CN217815392U - Integrated bracket for installing pipeline and ceiling - Google Patents

Integrated bracket for installing pipeline and ceiling Download PDF

Info

Publication number
CN217815392U
CN217815392U CN202221974787.8U CN202221974787U CN217815392U CN 217815392 U CN217815392 U CN 217815392U CN 202221974787 U CN202221974787 U CN 202221974787U CN 217815392 U CN217815392 U CN 217815392U
Authority
CN
China
Prior art keywords
pipeline
ceiling
supporting part
vertical rods
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202221974787.8U
Other languages
Chinese (zh)
Inventor
蒲祥
李刚
辜飞
张荣国
唐靖武
马文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202221974787.8U priority Critical patent/CN217815392U/en
Application granted granted Critical
Publication of CN217815392U publication Critical patent/CN217815392U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an integrated bracket for installing pipelines and a ceiling, which is fixedly connected on a multi-ribbed beam and comprises a pipeline supporting part and a ceiling connecting part; the pipeline supporting part is fixedly connected with the multi-ribbed beam, and a pipeline installation cavity for a pipeline to penetrate through is formed in the pipeline supporting part; the plurality of ceiling connecting parts are uniformly distributed at the bottom of the pipeline supporting part and used as connecting and supporting points of the ceiling; compared with the prior art, this an integral type leg joint for pipeline and ceiling installation just mainly comprises pipeline supporting part and ceiling connecting portion on the close rib roof beam, and the pipeline is worn to establish and is supported spacingly in the pipeline installation intracavity that the pipeline supporting part inboard formed, and a plurality of ceiling connecting portion are connected and are regarded as the connection support point of ceiling in pipeline supporting part bottom to the stable roof is installed.

Description

Integrated bracket for installing pipeline and ceiling
Technical Field
The utility model relates to an interior decoration supporting structure technical field, concretely relates to integral type support for pipeline and ceiling installation.
Background
In recent years, people have higher and higher requirements on indoor net height of buildings, and structural designers apply the dense rib floor to a structure, namely the dense rib beam and the steel mesh are engraved to form the dense rib floor. The spacing between the multi-ribbed beams is generally 800-1200 mm, and the steel mesh plates are positioned between the multi-ribbed beams. Therefore, various electromechanical pipeline bridges and indoor ceiling suspended ceilings can only be directly installed at the bottoms of the multi-ribbed beams, and the maximum size of the electromechanical pipeline bridge can reach 2000mm, so that a support needs to be installed between two spans of the multi-ribbed beams when the bridge is installed.
The installation of pipelines and ceilings is now performed using separate brackets.
For example: the application number is CN 202210118759.4's patent application discloses a save pipeline installing support that building layer is high, including link A and link B, link A with link B is through connecting mounting fixed connection, link A's bottom mounting is equipped with pipe clamp A, link B's bottom mounting is equipped with pipe clamp B, pipe clamp A with pipe clamp B is used for the centre gripping to support the pipeline, just pipe clamp A with pipe clamp B's bottom is higher than the bottom of its pipeline that supports of centre gripping or keeps level rather than the bottom of the pipeline that the centre gripping supported.
The patent application document with application number CN201910844794.2 discloses an inside furred ceiling is with bearing frame, comprising a base plate, the last fixed surface of bottom plate is connected with driving motor, driving motor's output fixedly connected with pivot, the top fixedly connected with driving gear of pivot, the upper surface of bottom plate is rotated through the bearing and is connected with two threaded sleeves, two the equal threaded connection in inside of threaded sleeve has the threaded rod, two the top fixedly connected with loading board of threaded rod, left the telescopic surface fixed connection of threaded sleeve has driven gear, the driving gear with driven gear meshes mutually, two the equal fixedly connected with sprocket in threaded sleeve's surface, two the transmission is connected with the chain between the surface of sprocket, the last fixed surface of bottom plate is connected with the installation sleeve, the inside cover of installation sleeve is equipped with the bracing piece, the top of bracing piece with the lower fixed surface of loading board is connected, the telescopic inside diapire fixedly connected with buffer spring, buffer spring's top with the bottom fixed connection of bracing piece, the last fixed surface of bottom plate is connected with the cat ladder, the lower fixed surface of bottom plate is connected with a set of supporting leg firm, the bottom plate upper fixed surface is connected with two balancing weights.
At present, the problem that the pipeline mounting bracket is combined with the bearing frame for the suspended ceiling, and the pipeline and the suspended ceiling are mounted to meet the actual requirement is not found.
SUMMERY OF THE UTILITY MODEL
To the not enough that exists among the prior art, the utility model aims to provide an integral type support for pipeline and ceiling installation to solve among the prior art, do not discover now to have to combine pipeline installation support and furred ceiling with bearing frame, install pipeline and ceiling simultaneously, in order to satisfy actual demand's problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme: an integrated rack for pipeline and ceiling installation fixedly attached to a multi-ribbed beam, comprising:
the pipeline supporting part is fixedly connected with the multi-ribbed beam and is internally provided with a pipeline installation cavity for penetrating a pipeline;
the ceiling connecting parts are uniformly distributed at the bottoms of the pipeline supporting parts and are used as connecting and supporting points of the ceiling.
Compared with the prior art, the utility model discloses following beneficial effect has:
this an integral type leg joint for pipeline and ceiling installation just mainly comprises pipeline supporting part and ceiling connecting portion on the close rib roof beam, and the pipeline is worn to establish and is supported spacingly in the pipeline installation intracavity that the pipeline supporting part inboard formed, and a plurality of ceiling connecting portion are connected and are regarded as the connection support point of ceiling in pipeline supporting part bottom to stable installing the ceiling.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a locking portion according to an embodiment of the present invention.
Reference numerals in the drawings of the specification include: dense rib beam 1, horizontal pole 2, montant 3, ceiling jib 4, spacing section of thick bamboo 5, locating claw 6, adapter sleeve 7, "U" type claw 8, stopper 9, locking cap 10, elastic expansion piece 11, briquetting 12.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments:
as shown in fig. 1, the embodiment of the present invention provides an integrated bracket for installing a pipeline and a ceiling, which is fixedly connected to a multi-ribbed beam 1, and comprises a pipeline supporting portion and a ceiling connecting portion;
the pipeline supporting part is fixedly connected with the multi-ribbed beam 1, and a pipeline installation cavity for a pipeline to penetrate through is formed in the pipeline supporting part;
the ceiling connecting parts are uniformly distributed at the bottoms of the pipeline supporting parts and are used as connecting and supporting points of the ceiling.
This an integral type leg joint for pipeline and ceiling installation just mainly comprises pipeline supporting part and ceiling connecting portion on dense rib beam 1, and the pipeline is worn to establish and is supported spacingly in the pipeline installation intracavity that the pipeline supporting part inboard formed, and a plurality of ceiling connecting portion are connected and are regarded as the connection support point of ceiling in pipeline supporting part bottom to stable installing the ceiling.
According to another embodiment of the present invention, as shown in fig. 1, the one-piece bracket for pipeline and ceiling installation, wherein the pipeline supporting part comprises a cross bar 2 and a vertical bar 3;
wherein the cross bar 2 is connected with a plurality of ceiling connecting parts;
the two vertical rods 3 are provided, one ends of the two vertical rods 3 are correspondingly connected to the two ends of the cross rod 2 one by one, the other ends of the two vertical rods 3 are fixedly connected to different multi-ribbed beams 1, and the two vertical rods 3 are positioned on the same side of the cross rod 2;
the pipeline installation cavity is a space formed by the two vertical rods 3 and the cross rod 2 in an enclosing mode.
In this embodiment: the transverse rod 2 and the two vertical rods 3 are matched specifically to form a U-shaped structure, and two ends of the U-shaped structure are fixedly connected to different multi-ribbed beams 1; mounting blocks can be welded at two ends of the U-shaped structure, and the mounting blocks are fixedly connected with the corresponding multi-ribbed beams 1 through screws; the pipeline installation cavity is the space inside the U-shaped structure, so that the pipeline can pass through the pipeline conveniently, the pipeline is supported by the cross rod 2, and the pipeline is limited in the pipeline installation cavity.
Based on the scheme, each ceiling connecting part is a ceiling suspender 4 arranged along the vertical direction, and the top end of each ceiling suspender 4 is connected with the bottom of the pipeline supporting part; the top ends of the ceiling suspenders 4 are fixedly connected to the bottom of the cross rod 2 to form a plurality of connection points, so that the ceiling can be connected and supported.
The integrated bracket for installing the pipeline and the ceiling is mainly formed by a U-shaped structure and a plurality of ceiling suspenders 4, the structure is simple and easy to manufacture, and the pipeline and the ceiling are reasonably installed.
As shown in fig. 1, according to another embodiment of the present invention, the integrated bracket for pipeline and ceiling installation is provided, wherein an adjustable locking component is connected between the cross rod 2 and the two vertical rods 3, and the adjustable locking component is used for limiting and fixing the pipeline penetrating through the pipeline installation cavity.
Herein, the pipeline after installing is stably arranged in the pipeline installation cavity through the cooperation of the adjustable locking assembly, and the pipeline is prevented from shaking to cause pipeline damage.
Based on the scheme, the adopted adjustable locking assembly comprises a limiting cylinder 5 and a locking part;
the two ends of the limiting cylinder 5 can be detachably connected with positioning claws 6, and the two positioning claws 6 are movably arranged on the two vertical rods 3 one by one for positioning;
the locking part is connected with the limiting cylinder 5 in a sliding mode and is detachably and fixedly connected with the cross rod 2.
In this embodiment: the positioning claws 6 are respectively composed of an arc-shaped block and a connecting screw rod, one end of the connecting screw rod is fixedly connected to the outer wall of the arc-shaped block, and the other end of the connecting screw rod is in threaded connection with the limiting cylinder 5; the arc piece one-to-one activity of two locating claws 6 is embraced and is established on two montants 3, rotate spacing section of thick bamboo 5, adjust the relative length after two locating claws 6 and spacing section of thick bamboo 5 are connected, so that two locating claws 6 slide to support between two montants 3 mutually, the spacing section of thick bamboo 5 of back removal makes the pipeline centre gripping of installation between spacing section of thick bamboo 5 and horizontal pole 2, the lock part can dismantle fixed continuous with horizontal pole 2 again, the centre gripping that makes the pipeline stable is between spacing section of thick bamboo 5 and horizontal pole 2, in order to fix the installation of pipeline, stability after the pipeline installation is improved.
The locking part can be formed by a connecting sleeve 7, a screw rod and a nut, a locking hole needs to be formed in the cross rod 2 at the moment, the connecting sleeve 7 is sleeved on the limiting cylinder 5 in a sliding mode, one end of the screw rod is fixedly connected with the connecting sleeve 7, and the other end of the screw rod is connected with the nut in a threaded mode after penetrating through the locking hole, so that the pipeline is stably clamped between the limiting cylinder 5 and the cross rod 2.
Referring to fig. 1 and 2, according to another embodiment of the present invention, the integrated bracket for pipeline and ceiling installation is different from the previous embodiment in that the locking part has a different structure, and the locking part used in this embodiment includes a connecting sleeve 7, a "U" -shaped claw 8, a limiting block 9 and a locking cap 10;
wherein the connecting sleeve 7 is movably sleeved on the limiting cylinder 5;
the middle part of the U-shaped claw 8 is fixedly connected with the connecting sleeve 7 through a connecting rod, and the inner side of the U-shaped claw 8 is connected with a pressing block 12 through an elastic telescopic piece 11;
the limiting blocks 9 are connected with two ends of the U-shaped claw 8 in a sliding mode;
the two locking caps 10 are in one-to-one corresponding threaded connection with two ends of the U-shaped claw 8 and are used for limiting the limiting block 9 on the U-shaped claw 8;
after assembly, the cross rod 2 is propped against the limiting block 9 and the pressing block 12.
The utility model discloses in: the connecting sleeve 7 is arranged on the limiting cylinder 5 in a sliding manner, so that the relative position of the locking part and the limiting cylinder 5 or the cross rod 2 can be adjusted according to actual requirements; during matching, the cross rod 2 is placed in the U-shaped claw 8 to abut against the pressing block 12, the elastic telescopic piece 11 can be an elastic telescopic rod which provides a supporting force for the pressing block 12 to abut against the cross rod 2, and the two rear locking caps 10 are correspondingly connected to two ends of the U-shaped claw 8 one by one, so that the limiting block 9 is matched with the pressing block 12 to clamp and fix the cross rod 2, and an installed pipeline is fixed between the cross rod 2 and the limiting cylinder 5; the structural design of this locking portion need not set up the locking hole on horizontal pole 2 and come the cooperation, has improved the structural stability of horizontal pole 2.
Wherein, the flexible telescopic link can stretch out and draw back and adjust, then avoids stopper 9 and briquetting 12 too big to the clamping-force of horizontal pole 2 to make locking portion and being connected of horizontal pole 2 safer.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (6)

1. An integral support for pipeline and ceiling installation which is fixedly connected to a multi-ribbed beam, comprising:
the pipeline supporting part is fixedly connected with the multi-ribbed beam and is internally provided with a pipeline installation cavity for a pipeline to penetrate through;
the ceiling connecting parts are uniformly distributed at the bottoms of the pipeline supporting parts and are used as connecting and supporting points of the ceiling.
2. An integrated rack for pipeline and ceiling mounting according to claim 1, wherein: the line support portion includes:
a cross bar connected to the plurality of ceiling connection parts;
the two vertical rods are provided, one ends of the two vertical rods are connected to the two ends of the cross rod in a one-to-one correspondence mode, the other ends of the two vertical rods are fixedly connected to different ribbed beams, and the two vertical rods are located on the same side of the cross rod;
the pipeline installation cavity is a space formed by the two vertical rods and the cross rod in an enclosing mode.
3. An integrated rack for pipeline and ceiling mounting according to claim 1 or 2, wherein: each ceiling connecting part is a ceiling hanging rod arranged in the vertical direction, and the top end of the ceiling hanging rod is connected with the bottom of the pipeline supporting part.
4. An integrated rack for pipeline and ceiling mounting according to claim 2, wherein: and an adjustable locking assembly is connected between the cross rod and the two vertical rods and used for limiting and fixing the pipeline penetrating in the pipeline installation cavity.
5. An integrated rack for pipeline and ceiling mounting according to claim 4, wherein: the adjustable locking assembly comprises:
the two ends of the limiting cylinder can be detachably connected with positioning claws, and the two positioning claws are movably arranged on the two vertical rods one by one in a surrounding mode for positioning;
the locking portion, the locking portion slides with spacing section of thick bamboo and links to each other and can dismantle fixedly with the horizontal pole and link to each other.
6. An integrated rack for pipeline and ceiling mounting according to claim 5, wherein: the lock portion includes:
the connecting sleeve is movably sleeved on the limiting cylinder;
the middle part of the U-shaped claw is fixedly connected with the connecting sleeve through a connecting rod, and the inner side of the U-shaped claw is connected with a pressing block through an elastic telescopic piece;
the limiting blocks are connected with two ends of the U-shaped claw in a sliding mode;
the two locking caps are in one-to-one corresponding threaded connection with two ends of the U-shaped claw and are used for limiting the limiting block on the U-shaped claw;
after assembly, the cross rod is propped against the position between the limiting block and the pressing block.
CN202221974787.8U 2022-07-28 2022-07-28 Integrated bracket for installing pipeline and ceiling Withdrawn - After Issue CN217815392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221974787.8U CN217815392U (en) 2022-07-28 2022-07-28 Integrated bracket for installing pipeline and ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221974787.8U CN217815392U (en) 2022-07-28 2022-07-28 Integrated bracket for installing pipeline and ceiling

Publications (1)

Publication Number Publication Date
CN217815392U true CN217815392U (en) 2022-11-15

Family

ID=83971248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221974787.8U Withdrawn - After Issue CN217815392U (en) 2022-07-28 2022-07-28 Integrated bracket for installing pipeline and ceiling

Country Status (1)

Country Link
CN (1) CN217815392U (en)

Similar Documents

Publication Publication Date Title
CN201704942U (en) Clip-type hanging basket suspension support
CN215803108U (en) Attached beam type hanging basket
CN217815392U (en) Integrated bracket for installing pipeline and ceiling
CN212338414U (en) Corridor gallows convenient to installation
CN107178658B (en) Footstock structure of lifting rod type support and hanger
CN215594383U (en) Cross arched pipe truss building with net rack steel structure
CN210739578U (en) Antidetonation support convenient to installation
CN113622579A (en) Fastening type light gauge steel hangs member
CN209876443U (en) Fan hanger
CN214990093U (en) Suspension bracket and suspension system
CN112854746A (en) Inverted hanging type supporting system for steel truss floor support plate and construction method
CN218153472U (en) Multifunctional movable hoisting support for indoor equipment
CN201203271Y (en) Water heater support hook
CN218828898U (en) Telescopic mechanism for bridge convenient to install fast
CN220976253U (en) Pulley block hoisting superimposed sheet mechanism
CN112252566B (en) Wall corner suspended ceiling structure for interior decoration
CN218881713U (en) Support jacking of cast-in-situ reinforced concrete structure bearing template
CN216810527U (en) Glass curtain wall convenient to install for architectural design
CN218668470U (en) Wall-attached seat for attached lifting scaffold
CN213502660U (en) Bicycle wall hook
CN117146164B (en) Suspension bracket of laser level meter
CN216109797U (en) Light wall body installation mechanism
CN209854999U (en) Building curtain wall mounting and fixing support
CN215920192U (en) Adjustable steel bar support for steel bar derusting machine
CN220341942U (en) Adjustable cable bridge used on tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20221115

Effective date of abandoning: 20230626

AV01 Patent right actively abandoned

Granted publication date: 20221115

Effective date of abandoning: 20230626

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned