CN210767179U - Civil engineering road drainage device - Google Patents

Civil engineering road drainage device Download PDF

Info

Publication number
CN210767179U
CN210767179U CN201921642905.3U CN201921642905U CN210767179U CN 210767179 U CN210767179 U CN 210767179U CN 201921642905 U CN201921642905 U CN 201921642905U CN 210767179 U CN210767179 U CN 210767179U
Authority
CN
China
Prior art keywords
water pump
bucket
pipe
water
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921642905.3U
Other languages
Chinese (zh)
Inventor
熊焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CN201921642905.3U priority Critical patent/CN210767179U/en
Application granted granted Critical
Publication of CN210767179U publication Critical patent/CN210767179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the civil engineering technique and specifically relates to a civil engineering road drainage device, which comprises a mounting plate and i, first water pump is installed on the right side on mounting panel top, the input of first water pump passes the mounting panel downwards and the intercommunication has the pipe that absorbs water, the second water pump is installed on the top of first water pump, the inlet tube is installed to the input of second water pump. Through install first filter plate and second filter plate additional in pipe and the inlet tube that absorbs water, can prevent inside great stone or other thing admission plant, thereby cause the damage to the device, and can filter and collect the little stone in ponding and great clod through the screening bucket, prevent that it from causing the jam to the device, can conveniently clear up the material of crossing off, then can make mud and water separate in the ponding through the sedimentation bucket, prevent that mud from plugging up drainage pipe, the efficiency of drainage has greatly been improved.

Description

Civil engineering road drainage device
Technical Field
The utility model relates to a civil engineering technical field especially relates to a civil engineering road drainage device.
Background
Civil engineering is a general term for the science and technology of building various land engineering facilities, and refers to both the materials and equipment used and the technical activities of surveying, designing, constructing, maintaining, repairing, etc. performed, and the objects of engineering construction. I.e. various engineering facilities such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, ports, power stations, airports, ocean platforms, water supply and drainage and protection projects, which are built on or under the ground, on land and directly or indirectly serve human life, production, military affairs and scientific research.
In civil engineering's work progress, can meet rainwater weather sometimes and lead to the construction site to have more ponding to influence the construction, need discharge the ponding in the place before the construction, current drainage device structure is comparatively simple, meetting the place that rainwater mud and stone mix, not only its drainage efficiency is comparatively low, and can cause serious damage to the device, influences the normal construction in place, so propose a civil engineering road drainage device and solve the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the civil engineering road drainage device who proposes makes its efficiency that improves the drainage and can collect and handle mud.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the civil engineering road drainage device comprises a mounting plate, wherein a first water pump is mounted on the right side of the top end of the mounting plate, the input end of the first water pump downwards penetrates through the mounting plate and is communicated with a water suction pipe, a second water pump is mounted at the top end of the first water pump, a water inlet pipe is mounted at the input end of the second water pump, a screening barrel is mounted on the left side of the top end of the mounting plate, the output end of the first water pump is communicated with the screening barrel through a water conveying pipe, the output end of the second water pump is communicated with the water conveying pipe through a communicating pipe, a limiting sleeve is mounted in the middle of the inner bottom wall of the screening barrel, a sealing cover is mounted at the top end of the screening barrel, an annular groove is formed in the bottom end of the sealing cover, a sealing ring is mounted inside the, the utility model discloses a screening device of a sewage treatment device, including a motor frame, a mounting panel, a screening barrel, a filter frame, a cover, a rotating rod, a support frame, a filter frame, a limiting rod, a setting bucket, a cover plate, a water guide pipe, a support seat, a filter barrel, a water guide pipe and a, the bottom of the back of the sedimentation barrel is communicated with a drain pipe.
Preferably, a first filter plate is installed at the bottom of the inner cavity of the water suction pipe, and a second filter plate is installed at one end, far away from the second water pump, of the water inlet pipe.
Preferably, the top of both sides all installs the backup pad around the screening bucket, every electric putter is all installed on the top of backup pad, every electric putter's top all is connected with sealed lid through the connecting plate.
Preferably, the four corners of mounting panel bottom all install the bracing piece, every the decompression board is all installed to the bottom of bracing piece.
The utility model provides a pair of civil engineering road drainage device, beneficial effect lies in: through install first filter plate and second filter plate additional in pipe and the inlet tube that absorbs water, can prevent inside great stone or other thing admission plant, thereby cause the damage to the device, and can filter and collect the little stone in ponding and great clod through the screening bucket, prevent that it from causing the jam to the device, can conveniently clear up the material of crossing off, then can make mud and water separate in the ponding through the sedimentation bucket, prevent that mud from plugging up drainage pipe, the efficiency of drainage has greatly been improved.
Drawings
Fig. 1 is a schematic structural view of a civil engineering road drainage device provided by the utility model;
fig. 2 is the utility model provides a civil engineering road drainage device side's schematic structure diagram.
In the figure: the filter comprises a mounting plate 1, a first filter plate 2, a support rod 3, a pressure reducing plate 4, a water suction pipe 5, a first water pump 6, a second water pump 7, a second filter plate 8, a water inlet pipe 9, a communicating pipe 10, a water conveying pipe 11, a rotating rod 12, a motor frame 13, a driving motor 14, a sealing cover 15, a sealing ring 16, an annular groove 17, a screening barrel 18, a support frame 19, a filter frame 20, a water guide pipe 21, a limiting rod 22, a limiting sleeve 23, a connecting plate 24, an electric push rod 25, a support plate 26, a movable seat 27, a third water pump 28, a cover plate 29, a filter barrel 30, a drain pipe 31, a support seat 32 and.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a civil engineering road drainage device, including mounting panel 1, first water pump 6 is installed on the right side on mounting panel 1 top, the input of first water pump 6 passes mounting panel 1 downwards and is connected with the pipe 5 that absorbs water, second water pump 7 is installed on the top of first water pump 6, inlet tube 9 is installed to the input of second water pump 7, first filter plate 2 is installed to the bottom of the pipe 5 inner chamber that absorbs water, second filter plate 8 is installed to the one end that second water pump 7 was kept away from to inlet tube 9, can prevent through first filter plate 2 and second filter plate 8 that great stone and other materials get into the water pump in the ponding inside, avoided causing the destruction to the water pump.
The left side of the top end of the mounting plate 1 is provided with a screening barrel 18, the output end of the first water pump 6 is communicated with the screening barrel 18 through a water delivery pipe 11, the output end of the second water pump 7 is communicated with the water delivery pipe 11 through a communicating pipe 10, the middle part of the inner bottom wall of the screening barrel 18 is provided with a stop collar 23, the stop collar 23 ensures that a filter frame 20 is kept stable when rotating, the top end of the screening barrel 18 is provided with a sealing cover 15, the bottom end of the sealing cover 15 is provided with an annular groove 17, a sealing ring 16 is arranged inside the annular groove 17, the sealing ring 16 can prevent accumulated water from overflowing from the screening barrel 18, the sealing cover 15 is clamped at the top end of the screening barrel 18 through the annular groove 17, the top parts of the front side and the back side of the screening barrel 18 are provided with supporting plates 26, the top end of each supporting plate 26 is, the sealing cover 15 can be separated from the screening barrel 18, and stones and soil blocks in the filter frame 20 can be conveniently cleaned.
There is motor frame 13 at the mid-mounting on 15 tops of sealed lid, the internally mounted of motor frame 13 has driving motor 14, driving motor 14's output shaft passes sealed lid 15 downwards and is connected with dwang 12, support frame 19 is installed to the bottom of dwang 12, filter frame 20 is installed to support frame 19's bottom, it can filter mud piece and stone in the ponding to drive filter frame 20 through driving motor 20 and slowly rotate, filter frame 20's bottom is installed and is worn to insert the gag lever post 22 inside stop collar 23, it can rotate steadily to guarantee to filter frame 20.
A sedimentation barrel 33 is arranged on the left side of the top end of the mounting plate 1 and positioned at the rear side of the screening barrel 18, a movable seat 27 is arranged on the top of the front end surface of the sedimentation barrel 33, a cover plate 29 is arranged on the top end of the sedimentation barrel 33, one end of the cover plate 29 is connected with the movable seat 27, the cover plate 29 and the movable seat 27 are combined to open the sedimentation barrel 33 so as to be convenient for cleaning the interior of the sedimentation barrel 33, a third water pump 28 is arranged in the middle of the top end of the cover plate 29, the input end of the third water pump 28 is communicated with the screening barrel 18 through a water guide pipe 21, the output end of the third water pump 28 penetrates through the cover plate 29 and is communicated with the sedimentation barrel 33, accumulated water is conveyed into the sedimentation barrel 33 through the third water conveying pump 28, a support base 32 is arranged in the middle of the inner bottom wall of the sedimentation barrel 33, a filter barrel 30 is arranged on the top end of the support base 32, the filter barrel 30 can, guarantee that whole device can normal stable operation, the bottom intercommunication at the precipitation bucket 33 back has drain pipe 31, and bracing piece 3 is all installed in the four corners of 1 bottom of mounting panel, and decompression board 4 is all installed to the bottom of every bracing piece 3.
The working principle is as follows: the whole device is placed in accumulated water, a water pipe connected through a water inlet pipe 9 is placed at a deep place of the accumulated water, the first water pump 6 and the second water pump 7 are started to pump the accumulated water, when the accumulated water passes through the first filter plate 2 and the second filter plate 8, larger substances in the accumulated water can be blocked to prevent the accumulated water from entering the water pumps to damage the water pumps, the accumulated water mixed with slurry and stones is conveyed into the screening barrel 18 through the water conveying pipe 11 by the first water pump 6 and the second water pump 7, then the driving motor 14 is started to drive the rotating rod 12 to rotate, the filter frame 20 slowly rotates along with the accumulated water, the slurry particles and small stones in the accumulated water enter the screening barrel 18, the slurry particles and the small stones are collected by the filter frame 20 to prevent the slurry particles and the small stones from blocking the water guide pipe 21, the slurry mixed in the screening barrel 18 can be pumped into the sedimentation barrel 33 through the third water pump 28, the mixed accumulated water enters the filter barrel 30 through the third water pump 28, mud in ponding deposits the bottom to deposiing bucket 30 gradually, and ponding can flow out in the hole of deposiing bucket 30 lateral wall, then is connected with water pipe eduction gear through drain pipe 31, can not lead to the fact the jam to the water pipe through filterable ponding, can improve the drainage efficiency of whole device.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (4)

1. The utility model provides a civil engineering road drainage device, includes mounting panel (1), its characterized in that, first water pump (6) are installed to the right side on mounting panel (1) top, the input of first water pump (6) passes mounting panel (1) downwards and is linked together and has absorb water pipe (5), second water pump (7) are installed to the top of first water pump (6), inlet tube (9) are installed to the input of second water pump (7), screening bucket (18) are installed to the left side on mounting panel (1) top, the output of first water pump (6) is linked together through raceway (11) and screening bucket (18), the output of second water pump (7) is linked together through communicating pipe (10) and raceway (11), the mid-mounting of screening bucket (18) interior diapire has stop collar (23), sealed lid (15) are installed to the top of screening bucket (18), annular groove (17) have been seted up to the bottom of sealed lid (15), the internally mounted of annular groove (17) has sealing washer (16), sealed lid (15) are through annular groove (17) joint on the top of screening bucket (18), the mid-mounting on sealed lid (15) top has motor frame (13), the internally mounted of motor frame (13) has driving motor (14), the output shaft of driving motor (14) passes sealed lid (15) downwards and is connected with dwang (12), support frame (19) are installed to the bottom of dwang (12), filter frame (20) are installed to the bottom of support frame (19), insert gag lever post (22) inside stop collar (23) in the bottom of filter frame (20), the left side on mounting panel (1) top just is located the rear side of screening bucket (18) and installs sediment bucket (33), movable seat (27) are installed at the top of terminal surface before sediment bucket (33), apron (29) are installed on the top of sediment bucket (33), the one end of apron (29) is connected with movable seat (27), the mid-mounting on apron (29) top has third water pump (28), the input of third water pump (28) is linked together with screening bucket (18) through aqueduct (21), the output of third water pump (28) passes apron (29) and is linked together with sediment bucket (33), the mid-mounting of diapire has supporting seat (32) in sediment bucket (33), filter vat (30) are installed on the top of supporting seat (32), the bottom intercommunication at the back of sediment bucket (33) has drain pipe (31).
2. Civil engineering road drainage device according to claim 1, characterized in that the bottom of the inner cavity of the suction pipe (5) is provided with a first filter plate (2), and the end of the inlet pipe (9) far away from the second water pump (7) is provided with a second filter plate (8).
3. Civil engineering road drainage device according to claim 1, characterized in that the screening barrel (18) is provided with support plates (26) at the top of the front and rear sides, each support plate (26) is provided with an electric push rod (25) at the top end, and each electric push rod (25) is connected with the sealing cover (15) through a connecting plate (24) at the top end.
4. Civil engineering road drainage device according to claim 1, characterized in that the four corners of the bottom end of the mounting plate (1) are equipped with support rods (3), the bottom end of each support rod (3) being equipped with a pressure reducing plate (4).
CN201921642905.3U 2019-09-29 2019-09-29 Civil engineering road drainage device Expired - Fee Related CN210767179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921642905.3U CN210767179U (en) 2019-09-29 2019-09-29 Civil engineering road drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921642905.3U CN210767179U (en) 2019-09-29 2019-09-29 Civil engineering road drainage device

Publications (1)

Publication Number Publication Date
CN210767179U true CN210767179U (en) 2020-06-16

Family

ID=71037782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921642905.3U Expired - Fee Related CN210767179U (en) 2019-09-29 2019-09-29 Civil engineering road drainage device

Country Status (1)

Country Link
CN (1) CN210767179U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725266A (en) * 2019-09-23 2020-01-24 江苏万德福公共设施科技有限公司 Water adding device of sanitation sprinkler
CN113106904A (en) * 2021-04-19 2021-07-13 郑州工业应用技术学院 High-rise drainage device for building construction and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725266A (en) * 2019-09-23 2020-01-24 江苏万德福公共设施科技有限公司 Water adding device of sanitation sprinkler
CN113106904A (en) * 2021-04-19 2021-07-13 郑州工业应用技术学院 High-rise drainage device for building construction and use method thereof

Similar Documents

Publication Publication Date Title
CN210767179U (en) Civil engineering road drainage device
CN211172150U (en) Hydraulic engineering desilting device
CN110644553A (en) Dredging system and environment-friendly dredging method based on mobile platform
CN210369116U (en) Sediment removal device is used in hydraulic engineering construction
CN210529806U (en) Hydraulic engineering is with quick desilting device
CN213914718U (en) Efficient sand screening equipment for civil engineering
CN204000794U (en) A kind of slope runoff generating retaining and Landscape River energy supplying system
CN106351272A (en) Washing device for milling wheels of slot milling machine
CN208965621U (en) A kind of dredging device for water conservancy projects
CN112502174A (en) Quick dewatering device for deep foundation pit
CN213868007U (en) Device of hydraulic engineering clearance silt
CN110746075B (en) Building site builds with ground and uses silt processing apparatus
CN211753093U (en) A purifier is retrieved to groundwater for foundation ditch precipitation
CN213738792U (en) Water body purification device for ecological restoration
CN211057828U (en) Interim drainage structures is dug to earthwork packing
CN113914447A (en) Waterlogging drainage pump station and construction method thereof
CN202219253U (en) Shield machine and grouting pipe cleaning device thereof
CN112112205B (en) Road drainage ditch cleaning device
CN210305036U (en) Enclosed electric treatment system for polluted site
CN211546100U (en) Constructed wetland structure
CN217758889U (en) Foundation ditch drainage device for civil engineering
CN217175006U (en) River channel branch inlet sludge cleaning device
CN210917525U (en) Water conservancy construction sediment removal device
CN215801913U (en) Silt cleaning device suitable for water conservancy
CN213805721U (en) Water conservancy water and electricity construction drainage structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616