CN217782174U - Building engineering detects and detects with engineering foundation pile detection fixing device - Google Patents
Building engineering detects and detects with engineering foundation pile detection fixing device Download PDFInfo
- Publication number
- CN217782174U CN217782174U CN202221898984.6U CN202221898984U CN217782174U CN 217782174 U CN217782174 U CN 217782174U CN 202221898984 U CN202221898984 U CN 202221898984U CN 217782174 U CN217782174 U CN 217782174U
- Authority
- CN
- China
- Prior art keywords
- foundation pile
- sets
- detects
- fixing device
- plectane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
The utility model discloses a building engineering detects and detects with engineering foundation pile detection fixing device, including the plectane, first opening has been seted up to the upper surface of plectane, two sets of screw holes have been seted up to the surface of plectane, every the equal threaded connection of inner wall of screw hole has the threaded rod, the inside of first opening is equipped with two sets of arc splint, every group a side that arc splint were kept away from each other is all fixed to be inlayed and is had the bearing, every group the one end that the threaded rod is close to each other all with the inner circle fixed connection of bearing. This device is through the threaded rod that sets up, the cooperation of screw hole and arc splint, when the fixed foundation pile that detects of staff, only needs to establish this device cover at the surface of foundation pile, utilizes the threaded connection of threaded rod and screw hole, and the staff only needs to rotate the threaded rod, and every arc splint all can remove to the centre of a circle of first opening, has avoided the stable unstable condition of foundation pile, prevents to examine the condition that the time measuring can the error appear, the staff's of being convenient for work.
Description
Technical Field
The utility model belongs to the technical field of foundation pile detection is fixed and specifically relates to a building engineering detects and detects with engineering foundation pile and detect fixing device.
Background
The low pile foundation is a deep foundation consisting of piles and pile bearing platforms (bearing platforms for short) connected with the pile tops or a single pile foundation connected with the piles by the piles and the pile foundation, namely a pile foundation for short, and if the pile bodies are completely buried in the soil and the bottom surfaces of the bearing platforms are contacted with the soil body, the low pile foundation is called as a low pile foundation; if the upper part of the pile body is exposed out of the ground and the bottom of the pile cap is positioned above the ground, the pile body is called a high pile cap foundation, the building pile foundation is usually a low pile cap pile foundation, and the pile foundation is widely applied in high-rise buildings.
When building engineering detected the foundation pile, need use fixing device to fix the foundation pile and detect, present detection fixing device when using, may appear fixed insecure to error can appear when the staff detects, be unfavorable for staff's work, for this reason, we propose a building engineering detects with engineering foundation pile and detect fixing device and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering detects and detects fixing device with engineering foundation pile to provide when building engineering detects the foundation pile in solving above-mentioned background art, need use fixing device to fix the foundation pile and detect, present detection fixing device when using, can appear fixed insecure, so that examine time measuring at the staff and can the error appear, be unfavorable for the problem of staff's work.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a building engineering detects and detects with engineering foundation pile detects fixing device, includes the plectane, first opening has been seted up to the upper surface of plectane, two sets of screw holes have been seted up to the surface of plectane, every the equal threaded connection of inner wall of screw hole has the threaded rod, the inside of first opening is equipped with two sets of arc splint, every group the equal fixed bearing of inlaying in a side that arc splint kept away from each other, every group the one end that the threaded rod is close to each other all with the inner circle fixed connection of bearing, two sets of screw thread section of thick bamboo of bottom surface fixedly connected with of plectane, every the inside of screw thread section of thick bamboo all is equipped with the bull stick, every the equal fixedly connected with socket in bottom of bull stick.
In a further embodiment, the anti-skid pads are fixedly mounted on one side face, close to each other, of each group of arc-shaped clamping plates, and each anti-skid pad is arc-shaped.
In a further embodiment, each group of threaded rods is fixedly connected with a rotating handle at one end far away from each other, and a protective sleeve is sleeved on the outer surface of each rotating handle.
In a further embodiment, the outer surface of the circular plate is fixedly connected with two groups of hanging rings, and the upper surface of each hanging ring is provided with a second through hole.
In a further embodiment, the inner circle fixedly connected with two sets of stoppers of first opening, two sets of the equal fixed mounting of one end that is close to each other has the shock pad.
In a further embodiment, the outer surface of each rotating rod is provided with threads, and the outer surface of each rotating rod is in threaded connection with the inner wall of the threaded cylinder.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the cooperation of the threaded rod, the threaded hole and the arc splint that set up, when the fixed foundation pile that detects of staff, only need establish the surface at the foundation pile with this device cover, utilize the threaded connection of threaded rod and threaded hole, the staff only needs to rotate the threaded rod, and every arc splint all can remove to the centre of a circle of first opening, has avoided the stable unstable condition of foundation pile, prevents to examine the condition that time measuring can the error appear, the staff's of being convenient for work.
2. Through the cooperation of the screw thread section of thick bamboo, bull stick and the socket that sets up, utilize the threaded connection of a bull stick and a screw thread section of thick bamboo, when facing not the foundation pile of co-altitude, suitable height can be adjusted to this device, makes this device more firm when fixed the detection foundation pile, prevents to detect the condition that the error can appear, the staff's of being convenient for work.
Drawings
Fig. 1 is a schematic view of the three-dimensional structure of the threaded rod of the present invention.
Fig. 2 is a cross-sectional view of a top view of a circular plate according to the present invention.
Fig. 3 is a cross-sectional view of the first port front view of the present invention.
Fig. 4 is a cross-sectional view of the front view of the rotating rod of the present invention.
In the figure: 1. a circular plate; 2. a first port; 3. a hoisting ring; 4. a threaded hole; 5. a socket; 6. a rotating rod; 7. a threaded barrel; 8. turning a handle; 9. a threaded rod; 10. a second port; 11. an arc-shaped splint; 12. a non-slip mat; 13. a bearing; 14. and a limiting block.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Embodiment, as shown in fig. 1-4, the utility model discloses in, a building engineering detects and detects fixing device with engineering foundation pile, including plectane 1, first opening 2 has been seted up to plectane 1's upper surface, two sets of screw holes 4 have been seted up to plectane 1's surface, the equal threaded connection of inner wall of every screw hole 4 has threaded rod 9, the inside of first opening 2 is equipped with two sets of arc splint 11, the equal fixed bearing 13 that inlays in a side that every arc splint 11 of group kept away from each other, the one end that every threaded rod 9 of group is close to each other all with bearing 13's inner circle fixed connection, the two sets of screw thread section of thick bamboo 7 of bottom surface fixedly connected with of plectane 1, the inside of every screw thread section of thick bamboo 7 all is equipped with bull stick 6, the equal fixedly connected with socket 5 in bottom of every bull stick 6.
The effect that its whole embodiment reached does, when the fixed foundation pile that detects of staff, only need establish the surface at the foundation pile with this device cover, utilize threaded rod 9 and threaded hole 4's threaded connection, the staff only needs to rotate threaded rod 9, every arc splint 11 all can remove to the centre of a circle of first opening 2, utilize the threaded connection of bull stick 6 and screw thread section of thick bamboo 7, when facing the foundation pile of co-altitude, suitable height can be adjusted to this device, make this device more firm when fixed when examining the detection foundation pile, the unstable condition of foundation pile stability has been avoided, the condition that the error can appear when preventing to examine, the staff's of being convenient for work.
In this embodiment, the anti-skid pads 12 are fixedly mounted on one side surface of each group of arc-shaped clamping plates 11, which is close to each other, and the shape of each anti-skid pad 12 is arc-shaped, so that the effect is achieved; the sliding in the detection fixing process is prevented, and the work of workers is facilitated.
In this embodiment, one end of each group of the threaded rods 9, which is far away from each other, is fixedly connected with a rotating handle 8, and a protective sleeve is sleeved on the outer surface of each rotating handle 8, so that the effect is as follows; the staff of being convenient for makes to detect more swiftly in the fixed process to threaded rod 9's rotation.
In this embodiment, two sets of rings 3 are fixedly connected to the outer surface of the circular plate 1, and a second opening 10 is formed in the upper surface of each ring 3, which has the following effects; the device is convenient to move by the crane, so that the detection and fixation process is faster.
In this embodiment, two sets of limiting blocks 14 are fixedly connected to the inner ring of the first through opening 2, and two sets of damping pads are fixedly mounted at the ends close to each other, so that the effect is as follows; prevent that the staff from excessively rotating, be favorable to the staff to the operation of this device.
In the embodiment, the outer surface of each rotating rod 6 is provided with threads, and the outer surface of each rotating rod 6 is in threaded connection with the inner wall of the threaded cylinder 7, so that the effect is as follows; the height of the device can be freely adjusted, which is beneficial to the work of workers.
The utility model discloses a theory of operation is: when detecting fixed foundation pile, at first remove work area with this device, then the rope winding that the staff used the loop wheel machine is in the second through-opening 10 of rings 3 surface, utilize first through-opening 2 to establish this device cover on the surface of foundation pile after that, the cover is established the back, the staff rotates fixed height of regulation when bull stick 6 is opened, fixed completion back, the staff holds after that and rotates when changeing 8, utilize threaded rod 9 and threaded hole 4's threaded connection, make arc splint 11 can be to centre of a circle parallel movement, remaining arc splint 11 remove like this can equally, the stable unstable condition of foundation pile has been avoided, the condition that the error can appear in the time measurement of preventing to examine, be convenient for staff's work.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. The utility model provides a building engineering detects and detects fixing device with engineering foundation pile which characterized in that: including plectane (1), first opening (2) have been seted up to the upper surface of plectane (1), two sets of screw hole (4), every have been seted up to the surface of plectane (1) the equal threaded connection of inner wall of screw hole (4) has threaded rod (9), the inside of first opening (2) is equipped with two sets of arc splint (11), every group the equal fixed embedding in a side of keeping away from each other of arc splint (11) has bearing (13), every group the one end that threaded rod (9) are close to each other all with the inner circle fixed connection of bearing (13), the two sets of screw thread section of thick bamboo (7) of bottom surface fixedly connected with of plectane (1), every the inside of screw thread section of thick bamboo (7) all is equipped with bull stick (6), every the equal fixedly connected with socket (5) in bottom of bull stick (6).
2. The engineering foundation pile detection fixing device for building engineering detection as claimed in claim 1, wherein: each group of arc-shaped clamping plates (11) are fixedly provided with anti-skid pads (12) on one side surface close to each other, and each anti-skid pad (12) is arc-shaped.
3. The engineering foundation pile detection fixing device for building engineering detection as recited in claim 1, wherein: every group the equal fixedly connected with in one end that threaded rod (9) kept away from each other changes (8), every it all overlaps the protective sheath to change the surface of (8).
4. The engineering foundation pile detection fixing device for building engineering detection as claimed in claim 1, wherein: the outer surface fixed connection of plectane (1) has two sets of rings (3), every second opening (10) have all been seted up to the upper surface of ring (3).
5. The engineering foundation pile detection fixing device for building engineering detection as recited in claim 1, wherein: the inner ring of first opening (2) fixedly connected with two sets of stoppers (14), two sets of the equal fixed mounting in one end that is close to each other has the shock pad.
6. The engineering foundation pile detection fixing device for building engineering detection as claimed in claim 1, wherein: the outer surface of each rotating rod (6) is provided with threads, and the outer surface of each rotating rod (6) is in threaded connection with the inner wall of the threaded cylinder (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221898984.6U CN217782174U (en) | 2022-07-21 | 2022-07-21 | Building engineering detects and detects with engineering foundation pile detection fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221898984.6U CN217782174U (en) | 2022-07-21 | 2022-07-21 | Building engineering detects and detects with engineering foundation pile detection fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217782174U true CN217782174U (en) | 2022-11-11 |
Family
ID=83941681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221898984.6U Active CN217782174U (en) | 2022-07-21 | 2022-07-21 | Building engineering detects and detects with engineering foundation pile detection fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217782174U (en) |
-
2022
- 2022-07-21 CN CN202221898984.6U patent/CN217782174U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217782174U (en) | Building engineering detects and detects with engineering foundation pile detection fixing device | |
CN210533769U (en) | Sampling device for hydraulic ring geological exploration | |
CN213452540U (en) | Multi-functional mapping appearance positioner for survey and drawing | |
CN214531785U (en) | Double scaffold frame of encorbelmenting is faced limit in foundation ditch | |
CN211287661U (en) | Bored concrete pile hole depth detector | |
CN218708584U (en) | Anti-winding sling | |
CN214302713U (en) | Support for building wall whitewashing | |
CN109626283B (en) | Offshore platform cage with adjustable storage space | |
CN212779196U (en) | Level ruler hank seat type ruler pad | |
CN218581206U (en) | Lifting device for building engineering | |
CN112031275A (en) | Low-retraction prestressed anchorage device | |
CN213824905U (en) | Coating viscosity detection device | |
CN221053606U (en) | High altitude frame with port clamping function | |
CN215548039U (en) | Pressure vessel clamp | |
CN206899269U (en) | Extra high voltage direct current transmission line insulator detecting robot multi-function rotating axle construction | |
CN215114567U (en) | A lofting pole for pile foundation engineering | |
CN212430252U (en) | Security protection supervisory equipment convenient to installation | |
CN217484036U (en) | Anchor rod and soil nail drawing force detection supporting device | |
CN214807356U (en) | Novel infusion support structure | |
CN216194471U (en) | Hydraulic engineering seepage prevention structure | |
CN210888915U (en) | Safe hoisting device of wireless inclinometer | |
CN217654511U (en) | Device for detecting perpendicularity of pile foundation | |
CN210263905U (en) | Construction hydraulic pressure template climbing device | |
CN212223985U (en) | Hydraulic engineering ground detection device | |
CN217128298U (en) | Double-end-thread tensile foundation bolt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |