CN217812262U - Scaffold frame of encorbelmenting that engineering construction used - Google Patents

Scaffold frame of encorbelmenting that engineering construction used Download PDF

Info

Publication number
CN217812262U
CN217812262U CN202222170054.5U CN202222170054U CN217812262U CN 217812262 U CN217812262 U CN 217812262U CN 202222170054 U CN202222170054 U CN 202222170054U CN 217812262 U CN217812262 U CN 217812262U
Authority
CN
China
Prior art keywords
saddle
engineering construction
montant
connecting rod
inserted block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222170054.5U
Other languages
Chinese (zh)
Inventor
徐英达
张书宁
张贺非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Huasha Architectural Design Co ltd
Original Assignee
Jilin Huasha Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Huasha Architectural Design Co ltd filed Critical Jilin Huasha Architectural Design Co ltd
Priority to CN202222170054.5U priority Critical patent/CN217812262U/en
Application granted granted Critical
Publication of CN217812262U publication Critical patent/CN217812262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold frame of encorbelmenting that engineering construction used belongs to engineering construction technical field, including the montant, it is provided with the saddle to slide on the montant, first slide opening has been seted up to the intermediate position department of saddle, the slot has been seted up at the top of first slide opening, positioning bolt is installed to the bottom in the outside of saddle, the inside of slot is evenly pegged graft and is had the inserted block. The utility model discloses setting of saddle on montant, setting through saddle top slot, can peg graft the inserted block of connecting rod tip, be connected between the external screw thread in the inside internal thread groove of deuterogamy briquetting and the inserted block outside, make the device can fix montant connecting rod all around simultaneously when the installation, it is more convenient to install and dismantle, connecting rod through two-way interior screw rod and two sets of interior screwed pipe constitutions, can be at the in-process service length who uses regulation connecting rod, not only carry more laborsavingly, and it is more convenient to use.

Description

Overhanging scaffold for engineering construction
Technical Field
The utility model relates to a scaffold frame of encorbelmenting especially relates to a scaffold frame of encorbelmenting that engineering construction used belongs to engineering construction technical field.
Background
The overhanging scaffold is a scaffold in which a frame body structure is unloaded on a rigid overhanging beam (frame) attached to a building structure, is used for the operation of a main body or decoration project in building construction and the safety protection requirement thereof, is generally suitable for the operation of a reinforced concrete structure, a steel structure high-rise or super high-rise and the main body or decoration project in building construction and the safety protection requirement thereof, and the erection height of each section is not more than 20 m.
As in application No.: 202021433425.9, a scaffold frame that encorbelments for building engineering construction uses, through set up the connector of dislocation at the both ends of running-board, the cylinder cover in the connector aligns behind the butt joint of adjacent two sets of running-boards, then insert connecting screw in proper order, can connect the running-board, utilize connecting screw and connector can connect into whole with the multiunit running-board, thereby make the place that each group running-board docks more firm, avoid trampling taking place the separation phenomenon and cause unsettled state, the running-board after the connection is more firm and safe.
Similar to the above applications, there are currently deficiencies:
1. the steel pipes are fixed by adopting the connecting fasteners, and the transverse steel pipes and the longitudinal steel pipes are longer, so that the transverse steel pipes and the longitudinal steel pipes are inconvenient to carry in the erecting process and are difficult to detach after connection;
2. the lengths of the transverse steel pipe and the longitudinal steel pipe are fixed, so that the clearance during construction cannot be adjusted according to the use requirement, and the practicability is low;
therefore, the overhanging scaffold for engineering construction is designed to optimize the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a scaffold frame of encorbelmenting of engineering construction usefulness, the setting of saddle on the montant, setting through saddle top slot, can peg graft the inserted block of connecting rod tip, be connected between the external screw thread in the inside internal thread groove of deuterogamy briquetting and the inserted block outside, make the device fix montant connecting rod all around simultaneously when the installation, it is more convenient to install and dismantle, connecting rod through two-way interior screw rod and two sets of interior screwed pipe constitutions, can be at the in-process adjusting connecting rod's of use live length, not only carry laborsavingly, and it is more convenient to use, in addition, the setting of the parallel tangent plane that sets up through interior screwed pipe outside symmetry, can improve the area of contact with the running-board in the use, the stability of placing of running-board has been improved.
The purpose of the utility model can be achieved by adopting the following technical scheme:
the utility model provides a scaffold frame of encorbelmenting that engineering construction used, includes the montant, it is provided with the saddle to slide on the montant, first slide opening has been seted up to the intermediate position department of saddle, the slot has been seted up at the top of first slide opening, positioning bolt is installed to the bottom in the outside of saddle, the inside of slot is evenly pegged graft and is had the inserted block, the inboard and the montant laminating of inserted block, the intermediate position department in the inserted block outside all installs the connecting rod, the external screw thread has all been seted up at the top in the inserted block outside, the top of saddle all slides and is provided with the briquetting, the intermediate position department of briquetting seted up with montant complex second slide opening, the bottom of second slide opening seted up with external screw thread complex internal thread groove.
Preferably: the both sides of montant all evenly are provided with anti-skidding groove, positioning bolt's tip and the laminating of anti-skidding groove.
Preferably, the following components: the inner side of the insertion block is arc-shaped, and the radius of the arc is the same as the outer diameter of the vertical rod.
Preferably: the outside of briquetting all has seted up the thumb lever hole.
Preferably: the connecting rod includes two-way screw rod and interior screwed pipe, the screwed pipe in all threaded mounting in the both ends of two-way screw rod, the tip of interior screwed pipe all with inserted block fixed connection.
Preferably: the top and the bottom of interior screwed pipe all are provided with parallel tangent plane, and all are provided with anti-skidding line on the parallel tangent plane.
Preferably: and an adjusting wheel is fixed in the middle of the bidirectional screw.
The utility model has the advantages that:
the utility model provides a pair of cantilever scaffold frame that engineering construction used, the setting of saddle on the montant through the setting of saddle top slot, can peg graft the inserted block of connecting rod end portion, and the interior thread groove of deuterogamying briquetting inside is connected with the external screw thread outside the inserted block, makes the device can fix the connecting rod around the montant simultaneously when the installation, and the installation and dismantlement are more convenient;
through the connecting rod that two-way interior screw rod and two sets of interior screwed pipes are constituteed, can be at the in-process use length of adjusting the connecting rod that uses, not only the transport is more laborsaving, and it is more convenient to use, in addition through the setting of the parallel tangent plane that interior screwed pipe outside symmetry set up, can improve in the use with the area of contact of running-board, improved the stability of placing of running-board.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is an enlarged view of the structure at a in fig. 1 of the present invention;
FIG. 3 is a cross-sectional view of the pallet of the present invention;
FIG. 4 is a sectional view of the press block of the present invention;
fig. 5 is a structure diagram of the connecting rod of the present invention.
In the figure: 1. a vertical rod; 2. a saddle; 3. a first slide hole; 4. a slot; 5. positioning a bolt; 6. inserting a block; 7. a connecting rod; 8. an external thread; 9. briquetting; 10. a second slide hole; 11. an internal thread groove; 12. a toggle rod hole; 13. a bidirectional screw; 14. an inner solenoid; 15. cutting the surface in parallel; 16. An adjustment wheel.
Detailed Description
In order to make the technical solutions of the present invention clearer and clearer for those skilled in the art, the present invention will be described in further detail with reference to the following embodiments and drawings, but the embodiments of the present invention are not limited thereto.
Example one
As shown in fig. 1-5, this embodiment provides a scaffold that encorbelments of engineering construction usefulness, including montant 1, it is provided with saddle 2 to slide on montant 1, first slide opening 3 has been seted up to saddle 2's intermediate position department, slot 4 has been seted up at the top of first slide opening 3, positioning bolt 5 is installed to the bottom in the outside of saddle 2, plug-in block 6 has evenly been pegged graft in the inside of slot 4, the inboard and the montant 1 laminating of plug-in block 6, connecting rod 7 has all been installed to the intermediate position department in the plug-in block 6 outside, external screw thread 8 has all been seted up at the top in the plug-in block 6 outside, the top of saddle 2 all slides and is provided with briquetting 9, the intermediate position department of briquetting 9 sets up with montant 1 complex second slide opening 10, the bottom of second slide opening 10 sets up with external screw thread 8 complex internal thread groove 11, the both sides of montant 1 all evenly are provided with anti-skid groove, positioning bolt 5's tip and the laminating of slot, the inboard of plug-in 6 is the arc, and the arc radius is the same with the external diameter of montant 1.
During the use, earlier fix montant 1, then highly adjust the interval of saddle 2, and according to the interval between montant 1, adjust the length of connecting rod 7, after the length adjustment of connecting rod 7 is accomplished, insert the inside of slot 4 with the inserted block 6 of connecting rod 7 tip, after the connecting rod 7 in the montant 1 outside is pegged graft and is accomplished, the moving down of control briquetting 9, with threaded connection between briquetting 9 and the inserted block 6, fix the position of connecting rod 7, after the fixed completion of connecting rod 7, place the top of connecting rod 7 with the pedal.
Example two
In the present embodiment, as shown in fig. 1 to 5, the pressing block 9 is provided with a toggle rod hole 12 on the outer side.
With the arrangement of the toggle lever bore 12, it is possible to control the tightening of the pressure piece 9 by inserting a steel bar or a hard tool into the control pressure piece 9 when it is rotated.
In this embodiment, the connecting rod 7 includes a bidirectional screw 13 and an inner screw 14, the inner screw 14 is threadedly mounted on both ends of the bidirectional screw 13, and the ends of the inner screw 14 are fixedly connected to the inserting block 6.
When the length of the connecting rod 7 is adjusted, the bidirectional screw 13 is controlled to rotate, the two groups of inner screw pipes 14 simultaneously extend or contract outwards, and then the length of the connecting rod 7 formed by the bidirectional screw 13 and the inner screw pipes 14 is adjusted.
In the present embodiment, the top and the bottom of the inner spiral tube 14 are provided with parallel sections 15, and the parallel sections 15 are provided with anti-slip threads.
The anti-slip lines on the top of the parallel tangent plane 15 are used for improving the contact area and the friction force between the pedal and the pedal, and the use stability is ensured.
In the present embodiment, an adjustment wheel 16 is fixed to the bidirectional screw 13 at an intermediate position.
By means of the arrangement of the adjusting wheel 16, the rotation of the bidirectional screw 13 is conveniently controlled, and the use is more convenient.
The above, only be the further embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, and any person skilled in the art is in the scope of the present invention, and the technical solution and the design of the present invention are equivalent to replace or change, and all belong to the scope of protection of the present invention.

Claims (7)

1. The utility model provides a scaffold frame of encorbelmenting that engineering construction used which characterized in that: including montant (1), it is provided with saddle (2) to slide on montant (1), first slide opening (3) have been seted up to the intermediate position department of saddle (2), slot (4) have been seted up at the top of first slide opening (3), positioning bolt (5) are installed to the bottom in the outside of saddle (2), the inside of slot (4) is evenly pegged graft and is had inserted block (6), the inboard and the montant (1) laminating of inserted block (6), connecting rod (7) are all installed to the intermediate position department in the inserted block (6) outside, external screw thread (8) have all been seted up at the top in the inserted block (6) outside, the top of saddle (2) all slides and is provided with briquetting (9), the intermediate position department of briquetting (9) sets up with montant (1) complex second slide opening (10), internal thread groove (11) with external screw thread (8) complex have been seted up to the bottom of second slide opening (10).
2. The overhanging scaffold for engineering construction according to claim 1, wherein: the anti-skidding type vertical rod is characterized in that anti-skidding grooves are evenly formed in the two sides of the vertical rod (1), and the end portion of the positioning bolt (5) is attached to the anti-skidding grooves.
3. The overhanging scaffold for engineering construction according to claim 2, wherein: the inner side of the insert block (6) is arc-shaped, and the radius of the arc-shaped insert block is the same as the outer diameter of the vertical rod (1).
4. The overhanging scaffold for engineering construction according to claim 3, wherein: the outer side of the pressing block (9) is provided with a poking rod hole (12).
5. The overhanging scaffold for engineering construction according to claim 4, wherein: connecting rod (7) include two-way screw rod (13) and interior screwed pipe (14), screwed pipe (14) in all threaded installations at the both ends of two-way screw rod (13), the tip of interior screwed pipe (14) all with inserted block (6) fixed connection.
6. The overhanging scaffold for engineering construction according to claim 5, wherein: the top and the bottom of the inner screw tube (14) are both provided with parallel tangent planes (15), and the parallel tangent planes (15) are both provided with anti-skid lines.
7. The overhanging scaffold for engineering construction according to claim 5, wherein: an adjusting wheel (16) is fixed at the middle position of the bidirectional screw (13).
CN202222170054.5U 2022-08-17 2022-08-17 Scaffold frame of encorbelmenting that engineering construction used Active CN217812262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222170054.5U CN217812262U (en) 2022-08-17 2022-08-17 Scaffold frame of encorbelmenting that engineering construction used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222170054.5U CN217812262U (en) 2022-08-17 2022-08-17 Scaffold frame of encorbelmenting that engineering construction used

Publications (1)

Publication Number Publication Date
CN217812262U true CN217812262U (en) 2022-11-15

Family

ID=83976569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222170054.5U Active CN217812262U (en) 2022-08-17 2022-08-17 Scaffold frame of encorbelmenting that engineering construction used

Country Status (1)

Country Link
CN (1) CN217812262U (en)

Similar Documents

Publication Publication Date Title
CN206873769U (en) A kind of U-shaped body reinforcing bar connector
CN217812262U (en) Scaffold frame of encorbelmenting that engineering construction used
CN106677505A (en) Adjustable steel tube supporting piece and installation method thereof
CN206477582U (en) Formwork reinforcement keel fastener constructions
CN104158119B (en) A kind of overhead ground wire suspension clamp regulation method and buffer unit
CN216479591U (en) Compression-resistant structure of school district underground pipeline
CN206241114U (en) A kind of multistation terminal-collecting machine rapid fixing
CN202706507U (en) Scaffold tool type wall connecting piece resisting high air pressure
CN212943100U (en) Cone crusher fixed cone locking device
CN211254995U (en) Tiger mouth clamp with high stability
CN207032680U (en) A kind of bar connecting fixing device
CN211100802U (en) Guide crossbeam locking structure of short stress rolling mill
CN210013387U (en) Tensile and compressive steel bar connector
CN202152543U (en) Exposed column template support combining structure
CN201405279Y (en) Draw rod assembly overall length regulating device
CN214393966U (en) Screw rod and cap quick detach anchor clamps
CN207086581U (en) A kind of combination hydraulic size reducing machine
CN2492640Y (en) Pull rod unit for building formwork
CN206829298U (en) A kind of fixing device of closestool
CN100455756C (en) Connector unit of steel frame and connection method
CN206393559U (en) Valve replacer
CN211624427U (en) Installing support is used in fire engineering construction
CN210732304U (en) Auxiliary supporting device for hydraulic wrench
CN216305353U (en) Adjustable sleeve wall connecting piece for civil construction
CN219080752U (en) Temporary connection fixing tool for reinforcement cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant