CN217866750U - Power plant chimney steel mould hoisting device - Google Patents

Power plant chimney steel mould hoisting device Download PDF

Info

Publication number
CN217866750U
CN217866750U CN202222146366.2U CN202222146366U CN217866750U CN 217866750 U CN217866750 U CN 217866750U CN 202222146366 U CN202222146366 U CN 202222146366U CN 217866750 U CN217866750 U CN 217866750U
Authority
CN
China
Prior art keywords
threaded rod
block
roof beam
threaded
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222146366.2U
Other languages
Chinese (zh)
Inventor
高东奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222146366.2U priority Critical patent/CN217866750U/en
Application granted granted Critical
Publication of CN217866750U publication Critical patent/CN217866750U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a power plant's chimney steel mould hoisting device belongs to lifting means technical field, the utility model discloses a erect roof beam and coupling assembling, erect and be provided with first fixed block on the roof beam. The utility model discloses be provided with coupling assembling in perpendicular roof beam below, it has the sleeve to erect roof beam bottom threaded connection, be provided with screwed pipe and threaded rod cooperation in the sleeve and use, movable circle on the threaded rod reciprocates on the threaded rod, thereby it changes to drive the angle of second activity strip, make butt plate and rubber layer and the laminating of outside steel pipe inner wall looks butt on second activity strip and the first activity strip, thereby play the effect of bloated tight fixed steel pipe, can directly insert the steel pipe with erecting roof beam bottom cover when erecting the roof beam in the installation, rotate the threaded rod, make the steel pipe by bloated tight fixed, also can take off the sleeve simultaneously, directly will erect in the coupling assembling of roof beam bottom inserts the hole of steel pipe, rotate the threaded rod equally, make the steel pipe by bloated tight fixed, thereby it is more convenient when erecting the roof beam in the installation, it is firm.

Description

Power plant chimney steel mould hoisting device
Technical Field
The utility model relates to a lifting means technical field specifically is a chimney steel mould hoisting device of power plant.
Background
Buildings such as cooling tower, high chimney and circular storage vertical storehouse all need use a large amount of steel templates in the building process to along with the continuous increase of building height, the height of setting up of steel template need reach more than 50 meters, and the artifical intensity of labour who draws the template also increases gradually, then people begin to use steel mould hoisting device to carry out supplementary function, in order to improve the efficiency of construction, need install hoisting device and use in suitable position. Current hoisting device is convenient inadequately when the installation, especially erects the fixed of roof beam, and it is consuming time hard to operate, so we have proposed a power plant's chimney steel mould hoisting device to in solving the problem that proposes in the aforesaid.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a power plant's chimney steel mould hoisting device to current hoisting device who solves above-mentioned background art and propose is convenient inadequately when the installation, especially erects the fixed of roof beam, operates the hard problem consuming time.
In order to achieve the above object, the utility model provides a following technical scheme: a steel mould lifting device for a chimney of a power plant comprises a vertical beam and a connecting assembly, wherein a first fixed block is arranged on the vertical beam, and the connecting assembly is arranged below the vertical beam;
the connecting assembly comprises a sleeve, a threaded pipe, a threaded rod, a movable ring, a first connecting block, a second connecting block, a first movable strip, a second movable strip and an expansion part, the bottom end of the vertical beam is in threaded connection with the sleeve, the threaded pipe is arranged in the sleeve, the threaded rod is arranged in the threaded pipe, a threaded part is formed in the threaded rod, a stop block is arranged on the threaded rod, a bolt head is arranged at one end, away from the threaded part, of the threaded rod, a cross groove is formed in the bolt head, the movable ring is sleeved on the threaded rod, the first connecting block is uniformly formed in the movable ring, a second connecting block matched with the first connecting block is formed in the sleeve, the second connecting block is hinged and connected with the first movable strip, the first connecting block is hinged and connected with the second movable strip, the other end of the second movable strip is hinged and connected with the expansion part, the other end of the first movable strip is hinged and connected with the expansion part, the expansion part comprises a connecting plate, a abutting plate and a rubber layer, the connecting plate is perpendicular to the abutting plate;
erect the roof beam top and be provided with the grip block, be connected with the bearing crossbeam on the grip block, the second fixed block has been seted up on the bearing crossbeam, the one end that the grip block was kept away from to the bearing crossbeam is provided with the fixed plate, be connected with electronic hoist on the fixed plate, be provided with the wire rope couple on the electronic hoist, erect one side of keeping away from electronic hoist on the roof beam and seted up first angle adjusting device, erect one side that is close to electronic hoist on the roof beam and seted up second angle adjusting device.
Preferably, the threaded pipe is connected with the bottom surface of the vertical beam, and the threaded pipe is matched with the threaded rod for use.
Preferably, the dog is located the bottom of screw portion, the movable ring is located the top of dog, movable ring and threaded rod threaded connection, and the movable ring reciprocates on the threaded rod.
Preferably, the first movable bar and the second movable bar are crossed.
Preferably, one end of the first angle adjusting device is hinged to the second fixed block, and the other end of the first angle adjusting device is hinged to the first fixed block.
Preferably, one end of the second angle adjusting device is hinged to the second fixing block, and the other end of the second angle adjusting device is hinged to the first fixing block.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses be provided with coupling assembling in perpendicular roof beam below, it has the sleeve to erect roof beam bottom threaded connection, be provided with screwed pipe and threaded rod cooperation in the sleeve and use, movable circle on the threaded rod reciprocates on the threaded rod, thereby it changes to drive the angle of second activity strip, make butt plate and rubber layer and the laminating of outside steel pipe inner wall looks butt on second activity strip and the first activity strip, thereby play the effect of bloated tight fixed steel pipe, can directly insert the steel pipe with erecting roof beam bottom cover when erecting the roof beam in the installation, rotate the threaded rod, make the steel pipe by bloated tight fixed, also can take off the sleeve simultaneously, directly will erect in the coupling assembling of roof beam bottom inserts the hole of steel pipe, rotate the threaded rod equally, make the steel pipe by bloated tight fixed, thereby it is more convenient when erecting the roof beam in the installation, it is firm.
Drawings
FIG. 1 is a schematic view of the structure of the plug-in mounting body of the present invention;
FIG. 2 is a schematic view of the structure of the sleeve-insertion type mounting main body of the present invention;
fig. 3 is a schematic structural view of the connection assembly of the present invention;
FIG. 4 is a schematic view of the inserting mounting sectional structure of the present invention;
fig. 5 is a schematic view of the plug-in mounting sectional structure of the present invention.
In the figure: 1. a vertical beam; 101. a first fixed block; 2. a sleeve; 3. a threaded pipe; 4. a threaded rod; 401. a threaded portion; 402. a stopper; 403. a bolt head; 5. a movable ring; 6. a first connection block; 7. a second connecting block; 8. a first movable bar; 9. a second movable bar; 10. an expansion part; 1001. a connecting plate; 1002. a butt joint plate; 1003. a rubber layer; 11. a steel pipe; 12. a clamping plate; 13. a load-bearing cross beam; 1301. a second fixed block; 14. a fixing plate; 15. an electric hanger; 1501. a steel wire rope hook; 16. a first angle adjusting device; 17. a second angle adjustment device.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a steel mould lifting device for a chimney of a power plant comprises a vertical beam 1, a connecting assembly, a steel pipe 11, a clamping plate 12, a bearing cross beam 13, a fixing plate 14, an electric hanger 15, a first angle adjusting device 16 and a second angle adjusting device 17, wherein a first fixing block 101 is arranged on the vertical beam 1, and the connecting assembly is arranged below the vertical beam 1;
the connecting assembly comprises a sleeve 2, a threaded pipe 3, a threaded rod 4, a movable ring 5, a first connecting block 6, a second connecting block 7, a first movable strip 8, a second movable strip 9 and an expansion part 10, the bottom end of a vertical beam 1 is in threaded connection with the sleeve 2, the threaded pipe 3 is arranged in the sleeve 2, the threaded rod 4 is arranged in the threaded pipe 3, a threaded part 401 is arranged on the threaded rod 4, a stop block 402 is arranged on the threaded rod 4, one end, far away from the threaded part 401, of the threaded rod 4 is provided with a bolt head 403, a cross groove is formed in the bolt head 403, the threaded rod 4 is sleeved with the movable ring 5, the movable ring 5 is uniformly provided with the first connecting block 6, the sleeve 2 is provided with the second connecting block 7 matched with the first connecting block 6, the second connecting block 7 is hinged and connected with the first movable strip 8, the first connecting block 6 is hinged and connected with the second movable strip 9, the other end of the second movable strip 9 is hinged and connected with the expansion part 10, the other end of the first movable strip 8 is hinged and connected with the expansion part 10, the expansion part 10 comprises a connecting plate 1002, a rubber layer 1003, a connecting plate 1002 and a connecting plate 1002, and a connecting plate 1002, which are vertically attached to each other;
erect 1 top of roof beam and be provided with grip block 12, be connected with bearing crossbeam 13 on the grip block 12, second fixed block 1301 has been seted up on the bearing crossbeam 13, the one end that grip block 12 was kept away from to bearing crossbeam 13 is provided with fixed plate 14, be connected with electric hoist 15 on the fixed plate 14, be provided with wire rope couple 1501 on the electric hoist 15, first angle adjusting device 16 has been seted up to one side of keeping away from electric hoist 15 on erecting roof beam 1, second angle adjusting device 17 has been seted up to one side of being close to electric hoist 15 on erecting roof beam 1.
The screwed pipe 3 is connected with the bottom surface of the vertical beam 1, and the screwed pipe 3 is matched with the threaded rod 4 for use.
The stop 402 is located at the bottom end of the threaded portion 401, the movable ring 5 is located above the stop 402, the movable ring 5 is in threaded connection with the threaded rod 4, and the movable ring 5 moves up and down on the threaded rod 4.
The first movable bar 8 is crossed with the second movable bar 9.
One end of the first angle adjusting means 16 is hinge-connected to the second fixing block 1301, and the other end of the first angle adjusting means 16 is hinge-connected to the first fixing block 101.
One end of the second angle adjusting device 17 is hinged to the second fixing block 1301, and the other end of the second angle adjusting device 17 is hinged to the first fixing block 101.
The working principle is as follows: when the steel mould lifting device for the chimney of the power plant is used, firstly, the vertical beam 1 is sleeved on the steel pipe 11, the threaded rod 4 is rotated, the threaded rod 4 moves upwards in the threaded pipe 3, the stop block 402 assists the movable ring 5 to move upwards, the first connecting block 6 is close to the second connecting block 7, the position of a cross point between the first movable strip 8 and the second movable strip 9 is changed, the position of the expansion part 10 moves outwards, the abutting plate 1002 and the rubber layer 1003 are attached to the inner wall of the external steel pipe 11, and the steel pipe 11 is expanded and fixed; also can take off sleeve 2, directly insert the hole of steel pipe 11 with the coupling assembling of erecting 1 bottoms of roof beam in, rotate threaded rod 4 equally for 11 bloated tightly fixed of steel pipe, thereby it is more convenient, firm when erecting roof beam 1 in the installation.
The bearing beam 13 can adjust the front and rear angles through the first angle adjusting device 16 and the second angle adjusting device 17, fix the steel die to the steel wire rope hook 1501, and start the electric lifting appliance 15 to lift the steel die. This is the entire workflow of the present invention. And those not described in detail in this specification are well within the skill of those in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a chimney steel mould hoisting device of power plant which characterized in that: the connecting device comprises a vertical beam (1) and a connecting assembly, wherein a first fixing block (101) is arranged on the vertical beam (1), and the connecting assembly is arranged below the vertical beam (1);
the connecting assembly comprises a sleeve (2), a threaded pipe (3), a threaded rod (4), a movable ring (5), a first connecting block (6), a second connecting block (7), a first movable strip (8), a second movable strip (9) and a tensioning portion (10), wherein the bottom end of the vertical beam (1) is in threaded connection with the sleeve (2), the threaded pipe (3) is arranged in the sleeve (2), the threaded rod (4) is arranged in the threaded pipe (3), a threaded portion (401) is arranged on the threaded rod (4), a stop block (402) is arranged on the threaded rod (4), one end, away from the threaded portion (401), of the threaded rod (4) is provided with a bolt head (403), a cross groove is formed in the bolt head (403), the threaded rod (4) is sleeved with the movable ring (5), the movable ring (5) is uniformly provided with the first connecting block (6), the second connecting block (7) matched with the first connecting block (6) is arranged on the sleeve (2), the second connecting block (7) is hinged with the first movable ring (8), the other end of the second connecting block (6) is connected with the tensioning portion (403), and the tensioning portion (9) is connected with the tensioning portion (403), the tensioning portion (403) of the second movable ring (9), the tensioning portion (403) is connected with the tensioning portion (9), and the tensioning portion (403) The expansion part (10) comprises a connecting plate (1001), a butt plate (1002) and a rubber layer (1003), the connecting plate (1001) is perpendicular to the butt plate (1002), and the rubber layer (1003) is attached to the butt plate (1002);
erect roof beam (1) top and be provided with grip block (12), be connected with bearing crossbeam (13) on grip block (12), second fixed block (1301) have been seted up on bearing crossbeam (13), the one end that grip block (12) were kept away from in bearing crossbeam (13) is provided with fixed plate (14), be connected with electric hoist (15) on fixed plate (14), be provided with wire rope couple (1501) on electric hoist (15), erect one side of keeping away from electric hoist (15) on roof beam (1) and seted up first angle adjusting device (16), erect one side that is close to electric hoist (15) on roof beam (1) and seted up second angle adjusting device (17).
2. The power plant chimney steel mould lifting device of claim 1, characterized in that: the screwed pipe (3) is connected with the bottom surface of the vertical beam (1), and the screwed pipe (3) is matched with the threaded rod (4) for use.
3. The power plant chimney steel mould lifting device of claim 1, characterized in that: the stop block (402) is located at the bottom end of the threaded portion (401), the movable ring (5) is located above the stop block (402), the movable ring (5) is in threaded connection with the threaded rod (4), and the movable ring (5) moves up and down on the threaded rod (4).
4. The power plant chimney steel mould lifting device of claim 1, characterized in that: the first movable strip (8) and the second movable strip (9) are crossed.
5. The power plant chimney steel mould lifting device of claim 1, characterized in that: one end of the first angle adjusting device (16) is hinged with the second fixing block (1301), and the other end of the first angle adjusting device (16) is hinged with the first fixing block (101).
6. The power plant chimney steel mould lifting device of claim 1, characterized in that: one end of the second angle adjusting device (17) is hinged with the second fixing block (1301), and the other end of the second angle adjusting device (17) is hinged with the first fixing block (101).
CN202222146366.2U 2022-08-16 2022-08-16 Power plant chimney steel mould hoisting device Active CN217866750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222146366.2U CN217866750U (en) 2022-08-16 2022-08-16 Power plant chimney steel mould hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222146366.2U CN217866750U (en) 2022-08-16 2022-08-16 Power plant chimney steel mould hoisting device

Publications (1)

Publication Number Publication Date
CN217866750U true CN217866750U (en) 2022-11-22

Family

ID=84077701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222146366.2U Active CN217866750U (en) 2022-08-16 2022-08-16 Power plant chimney steel mould hoisting device

Country Status (1)

Country Link
CN (1) CN217866750U (en)

Similar Documents

Publication Publication Date Title
CN206971473U (en) A kind of embedded wallboard and the attachment structure of girder steel lower flange
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN217866750U (en) Power plant chimney steel mould hoisting device
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN204960030U (en) A wall structure for reasonable in design of villa
CN202416854U (en) Table form concrete formwork device
CN206457963U (en) A kind of seat structure of type unitized curtain wall
CN203347247U (en) Preinstallation floor type support for brick masonry inner wire box
CN213923842U (en) Wallboard lifting device in assembled
CN212248809U (en) Prefabricated formula side fascia of assembly type structure
CN210032102U (en) Support for mounting external hanging piece of building
CN210658449U (en) Remove aluminum alloy template structure
CN209145257U (en) Hang lift-type pit shaft platform
CN204721285U (en) Adjustable combination type hanger
CN207905584U (en) A kind of detachable band exterior window trim aluminium alloy energy-saving auxiliary frame of door and window
CN102475043A (en) Novel multifunctional sunlight greenhouse
CN214169634U (en) Arc-shaped component assembly type building
CN205945605U (en) Distributing type photovoltaic module ground mounting structure
CN211447587U (en) Assembled frame construction cladding construction node
CN219548267U (en) Outer wall moulding shaping structure
CN211816893U (en) Steel structure frame prefabricated plate house
CN217975110U (en) Solar roof structure of ecological energy-saving building
CN215948530U (en) Heat preservation integration infilled wall embeds connecting piece and infilled wall thereof
CN205955292U (en) Assembled octagon operating room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant