CN217812432U CN202221989018.5U CN202221989018U CN217812432U CN 217812432 U CN217812432 U CN 217812432U CN 202221989018 U CN202221989018 U CN 202221989018U CN 217812432 U CN217812432 U CN 217812432U
Authority
CN
China
Prior art keywords
pulley
fixed
spout
steel structure
building steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221989018.5U
Other languages
Chinese (zh)
Inventor
莫磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221989018.5U priority Critical patent/CN217812432U/en
Application granted granted Critical
Publication of CN217812432U publication Critical patent/CN217812432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to the technical field of the architectural steel structure technique and specifically relates to a whole displacement device of architectural steel structure, including a plurality of connecting rods and two first spouts, a plurality of connecting rod both ends are fixed respectively on two first spouts, still include: glide machanism, glide machanism establishes two in the first spout, glide machanism includes first backup pad and a plurality of subassembly of preventing shifting, and a plurality of subassembly equipartitions of preventing shifting are fixed on the first backup pad, it is a plurality of the subassembly of preventing shifting is equallyd divide the cartridge two in the first spout, prevent that the subassembly of shifting includes first pulley, supporting leg and two second pulleys, first pulley and two the second pulley is all fixed on the supporting leg. The utility model discloses when using, let the condition that the skew can not appear when sliding in the building steel construction of placing on the first backup pad to removal that can also relax more, more laborsaving.

Description

Whole displacement device of building steel construction
Technical Field
The utility model relates to a building steel construction technical field especially relates to a whole displacement device of building steel construction.
Background
At present, in the building engineering work progress, to the steel construction installation, the mounting means that generally adopts the hoist and mount makes the steel construction remove to appointed position, however, run into and stride the irrigation canals and ditches or other occasions that receive the place restriction and be not convenient for the hoist and mount construction, need adopt other construction methods to replace the operation mode of hoist and mount construction. The sliding device is used for moving the construction steel structure. Present sliding device is when using, the majority is the cooperation of slider and spout and uses, it slides and drives the building steel structure and slides to utilize the slider to slide in the spout, but when in-service use, frictional force between slider and the spout is great, and when sliding in slider and the spout, if the skew has appeared in the atress, the slider can skew in gliding direction in the spout, frictional force between further increase slider and the spout, be unfavorable for the laborsaving when building steel structure slides, consequently, need the whole sliding device of building steel structure to satisfy the demand.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the sliding device in the prior art is easy to have a low price and is not labor-saving when sliding, and providing a whole sliding device of a building steel structure.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the design is a whole displacement device of building steel structure, and including a plurality of connecting rods and two first spouts, a plurality of connecting rod both ends are fixed respectively on two first spouts, still include:
glide machanism, glide machanism establishes two in the first spout, glide machanism includes first backup pad and a plurality of subassembly that prevents shifting, and a plurality of subassembly equipartitions that prevent shifting are fixed on the first backup pad, it is a plurality of the cartridge is equallyd divide in two to prevent shifting the subassembly in the first spout, prevent shifting the subassembly and include first pulley, supporting leg and two second pulleys, first pulley and two the second pulley is all fixed on the supporting leg, first pulley and two the second pulley all with first spout contacts.
Preferably, the water leakage device further comprises a plurality of water leakage holes, and the water leakage holes are formed in the two first sliding grooves respectively.
Preferably, the support device further comprises an adjusting mechanism, and the adjusting mechanism is fixed on the first support plate.
Preferably, adjustment mechanism includes first backup pad, a plurality of dead lever, second backup pad and two adjusting part, and is a plurality of dead lever one end equipartition is fixed on the first backup pad, the other end equipartition is fixed in the second backup pad, two adjusting part symmetry is established first backup pad with on the second backup pad.
Preferably, the adjusting part includes hole, linear electric motor, cylinder, second spout and a plurality of deflector roll, the hole is established in the second backup pad, linear electric motor fixes in the first backup pad, the cylinder is fixed linear electric motor with on the second spout, it is a plurality of the deflector roll is all rotated and is established on the second spout.
The utility model provides a whole displacement device of building steel structure, beneficial effect lies in: this whole displacement device of building steel construction is when using, utilize a plurality of connecting rods with two first spout fixed connection become a whole, the setting of first pulley and two second pulleys on the supporting leg, first pulley supports the supporting leg, and can not influence the supporting leg and drive the more laborsaving removal of first supporting plate, two second pulley symmetries are established on the supporting leg, two second pulleys that utilize the symmetry to set up limit first pulley rolling direction in first spout, under the restriction of two second pulleys, let first pulley along rectilinear movement in first spout, let the condition that the skew can not appear when sliding in the building steel construction of placing in first supporting plate, and can also lighter removal, more laborsaving.
Drawings
Fig. 1 is a front view of a building steel structure integral sliding device provided by the utility model;
fig. 2 is a side view of the integral sliding device of the building steel structure provided by the utility model;
fig. 3 is the utility model provides a building steel construction unit slide's adjusting part's top view.
In the figure: connecting rod 1, first spout 2, the hole of leaking 3, first pulley 4, supporting leg 5, second pulley 6, first backup pad 7, dead lever 8, second backup pad 9, hole 10, linear electric motor 11, cylinder 12, slip supporting component 13, second spout 14, deflector roll 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1 and 2, a whole displacement device of building steel structure, including a plurality of connecting rods 1 and two first spouts 2, 1 both ends of a plurality of connecting rods are fixed respectively on two first spouts 2, and a plurality of connecting rods 1 become a whole with two first spout 2 fixed connection, still include:
glide machanism, glide machanism establishes in two first spouts 2, glide machanism includes first backup pad 7 and a plurality of subassembly of preventing shifting, a plurality of subassembly of preventing shifting can prevent when removing first backup pad 7, the condition of skew appears between first backup pad 7 and two first spouts 2, a plurality of subassembly equipartitions of preventing shifting are fixed on first backup pad 7, a plurality of subassemblies of preventing shifting are equallyd divide the cartridge in two first spouts 2, the subassembly of preventing shifting includes first pulley 4, supporting leg 5 and two second pulleys 6, first pulley 4 and two second pulleys 6 are all fixed on supporting leg 5, 6 symmetries of two second pulleys are fixed on the both sides of supporting leg 5, first pulley 4 and two second pulleys 6 all contact with first spout 2.
In rainy day, the inside condition that ponding appears easily of first spout 2 still includes a plurality of holes of leaking 3, and a plurality of holes of leaking 3 all divide and establish on two first spouts 2. The setting of a plurality of holes 3 that leak can let the quick discharge of the rainwater in first spout 2, avoids piling up the rainwater in first spout 2.
The working principle is as follows: this whole displacement device of building steel construction when using, utilize a plurality of connecting rods 1 with 2 fixed connection of two first spouts into a whole, first pulley 4 and two second pulley 6's setting on supporting leg 5, first pulley 4 supports supporting leg 5, and can not influence supporting leg 5 and drive the more laborsaving removal of first backup pad 7, two second pulley 6 symmetries are established on supporting leg 5, two second pulley 6 that utilize the symmetry to set up restrict first pulley 4 rolling direction in first spout 2, under the restriction of two second pulley 6, let first pulley 4 along rectilinear movement in first spout 2, let the condition of skew can not appear when sliding in the building steel construction of placing on first backup pad 7, and can also lighter removal, more laborsaving.
Example 2
In embodiment 1, when the building steel structure was put on first backup pad 7, the position of building steel structure was not necessarily just can be once only just rightly, and also did not have the position control mechanism to building steel structure on first backup pad 7, when not serious, the staff just also did not move the position of building steel structure on first backup pad 7, then just fix building steel structure on first backup pad 7, when building steel structure slided, the accident that scratches appears easily in building steel structure takes place, refer to fig. 1-3, as the utility model discloses a another preferred embodiment, with embodiment 1's difference lie in, still include adjustment mechanism, adjustment mechanism fixes on first backup pad 7. The adjusting mechanism is used for adjusting the building steel structure placed on the first supporting plate 7 for the second time.
Adjustment mechanism includes first backup pad 7, a plurality of dead levers 8, second backup pad 9 and two adjusting part, and a plurality of dead levers 8 and second backup pad 9 adjust the space that the building steel structure provided the operation for two adjusting part, and 8 one end equipartitions of a plurality of dead levers are fixed on first backup pad 7, other end equipartition are fixed in second backup pad 9, and two adjusting part symmetries are established on first backup pad 7 and second backup pad 9. Two adjusting part can carry out secondary regulation to the building steel structure of placing on the first backup pad 7.
The adjusting assembly comprises a hole 10, a linear motor 11, an air cylinder 12, a second sliding groove 14 and a plurality of guide rollers 15, the hole 10 is formed in a second supporting plate 9, the linear motor 11 is fixed on a first supporting plate 7, the air cylinder 12 is fixed on the linear motor 11 and the second sliding groove 14, the push rod of the air cylinder 12 can adjust the height of the second sliding groove 14, and the guide rollers 15 are all rotatably arranged on the second sliding groove 14. Through adjustment of the cylinder 12, a plurality of guide rollers 15 can be run out of the hole 10 and into contact with the building steel structure.
The device further comprises two sliding support assemblies 13, and the two sliding support assemblies 13 are respectively fixed on the second sliding grooves 14 on two sides of the air cylinder 12. The sliding support assemblies 13 can adjust the length, and thus the two sliding support assemblies 13 can support the second chute 14 no matter how the cylinder 12 adjusts the height of the second chute 14.
The working principle is as follows: when in use, the building steel structure is placed on the second support plate 9, if the position of the building steel structure on the second support plate 9 needs to be adjusted, the cylinder 12 is started, the cylinder 12 drives the guide rollers 15 on the second sliding groove 14 to leak the holes 10 through the push rod, and then the building steel structure is contacted, the building steel structure on the second support plate 9 is jacked up, then the linear motor 11 is started, the position of the second sliding groove 14 is adjusted by the linear motor 11, the building steel structure is simultaneously pushed, the building steel structure can roll on the guide rollers 15, and then the position of the building steel structure on the second support plate 9 is adjusted, the building steel structure is placed at a proper position on the second support plate 9, so that the occurrence of scraping accidents is facilitated, then the push rod of the cylinder 12 is contracted, the guide rollers 15 are separated from the building, the building steel structure is contacted with the second support plate 9 again, and the building steel structure is fixed on the second support plate 9.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a whole displacement device of building steel structure, includes a plurality of connecting rods (1) and two first spout (2), and a plurality of connecting rods (1) both ends are fixed respectively on two first spout (2), and its characterized in that still includes:
glide machanism, glide machanism establishes two in first spout (2), glide machanism includes first backup pad (7) and a plurality of subassembly of preventing shifting, and a plurality of subassembly equipartitions of preventing shifting are fixed on first backup pad (7), it is a plurality of the cartridge is equallyd divide to two to prevent shifting in first spout (2), prevent shifting the subassembly and include first pulley (4), supporting leg (5) and two second pulley (6), first pulley (4) and two second pulley (6) are all fixed on supporting leg (5), first pulley (4) and two second pulley (6) all with first spout (2) contact.
2. The integral sliding device of the construction steel structure according to claim 1, further comprising a plurality of water leakage holes (3), wherein the plurality of water leakage holes (3) are respectively arranged on the two first sliding grooves (2).
3. The building steel structure integral sliding device according to claim 1, further comprising an adjusting mechanism fixed on the first supporting plate (7).
4. The building steel structure integral sliding device according to claim 3, wherein the adjusting mechanism comprises a first supporting plate (7), a plurality of fixing rods (8), a second supporting plate (9) and two adjusting components, one end of each fixing rod (8) is uniformly fixed on the first supporting plate (7), the other end of each fixing rod is uniformly fixed on the second supporting plate (9), and the two adjusting components are symmetrically arranged on the first supporting plate (7) and the second supporting plate (9).
5. The building steel structure integral sliding device according to claim 4, wherein the adjusting component comprises a hole (10), a linear motor (11), a cylinder (12), a second sliding chute (14) and a plurality of guide rollers (15), the hole (10) is arranged on the second supporting plate (9), the linear motor (11) is fixed on the first supporting plate (7), the cylinder (12) is fixed on the linear motor (11) and the second sliding chute (14), and the plurality of guide rollers (15) are rotatably arranged on the second sliding chute (14).
CN202221989018.5U 2022-07-30 2022-07-30 Whole displacement device of building steel construction Active CN217812432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221989018.5U CN217812432U (en) 2022-07-30 2022-07-30 Whole displacement device of building steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221989018.5U CN217812432U (en) 2022-07-30 2022-07-30 Whole displacement device of building steel construction

Publications (1)

Publication Number Publication Date
CN217812432U true CN217812432U (en) 2022-11-15

Family

ID=83970901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221989018.5U Active CN217812432U (en) 2022-07-30 2022-07-30 Whole displacement device of building steel construction

Country Status (1)

Country Link
CN (1) CN217812432U (en)

Similar Documents

Publication Publication Date Title
CN205056871U (en) Pole piece collection device
CN217812432U (en) Whole displacement device of building steel construction
CN101624130A (en) Self-moving belt machine tail part
CN101850658B (en) Ink scraping device
CN220013605U (en) River course cuts dirty device
CN214686116U (en) Grid assemblage tool
CN217191628U (en) Rolling mill equipment for copper strip processing production
CN208088136U (en) A kind of girder pushing tow structure based on permanent bridge pier fulcrum
CN211966536U (en) Dismounting device of tower crane jacking cylinder
CN214527765U (en) Municipal works road pipeline construction equipment
CN208893688U (en) A kind of pulley arrangement of reciprocating mud scraper
CN213038332U (en) Gate device for hydraulic engineering
CN209367134U (en) Production tree movement skid
CN201071199Y (en) Sliding plate type mobile device
CN210943716U (en) Steel plate turnover machine
CN109761166A (en) A kind of intelligent elevated mechanism
CN219860350U (en) Hydraulic engineering construction pipeline lowering device
CN211681971U (en) Clamping structure for overhauling and installing electromechanical equipment
CN220893870U (en) River sediment collection device
CN216619260U (en) Liquid crystal splicing display unit convenient to install
CN219603151U (en) Elevator driving mechanism
CN109807583A (en) A kind of shearing machine blade exchange device and replacing options
CN215052198U (en) Steel construction bridge construction structures
CN210356186U (en) Water flat plate filtering device convenient to lift
CN215249201U (en) Hoist device for assembly type building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant