a first baffle plate; 120. a second baffle; 130. a base plate; 131. positioning holes; 132. a first row of positioning holes; 133. a second row of positioning holes;
200. a template; 210. a communicating pipe; 220. oppositely pulling bolts; 221. a fastener; 230. a steel pipe; 240. wood purlin; 250. a cinch;
300. pouring a cavity in the wall column; 310. a cement support bar; 320. and (5) reinforcing steel bars.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described in more detail with reference to the accompanying drawings and specific embodiments. It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may be present. The terms "vertical," "horizontal," "left," "right," "inner," "outer," and the like as used herein are for purposes of description only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
As shown in fig. 1-3, it has given respectively the embodiment of the utility model provides a schematic diagram, the frock that is used for the wall post to pour fashioned frock are used for pouring the schematic diagram of shear force wall and the schematic diagram that the frock is used for pouring the structure post, and this a frock for wall post pours fashioned frock includes a plurality of riser subassemblies, and a plurality of riser subassemblies set up with two liang of relative forms, form the wall post between the two and pour the cavity. The riser assembly includes a base 100 and a die plate 200. The base 100 not only serves to support the form 200, but also helps to reduce the gap between the form 200 and the ground, i.e., reduces the risk of grout leakage at the root of the wall stud. The formwork 200 is fixed to the base 100, and the formwork 200 mainly functions to enclose a space to be poured. The base 100 and the template 200 will be described in detail below.
With respect to the susceptor 100, it includes a first baffle 110, a second baffle 120, and a base plate 130. The first baffle 110 and the second baffle 120 are arranged opposite to each other, the first baffle 110 and the second baffle 120 are perpendicular to the base plate 130, and the first baffle 110 and the second baffle 120 are used for clamping the root of the template 200. One end surface of the base plate 130 is connected to one end surface of the first barrier 110, and the other end surface extends out of the second barrier 120. The bottom plate 130, the first barrier 110 and the second barrier 120 define a slot for receiving the heel of the template 200. The bottom plate 130 is provided with a plurality of positioning holes 131 at a portion beyond the second barrier 120, and the bottom plate 130 is nailed to the ground through the positioning holes 131 by a nail. In order to make the stress on the bottom plate 130 uniform, the positioning holes 131 are arranged in two rows, and the distance between adjacent positioning holes 131 in each row is the same. Specifically, the first baffle 110 is 1000 mm long, 60 mm high, 2mm thick and made of aluminum alloy. The second baffle 120 is 1000 mm long, 58 mm high and 2mm thick, and is made of aluminum alloy. The bottom plate 130 is 1000 mm long, 98 mm wide and 2mm thick, and is made of aluminum alloy. The first baffle 110 and the bottom plate 130 are welded and fixed to form an L-shaped right angle, and then the second baffle 120 is welded at a position spaced by about 15 mm (thickness of the template) from the first baffle 110. A first row of positioning holes 132 are drilled from the outer edge of the second baffle plate 120 by 20mm, a second row of positioning holes 133 are drilled from the outer edge of the first row of positioning holes 132 by 66mm, and the distance between every two adjacent rows of positioning holes 131 is 100mm. And (5) drilling by aligning the phi 3.5 mm drill bit with the circle center. The first row of positioning holes 132 and the second row of positioning holes 133 are staggered.
Regarding the template 200, it is inserted into the slot, and the height of the template 200 should exceed the first barrier 110. If a taller wall stud is desired, the form 200 may be purposefully raised several centimeters within the slot. In order to facilitate the requirements of later-stage shear wall formwork reinforcement and air exhaust and the like, a communication pipe 210 is arranged between the two oppositely-arranged formworks 200, and the communication pipe 210 penetrates through the two formworks 200. Preferably, the communication pipe 210 is made of PVC, and the communication pipe 210 may be disposed perpendicular to the mold plate 200. In order to fix the concrete between the formworks 200 conveniently, the tie bolts 220 pass through the connection pipes 210, the fastening members 221 are respectively provided at both ends of the tie bolts 220, and the steel pipes 230 are provided between the fastening members 221 and the formworks 200. Tightening of fasteners 221 on counter bolts 220 causes steel duct 230 to act on form 200. In addition, in order to enable the template 200 to be stressed uniformly, a plurality of wood purlins 240 are arranged between the steel pipe 230 and the template 200, and the wood purlins 240 and the steel pipe 230 are arranged at a certain angle.
The ground is provided with a plurality of bases 100 and templates 200, and the bases 100 and the templates 200 and the ground are enclosed to form a wall column pouring cavity 300. When the structural wall needs to be poured, two bases 100 and two templates 200 which are arranged oppositely are fixed on the ground, and a wall pouring space is formed between the two templates 200. When the structural column needs to be poured, four bases 100 and four templates 200 which are arranged in pairs in an opposite mode can be fixed on the ground, and the periphery of each template 200 is provided with a hoop member 250. Preferably, a wood brace 240 is disposed between the tightening member 250 and the form 200. Conventionally, a cement support bar 310 and a steel bar 320 are arranged in the pouring space, the cement support bar 310 is erected on the formwork 200, and the steel bar 320 is erected on the cement support bar 310, and the two support bars and the steel bar play a role in assisting in supporting the concrete material.
The utility model is used for the use that the wall was pour: firstly, measuring and marking the ground; secondly, installing the base 100, and shooting and fixing the nail; thirdly, the template 200 is inserted into the base 100; fourthly, placing the cement support bars 310; fifthly, the other side template 200 is correspondingly installed; sixthly, vertically mounting a wood balk 240; seventh, a communicating pipe 210 and a split bolt 220 are set up; eighthly, building a transverse steel pipe 230 at the periphery; ninth, the split bolt 220 is locked; tenth, concrete is poured, and after the concrete is formed, the base 100 and the formwork 200 are removed.
The utility model is used for the use that the column was pour is pour slightly differently with above-mentioned wall, when enclosing to close the column and pour the space, generally need be equipped with 4 bases 100 and template 200, then tie up template 200 through outer hoop spare 250. The rest is similar to the above.
To sum up, compare with prior art, the embodiment of the utility model provides a design both sides fixed die plate 200 that is used for wall post to pour fashioned frock accessible base 100 is equipped with locating hole 131 on the base 100 in addition, locks base 100 on the top surface, reduces shear force wall and template 200's clearance, reduces the root risk of leaking thick liquid. Through the design that bottom plate 130 outwards extends, except that first baffle 110 and template 200 contact with the concrete, it does not contact with the concrete with spare part, has effectively realized that the frock can dismantle many times, cyclic utilization, reduce cost budget. And this frock is not influenced by wall post width factor, is applicable to the wall post width condition of difference.
It should be noted that the preferred embodiments of the present invention are described in the specification and the drawings, but the present invention can be realized in many different forms, and is not limited to the embodiments described in the specification, and these embodiments are not provided as additional limitations to the present invention, and are provided for the purpose of making the understanding of the disclosure of the present invention more thorough and complete. Moreover, the above technical features are combined with each other to form various embodiments which are not listed above, and all the embodiments are regarded as the scope of the present invention; further, it will be apparent to those skilled in the art that modifications and variations can be made in the light of the above teachings, and all such modifications and variations are intended to be within the scope of the present invention.

Claims (8)

1. The utility model provides a be used for wall post to pour fashioned frock, its characterized in that includes a plurality of riser subassemblies, the riser subassembly includes:
the base comprises a first baffle plate, a second baffle plate and a bottom plate, the bottom end of the first baffle plate is connected to one side end of the bottom plate, the bottom end of the second baffle plate is connected to the upper surface of the bottom plate, the first baffle plate and the second baffle plate are arranged oppositely, a slot is formed between the first baffle plate and the second baffle plate, the bottom plate is provided with a plurality of positioning holes, and the positioning holes are positioned on one side, back to the first baffle plate, of the second baffle plate;
the template is inserted into the slot, and the height of the template exceeds that of the first baffle;
the vertical plate assemblies are arranged pairwise in a mode that the templates are opposite, and a wall column pouring cavity is formed between the vertical plate assemblies and the templates.
2. The tool for casting the wall column according to claim 1, wherein the positioning holes are arranged in a double row parallel to the first baffle plate and the second baffle plate, and the distance between any two adjacent positioning holes in each row is the same.
3. The tool for casting the wall column according to claim 1, wherein the two opposite templates are provided with communicating pipes, and the communicating pipes penetrate through the two templates.
4. The tool for casting the wall column according to claim 3, wherein a split bolt penetrates through the communicating pipe, two ends of the split bolt are respectively provided with a fastener, and a steel pipe is arranged between the fastener and the template.
5. The tool for casting and forming the wall column according to claim 4, wherein a plurality of wood purlins are arranged between the steel pipe and the template, and the wood purlins and the steel pipe are arranged at a certain angle.
6. The tool for casting the wall column according to claim 1, wherein a cement support bar and a steel bar are arranged in the wall column casting cavity, the cement support bar is erected on the formwork, and the steel bar is erected on the cement support bar.
7. The tool for casting the wall column according to claim 1, wherein the two groups of vertical plate assemblies surround a columnar wall column casting cavity, and a tightening piece is arranged on the periphery of each vertical plate assembly.
8. The tool for casting the wall column according to claim 7, wherein a wood purlin is arranged between the hooping piece and the template.
CN202221099755.8U 2022-05-07 2022-05-07 Be used for wall post to pour fashioned frock Active CN217871782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221099755.8U CN217871782U (en) 2022-05-07 2022-05-07 Be used for wall post to pour fashioned frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221099755.8U CN217871782U (en) 2022-05-07 2022-05-07 Be used for wall post to pour fashioned frock

Publications (1)

Publication Number Publication Date
CN217871782U true CN217871782U (en) 2022-11-22

Family

ID=84090073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221099755.8U Active CN217871782U (en) 2022-05-07 2022-05-07 Be used for wall post to pour fashioned frock

Country Status (1)

Country Link
CN (1) CN217871782U (en)

Similar Documents

Publication Publication Date Title
US8424835B2 (en) Method of supporting panel structures over concrete footings utilizing tie system for forming poured concrete walls
US4211043A (en) Precast concrete building module form
US8844224B2 (en) Utility dowel bracket
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN110029813B (en) Wall formwork construction method at deformation joint
CN114319864A (en) Shear wall end mold locking tool and locking method
CN217871782U (en) Be used for wall post to pour fashioned frock
CN213115480U (en) Cast-in-place wall body fast-assembling mark mould strutting arrangement
KR102124402B1 (en) Construction Method of Balcony using Super Speed System Method
US20170121988A1 (en) Wall forming system and method thereof
CN111877752A (en) Reinforcing system of building template and construction method thereof
CN217079684U (en) Split type form removal-free concrete hollow structure
RU2671872C1 (en) Set of formwork and the method of its mounting
CN214061677U (en) Prefabricated reinforced concrete basis that can splice
CN210032563U (en) Outer frame wall connecting piece
CN212642113U (en) Formwork support system and construction structure
CN210850736U (en) Adjustable mould of prefabricated post
CN113482007A (en) Waist beam supporting structure and construction method thereof
KR100626326B1 (en) concrete structure
RU122678U1 (en) FORMING SHIELD
CN215760021U (en) Steel bar protection layer structure of concrete beam
CN215926729U (en) Stair formwork structure
JPH0371537B2 (en)
CN218758735U (en) Beam column template reinforcing apparatus
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant