CN217811032U - Civil engineering construction is with clear native equipment in site pile hole - Google Patents

Civil engineering construction is with clear native equipment in site pile hole Download PDF

Info

Publication number
CN217811032U
CN217811032U CN202221702161.1U CN202221702161U CN217811032U CN 217811032 U CN217811032 U CN 217811032U CN 202221702161 U CN202221702161 U CN 202221702161U CN 217811032 U CN217811032 U CN 217811032U
Authority
CN
China
Prior art keywords
wall
fixedly connected
storage device
civil engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202221702161.1U
Other languages
Chinese (zh)
Inventor
武鹏选
郑晓龙
窦秋杨
刘志昂
王宪勇
韩志会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yubing Construction And Installation Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221702161.1U priority Critical patent/CN217811032U/en
Application granted granted Critical
Publication of CN217811032U publication Critical patent/CN217811032U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an on-site pile hole soil cleaning device for civil engineering construction, which relates to the technical field of civil engineering construction equipment and solves the technical problems that the soil around the existing pile hole is inconvenient to clean and the cleaning efficiency is reduced because the dry soil is difficult to clean; the device comprises a device body, wherein a plurality of handrails are fixedly connected to the outer wall of the side edge of the device body, a plurality of movable rollers are movably connected to the outer wall of the bottom of the device body, a first through hole is formed in the outer wall of the top end of the device body, a containing device is arranged below the first through hole, a water flow assembly is arranged on one side of the device body, and a cleaning assembly is arranged inside the containing device; the utility model has the advantages of the clearance is effectual and the efficient advantage of clearance.

Description

Civil engineering construction is with clear native equipment in on-spot stake hole
Technical Field
The utility model relates to a civil engineering construction equipment technical field especially relates to a civil engineering construction is with clear native equipment in site pile hole.
Background
Civil engineering is a general term for the science and technology of building various land engineering facilities. It refers to both the materials, equipment used and the technical activities carried out such as surveying, designing, construction, maintenance, repair, etc., as well as the objects of engineering construction. I.e. various engineering facilities such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, ports, power stations, airports, ocean platforms, water supply and drainage and protection projects, which are built on or under the ground, on land and directly or indirectly serve human life, production, military affairs and scientific research. Civil engineering refers to engineering entities which are used for surveying, planning, designing, constructing, installing, maintaining and the like of buildings, structures, related supporting facilities and the like of various new construction, reconstruction or extension besides house construction and are completed by the technical work, and a plurality of pile holes are usually manufactured and cement is poured into the pile holes to reinforce the buildings in the daily construction process;
but the device of clearing soil on the existing market is only to clearing up the earth of stake hole bottom, and stake hole earth all around does not obtain effectual clearance, can make the cement column quality of follow-up pouring like this and receive the influence, and dry earth is inconvenient collects equally when clearing soil, and then makes the efficiency of clearing soil descend, therefore, we propose an on-the-spot stake downthehole equipment of clearing soil for civil engineering construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a civil engineering construction is with on-spot stake downthehole clear native equipment has solved stake hole earth all around and has not cleared up convenient to, clears up comparatively difficultly and lead to the technical problem that cleaning efficiency descends with dry earth.
For solving the technical problem, the utility model provides a pair of civil engineering construction is with on-spot stake downthehole clear native equipment, the device comprises a device main part, a plurality of handrails of side outer wall fixedly connected with of device main part, the bottom outer wall swing joint of device main part has a plurality of removal gyro wheels, the top outer wall of device main part has been seted up the one number through-hole, the below of one number through-hole is provided with storage device, one side of device main part is provided with the rivers subassembly, storage device's inside is provided with the clearance subassembly.
Preferably, a plurality of support frames are fixedly connected to the outer wall of the side edge of the device main body, the storage roller is arranged at the center of each support frame, the outer wall of the side edge of each storage roller is wound with a connecting rope, and the outer wall of one end, far away from the storage roller, of each connecting rope is movably connected with the outer wall of the top end of the storage device.
Preferably, the rivers subassembly includes storage water tank, control water pump, a pipe, reposition of redundant personnel connector and output pipe, the side outer wall fixedly connected with storage water tank of device main part, the top outer wall fixedly connected with control water pump of device main part, no. one the pipe of inner wall fixedly connected with of control water pump, the one end outer wall fixedly connected with reposition of redundant personnel connector of control water pump is kept away from to No. one the pipe, a plurality of output pipes of the inner wall fixedly connected with of reposition of redundant personnel connector.
Preferably, the output ends of the output conduits penetrate through the outer wall of the bottom of the containing device and extend to the lower part of the containing device.
Preferably, the top inner wall of the storage device is fixedly connected with a suction pump, the center of the bottom outer wall of the storage device is provided with a plurality of absorption through holes, and the side inner wall of the storage device is fixedly connected with a transparent observation window.
Preferably, the clearance subassembly includes control motor, connecting rod and gathers together the blade, a plurality of control motors of storage device's bottom inner wall fixedly connected with, control motor's output all with the outer wall fixed connection of connecting rod, the equal fixedly connected with of side outer wall of connecting rod gathers together the blade.
Compared with the prior art, the utility model provides a pair of civil engineering construction is with on-spot stake downthehole clear native equipment has following beneficial effect:
the utility model provides a civil engineering construction is with downthehole clear native equipment of scene stake, extract the water source from the storage water tank through control water pump and a pipe with the help of the top of device main part, and when storage device descends at the uniform velocity and strikes off stake hole earth all around, borrow by reposition of redundant personnel connector and output pipe and spray the rivers on stake hole inner wall all around, and then soften dry earth, make storage device's bottom can scrape down these earth and make it pile up and clear up in convenient follow-up unity in stake hole bottom, borrow this to solve the stake hole earth that is infected with all around and not clear up and lead to the not good problem of the cement column quality that fills.
The utility model provides a civil engineering construction is with on-spot stake downthehole clear native equipment, through making earth wholly soften with the help of rivers subassembly, when storage device reachs stake hole bottom, start control motor, it rotates with the help of control motor drive connecting rod and gather together the blade, the earth that has been softened by water at this moment is further broken, and gather together towards storage device center department, meanwhile, start the suction pump, inhale storage device with the help of the through-hole of receiving device bottom with the rare mud end, retrieve storage device with the help of the cooperation of accomodating the roller bearing and connecting the rope afterwards, observe in the storage device with the help of the transparent observation window of storage device side this moment, the person of facilitating the use knows the concrete quantity of earth in the storage device, the problem of having solved borrow this and having solved dry earth and be not convenient for collecting and clearing up is solved.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a partial structural sectional view of the present invention.
The reference numbers in the figures: 1. a device main body; 2. a handrail; 3. moving the roller; 4. a first through hole; 5. a support frame; 6. a take-in roller; 7. connecting ropes; 8. a storage device; 9. a water flow assembly; 901. a water storage tank; 902. controlling the water pump; 903. a first catheter; 904. a shunt connector; 905. an output conduit; 10. a suction pump; 11. receiving the through hole; 12. cleaning the assembly; 1201. controlling the motor; 1202. a connecting rod; 1203. gathering the blades; 13. a transparent viewing window.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Embodiment one is given by fig. 1-4, the utility model discloses a device main part 1, a plurality of handrails 2 of the side outer wall fixedly connected with of device main part 1, the bottom outer wall swing joint of device main part 1 has a plurality of removal gyro wheels 3, and the top outer wall of device main part 1 has seted up one number through-hole 4, and the below of one number through-hole 4 is provided with storage device 8, and one side of device main part 1 is provided with rivers subassembly 9, and storage device 8's inside is provided with clearance subassembly 12.
By moving the device over the appropriate stake holes by means of the cooperation of handrail 2 and moving rollers 3, the soil is then collected and softened by means of water flow assembly 9 and cleaning assembly 12 in receptacle 8 and finally fed into receptacle 8.
In the second embodiment, on the basis of the first embodiment, the plurality of support frames 5 are fixedly connected to the outer side wall of the device main body 1, the storage rollers 6 are arranged at the centers of the support frames 5, the connecting ropes 7 are wound on the outer side walls of the storage rollers 6, and the outer walls of the ends, far away from the storage rollers, of the connecting ropes 7 are movably connected with the outer top walls of the storage devices 8.
The position of the storage device 8 can be freely adjusted by the matching of the storage roller 6 and the connecting rope 7 on the support frame 5, and the device is further suitable for pile holes with various depths.
Third embodiment, on the basis of first embodiment, rivers subassembly 9 includes storage water tank 901, control water pump 902, a pipe 903, reposition of redundant personnel connector 904 and output conduit 905, the side outer wall fixedly connected with storage water tank 901 of device main part 1, the top outer wall fixedly connected with control water pump 902 of device main part 1, the inner wall fixedly connected with pipe 903 of control water pump 902, one end outer wall fixedly connected with reposition of redundant personnel connector 904 that control water pump 902 was kept away from to pipe 903, the inner wall fixedly connected with a plurality of output conduit 905 of reposition of redundant personnel connector 904.
Through control water pump 902 and a pipe 903 extraction water source in following storage water tank 901 with the help of the top of device main part 1 to at the time of storage device 8 at the uniform velocity descends and strikes off stake hole earth all around, borrow by reposition of redundant personnel connector 904 and output pipe 905 with rivers spray on stake hole inner wall all around, and then soften dry earth, make storage device 8's bottom can scrape down these earth and make it pile up in convenient follow-up unified clearance in stake hole bottom, borrow this to solve the stake hole earth of being infected with all around and not clear up and lead to the not good problem of bored concrete column quality.
In the fourth embodiment, based on the first embodiment, the output ends of the output conduits 905 penetrate through the outer wall of the bottom of the containing device 8 and extend to the lower part thereof.
By locating the output end of the output conduit 905 below the receptacle 8, the receptacle 8 is already wetted by water before scraping the soil, which is more convenient for scraping.
In the fifth embodiment, on the basis of the first embodiment, the top inner wall of the storage device 8 is fixedly connected with a suction pump 10, the center of the bottom outer wall of the storage device 8 is provided with a plurality of absorption through holes 11, and the side inner wall of the storage device 8 is fixedly connected with a transparent observation window 13.
Through starting suction pump 10, inhale storage device 8 with the help of the through-hole 11 of accomodating 8 bottoms in with the rare mud utmost, retrieve storage device 8 with the help of the cooperation of accomodating roller bearing 6 and connecting rope 7 afterwards, observe in storage device 8 with the help of transparent observation window 13 of storage device 8 side this moment, the concrete quantity of earth in the person of facilitating the use knows storage device 8.
Sixth embodiment, on the basis of first embodiment, clearance subassembly 12 includes control motor 1201, connecting rod 1202 and gathers together blade 1203, a plurality of control motors 1201 of the bottom inner wall fixedly connected with of storage device 8, the output of control motor 1201 all with the outer wall fixed connection of connecting rod 1202, the equal fixedly connected with of side outer wall of connecting rod 1202 gathers together blade 1203.
Through when storage device 8 reachs stake hole bottom, start control motor 1201, drive connecting rod 1202 with the help of control motor 1201 and gather together blade 1203 and rotate, the earth that has been softened by water this moment is by further breakage to gather together towards storage device 8 center department, borrow this to promote the collection efficiency of earth.
The working principle is as follows:
at first through the cooperation with handrail 2 and removal gyro wheel 3 with this device remove suitable stake hole top, later with the help of support frame 5, it is downthehole to put into the stake with storage device 8 with storage reel and connection rope 7, draw the water source in control pump 902 and a pipe 903 follow storage water tank 901 with the help of the top of device main part 1 this moment, and when storage device 8 descends at the uniform velocity and strikes off stake hole earth all around, borrow by reposition of redundant personnel connector 904 and output pipe 905 with rivers spray on stake hole inner wall all around, and then soften dry earth, make storage device 8's bottom can scrape these earth down and make it pile up convenient follow-up unified in stake hole bottom and clear up, when storage device 8 reachs stake hole bottom, start control motor 1201, drive connecting rod 1202 and gather together blade 1203 with the help of control motor 1201 and rotate, the earth that has been softened by the water at this moment is further broken, and gather together towards storage device 8 center department, start suction pump 10 simultaneously, inhale the rare earth with the help of storage device 8 bottom to the utmost in storage device 8 through storage device 11, follow-up the cooperation with the help of storage roller 6 and connection rope 7 carry out the convenient side of storage device 8 in the observation window to the observation device 8 in this moment, the observation device collection window, at this moment, the side of storage device 8 in the convenient observation window of storage device is retrieved.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a civil engineering construction is with clear native equipment in site pile hole, includes device main part (1), its characterized in that: the side outer wall fixedly connected with of device main part (1) has a plurality of handrails (2), the bottom outer wall swing joint of device main part (1) has a plurality of removal gyro wheels (3), one number through-hole (4) have been seted up to the top outer wall of device main part (1), the below of one number through-hole (4) is provided with storage device (8), one side of device main part (1) is provided with rivers subassembly (9), the inside of storage device (8) is provided with clearance subassembly (12).
2. The on-site pile hole soil cleaning equipment for civil engineering construction according to claim 1, characterized in that a plurality of support frames (5) are fixedly connected to the outer side wall of the device main body (1), a storage roller (6) is arranged at the center of each support frame (5), a connecting rope (7) is wound on the outer side wall of each storage roller (6), and the outer wall of one end, far away from the storage roller, of each connecting rope (7) is movably connected with the outer wall of the top end of each storage device (8).
3. The in-site pile hole soil cleaning equipment for civil engineering construction according to claim 1, wherein the water flow component (9) comprises a water storage tank (901), a control water pump (902), a first guide pipe (903), a diversion connector (904) and an output guide pipe (905), the water storage tank (901) is fixedly connected to the outer side wall of the side edge of the device main body (1), the control water pump (902) is fixedly connected to the outer wall of the top end of the device main body (1), the first guide pipe (903) is fixedly connected to the inner wall of the control water pump (902), the diversion connector (904) is fixedly connected to the outer wall of one end of the first guide pipe (903) far away from the control water pump (902), and a plurality of output guide pipes (905) are fixedly connected to the inner wall of the diversion connector (904).
4. The on-site pile hole soil cleaning equipment for civil engineering construction according to claim 3, characterized in that the output ends of the output conduits (905) all penetrate through the outer wall of the bottom of the containing device (8) and extend to the lower part.
5. The in-situ pile hole soil cleaning equipment for civil engineering construction according to claim 1, wherein a suction pump (10) is fixedly connected to the inner wall of the top end of the storage device (8), a plurality of absorption through holes (11) are formed in the center of the outer wall of the bottom of the storage device (8), and a transparent observation window (13) is fixedly connected to the inner wall of the side edge of the storage device (8).
6. The in-site pile hole soil cleaning equipment for civil engineering construction according to claim 1, wherein the cleaning assembly (12) comprises a control motor (1201), a connecting rod (1202) and a gathering blade (1203), the bottom inner wall of the storage device (8) is fixedly connected with a plurality of control motors (1201), the output ends of the control motors (1201) are fixedly connected with the outer wall of the connecting rod (1202), and the side outer wall of the connecting rod (1202) is fixedly connected with the gathering blade (1203).
CN202221702161.1U 2022-07-03 2022-07-03 Civil engineering construction is with clear native equipment in site pile hole Withdrawn - After Issue CN217811032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221702161.1U CN217811032U (en) 2022-07-03 2022-07-03 Civil engineering construction is with clear native equipment in site pile hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221702161.1U CN217811032U (en) 2022-07-03 2022-07-03 Civil engineering construction is with clear native equipment in site pile hole

Publications (1)

Publication Number Publication Date
CN217811032U true CN217811032U (en) 2022-11-15

Family

ID=83963471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221702161.1U Withdrawn - After Issue CN217811032U (en) 2022-07-03 2022-07-03 Civil engineering construction is with clear native equipment in site pile hole

Country Status (1)

Country Link
CN (1) CN217811032U (en)

Similar Documents

Publication Publication Date Title
CN106400648B (en) Sponge city water collecting and purifying ecology road
CN112323910B (en) Rainwater collecting and utilizing device suitable for garden landscape
CN107761897A (en) Self contained underground stores and oozes system
CN111778794A (en) Construction structure and construction method for roadbed earthwork engineering in rainy season
CN208717990U (en) A kind of hydraulic engineering Accrete clearing device
CN217811032U (en) Civil engineering construction is with clear native equipment in site pile hole
CN106351272A (en) Washing device for milling wheels of slot milling machine
CN106758799A (en) For the system for reclaiming rainwater and its construction method of sponge urban interchange
CN210946652U (en) Environmental protection scarfing cinder device for civil engineering
CN210767179U (en) Civil engineering road drainage device
CN206368311U (en) A kind of ecological road of sponge city water collecting and purifying
CN216615925U (en) Green construction precipitation recycle device of foundation ditch
CN210857337U (en) Hydraulic and hydroelectric engineering is with high-efficient desilting equipment
CN208486268U (en) A kind of pit foundation structure convenient for draining
CN209810820U (en) Civil construction waste cement separator
CN215165749U (en) Foundation pit drainage device
CN112112205B (en) Road drainage ditch cleaning device
CN215562897U (en) Foundation leveling equipment for constructional engineering
CN215906717U (en) Hydraulic engineering drainage canal structure
CN214264088U (en) Building materials cutting device for civil engineering
CN212835587U (en) Culvert dredging robot based on high-pressure water drive
CN216195240U (en) Seepage collecting well for improving drainage culvert of tailing pond
CN217923488U (en) Foundation tamping device for civil engineering
CN113756420B (en) Building construction pothole topography ponding remove device
CN214345149U (en) Dust collector for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240312

Address after: No. 1315-1317, Block B, Chengzhi Building, Shangpai Town, Feixi County, Hefei City, Anhui Province, 230000

Patentee after: Anhui Yubing construction and Installation Engineering Co.,Ltd.

Country or region after: China

Address before: No.8 Kangsheng Hutong, Jiannan Road, Nanzhuang Village, Liucun Township, Yuhua District, Shijiazhuang City, Hebei Province, 050000

Patentee before: Wu Pengxuan

Country or region before: China

AV01 Patent right actively abandoned

Granted publication date: 20221115

Effective date of abandoning: 20240407

AV01 Patent right actively abandoned

Granted publication date: 20221115

Effective date of abandoning: 20240407