CN217842254U - Alloy ring structure for mechanical equipment installation - Google Patents

Alloy ring structure for mechanical equipment installation Download PDF

Info

Publication number
CN217842254U
CN217842254U CN202222395768.6U CN202222395768U CN217842254U CN 217842254 U CN217842254 U CN 217842254U CN 202222395768 U CN202222395768 U CN 202222395768U CN 217842254 U CN217842254 U CN 217842254U
Authority
CN
China
Prior art keywords
wall
ring seat
seat
mechanical equipment
equipment installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222395768.6U
Other languages
Chinese (zh)
Inventor
郭群生
郭翔
罗开财
罗开宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ganzhou Quntai New Materials Co ltd
Original Assignee
Ganzhou Quntai New Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ganzhou Quntai New Materials Co ltd filed Critical Ganzhou Quntai New Materials Co ltd
Priority to CN202222395768.6U priority Critical patent/CN217842254U/en
Application granted granted Critical
Publication of CN217842254U publication Critical patent/CN217842254U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)
  • Connection Of Plates (AREA)

Abstract

The utility model discloses an alloy ring structure for mechanical equipment installation, which comprises a first ring seat and a second ring seat, wherein the second ring seat is attached to the bottom of the first ring seat, an upper clamping plate is sleeved at the position, close to the bottom, of the circumferential outer wall of the first ring seat, a lower clamping plate is sleeved at the position, close to the top, of the circumferential outer wall of the second ring seat, the lower clamping plate is clamped on the outer wall of the bottom of the upper clamping plate, a plurality of vertical through holes are formed at the positions, close to the edge, of the circumferential outer walls of the upper clamping plate and the lower clamping plate, a locking mechanism is arranged on the circumferential inner wall of each through hole, and the locking mechanism comprises a locking rod; the utility model discloses with first ring seat and second ring seat laminating joint back, punch holder and lower plate paste tightly each other, peg graft through the check lock lever and form a whole, then utilize locking cap and gasket fixed with the check lock lever to make first ring seat and second ring seat fixed, when having guaranteed stably, also be convenient for dismantlement between them.

Description

Alloy ring structure for mechanical equipment installation
Technical Field
The utility model relates to a ring technical field specifically is an alloy ring structure of mechanical equipment installation.
Background
The alloy is a substance with metal characteristics formed by mixing two or more chemical substances, generally, each component is melted into uniform liquid, and then the uniform liquid is condensed to obtain the alloy.
Through retrieval, the alloy ring structure installed by the existing mechanical equipment has the following defects: the ring is difficult for fixing and dismantling after the laminating, appears becoming flexible easily between two rings, influences the normal work after two ring combinations, consequently, needs the alloy ring structure of a mechanical equipment installation of design urgent need to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an alloy ring structure of mechanical equipment installation to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides an alloy ring structure of mechanical equipment installation, includes first ring seat and second ring seat, the laminating of second ring seat is in the bottom of first ring seat, the punch holder has been cup jointed to the position that first ring seat circumference outer wall is close to the bottom, the lower plate has been cup jointed to the position that second ring seat circumference outer wall is close to the top, the lower plate joint is on the bottom outer wall of punch holder, the position that punch holder and lower plate circumference outer wall are close to the edge is opened there are a plurality of vertical through-holes, be equipped with locking mechanism on the circumference inner wall of through-hole.
Preferably, the locking mechanism comprises a locking rod, the locking rod is inserted into the inner wall of the circumference of the through hole, gaskets are sleeved at two ends of the outer wall of the circumference of the locking rod, the gaskets are respectively attached to the outer walls of the upper clamping plate and the lower clamping plate, and locking caps are screwed at positions, close to the gaskets, of two ends of the outer wall of the circumference of the locking rod.
Preferably, a first annular groove is formed in the circumferential outer wall of the first annular seat, and a second annular groove is formed in the circumferential outer wall of the second annular seat.
Preferably, a plurality of circular grooves are formed in the outer wall of the top of the first circular ring seat.
Preferably, a plurality of arc-shaped grooves are formed in the outer wall of the bottom of the second circular ring seat.
Preferably, the positions, close to the two sides, of the circumferential outer walls of the upper clamping plate and the lower clamping plate are provided with vertical mounting holes, the circumferential inner walls of the mounting holes are spliced with insertion rods, the circumferential outer walls of the insertion rods are sleeved with elastic clamps, and the two ends of each elastic clamp are respectively attached to the outer walls of the two sides of the upper clamping plate and the outer wall of the two sides of the lower clamping plate.
Preferably, the rubber seat is sleeved on the position, close to the bottom, of the circumferential outer wall of the second circular ring seat.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, after the first circular ring seat and the second circular ring seat are jointed by arranging the upper clamping plate, the lower clamping plate, the locking rod, the gasket and the locking cap, the upper clamping plate and the lower clamping plate are mutually adhered to form a whole by inserting the locking rod, and then the locking rod is fixed by utilizing the locking cap and the gasket, so that the first circular ring seat and the second circular ring seat are fixed, and the first circular ring seat and the second circular ring seat are convenient to disassemble while the stability is ensured;
the utility model discloses in through setting up inserted bar and elasticity clamp, utilize the inserted bar to link together back with punch holder and lower plate, the elasticity tightening force that utilizes the elasticity clamp passes the both ends of inserted bar and presss from both sides the punch holder with punch holder and lower plate clamp tightly for first ring seat and second ring seat are stable fixed.
Drawings
Fig. 1 is a schematic overall structure diagram of an alloy ring structure example 1 for mechanical equipment installation.
FIG. 2 is a schematic bottom view of an alloy ring structure of example 1 for mechanical equipment installation.
Fig. 3 is an enlarged schematic view of a portion a of fig. 1.
Fig. 4 is a schematic perspective view of an alloy ring structure of example 2 for mechanical equipment installation.
In the figure: 1. a first annular seat; 2. a circular groove; 3. a first annular groove; 4. a rod is inserted; 5. an elastic clip; 6. a second annular seat; 7. a second annular groove; 8. an upper splint; 9. a lower splint; 10. a locking lever; 11. an arc-shaped slot; 12. a locking cap; 13. a gasket; 14. a rubber seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Please refer to fig. 1-3, in an embodiment of the present invention, an alloy ring structure for mechanical equipment installation, includes a first ring seat 1 and a second ring seat 6, the second ring seat 6 is attached to the bottom of the first ring seat 1, an upper clamp plate 8 is sleeved at a position of the outer wall of the circumference of the first ring seat 1 near the bottom, a lower clamp plate 9 is sleeved at a position of the outer wall of the circumference of the second ring seat 6 near the top, the lower clamp plate 9 is connected to the outer wall of the bottom of the upper clamp plate 8 in a clamping manner, a plurality of vertical through holes are opened at positions of the outer wall of the circumference of the upper clamp plate 8 and the lower clamp plate 9 near the edge, a locking mechanism is arranged on the inner wall of the circumference of the through holes, the upper clamp plate 8 and the lower clamp plate 9 are locked and fixed by the locking mechanism after the first ring seat 1 and the second ring seat 6 are attached, so that the first ring seat 1 and the second ring seat 6 are connected and fixed.
Further, locking mechanism includes check lock lever 10, check lock lever 10 pegs graft on the circumference inner wall of through-hole, gasket 13 has all been cup jointed at the both ends of check lock lever 10 circumference outer wall, gasket 13 laminates respectively on the outer wall of punch holder 8 and lower plate 9, the equal spiro union in position that the both ends of check lock lever 10 circumference outer wall are close to gasket 13 has locking cap 12, utilize check lock lever 10 to link together punch holder 8 and lower plate 9, then screw up back fixed punch holder 8 and lower plate 9 through locking cap 12, thereby guarantee the fixed between first ring seat 1 and the second ring seat 6.
Furthermore, a first annular groove 3 is formed in the circumferential outer wall of the first annular seat 1, a second annular groove 7 is formed in the circumferential outer wall of the second annular seat 6, and other workpieces can be embedded into the first annular groove 3 and the second annular groove 7.
Further, it has a plurality of circular slots 2 to open on the top outer wall of first ring seat 1, through the circular slot 2 that sets up, is convenient for fix spare part through circular slot 2, alternates the rivet.
Furthermore, a plurality of arc-shaped grooves 11 are formed in the outer wall of the bottom of the second circular ring seat 6, and the corresponding parts can be conveniently clamped and fixed through the arc-shaped grooves 11.
Further, the position that punch holder 8 and lower plate 9 circumference outer wall are close to both sides has all been opened vertical mounting hole, it has inserted bar 4 to peg graft on the circumference inner wall of mounting hole, elasticity clamp 5 has been cup jointed on the circumference outer wall of inserted bar 4, the both ends that elasticity clamp 5 laminates respectively on the both sides outer wall of punch holder 8 and lower plate 9, inserted bar 4 and elasticity clamp 5 through setting up, utilize inserted bar 4 with punch holder 8 and lower plate 9 even back together, the elasticity that utilizes elasticity clamp 5 is tightened the power and is passed the both ends of inserted bar 4 and press from both sides punch holder 8 and lower plate 9 tightly, make first ring seat 1 and second ring seat 6 stable fixed.
The utility model discloses a theory of operation is: during the use, laminate first ring seat 1 in the top of second ring seat 6 for punch holder 8 and lower plate 9 laminate, link to each other punch holder 8 and lower plate 9 through check lock lever 10, screw up fixedly through gasket 13 and locking cap 12, thereby guarantee the fixed between first ring seat 1 and the second ring seat 6, then utilize inserted bar 4 to link to each other punch holder 8 and lower plate 9, pass the both ends of inserted bar 4 through the elasticity tightening force of elasticity clamp 5 and press from both sides punch holder 8 and lower plate 9 and press from both sides tightly, when needing to dismantle, take off elasticity clamp 5, take out inserted bar 4, unscrew locking cap 12, take out check lock lever 10, pull out punch holder 8, can loosen the connection of first ring seat 1 and second ring seat 6.
Example 2
Referring to fig. 1 and 4, the difference from embodiment 1 is that a rubber seat 14 is sleeved on the outer circumferential wall of the second annular seat 6 near the bottom.
Through setting up rubber seat 14, conveniently put this structure, have the skid-proof effect of shock attenuation buffering.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention.

Claims (7)

1. The utility model provides an alloy ring structure of mechanical equipment installation, includes first ring seat (1) and second ring seat (6), second ring seat (6) laminating is in the bottom of first ring seat (1), its characterized in that: the position that first ring seat (1) circumference outer wall is close to the bottom has cup jointed punch holder (8), lower plate (9) have been cup jointed to the position that second ring seat (6) circumference outer wall is close to the top, lower plate (9) joint is on the bottom outer wall of punch holder (8), punch holder (8) and lower plate (9) circumference outer wall are close to the position on edge and open and have a plurality of vertical through-holes, be equipped with locking mechanism on the circumference inner wall of through-hole.
2. The mechanical equipment installation alloy ring structure of claim 1, wherein: locking mechanism includes check lock lever (10), peg graft on the circumference inner wall of through-hole check lock lever (10), gasket (13) have all been cup jointed at the both ends of check lock lever (10) circumference outer wall, gasket (13) laminate respectively on the outer wall of upper plate (8) and lower plate (9), the equal spiro union in position that the both ends of check lock lever (10) circumference outer wall are close to gasket (13) has locking cap (12).
3. The mechanical equipment installation alloy ring structure of claim 1, wherein: a first annular groove (3) is formed in the circumferential outer wall of the first annular seat (1), and a second annular groove (7) is formed in the circumferential outer wall of the second annular seat (6).
4. The mechanical equipment installation alloy ring structure of claim 1, wherein: the outer wall of the top of the first circular ring seat (1) is provided with a plurality of circular grooves (2).
5. The mechanical equipment installation alloy ring structure of claim 1, wherein: the outer wall of the bottom of the second circular ring seat (6) is provided with a plurality of arc-shaped grooves (11).
6. The mechanical equipment installation alloy ring structure of claim 1, wherein: the utility model discloses a clamp for fixing the automobile seat, including upper plate (8) and lower plate (9), the position that upper plate (8) and lower plate (9) circumference outer wall are close to both sides has all opened vertical mounting hole, it has inserted bar (4) to peg graft on the circumference inner wall of mounting hole, elasticity clamp (5) have been cup jointed on the circumference outer wall of inserted bar (4), the both ends of elasticity clamp (5) are laminated respectively on the both sides outer wall of upper plate (8) and lower plate (9).
7. The mechanical equipment installation alloy ring structure of claim 1, wherein: and a rubber seat (14) is sleeved at the position, close to the bottom, of the circumferential outer wall of the second circular ring seat (6).
CN202222395768.6U 2022-09-09 2022-09-09 Alloy ring structure for mechanical equipment installation Active CN217842254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222395768.6U CN217842254U (en) 2022-09-09 2022-09-09 Alloy ring structure for mechanical equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222395768.6U CN217842254U (en) 2022-09-09 2022-09-09 Alloy ring structure for mechanical equipment installation

Publications (1)

Publication Number Publication Date
CN217842254U true CN217842254U (en) 2022-11-18

Family

ID=84016449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222395768.6U Active CN217842254U (en) 2022-09-09 2022-09-09 Alloy ring structure for mechanical equipment installation

Country Status (1)

Country Link
CN (1) CN217842254U (en)

Similar Documents

Publication Publication Date Title
CN217842254U (en) Alloy ring structure for mechanical equipment installation
CN205545114U (en) Dual -glass photovoltaic assembly fixing device
CN110985834A (en) Wall installation mechanism of wisdom blackboard
CN113418066A (en) High-strength flange connection structure and mounting method thereof
CN201068889Y (en) Quick-speed assembling blade of ceiling fan
CN216590277U (en) Fixing clamp
CN210723153U (en) Portable mounting and dismounting structure for battery
CN201084873Y (en) A whole-molding high-strength aluminum alloy solar module framework
CN216111693U (en) Expansion rivet nut with self-fastening function
CN211475146U (en) Round-mouth corrugated pipe sealing joint for prestressed bridge
CN213114996U (en) Edge laminating fixing piece structure for membrane structure
CN213870596U (en) Fixing device of flange limit on reation kettle
CN215889807U (en) Novel glass door clamp
CN209881336U (en) Grid bridge flag type support
CN218448837U (en) Push hook type motor commutator
CN219993393U (en) Pressing plate locking mechanism of connecting rod lock
CN216565990U (en) Circuit board mounting box
CN218624916U (en) Connecting structure of desktop plate and screen plate
CN217282526U (en) Mounting bracket and motor using same
CN208827387U (en) It is a kind of to be pressed from both sides convenient for the office of assembling with plastic document
CN217991225U (en) Novel locking plate iron sheet mounting structure
CN219738072U (en) Android mini computer motherboard
CN217272610U (en) Seamless device for municipal pipeline connection
CN218882741U (en) Nut and press-riveting nut structure
CN208246009U (en) A kind of fixation device for pcb board welding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant