CN217782054U - Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device - Google Patents

Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device Download PDF

Info

Publication number
CN217782054U
CN217782054U CN202221878437.1U CN202221878437U CN217782054U CN 217782054 U CN217782054 U CN 217782054U CN 202221878437 U CN202221878437 U CN 202221878437U CN 217782054 U CN217782054 U CN 217782054U
Authority
CN
China
Prior art keywords
wall
conveying mechanism
vertical axis
spiral vertical
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221878437.1U
Other languages
Chinese (zh)
Inventor
沈超
郭震
陈国飞
张宝
汪晨艺
马永豪
李子昂
王鑫
余晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Technology Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Technology Construction Co Ltd filed Critical China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority to CN202221878437.1U priority Critical patent/CN217782054U/en
Application granted granted Critical
Publication of CN217782054U publication Critical patent/CN217782054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a sectional wall-hanging type concrete pouring device for a spiral vertical shaft deep foundation pit side wall, which comprises a feeding mechanism, a conveying mechanism and a U-shaped bolt clamp; the feeding mechanism comprises a configuration block, a fixed plate is arranged on the outer wall of the top of the configuration block, and a discharging hopper is inserted into one side of the outer wall of the top of the fixed plate; conveying mechanism is located the below of fixed plate, and conveying mechanism includes the backup pad, the utility model discloses a be provided with conveying mechanism, with the backup pad welding on conveying mechanism to on the ground wall reinforcing bar that the chisel hair was accomplished to confirm position and distance, then insert the circular port on L shape mount with mounting panel and conveyer pipe through the spacing post on the support frame, fix mounting panel and conveyer pipe, carry out fixed seal with U type bolt clamp with adjacent conveyer pipe, convenient next watering work has improved and has pour efficiency.

Description

Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device
Technical Field
The utility model relates to a construction technical field specifically is a segmentation wall-hanging spiral vertical axis deep basal pit side wall concrete placement device.
Background
And (3) pouring the underground main structure of the deep foundation pit or pouring the underground main structure with dense internal support and more upper obstacles in the foundation pit. Overview of the engineering: in the construction stage of the underground main structure of the deep foundation pit, at the position of a 26m deep foundation pit on the south side, because of the influence that a road and a peripheral civil house are not removed, a 5.8m trestle is arranged on the upper part of the foundation pit, the positions of end wells are seven supports, the supports are dense, the construction stage of the underground main structure is caused, the side wall pouring difficulty is large, the pouring progress is slow, the side wall pouring difficulty at the bottom of the deep foundation pit is high, the construction efficiency is improved, particularly, steel supports in the pit are dense, the trestle and the deep foundation pit with more upper obstacles are constructed on the upper part, and therefore the wall-hanging needs a sectional type spiral vertical axis deep foundation pit side wall concrete pouring device to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a segmentation wall-hanging spiral vertical axis deep basal pit side wall concrete placement device to solve the problem that proposes in the above-mentioned background art.
The technical scheme of the utility model is that: a sectional wall-mounted spiral vertical axis deep foundation pit side wall concrete pouring device comprises a feeding mechanism, a conveying mechanism and a U-shaped bolt clamp;
the feeding mechanism comprises a configuration block, a fixed plate is arranged on the outer wall of the top of the configuration block, and a discharging hopper is inserted into one side of the outer wall of the top of the fixed plate;
conveying mechanism is located the below of fixed plate, and conveying mechanism includes the backup pad, the L shape mount that the equidistance distributes is installed to backup pad one side outer wall, and the circular port has been seted up to L shape mount top outer wall, conveying mechanism includes a plurality of mounting panels, and mounting panel one side outer wall installs the conveyer pipe.
Preferably, two rectangular blocks are installed on the other side of the outer wall of the top of the fixing plate, and the same arc-shaped material receiving plate is installed on the outer wall of one end, opposite to the rectangular blocks, of the outer wall of the end.
Preferably, the support frame that the equidistance distributes is installed to mounting panel opposite side outer wall, and support frame top inner wall installs spacing post, spacing post and circular port phase-match.
Preferably, the U-shaped bolt hoop is fixed at the connecting position of the circumferential outer walls of the two adjacent conveying pipes.
Preferably, the fixed rods distributed equidistantly are installed on one side of the circumferential inner wall of the conveying pipe, the connecting shaft is installed on the outer wall of one side of the fixed rods, and the spiral blades distributed equidistantly are installed on the circumferential outer wall of the connecting shaft.
Preferably, the outer wall of the bottom of one of the conveying pipes is provided with a rotary joint hose.
The utility model discloses an improve and provide a segmentation wall-hanging spiral vertical axis deep basal pit side wall concrete placement device here, compare with prior art, have following improvement and advantage:
one is as follows: the utility model discloses a be provided with conveying mechanism, weld the backup pad on the conveying mechanism to the ground wall reinforcing bar that the chisel hair was accomplished to well the position and distance, then insert mounting panel and conveyer pipe into the circular port on the L shape mount through the spacing post on the support frame, fix mounting panel and conveyer pipe, carry out fixed seal with U type bolt clamp with adjacent conveyer pipe, make things convenient for following watering work, improved and pour efficiency;
the second step is as follows: the utility model discloses the inside dead lever of conveyer pipe, helical blade and connecting axle can carry out the water conservancy diversion with the concrete to the inflow, prevent the higher segregation that leads to of concrete free fall height, and the rotary joint hose is installed to conveyer pipe bottom outer wall below, increases the flexibility mobility of device and pours the scope, and the device is pour and is accomplished the back and hang out from last dismantlement down, used repeatedly during next section construction.
Drawings
The invention is further explained below with reference to the figures and examples:
fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic structural view of the feeding mechanism of the present invention;
fig. 3 is a schematic structural view of the conveying mechanism of the present invention;
fig. 4 is a schematic sectional structure view of the conveying pipe of the present invention.
Description of reference numerals:
1. a feeding mechanism; 101. a configuration block; 102. an arc-shaped material receiving plate; 103. a rectangular block; 104. a fixing plate; 105. feeding a hopper; 2. a conveying mechanism; 201. a support plate; 202. an L-shaped fixing frame; 203. a support frame; 204. a limiting column; 205. mounting a plate; 206. a delivery pipe; 207. fixing the rod; 208. a helical blade; 3. u-shaped bolt hoops; 4. a swivel joint hose.
Detailed Description
The present invention will be described in detail below, and it is apparent that the technical solutions in the embodiments of the present invention are described clearly and completely. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an improvement provides a segmentation wall-hanging spiral vertical axis deep basal pit side wall concrete placement device here, the technical scheme of the utility model is:
as shown in fig. 1-4, the sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device comprises a feeding mechanism 1, a conveying mechanism 2 and a U-shaped bolt hoop 3;
the feeding mechanism 1 comprises a configuration block 101, a fixing plate 104 is arranged on the outer wall of the top of the configuration block 101, and a discharging hopper 105 is inserted into one side of the outer wall of the top of the fixing plate 104;
the conveying mechanism 2 is located below the fixing plate 104, the conveying mechanism 2 comprises a supporting plate 201, L-shaped fixing frames 202 distributed at equal intervals are mounted on the outer wall of one side of the supporting plate 201, circular holes are formed in the outer wall of the top of each L-shaped fixing frame 202, the conveying mechanism 2 comprises a plurality of mounting plates 205, and conveying pipes 206 are mounted on the outer wall of one side of each mounting plate 205.
Furthermore, two rectangular blocks 103 are installed on the other side of the outer wall of the top of the fixing plate 104, the same arc-shaped material receiving plate 102 is installed on the outer wall of the end, opposite to the rectangular blocks 103, of the outer wall, then the arc-shaped material receiving plate 102 and the discharging hopper 105 on the feeding mechanism 1 are used, the discharging hopper 105 is aligned to the uppermost opening of the conveying pipe 206, and self-discharging pouring of concrete is achieved.
Furthermore, the support frame 203 that the equidistance distributes is installed to mounting panel 205 opposite side outer wall, and the spacing post 204 is installed to support frame 203 top inner wall, and spacing post 204 and circular port phase-match make things convenient for following mounting panel 205 and conveyer pipe 206.
Further, U type bolt clamp 3 is fixed in two adjacent conveyer pipe 206 circumference outer wall junction, fixes the U type bolt clamp 3 adjacent conveyer pipe 206 and seals, and mounting panel 205 and conveyer pipe 206 insert the circular port on the L shape mount 202 through spacing post 204 on the support frame 203 in, fixes mounting panel 205 and conveyer pipe 206.
Further, dead lever 207 that the equidistance distributes is installed to conveyer pipe 206 circumference inner wall one side, and dead lever 207 one side outer wall installs the connecting axle, and helical blade 208 that the equidistance distributes is installed to connecting axle circumference outer wall, can carry out the water conservancy diversion to the concrete that flows in, prevents the higher segregation that leads to of concrete free fall height.
Furthermore, a rotary joint hose 4 is arranged on the outer wall of the bottom of one of the conveying pipes 206, and the rotary joint hose 4 can rotate, so that the flexibility and the mobility of the device are improved, and the pouring range is enlarged.
The working principle is as follows: welding a support plate 201 on a conveying mechanism 2 to ground wall reinforcing steel bars which are roughened, determining positions and distances, inserting a mounting plate 205 and a conveying pipe 206 into a circular hole on an L-shaped fixing frame 202 through a limiting column 204 on a support frame 203 to fix the mounting plate 205 and the conveying pipe 206, fixing and sealing adjacent conveying pipes 206 by using a U-shaped bolt clamp 3, guiding inflow concrete by using a fixing rod 207, a spiral blade 208 and a connecting shaft inside the conveying pipe 206, preventing segregation caused by high free falling body height of the concrete, installing a rotary joint hose 4 on the outer wall of the bottom of the lowest conveying pipe 206 to increase flexibility and pouring range of the device, and aligning a discharging hopper 105 with the uppermost port of the conveying pipe 206 through an arc-shaped material receiving plate 102 and the discharging hopper 105 on a feeding mechanism 1 to realize self-discharging pouring of the concrete; and after the pouring is finished, the concrete is disassembled from top to bottom and is lifted out, and the concrete can be repeatedly used in the next section of construction.

Claims (6)

1. The utility model provides a segmentation wall-hanging spiral vertical axis deep basal pit side wall concrete placement device which characterized in that: the device comprises a feeding mechanism (1), a conveying mechanism (2) and a U-shaped bolt hoop (3);
the feeding mechanism (1) comprises a configuration block (101), a fixing plate (104) is installed on the outer wall of the top of the configuration block (101), and a discharging hopper (105) is inserted into one side of the outer wall of the top of the fixing plate (104);
conveying mechanism (2) are located the below of fixed plate (104), and conveying mechanism (2) include backup pad (201), L shape mount (202) that the equidistance distributes are installed to backup pad (201) one side outer wall, and the circular port has been seted up to L shape mount (202) top outer wall, conveying mechanism (2) include a plurality of mounting panels (205), and mounting panel (205) one side outer wall installs conveyer pipe (206).
2. The sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device of claim 1, characterized in that: two rectangular blocks (103) are installed on the other side of the outer wall of the top of the fixing plate (104), and the same arc-shaped material receiving plate (102) is installed on the outer wall of one end, opposite to the rectangular blocks (103).
3. The sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device of claim 1, characterized in that: support frame (203) that the equidistance distributes are installed to mounting panel (205) opposite side outer wall, and support frame (203) top inner wall installs spacing post (204), spacing post (204) and circular port phase-match.
4. The sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device of claim 1, characterized in that: u type bolt clamp (3) are fixed two adjacent conveyer pipe (206) circumference outer wall junction.
5. The sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device according to claim 1, characterized in that: fixing rods (207) which are distributed equidistantly are installed on one side of the circumferential inner wall of the conveying pipe (206), a connecting shaft is installed on the outer wall of one side of each fixing rod (207), and helical blades (208) which are distributed equidistantly are installed on the circumferential outer wall of the connecting shaft.
6. The sectional wall-hanging type spiral vertical axis deep foundation pit side wall concrete pouring device of claim 1, characterized in that: and a rotary joint hose (4) is arranged on the outer wall of the bottom of one of the conveying pipes (206).
CN202221878437.1U 2022-07-20 2022-07-20 Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device Active CN217782054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221878437.1U CN217782054U (en) 2022-07-20 2022-07-20 Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221878437.1U CN217782054U (en) 2022-07-20 2022-07-20 Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device

Publications (1)

Publication Number Publication Date
CN217782054U true CN217782054U (en) 2022-11-11

Family

ID=83941753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221878437.1U Active CN217782054U (en) 2022-07-20 2022-07-20 Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device

Country Status (1)

Country Link
CN (1) CN217782054U (en)

Similar Documents

Publication Publication Date Title
CN109403354B (en) Construction method for deep foundation pit support of inverted retaining wall of cyclone well
CN210439313U (en) A side slope reinforcerment system for basic building engineering
CN217782054U (en) Sectional wall-hanging spiral vertical axis deep basal pit side wall concrete placement device
CN211848785U (en) Cast-in-place concrete road terrace template quick supporting and dismounting device
CN211228607U (en) Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure
CN210263026U (en) Anti structure that floats of hole-forming bored concrete pile steel sleeve is protected to mud dado of going out terrace
CN214460366U (en) Pile foundation casing
CN106284683A (en) A kind of novel conjoined weldment being embedded between frame structure and filling wall
CN106836948B (en) A kind of construction technology of reinforced concrete structure
CN213869898U (en) Open low pressure slip casting integrated device
CN113152496A (en) Water sealing sleeve box for underwater welding of bracket on steel casing
CN212176685U (en) Instrument formula foundation ditch hangs step ladder
CN210917388U (en) Easy dismouting formula underground structure
CN209353838U (en) A kind of constructing structure of large cooling column herringbone column
CN209194572U (en) A kind of corrugated steel construction retaining wall of culvert end
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction
CN215330334U (en) Can have enough to meet need and use cast in situ concrete template strutting arrangement
CN216238605U (en) Well plugging device for dewatering well
CN113463642B (en) Deep basal pit raft board concrete placement device
CN111676977B (en) Concrete body support system for high-strength precipitation
CN201962682U (en) Building foundation pit enclosing structure with rear diaphragms
CN221345895U (en) Pre-buried bolt positioner of shock insulation support for building
CN220955622U (en) Assembled guide table suitable for ultra-large diameter shield launching and receiving
CN217027253U (en) Deep foundation pit narrow fertilizer groove backfilling device
CN214169076U (en) Socket joint formula concrete sewage pipe suspends protection device in midair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant