CN106677505A - Adjustable steel tube supporting piece and installation method thereof - Google Patents
Adjustable steel tube supporting piece and installation method thereof Download PDFInfo
- Publication number
- CN106677505A CN106677505A CN201710172833.XA CN201710172833A CN106677505A CN 106677505 A CN106677505 A CN 106677505A CN 201710172833 A CN201710172833 A CN 201710172833A CN 106677505 A CN106677505 A CN 106677505A
- Authority
- CN
- China
- Prior art keywords
- steel
- supporting
- double flute
- steel pipe
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 239
- 239000010959 steel Substances 0.000 title claims abstract description 239
- 238000009434 installation Methods 0.000 title claims abstract description 27
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000002994 raw material Substances 0.000 claims abstract description 7
- 230000007704 transition Effects 0.000 claims description 33
- 238000010276 construction Methods 0.000 abstract description 14
- 238000013461 design Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 3
- 230000008901 benefit Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004134 energy conservation Methods 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/06—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/12—Clamps or clips for crossing members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses an adjustable steel tube supporting piece and an installation method thereof. The adjustable steel tube supporting piece comprises a double-groove steel piece and a plurality of supporting steel tubes, wherein the supporting steel tubes are clamped into the double-groove steel piece and internally provided with an inner thread. A circular positioning ring used for clamping the corresponding supporting steel tube into a gap of the double-groove steel piece is welded to each supporting steel tube. The portions, on the two sides of each circular positioning ring, of the double-groove steel piece are each provided with a locking device used for locking the corresponding supporting steel tube into the double-groove steel piece. Meanwhile, the invention discloses an installation method of the steel tube supporting piece. The installation method comprises the steps of material preparing, selecting of installation positions, point positioning, locking and supporting. The steel tube supporting piece is reasonable in design, simple in structure, low in construction cost, easy to install and operate, and capable of adapting to multiple construction working conditions, raw materials are easy to obtain, and the positions of supporting points and the height of the supporting piece can be easily adjusted.
Description
Technical field
The present invention relates to a kind of construction prop, and in particular to a kind of adjustable steel tube support member and its installation method.
Background technology
Building industrialization is with design standard, element factory, mechanization of building operation, finishing integration, IT application in management
It is characterized, Integration Design, production, construction whole building industrial chain realize building products energy-saving and environmental protection, Life cycle value
The maximized novel building mode of production.Compared with traditional architecture mode, with high-tech as the building industrialization producer of support
The advantage of formula clearly, it can not only General Promotion building comprehensive quality and quality, greatly improve work
Production efficiency, energy conservation and consumption reduction effects significantly, be conducive to environmental conservation, realize civilized construction, and energy conservation and consumption reduction effects are significantly, may be used also
Construction cost is reduced, with obvious economic benefit.
Fabricated construction support system is the key components for realizing prefabricated dangerous component installation, with conventional cast-in-place concrete
The construction of structure construction support system is different, and its material selection, supporting member form, key position connected mode etc. are required to basis
Fabricated construction form is individually designed, develops the starting stage in fabricated construction, solves the problems, such as that support system is propulsion building work
An important ring of industryization development.
The content of the invention
An object of the present invention is to provide for a kind of adjustable steel tube support member, the steel pipe support part is reasonable in design,
Simple structure, raw material be easy to get, cheap, and can easily adjust supporting point position and supports support height, to meet difference
Construction requirement.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of adjustable steel tube support member, including double flute steel and it is all provided with female multiple supporting steel pipes;The double flute steel by
Two root architecture identical channel-section steels are processed, and it is in "] [" shape that gap and longitudinal section are carried in the middle part of which;The external diameter of the supporting steel pipe
With the gap width of double flute steel match, and supporting steel pipe on be socketed with positioning annulus, the positioning annulus is welded with supporting steel pipe
Connect, for supporting steel pipe clamp is set in the gap of double flute steel;One is respectively provided with also on the double flute steel of the positioning annulus both sides
For supporting steel pipe is locked at the locking device in double flute steel.
Preferably, the wide 3 ~ 10cm of the double flute steel middle gap.
Specifically, also including being arranged in supporting steel pipe, and the support bar that is threadedly coupled with supporting steel pipe, and arrange
In the jacking of support bar top, the support bar can adjust the height of jacking by the rotation of relative support steel pipe.
Preferably, length of the length of the support bar more than supporting steel pipe.
Further, the locking device includes two transition beam clamps, two straight bolts and two nuts, described two
The side at transition beam clamp two ends is equipped with the through hole matched with straight bolt, and two transition beam clamps are located at double flute respectively
Inside and outside steel, one of them straight bolt is located above double flute steel, and sequentially pass through corresponding logical on two transition beam clamps
Hole is connected with nut thread, and another straight bolt is located at below double flute steel, and sequentially passes through corresponding on two transition beam clamps
Through hole is connected with nut thread.
Or, the locking device includes transition beam clamp, U bolt and two nuts, and the transition beam clamp is upper and lower
The side at two ends is equipped with the through hole matched with U bolt, and the U bolt is matched with double flute steel, and U bolt two ends
Respectively from the upper and lower both sides of double flute steel after the upper lower through-hole of transition beam clamp, and two nut threads connection.
Preferably, the transition beam clamp is angle steel.
Another object of the present invention is to provide for a kind of installation method of adjustable steel tube support member, and the support member is pacified
Fill simple to operate, the support of support member installation site and support member height is adjustable, is suitable for various construction operating modes.
A kind of installation method for installing adjustable steel tube support member, the steel pipe support part are installed to disk button bracing frame
On, for supporting architectural prefab, comprise the following steps:
A, get the raw materials ready:Double flute steel, is welded positioning annulus and with female supporting steel pipe, the angle steel with through hole, and four straight
Bolt, the nut with straight bolt matching, length are more than supporting steel pipe and external diameter and supporting steel pipe internal diameter and match support bar, this
Jacking is welded with the top of strut also;
B, selection installation site:Select the disk button bracing frame below the architectural prefab to be supported, then will get ready
Double flute steel is placed on the disk button bracing frame on adjacent two socket joints disk;
C, fixed point:On double flute steel, at least one strong point is selected, the supporting steel pipe got ready is snapped in double flute steel, then will
Support bar screws in supporting steel pipe from above supporting steel pipe, touches at the top of supporting steel pipe to jacking, then moves supporting steel pipe
To the strong point of selection, and supporting steel pipe is pressed downwards, until positioning annulus is offseted with double flute steel;
D, locking:First in positioning disc side installation locking device, two straight bolts will be got ready and be each passed through one block of angle steel
Then two pieces of straight bolts are inserted in another piece of angle respectively behind the upper and lower both sides of double flute steel of positioning disc side by two through holes
In steel, nut is screwed in into bolt respectively finally, and is screwed;The installation locking on the double flute steel of positioning disc opposite side in this way
Device
E, support:The height of the architectural prefab for supporting as needed rotates support bar to adjust the height of jacking.
Compared with prior art, the invention has the advantages that:
(1)The steel pipe support part raw material of the present invention only uses steel pipe, channel-section steel, positioning annulus, angle steel and bolt and nut, is building
The material that construction site is extremely easy to get, and in the steel pipe processing method such as machining internal thread, welding also very simple is convenient, because
This, is easy to get with raw material, processes convenient and cheap advantage.
(2)Double flute steel as the support base of supporting steel pipe, is had gap by the present invention in the middle of double flute steel, can be easy to support
Steel pipe transverse shifting in the double flute steel, make supporting steel pipe it is easy for installation, and being capable of accurate positioning;Welding positioning on supporting steel pipe
Annulus is then in order which is stuck in supporting steel pipe on double flute steel, even if also will not down slide during load-bearing or swing;Supporting steel
Pipe is threadedly coupled with the support bar below jacking, jacking is moved up and down in support bar relative support steel pipe rotary, and then
Make its bearing height adjustable;And locking device has selected angle steel and bolt and nut, on the one hand it is that the locking effect of locking device is good,
Can effective locking support steel pipe, prevent supporting steel pipe from moving left and right or swinging, be on the other hand then that locking device element is easy to get, no
Can there are to double flute steel and supporting steel pipe welding, punching etc. to operate, installing/dismounting is very easy, make the supporting steel pipe can be in double flute steel
Install middle optional position.
(3)The installing/dismounting method also very simple of the present invention, it is only necessary to which each installation elements are combined dismounting i.e. after getting ready
Can, as supporting steel pipe can be moved left and right in double flute steel, and support bar can drive jacking by relative support steel pipe rotary
Move up and down, so that the positioning of support member is more accurate, installation is more facilitated.
Description of the drawings
Fig. 1 is supporting steel pipe structural representation.
Fig. 2 is transition beam clamp structures schematic diagram.
Fig. 3 is 1 front view of embodiment.
Fig. 4 is 1 top view of embodiment.
Fig. 5 is 1 side view of embodiment.
Fig. 6 is 2 front view of embodiment.
Fig. 7 is 2 top view of embodiment.
Fig. 8 is 2 side view of embodiment.
Wherein, reference is corresponding entitled:
1- double flute steel, 2- supporting steel pipes, 3- positioning annulus, 4- transition beam clamps, the straight bolts of 5-, 6- nuts, 7-U shape bolts.
Specific embodiment
The invention will be further described with embodiment for explanation below in conjunction with the accompanying drawings, and the mode of the present invention includes but not only limits
In following examples.
Embodiment 1
A kind of adjustable steel tube support member, as shown in Fig. 1 ~ Fig. 5, the steel pipe support part includes double flute steel 1 and multiple supporting steel pipes
2;1 longitudinal section of double flute steel in "] [" shape, be to be processed by two root architecture identical channel-section steels, in double flute steel two channel-section steels it
Between leave width be 3 ~ 10cm gap, for clamping supporting steel pipe.
As shown in figure 1, the external diameter of the supporting steel pipe 2 is matched with the gap width of double flute steel 1, and snap in double flute steel 1
Gap in;In order that supporting steel pipe 2 can snap in double flute steel 1 and be difficult to glide or swing, it is socketed on the supporting steel pipe 2
One positioning annulus 3, the annular diameters of the positioning annulus 3 are matched with 2 external diameter of supporting steel pipe, and are welded on supporting steel pipe 2.
As shown in Fig. 3 ~ 5, in order to supporting steel pipe 2 is locked in double flute steel 1, the double flute steel 1 of 3 both sides of the positioning annulus
On be also respectively provided with one for supporting steel pipe is locked at the locking device in double flute steel.The locking device includes two transition beams
The straight bolt 5 of clamp 4, two and two nuts 6.The transition beam clamp 4 can be steel plate, angle steel or other construction materials, this
Select in embodiment be angle steel as shown in Figure 2 as transition beam clamp, on angle steel, the upper and lower ends of same side plate are each beats
Spacing between one through hole matched with straight bolt 5, and two through holes is highly consistent with double flute steel 1, two
Angle steel is disposed longitudinally on both sides before and after double flute steel 1;5 length of straight bolt is matched with the width of double flute steel, also, two straight
In bolt 5, it is connected with nut thread after the through hole before and after a straight screw bolt passes double flute steel 1 above the angle steel of both sides, it is another
It is connected with another nut thread after the through hole that individual straight bolt then sequentially passes through before and after double flute steel 1 below the angle steel of both sides.
The present embodiment is also provided with support bar in supporting steel pipe, and is provided with jacking in support bar top.In order that top
The height adjustable of support, meets the demand of the architectural prefab to be supported of various height, and female thread will be provided with supporting steel pipe, supports
Be provided with the outside of bar match with female thread external screw thread, for being threadedly coupled with supporting steel pipe, adjust jacking height when, it is only necessary to will
Support bar relative support steel pipe rotary, you can realize moving up and down for jacking, adjusts the height of jacking.In order that jacking is highly adjusted
Whole scope is bigger, and support member more consolidate, the support pole length is grown more than supporting steel pipe 2.
The adjustable steel tube support member of the present embodiment is mainly arranged on the socket joint disk of disk button bracing frame, for supporting
Architectural prefab, its installation method are comprised the following steps:
A, get the raw materials ready:First take the channel-section steel of two shape and structure all sames, angle steel, a supporting steel pipe, one piece of annular diameters with
Positioning annulus, a jacking and standby steel plate that supporting steel pipe external diameter is matched;
The molding of double flute steel:First two channel-section steel base plates relative, notch is outwards placed in parallel, and its centre is had and supporting steel
The gap of pipe external diameter size, is then respectively welded one block of standby steel plate at two channel-section steel two ends, for two channel-section steels are welded as
Integrally, form double flute steel 1 of the longitudinal section in "] [" shape;
Process support steel pipe:By machining internal thread inside supporting steel pipe, then supporting steel pipe 2 is inserted in positioning annulus 3, and from
By itself and 2 firm welding of supporting steel pipe above positioning annulus;
The selection of locking device:From structure is identical and length more than 1 width of double flute steel two straight studs, and with straight stud
Supporting nut, then cuts two pieces of two length more than 1 height of double flute steel as transition beam clamp 4 from angle steel, and
Two through holes matched with straight stud, and the spacing of two through holes and double flute steel are opened longitudinally in two 4 sides of transition beam clamp
It is highly consistent.
The selection of support bar:Select length be more than steel pipe that supporting steel pipe and external diameter matched with supporting steel pipe internal diameter or
Steel pole is used as support bar, and car has the external screw thread matched with supporting steel pipe female thread on the outside of the support bar, then welds jacking
To support bar top.
B, selection installation site:The disk button bracing frame below architectural prefab to be supported is selected, then will be standby
Good double flute steel 1 is placed on the disk button bracing frame on adjacent two socket joints disk;
C, fixed point:On the double flute steel 1 below the architectural prefab for needing to support, at least one strong point is selected, will be processed
Supporting steel pipe 2 snap in double flute steel 1 from the position for easily snapping in, then support bar is screwed in from above supporting steel pipe supporting steel pipe
2, touch at the top of supporting steel pipe to jacking, then supporting steel pipe is moved to the strong point of selection, and supporting steel pipe is downward
Press, until positioning annulus 3 is offseted with double flute steel 1;
D, locking:The first installation locking device on the double flute steel of positioning annulus side, will one of transition beam clamp 4 be put into
Then get ready two straight bolts are each passed through the two of the transition beam clamp 4 by the double flute steel rear of 3 any side of positioning annulus
After individual through hole, reach after being each passed through the both sides up and down of double flute steel in front of double flute steel, then another piece of transition beam clamp 4 is placed
To in front of double flute steel, and make two straight bolts be each passed through the upper lower through-hole of the transition beam clamp 4, finally revolved with nut respectively
Tightly;Then this method installation locking device on the double flute steel of positioning annulus opposite side is installed, you can locking support steel pipe;
E, support:The height rotary support member of the architectural prefab for supporting as needed, you can the height of adjustment jacking so as to
Prop up architectural prefab.
Embodiment 2
From embodiment 1, the present embodiment the difference is that only that locking device is different, as shown in Fig. 6 ~ Fig. 8, the lock of the present embodiment
Tight device only includes 7, two nuts 6 of a U bolt and a transition beam clamp 4, wherein, the through hole and U of transition beam clamp 4
Shape bolt 7 matches, and remaining structure is identical with the transition beam clamp 4 of embodiment 1, and its 7 double flute steel 1 of U bolt matches, and
After U bolt wraps double flute steel, its two ends respectively from double flute steel about 1 both sides through transition beam clamp 4 upper lower through-hole with
Two nut thread connections.
The installation method of the steel pipe support part of the present embodiment the difference is that only step D, the present embodiment with embodiment
The installation process of step D is as follows:
D, locking:Locking device is taken out, now installation locking device on the double flute steel of positioning annulus side, will U bolt
Opening forward, be placed in double flute steel rear, then to double flute steel move, to U bolt two ends respectively pass through the upper and lower both sides of double flute steel
After reach in front of double flute steel, two through holes on transition beam clamp are set to into U bolt two ends respectively, then by nut are
Can;In this manner again positioning annulus opposite side double flute steel on installation locking device, you can locking support steel pipe;
Above-described embodiment is only the preferred embodiment of the present invention, should not be taken to limit protection scope of the present invention, as long as
The body design thought of the present invention and the change or polishing of having no essential meaning mentally made, its technical problem for being solved
Still it is consistent with the present invention, should be included within protection scope of the present invention.
Claims (8)
1. a kind of adjustable steel tube support member, it is characterised in that including double flute steel(1)Be all provided with female multiple supporting steels
Pipe(2);The double flute steel(1)Processed by two root architecture identical channel-section steels, it is in "] [" that gap and longitudinal section are carried in the middle part of which
Shape;The supporting steel pipe(2)External diameter and double flute steel gap width match, and supporting steel pipe on be welded with for supporting
Steel pipe strap is set to the positioning annulus in the gap of double flute steel(3);One is respectively provided with also on the double flute steel of the positioning annulus both sides
For supporting steel pipe is locked at the locking device in double flute steel.
2. a kind of adjustable steel tube support member according to claim 1, it is characterised in that the double flute steel(1)Middle part seam
Wide 3 ~ the 10cm of gap.
3. a kind of adjustable steel tube support member according to claim 1 and 2, it is characterised in that also including being arranged on support
Steel pipe(2)Interior, and the support bar that is threadedly coupled with supporting steel pipe, and it is arranged on the jacking of support bar top, the support bar
The height of jacking can be adjusted by the rotation of relative support steel pipe.
4. a kind of adjustable steel tube support member according to claim 3, it is characterised in that the length of the support bar is more than
The length of supporting steel pipe.
5. a kind of adjustable steel tube support member according to claim 4, it is characterised in that the locking device includes two
Transition beam clamp(4), two straight bolts(5)With two nuts(6), the side at described two transition beam clamp two ends be equipped with
The through hole that straight bolt matches, and two transition beam clamps are located at double flute steel respectively(1)Inside and outside, one of them straight spiral shell
Bolt is located above double flute steel, and sequentially pass through corresponding through hole on two transition beam clamps and be connected with nut thread, and another is straight
Bolt is located at below double flute steel, and sequentially pass through corresponding through hole on two transition beam clamps and be connected with nut thread.
6. a kind of adjustable steel tube support member according to claim 4, it is characterised in that the locking device includes transition
Beam clamp(4), U bolt(7)With two nuts(6), the side of the transition beam clamp upper and lower ends is equipped with and U bolt
The through hole for matching, the U bolt and double flute steel(1)Match, and U bolt two ends are passed through from the upper and lower both sides of double flute steel respectively
Through after the upper lower through-hole of bridging beam clamp, and two nut threads connection.
7. a kind of adjustable steel tube support member according to claim 5 or 6, it is characterised in that the transition beam clamp(4)
For angle steel.
8. it is a kind of install claim 6 described in adjustable steel tube support member method, it is characterised in that the steel pipe support part
It is installed on disk button bracing frame, for supporting architectural prefab, comprises the following steps:
A, get the raw materials ready:Double flute steel, is welded positioning annulus and with female supporting steel pipe, with through hole four blocks of angle steel, and four
Individual straight bolt, the nut with straight bolt matching, length are more than supporting steel pipe and external diameter and supporting steel pipe internal diameter and match support bar,
The support bar top is also welded with jacking;
B, selection installation site:Select the disk button bracing frame below the architectural prefab to be supported, then will get ready
Double flute steel is placed on the disk button bracing frame on adjacent two socket joints disk;
C, fixed point:On double flute steel, at least one strong point is selected, the supporting steel pipe got ready is snapped in double flute steel, then will
Support bar screws in supporting steel pipe from above supporting steel pipe, touches at the top of supporting steel pipe to jacking, then moves supporting steel pipe
To the strong point of selection, and supporting steel pipe is pressed downwards, until positioning annulus is offseted with double flute steel;
D, locking:First in positioning disc side installation locking device, two straight bolts will be got ready and be each passed through one block of angle steel
Then two pieces of straight bolts are inserted in another piece of angle respectively behind the upper and lower both sides of double flute steel of positioning disc side by two through holes
In steel, nut is screwed in into bolt respectively finally, and is screwed;The installation locking on the double flute steel of positioning disc opposite side in this way
Device;
E, support:The height of the architectural prefab for supporting as needed rotates support bar to adjust the height of jacking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710172833.XA CN106677505A (en) | 2017-03-22 | 2017-03-22 | Adjustable steel tube supporting piece and installation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710172833.XA CN106677505A (en) | 2017-03-22 | 2017-03-22 | Adjustable steel tube supporting piece and installation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106677505A true CN106677505A (en) | 2017-05-17 |
Family
ID=58826211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710172833.XA Pending CN106677505A (en) | 2017-03-22 | 2017-03-22 | Adjustable steel tube supporting piece and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677505A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316634A (en) * | 2018-03-28 | 2018-07-24 | 天津鼎维固模架工程股份有限公司 | A kind of aluminium joist structure for socket joint type disk button steel pipe support |
CN111288279A (en) * | 2020-03-24 | 2020-06-16 | 浙江工匠机电自动化有限公司 | Door type linkage support used in electromechanical installation engineering |
DE202021101627U1 (en) | 2021-03-26 | 2022-07-01 | Peri Se | connection component |
DE102021131584A1 (en) | 2021-12-01 | 2023-06-01 | Peri Se | Connection component for connecting scaffolding elements |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201358579Y (en) * | 2009-01-06 | 2009-12-09 | 广州市市政集团有限公司 | Adjustable support bracket device |
CN101975210A (en) * | 2010-09-08 | 2011-02-16 | 赵建菊 | Fastening device for cross connection between rectangular tubes or between rectangular tube and steel angle |
CN103216131A (en) * | 2013-04-20 | 2013-07-24 | 上海市政工程设计研究总院(集团)有限公司 | Reserved hole pore-forming construction method for concrete structure |
CN204081453U (en) * | 2014-09-17 | 2015-01-07 | 中国建筑一局(集团)有限公司 | Use formula builder's jack shaped steel fastening devices can be had enough to meet the need |
CN105839913A (en) * | 2016-03-29 | 2016-08-10 | 杭州二建建设有限公司 | Socket type slot mode steel tube support section steel joist construction method |
CN206607826U (en) * | 2017-03-22 | 2017-11-03 | 成都市工业设备安装公司 | A kind of adjustable steel tube support member |
-
2017
- 2017-03-22 CN CN201710172833.XA patent/CN106677505A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201358579Y (en) * | 2009-01-06 | 2009-12-09 | 广州市市政集团有限公司 | Adjustable support bracket device |
CN101975210A (en) * | 2010-09-08 | 2011-02-16 | 赵建菊 | Fastening device for cross connection between rectangular tubes or between rectangular tube and steel angle |
CN103216131A (en) * | 2013-04-20 | 2013-07-24 | 上海市政工程设计研究总院(集团)有限公司 | Reserved hole pore-forming construction method for concrete structure |
CN204081453U (en) * | 2014-09-17 | 2015-01-07 | 中国建筑一局(集团)有限公司 | Use formula builder's jack shaped steel fastening devices can be had enough to meet the need |
CN105839913A (en) * | 2016-03-29 | 2016-08-10 | 杭州二建建设有限公司 | Socket type slot mode steel tube support section steel joist construction method |
CN206607826U (en) * | 2017-03-22 | 2017-11-03 | 成都市工业设备安装公司 | A kind of adjustable steel tube support member |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316634A (en) * | 2018-03-28 | 2018-07-24 | 天津鼎维固模架工程股份有限公司 | A kind of aluminium joist structure for socket joint type disk button steel pipe support |
CN111288279A (en) * | 2020-03-24 | 2020-06-16 | 浙江工匠机电自动化有限公司 | Door type linkage support used in electromechanical installation engineering |
DE202021101627U1 (en) | 2021-03-26 | 2022-07-01 | Peri Se | connection component |
DE102021131584A1 (en) | 2021-12-01 | 2023-06-01 | Peri Se | Connection component for connecting scaffolding elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677505A (en) | Adjustable steel tube supporting piece and installation method thereof | |
CN202787968U (en) | Changeable-angle adjusting type template inclined support | |
CN202655402U (en) | Device for adjusting roundness of penstock and supporting penstock | |
CN206607826U (en) | A kind of adjustable steel tube support member | |
CN101890757B (en) | Assembled adjustable steel bar binding clamping fixture support | |
CN109317911A (en) | A kind of cross column welding production line | |
CN210122814U (en) | Laminated slab support frame | |
CN105781019A (en) | All-grouting sleeve for assembled building reinforcement connection and grouting method | |
CN208440996U (en) | A kind of novel inlet pipe | |
CN105672677A (en) | Support tool used for fabricated building wallboard installation and use method of support tool | |
CN105804418A (en) | Prefabricated wallboard fixed supporting system and construction method | |
CN214738756U (en) | Steel construction building connecting device | |
CN201883607U (en) | Steel structural beam | |
CN108086468B (en) | Prefabricated assembled CLT wood structure | |
CN210888058U (en) | Length-adjustable concrete column template rapid reinforcing device | |
CN100419166C (en) | Joint device and method using female and male arc end temper screw | |
CN201722627U (en) | Assembled adjustable support for reinforcing bar binding fixture | |
CN217580602U (en) | Steel construction building connecting device | |
CN202451171U (en) | Tool set for producing reinforcing bar curve unit of grid steel frame | |
CN214169930U (en) | Expansion single-side formwork supporting screw | |
CN216276932U (en) | Continuous opposite-supporting device for concrete structure formwork in narrow space | |
CN221001427U (en) | Assembly type building assembly component | |
CN216840059U (en) | Combined shear wall steel bundle tube structure | |
CN104251014A (en) | Connecting structure of concrete bent frame column and roof steel beam | |
CN210289127U (en) | Laminated plate support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 610000 No. 147 Qintai Road, Qingyang District, Chengdu City, Sichuan Province Applicant after: CHENGDU CONSTRUCTION INDUSTRIAL EQUIPMENT INSTALLATION Co.,Ltd. Address before: 610000 No. 147 Qintai Road, Qingyang District, Chengdu City, Sichuan Province Applicant before: CHENGDU INDUSTRY EQUIPMENT INSTALLATION Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |