CN217841663U - Permanent treatment plugging system for tunnel construction cross tunnel - Google Patents

Permanent treatment plugging system for tunnel construction cross tunnel Download PDF

Info

Publication number
CN217841663U
CN217841663U CN202220942772.7U CN202220942772U CN217841663U CN 217841663 U CN217841663 U CN 217841663U CN 202220942772 U CN202220942772 U CN 202220942772U CN 217841663 U CN217841663 U CN 217841663U
Authority
CN
China
Prior art keywords
transverse
tunnel
transverse hole
portal
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220942772.7U
Other languages
Chinese (zh)
Inventor
王玉龙
邹鑫
林国强
孙杰
曹拯
沈豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Railway Survey And Design Institute Co ltd
Original Assignee
Xi'an Railway Survey And Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Railway Survey And Design Institute Co ltd filed Critical Xi'an Railway Survey And Design Institute Co ltd
Priority to CN202220942772.7U priority Critical patent/CN217841663U/en
Application granted granted Critical
Publication of CN217841663U publication Critical patent/CN217841663U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a permanent shutoff system of handling of tunnel construction cross bore. The transverse holes are temporary projects, and collapse is easy to happen after the transverse holes are used for a long time. The system comprises a transverse hole connected with a main tunnel, a transverse hole door is arranged at the outer end of the transverse hole, and a partition wall and a transverse hole opening plugging wall are arranged in the transverse hole; the full section of the partition wall is arranged in the transverse tunnel lining and is positioned at the position, close to the main tunnel, of the inner end of the transverse tunnel; the full section of the transverse portal blocking wall is arranged in the transverse portal lining and is arranged close to the inner side of the transverse portal; and ramming earth is arranged on the outer side of the transverse tunnel portal and covers the outer side of the transverse tunnel portal, the top of the outer end of the transverse tunnel and two sides of the outer end of the transverse tunnel. The utility model discloses a setting, self after can effectual solution cross cut hole uses and collapses etc. to the safe threat problem in main tunnel, guarantee tunnel safety operation, easily construction, the durability is good, and economy is suitable for, easily promotes.

Description

Permanent treatment plugging system for tunnel construction cross tunnel
Technical Field
The utility model relates to a tunnel engineering construction technical field, concretely relates to permanent shutoff system of handling of tunnel construction cross bore.
Background
In the construction stage of tunnel engineering, in order to organize rapid construction, an auxiliary tunnel connected with a main tunnel needs to be built. Especially when constructing long and large tunnels, cross holes can be constructed for shortening construction period and increasing working faces, and the cross holes and the main tunnel are crossed in an orthogonal and oblique mode and can be used as inlets or ventilation shafts for tunnel construction.
The transverse holes are generally arranged on tunnels with thin lateral covering layers beside mountains, along rivers or mountain bodies and are only used during construction, the transverse holes are temporary projects, supporting measures are generally relatively weak, and safety accidents such as collapse and the like easily occur after the transverse holes are used for a long time.
Disclosure of Invention
The utility model aims at providing a permanent shutoff system of handling of tunnel construction cross bore to solve at least the cross bore and easily take place after the longer time incident such as collapse, the unreasonable problem that threatens main tunnel safety operation of treatment.
In order to achieve the above purpose, the utility model discloses the technical scheme who adopts is:
a permanent treatment plugging system for a tunnel construction cross tunnel comprises a cross tunnel connected with a main tunnel, a cross tunnel portal is arranged at the outer end of the cross tunnel, and a partition wall and a cross tunnel portal plugging wall are arranged in the cross tunnel;
the full section of the partition wall is arranged in the crosshole lining and is positioned at the position, close to the main tunnel, of the inner end of the crosshole;
the full section of the transverse portal blocking wall is arranged in the transverse portal lining and is arranged close to the inner side of the transverse portal;
and ramming earth is arranged on the outer side of the transverse tunnel portal and covers the outer side of the transverse tunnel portal, the top of the outer end of the transverse tunnel and two sides of the outer end of the transverse tunnel.
Furthermore, a longitudinal ditch is arranged on one side of the bottom of the transverse hole;
the outer end of the longitudinal ditch penetrates through the bottom of the blocking wall of the transverse tunnel opening and the bottom of the transverse tunnel portal and leads to the outside of the end part of the transverse tunnel;
the inner end of the longitudinal ditch penetrates through the bottom of the partition wall and is connected into an existing drainage ditch in the main tunnel.
Further, a transverse ditch is arranged at the bottom of the inner side of the transverse hole plugging wall;
one end of the transverse ditch is connected into the longitudinal ditch.
Furthermore, an inspection channel is reserved on the partition wall.
Furthermore, the partition wall is of a reinforced concrete structure.
Further, the transverse cave mouth plugging wall is of a mortar rubble structure.
Further, a waterproof layer is arranged on the outer side of the transverse hole door.
Furthermore, a transverse tunnel portal drainage ditch is arranged at the top of the inner side of the transverse tunnel portal.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a tunnel construction cross bore permanent treatment shutoff system mainly comprises partition wall and cross bore mouth shutoff wall, and the partition wall adopts reinforced concrete structure, and cross bore mouth shutoff wall adopts thick liquid to build a sheet stone concrete and builds by laying bricks or stones and forms, and the waterproof layer is laid outward in the hole back tamp filling stone, reserves the ditch in the cross bore, easily construction, and the durability is good, and economy is suitable for, easily promotes.
The utility model discloses a setting can self collapse etc. to the safety threat problem in main tunnel after effectual solution cross cut uses, groundwater can discharge naturally in the cross cut, and effectively prevents people and animals etc. and get into main tunnel through the cross cut, guarantee tunnel safe operation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, drawings of other embodiments can be obtained according to the drawings without creative efforts.
Fig. 1 is a cross-sectional view of an embodiment of the present invention.
Fig. 2 is a plan view of an embodiment of the present invention.
Fig. 3 is a cross-sectional view taken along line I-I in fig. 2.
The labels in the figure are:
1-main tunnel, 2-cross tunnel lining, 3-partition wall, 4-inspection channel, 5-transverse ditch, 6-cross tunnel portal, 7-cross tunnel portal blocking wall, 8-waterproof layer, 9-rammed filling soil, 10-ground line, 11-cross tunnel portal drainage ditch, 12-cross tunnel and 13-longitudinal ditch.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. The preferred embodiments of the present invention are shown in the drawings. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
In the description of this patent, it is to be understood that the terms "top," "bottom," "inner," "outer," "longitudinal," "transverse," and the like are used in the orientations and positional relationships indicated in the figures, which are based on the orientations and positional relationships shown in the figures, and are used for convenience in describing the patent and for simplicity in description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise explicitly stated or limited, the terms "connected," "disposed," and the like are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
In fig. 1, the left end of the transverse hole 12 is defined as the outer end, the right end of the transverse hole 12 is defined as the inner end, the direction of the transverse hole 12 is defined as the longitudinal direction, and the direction perpendicular to the longitudinal direction is defined as the transverse direction. The orientation definitions of the other figures are consistent with fig. 1. The utility model provides a pair of permanent shutoff system of handling of tunnel construction cross bore, include the cross bore 12 with the handing-over of main tunnel 1, as figure 2, in this embodiment, 12 slants of cross bore and the handing-over of main tunnel 1. As shown in figure 1, the outer end of the transverse hole 12 is provided with a transverse hole door 6, the area of the transverse hole door 6 is larger than the sectional area of the transverse hole 12, and the bottom of the transverse hole door 6 is inserted below the bottom of the transverse hole 12. The transverse hole 12 is internally provided with a partition wall 3 and a transverse hole opening plugging wall 7 as a main plugging structure.
Referring to fig. 1 and 2, the partition wall 3 is provided in full section in the lateral tunnel lining 2 at a position close to the main tunnel 1 at the inner end of the lateral tunnel 12. The full section of the transverse hole opening plugging wall 7 is arranged in the transverse hole lining 2 and is arranged close to the inner side of the transverse hole door 6. Partition wall 3 adopts reinforced concrete structure, and horizontal entrance to a cave shutoff wall 7 adopts and grouts the slabstone structure. And rammed earth 9 is arranged on the outer side of the transverse hole portal 6, and the rammed earth 9 covers the outer side of the transverse hole portal 6, the upper part of the ground line at the top of the outer end of the transverse hole 12 and the two sides of the outer end of the transverse hole 12 so as to recover the original landform of the transverse hole portal 6.
As shown in FIG. 2, drainage ditches are arranged inside the transverse holes 12 and comprise longitudinal ditches 13 and transverse ditches 5. One side of the bottom of the transverse hole 12 is provided with a longitudinal ditch 13, the outer end of the longitudinal ditch 13 penetrates through the bottom of the transverse hole opening blocking wall 7 and the bottom of the transverse hole door 6 and leads to the outside of the end part of the transverse hole 12, and the inner end of the longitudinal ditch 13 penetrates through the bottom of the partition wall 3 and is connected into the existing ditch in the main tunnel 1. The bottom of the inner side of the transverse hole plugging wall 7 is provided with a transverse ditch 5, and one end of the transverse ditch 5 is connected into a longitudinal ditch 13. The arrangement of the longitudinal ditches 13 and the transverse ditches 5 can enable underground water in the transverse holes 12 to flow out of the holes or flow to a drainage system of the main tunnel 1, and the water flow direction can be controlled by setting the gradient of the ditches. In addition, in order to prevent the transverse hole 12 from water seepage outwards into the transverse hole 12, a waterproof layer 8 (such as chlorinated polyethylene waterproof coiled material) is further arranged on the outer side of the transverse hole door 6, and as the tamping filling soil 9 covers the transverse hole 12, the waterproof layer 8 can be effectively prevented from weathering.
Like fig. 3, in order to facilitate later inspection and maintenance of the interior of the transverse hole 12, the partition wall 3 is reserved with an inspection passage 4 which can adopt a structural form of an inspection door, so that maintenance personnel can conveniently enter the inspection passage.
The top of the inner side of the transverse tunnel portal 6 is provided with a transverse tunnel portal drainage ditch 11, the transverse tunnel portal drainage ditch 11 is arranged outside the transverse tunnel 12 and is used for draining water during the use period of the transverse tunnel, and after the transverse tunnel is used, the transverse tunnel is filled with rammed earth 9 and is not used any more.
The utility model discloses an implement, can carry out proper treatment to this kind of temporary mechanism of cross bore, be a permanent treatment measure, can self collapse etc. to the security threat problem in main tunnel after effectual solution cross bore uses, groundwater can discharge naturally in the cross bore, and effectively prevents people and animals etc. and get into main tunnel through the cross bore, guarantee tunnel safe operation.
It is right to have used specific individual example above the utility model discloses expound, only be used for helping to understand the utility model discloses, not be used for the restriction the utility model discloses. To the technical field of the utility model technical personnel, the foundation the utility model discloses an idea can also be made a plurality of simple deductions, warp or replacement.

Claims (8)

1. The utility model provides a permanent shutoff system of handling of tunnel construction cross bore which characterized in that:
the system comprises a transverse hole (12) connected with the main tunnel (1), a transverse hole door (6) is arranged at the outer end of the transverse hole (12), and a partition wall (3) and a transverse hole blocking wall (7) are arranged in the transverse hole (12);
the full section of the partition wall (3) is arranged in the transverse tunnel lining (2) and is positioned at the position, close to the main tunnel (1), of the inner end of the transverse tunnel (12);
the full section of the transverse opening blocking wall (7) is arranged in the transverse opening lining (2) and is arranged close to the inner side of the transverse opening door (6);
and the outside of the transverse tunnel portal (6) is provided with rammed filling soil (9), and the rammed filling soil (9) covers the outside of the transverse tunnel portal (6), the top of the outer end of the transverse tunnel (12) and two sides of the outer end of the transverse tunnel (12).
2. The permanent treatment plugging system for the tunnel construction transverse hole according to claim 1, characterized in that:
a longitudinal ditch (13) is formed in one side of the bottom of the transverse hole (12);
the outer end of the longitudinal ditch (13) passes through the bottom of the transverse hole blocking wall (7) and the bottom of the transverse hole door (6) and leads to the outside of the end part of the transverse hole (12);
the inner end of the longitudinal ditch (13) penetrates through the bottom of the partition wall (3) and is connected into an existing drainage ditch in the main tunnel (1).
3. The permanent treatment plugging system for the tunnel construction crosshole according to claim 2, characterized in that:
a transverse ditch (5) is arranged at the bottom of the inner side of the transverse hole plugging wall (7);
one end of the transverse ditch (5) is connected into the longitudinal ditch (13).
4. The permanent treatment plugging system for the tunnel construction crosshole according to claim 3, characterized in that:
an inspection channel (4) is reserved on the partition wall (3).
5. The permanent treatment plugging system for the tunnel construction crosshole according to claim 4, wherein:
the partition wall (3) is of a reinforced concrete structure.
6. The permanent treatment plugging system for the tunnel construction crosshole according to claim 5, wherein:
the transverse hole plugging wall (7) is of a mortar rubble structure.
7. The permanent treatment plugging system for the tunnel construction crosshole according to claim 6, wherein:
and a waterproof layer (8) is arranged on the outer side of the transverse hole door (6).
8. The permanent treatment plugging system for the tunnel construction crosshole according to claim 7, wherein:
and a transverse tunnel portal drainage ditch (11) is arranged at the top of the inner side of the transverse tunnel portal (6).
CN202220942772.7U 2022-04-22 2022-04-22 Permanent treatment plugging system for tunnel construction cross tunnel Active CN217841663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220942772.7U CN217841663U (en) 2022-04-22 2022-04-22 Permanent treatment plugging system for tunnel construction cross tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220942772.7U CN217841663U (en) 2022-04-22 2022-04-22 Permanent treatment plugging system for tunnel construction cross tunnel

Publications (1)

Publication Number Publication Date
CN217841663U true CN217841663U (en) 2022-11-18

Family

ID=84017594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220942772.7U Active CN217841663U (en) 2022-04-22 2022-04-22 Permanent treatment plugging system for tunnel construction cross tunnel

Country Status (1)

Country Link
CN (1) CN217841663U (en)

Similar Documents

Publication Publication Date Title
CN104612160B (en) A kind of next-door neighbour's existing building pit maintenance soil structure and construction method
US4741644A (en) Environmental cut-off and drain
KR101011169B1 (en) Earthwall and Construction Method Using Ready-made Concrete Piles
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN104099943A (en) Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN114086969A (en) Tunnel entering construction method
CN109339079A (en) A foundation pit water stop system adjacent to the permeable stratum of the river and its construction technology
CN111926856A (en) Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure
CN113026757A (en) Rapid excavation and support construction method for complex stratum pipe-jacking comprehensive well
CN118481678A (en) Shallow-buried collapsible loess tunnel downward-penetrating gully construction method
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN217630349U (en) Connection system of old and new sewage pipe network based on reverse method of pipe jacking
CN217841663U (en) Permanent treatment plugging system for tunnel construction cross tunnel
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN213329051U (en) A flexible treatment structure for high slopes
JPS6158640B2 (en)
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN220953484U (en) High side slope joint support structure of tunnel portal
CN113266362A (en) Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN118166829A (en) Landscape platform retaining wall structure combined with box culvert co-construction and construction method thereof
CN110486062A (en) A kind of method of mechanical tunneling multilayer multispan underground engineering in weak soil
CN214784160U (en) Gravel reverse-filtering anti-seepage structure between piles of pile plate wall of foundation pit in water-rich stratum
CN216551791U (en) Riprap reinforcing structure for shield tunnel to pass through lake or river