CN217829214U - Real mineral varnish production is with multistage double-deck device that deposits - Google Patents

Real mineral varnish production is with multistage double-deck device that deposits Download PDF

Info

Publication number
CN217829214U
CN217829214U CN202221449590.2U CN202221449590U CN217829214U CN 217829214 U CN217829214 U CN 217829214U CN 202221449590 U CN202221449590 U CN 202221449590U CN 217829214 U CN217829214 U CN 217829214U
Authority
CN
China
Prior art keywords
drip chamber
horizontal groove
casing
chamber
slider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221449590.2U
Other languages
Chinese (zh)
Inventor
曾小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Haodi Paint Co ltd
Original Assignee
Chongqing Haodi Paint Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Haodi Paint Co ltd filed Critical Chongqing Haodi Paint Co ltd
Priority to CN202221449590.2U priority Critical patent/CN217829214U/en
Application granted granted Critical
Publication of CN217829214U publication Critical patent/CN217829214U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a real mineral varnish production is with multistage double-deck sediment device, which comprises a housin, the drip chamber has been seted up in the casing, be equipped with the hierarchical mechanism in the drip chamber, the horizontal groove has been seted up to the level in the casing, and the horizontal groove is located directly over the drip chamber, the inlet pipe that corresponds with first drip chamber is seted up to the vertical horizontal groove that runs through between roof and the casing up end in the drip chamber, horizontal sliding connection has the slider in the horizontal groove, and the upper and lower terminal surface of slider all with horizontal groove cell wall seal sliding connection, two through-holes have been seted up in the vertical running through on the slider. The utility model discloses in, can carry out multistage double-deck sediment to the raw materials through first drip chamber and second drip chamber, simultaneously, when filtering mechanism filtered the raw materials, can the fast switch over position of two through-holes and inlet pipe and access hole to both can not cause the influence to the normal circulation of inlet pipe, can also in time clear up the change to the filter plate, excellent in use effect.

Description

Real mineral varnish production is with multistage double-deck device that deposits
Technical Field
The utility model relates to a real mineral varnish production technical field especially relates to a real mineral varnish production is with multistage double-deck device that deposits.
Background
Real mineral varnish production need filter the raw materials before carrying out the fractional precipitation to get rid of impurity and the great material of volume in the raw materials, when traditional real mineral varnish filtering mechanism used, be not convenient for dismantle and clear up the filter plate, thereby reduced the efficiency of real mineral varnish production.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the traditional shortcoming that filtering mechanism is not convenient for to clear up for the production of real mineral varnish that exists among the prior art, and the multistage double-deck device that deposits is used in production of real mineral varnish that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a real mineral varnish production is with multistage double-deck sediment device, includes the casing, the drip chamber has been seted up in the casing, be equipped with the grader in the drip chamber, horizontal groove has been seted up to the level in the casing, and the horizontal groove is located directly over the drip chamber, the inlet pipe that corresponds with first drip chamber is seted up to the vertical horizontal groove that runs through between roof and the casing up end in the drip chamber, horizontal sliding connection has the slider in the horizontal groove, and the upper and lower terminal surface of slider all with horizontal groove cell wall sealing sliding connection, vertically run through on the slider and seted up two through-holes, every all be equipped with filtering mechanism in the through-hole, horizontal inslot roof and the vertical access hole of seting up two and corresponding with the through-hole of casing up end.
In above-mentioned real mineral varnish production is with multistage double-deck sediment device, the baffle of vertical fixed connection on the diapire in the precipitation chamber is drawn together to the grading mechanism, and the baffle separates the precipitation chamber for first precipitation chamber and second precipitation chamber, the drain pipe has been seted up between precipitation chamber and the casing lateral wall.
In above-mentioned real mineral varnish production is with multistage double-deck sediment device, vertically set up first unloading pipe and the second unloading pipe that corresponds with first precipitation chamber and second precipitation chamber between terminal surface under diapire and the casing in the precipitation chamber, all install the solenoid valve in first unloading pipe and the second unloading pipe.
In above-mentioned real mineral varnish production is with multistage double-deck device that deposits, every filtering mechanism all includes horizontal fixed connection's spacing ring in the through-hole, every vertical sliding connection has the filter plate in the through-hole, and every filter plate all is located corresponding spacing ring top.
In above-mentioned real mineral varnish production is with multistage double-deck sediment device, every the equal fixedly connected with in filter plate middle part solid fixed ring.
In above-mentioned real mineral varnish production is with multistage double-deck sediment device, the horizontal fixedly connected with connecting rod of slider lateral wall, the connecting rod is kept away from outside slider one end extends to the casing, the connecting rod is located the outer one end fixedly connected with handle of casing.
Compared with the prior art, the beneficial effects of the utility model reside in that: the utility model discloses in, can carry out multistage double-deck sediment to the raw materials through first drip chamber and second drip chamber, simultaneously, when filtering mechanism filtered the raw materials, can the fast switch over position of two through-holes and inlet pipe and access hole to both can not cause the influence to the normal circulation of inlet pipe, can also in time clear up the change to the filter plate, excellent in use effect.
Drawings
FIG. 1 is a schematic structural view of a multi-stage double-layer deposition apparatus for producing a real stone paint;
fig. 2 is an enlarged view of a point a in fig. 1.
In the figure: the device comprises a shell 1, a settling chamber 2, a partition plate 3, a first discharging pipe 4, a second discharging pipe 5, a water discharging pipe 6, a horizontal groove 7, a sliding block 8, a through hole 9, a feeding pipe 10, an access hole 11, a connecting rod 12, a handle 13, a limiting ring 14, a filter plate 15 and a fixing ring 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a real mineral varnish production is with multistage double-deck sediment device, including casing 1, the drip chamber 2 has been seted up in casing 1, be equipped with the hierarchical mechanism in the drip chamber 2, casing 1 water flat-open is equipped with horizontal groove 7, and horizontal groove 7 is located drip chamber 2 directly over, the inlet pipe 10 that corresponds with first drip chamber is seted up to vertical through horizontal groove 7 between roof and the 1 up end of casing in drip chamber 2, horizontal groove 7 water flat-moving connection has slider 8, and on slider 8, lower terminal surface all with 7 cell wall sealing sliding connection of horizontal groove, two through-holes 9 have been seted up to vertical running through on slider 8, all be equipped with in every through-hole 9 and be used for carrying out filterable filtering mechanism to the raw materials, two access holes 11 that correspond with through-hole 9 are vertically seted up to roof and the 1 up end of casing in the horizontal groove.
The grading mechanism includes on the diapire vertical fixed connection's baffle 3 in the drip chamber 2, and baffle 3 separates 2 levels of drip chamber for first drip chamber and second drip chamber from right to left, has seted up drain pipe 6 between drip chamber 2 and the 1 lateral wall of casing, and drain pipe 6 and second drip chamber intercommunication.
The first blanking pipe 4 and the second blanking pipe 5 corresponding to the first settling chamber and the second settling chamber are vertically arranged between the lower end face of the bottom wall of the settling chamber 2 and the lower end face of the shell 1, electromagnetic valves are arranged in the first blanking pipe 4 and the second blanking pipe 5, and the first blanking pipe 4 and the second blanking pipe 5 can be controlled to be opened and closed through the electromagnetic valves.
Every filtering mechanism all includes horizontal fixed connection's spacing ring 14 in the through-hole 9, and equal vertical sliding connection has filter plate 15 in every through-hole 9, and every filter plate 15 all is located corresponding spacing ring 14 top.
The middle part of each filter plate 15 is fixedly connected with a fixing ring 16, and the filter plates 15 are conveniently taken out by matching with external hook rods through the fixing rings 16.
The horizontal fixedly connected with connecting rod 12 of slider 8 lateral wall, connecting rod 12 keep away from slider 8 one end and extend to outside the casing 1, and connecting rod 12 is located the outer fixedly connected with handle 13 of one end of casing 1.
The utility model discloses its functional principle is explained to the following mode of operation of accessible: when the device is used, external raw materials pass through the corresponding through holes 9 and the filter plates 15 through the feeding pipes 10 and enter the first settling chamber, impurities in the raw materials are intercepted and filtered by the corresponding filter plates 15, the filtered raw materials sequentially flow through the first settling chamber and the second settling chamber, so that the raw materials are subjected to graded double-layer settling, after a period of time, the electromagnetic valves in the first blanking pipe 4 and the second blanking pipe 5 are opened, and sediments in the first settling chamber and the second settling chamber are discharged from the first blanking pipe 4 and the second blanking pipe 5 respectively;
after one end time, through handle 13 pulling slider 8, two through-holes 9 on the slider 8 switch with inlet pipe 10, access hole 11 just to the position, then the staff can be convenient clear up and change through corresponding access hole 11 to the filter plate 15 that corresponds in the through-hole 9, neither can cause the influence to the normal circulation of inlet pipe 10, can also in time clear up the change filter plate 15.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a real mineral varnish production is with multistage double-deck sediment device, includes casing (1), its characterized in that, has seted up drip chamber (2) in casing (1), be equipped with hierarchical mechanism in drip chamber (2), casing (1) water flat-open is equipped with horizontal groove (7), and horizontal groove (7) are located drip chamber (2) directly over, vertically run through horizontal groove (7) between roof and casing (1) up end in drip chamber (2) and set up inlet pipe (10) that correspond with first drip chamber, horizontal groove (7) water level smooth motion is connected with slider (8), and slider (8) upper and lower terminal surface all with horizontal groove (7) cell wall sealing sliding connection, two through-holes (9), every have been seted up to vertical running through on slider (8) all be equipped with filtering mechanism in through-hole (9), horizontal inslot roof and casing (1) up end vertically set up two maintenance mouths (11) that correspond with through-hole (9).
2. The multi-stage double-layer precipitation device for producing the real stone paint as claimed in claim 1, wherein the grading mechanism comprises a partition plate (3) vertically and fixedly connected to the inner bottom wall of the precipitation chamber (2), the precipitation chamber (2) is divided into a first precipitation chamber and a second precipitation chamber by the partition plate (3), and a drain pipe (6) is arranged between the precipitation chamber (2) and the side wall of the shell (1).
3. The multi-stage double-layer precipitation device for producing the real stone paint as claimed in claim 1, wherein a first discharging pipe (4) and a second discharging pipe (5) corresponding to the first precipitation chamber and the second precipitation chamber are vertically arranged between the inner bottom wall of the precipitation chamber (2) and the lower end surface of the shell (1), and electromagnetic valves are respectively arranged in the first discharging pipe (4) and the second discharging pipe (5).
4. The multi-stage double-layer precipitation device for producing real stone paint as claimed in claim 1, wherein each filtering mechanism comprises a limiting ring (14) horizontally and fixedly connected in a through hole (9), a filtering plate (15) is vertically and slidably connected in each through hole (9), and each filtering plate (15) is located above the corresponding limiting ring (14).
5. The multistage double-layer precipitation device for producing the real stone paint as claimed in claim 4, wherein a fixing ring (16) is fixedly connected to the middle of each filter plate (15).
6. The multi-stage double-layer precipitation device for producing real stone paint as claimed in claim 1, wherein a connecting rod (12) is horizontally and fixedly connected to the side wall of the sliding block (8), one end, far away from the sliding block (8), of the connecting rod (12) extends out of the shell (1), and a handle (13) is fixedly connected to one end, located outside the shell (1), of the connecting rod (12).
CN202221449590.2U 2022-06-11 2022-06-11 Real mineral varnish production is with multistage double-deck device that deposits Active CN217829214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221449590.2U CN217829214U (en) 2022-06-11 2022-06-11 Real mineral varnish production is with multistage double-deck device that deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221449590.2U CN217829214U (en) 2022-06-11 2022-06-11 Real mineral varnish production is with multistage double-deck device that deposits

Publications (1)

Publication Number Publication Date
CN217829214U true CN217829214U (en) 2022-11-18

Family

ID=84024074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221449590.2U Active CN217829214U (en) 2022-06-11 2022-06-11 Real mineral varnish production is with multistage double-deck device that deposits

Country Status (1)

Country Link
CN (1) CN217829214U (en)

Similar Documents

Publication Publication Date Title
CN203145090U (en) Gravity type rainwater flow abandoning filter
CN206934819U (en) A kind of efficient hydraulic engineering advection sedimentation device
CN203447826U (en) Oil-water separator
CN215137180U (en) Sewage treatment plant for environmental management
CN209596617U (en) A kind of sedimentation basin for material recycle
CN207680195U (en) Apparatus for treating sewage
CN217829214U (en) Real mineral varnish production is with multistage double-deck device that deposits
CN207012610U (en) A kind of oil water separator in garlic flavor oil manufacturing process
CN201959596U (en) Degasser, tank body thereof and stirring body thereof
CN211799006U (en) Bidirectional combined inclined plate sedimentation tank
CN211445349U (en) Waste water treatment device capable of improving filtering and impurity removing effects
CN208770931U (en) A kind of voltage regulation type fore filter
CN208372542U (en) A kind of Industrial Waste Water Treatments inclined-tube sedimentation tank
CN217724873U (en) Copper strips processing apparatus for waste water
CN215302430U (en) Aquaculture is with sinking dirty draw-out device
CN206069419U (en) A kind of water for industrial use pretreatment system of environment-friendly high-efficiency
CN220194254U (en) Filtering device with multistage filtering function
CN220301507U (en) Prefabricated pump station base of long-pending siltation function is prevented to high modulus polypropylene
CN215137319U (en) High-efficient self-discharging formula chilling water filter structure
CN214167569U (en) Online wastewater treatment and recycling device on aluminum anodic oxidation line
CN215667599U (en) Sewage treatment integration equipment with cyclic utilization function
CN216771143U (en) Sampling device with impurity removal function for river water quality detection
CN217677498U (en) Large-scale desert blue-green algae culture pond
CN210945094U (en) Air-blowing type wadding remover
CN215137634U (en) Circulating water side filtering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 400000 No. 6, Longjiang Road, Pulu Industrial Park, Tongliang District, Chongqing

Patentee after: Chongqing Haodi Paint Co.,Ltd.

Address before: 400000 No. 6, Longjiang Road, Pulu Industrial Park, Tongliang District, Chongqing

Patentee before: CHONGQING HAODI PAINT Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A multi-stage double-layer sedimentation device for the production of real stone paint

Granted publication date: 20221118

Pledgee: Bank of China Limited Chongqing Tongliang Branch

Pledgor: Chongqing Haodi Paint Co.,Ltd.

Registration number: Y2024500000022