CN210439313U - A side slope reinforcerment system for basic building engineering - Google Patents

A side slope reinforcerment system for basic building engineering Download PDF

Info

Publication number
CN210439313U
CN210439313U CN201921218028.7U CN201921218028U CN210439313U CN 210439313 U CN210439313 U CN 210439313U CN 201921218028 U CN201921218028 U CN 201921218028U CN 210439313 U CN210439313 U CN 210439313U
Authority
CN
China
Prior art keywords
slope
side slope
stock
straight portion
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921218028.7U
Other languages
Chinese (zh)
Inventor
李辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Hongtai Construction Engineering Co Ltd
Original Assignee
Huizhou Hongtai Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Hongtai Construction Engineering Co Ltd filed Critical Huizhou Hongtai Construction Engineering Co Ltd
Priority to CN201921218028.7U priority Critical patent/CN210439313U/en
Application granted granted Critical
Publication of CN210439313U publication Critical patent/CN210439313U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a side slope reinforcerment system for basic building engineering relates to side slope protection engineering technical field, and it is including seting up at the circular slot of side slope lateral wall department, inserting the inside stock of circular slot, pour the first concrete in the circular slot inside, and the side slope outside is provided with the fixing device that the lid was established on the stock, and fixing device includes the fixed plate that a plurality of concatenations are constituteed, is formed with the cavity between the adjacent fixed plate, is connected with the first locking ring that the lid was established in fixed plate center department on the stock. The utility model discloses have the effect that can carry out recycle according to the in service behavior of reality.

Description

A side slope reinforcerment system for basic building engineering
Technical Field
The utility model belongs to the technical field of the side slope protection engineering technique and specifically relates to a side slope reinforcerment system for basic building engineering is related to.
Background
At present, China is a multi-mountain country, plateaus, hills and mountains occupy about 70% of the land area of China, and a large amount of landslides, collapses and debris flow disasters occur every year. Moreover, when a ground is leveled in a civil engineering, the situation of large excavation, slope release and the like of a mountain is often encountered, the peripheral mountain needs to be cut, and the original balance is damaged by cutting operation. In order to ensure the safety of the side slope and the environment thereof, support, reinforcement and protection measures must be taken for the side slope. The slope anchor rod (cable) lattice reinforcing technology has the obvious advantages of flexible arrangement, various lattice forms, convenient section adjustment, close adhesion with a slope surface, capability of following the slope and the like, and is a commonly used method in slope reinforcement.
The prior Chinese utility model with publication number CN203654303U discloses a slope reinforcement structure, which comprises a concrete protective panel and an anchor rod vertically connected with the concrete protective panel. An anchor bar is axially arranged in the anchor rod, and the anchor rod is filled with cement mortar; a steel wire mesh is arranged in parallel in the middle of the whole concrete protective panel, and a hanging steel bar is welded on the steel wire mesh and bridged on the grids of the steel wire mesh; the top end of the anchor bar is bent into an anchor bar elbow, hung on the hanging steel bar and welded with the hanging steel bar; at the tail end of the anchor bar, two sections of reinforcing steel bars are welded on two sides of the middle anchor bar to form guide reinforcing steel bars which are arranged in parallel.
The above prior art solutions have the following drawbacks: the anchor bar elbow extends out of the slope surface and is hung on the hanging steel bar, the concrete protective panel arranged outside the steel wire mesh is composed of cast-in-place concrete panels, and if the concrete protective panel is only applied to temporary slope reinforcement, the concrete protective panel cannot be recycled, so that the engineering investment is not saved.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a slope reinforcerment system for basic building engineering can carry out recycle according to actual in service behavior.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a slope reinforceing system for basic building engineering, includes the circular slot of seting up in slope lateral wall department, inserts the inside stock of circular slot, pours the first concrete in the circular slot inside, and the slope outside is provided with the fixing device who establishes on the stock of lid, fixing device includes the fixed plate that a plurality of concatenations are constituteed, and is adjacent be formed with the cavity between the fixed plate, be connected with on the stock and cover the first locking ring of establishing in fixed plate center department.
By adopting the technical scheme, during installation, the required installation position of the anchor rod is firstly traced, then a plurality of circular grooves are formed in the side wall of the side slope through the punching device, then the anchor rod is inserted into the circular grooves, the first concrete layer is poured into the circular grooves, then the fixing plate is installed on the side wall of the side slope, and finally the first locking ring is connected to the anchor rod in a threaded mode; after the use is accomplished, take out first locking ring, can retrieve the fixed plate and recycle, practice thrift the engineering investment.
The utility model discloses further set up to, the fixed plate includes the central part, connects at the first straight portion and the second straight portion of central part both ends department, connects the first vertical portion and the vertical portion of second of both ends department about the central part, the end connection of first straight portion has the joint piece, the joint piece sets up for the interval with one side that first straight portion is close to the side slope, the joint groove that is used for placing the joint piece is offered to the tip of the straight portion of second.
Through adopting above-mentioned technical scheme, during the installation, establish first straight portion lid on second straight portion upper portion, install in proper order, after the installation is accomplished, the joint piece is located joint inslot portion, and first straight portion and the whole comparatively stable of second straight portion on the same horizontal position install comparatively firmly.
The utility model discloses further set up to, the square piece of bottom fixedly connected with of the vertical portion of second, the square groove that is used for placing the square piece is offered at the top of first vertical portion.
Through adopting above-mentioned technical scheme, the vertical portion lid of second is established on adjacent first vertical portion upper portion, makes two first vertical portions and the vertical portion connection of second of vertical direction comparatively inseparable, and the vertical portion of second that is located the bottom is pushed down, and is whole comparatively stable.
The utility model discloses further set up to, the inside planting layer that is provided with of cavity, be provided with drainage device in the flat straight portion of second, drainage device is including seting up wash port, the filter screen of placing in wash port inside that the flat straight portion of second deviates from side slope one side department.
Through adopting above-mentioned technical scheme, the inside rainwater of cavity flows downwards along the wash port, sets up the filter screen simultaneously, reduces the appearance that the inside debris of planting layer dropped the inside condition of lower floor's cavity, and filterable effect is better.
The utility model discloses further set up to, the relative lateral wall department of wash port seted up the standing groove the edge of filter screen is connected with the square frame of placing inside the standing groove.
Through adopting above-mentioned technical scheme, filter screen fixed connection is inside the standing groove, and the follow-up clearance of being not convenient for so through square frame joint inside the standing groove, it is whole comparatively convenient.
The utility model discloses further set up to, pour through the concrete between stock and the side slope, the stock is located a plurality of down tube of the inside lateral wall department of side slope including inserting round bar, the fixed connection of side slope inside.
Through adopting above-mentioned technical scheme, stock lateral wall department is provided with the down tube, increases the tight degree of being connected between round bar and the first concrete, makes the round bar connect comparatively firmly.
The utility model discloses further set up to, the down tube is from the junction with the stock to the lopsidedness of fixed plate.
Through adopting above-mentioned technical scheme, set up the down tube into inclining to one side of fixed plate, the down tube makes the down tube be difficult for breaking away from side slope inside with the lateral wall butt of circular slot, and is whole comparatively stable.
The utility model discloses further set up to, be connected with the second locking ring on the stock, the lateral wall of second locking ring and one side butt of the relative slope of central part, the baffle has been placed to the cavity inside, the lateral wall department of baffle is connected with two connecting plates, the connecting plate passes through bolted connection with first straight portion and first vertical portion respectively.
Through adopting above-mentioned technical scheme, if use in some loose regions department, need set up one deck second concrete layer in fixed plate and side slope lateral wall department, during the use, with second locking ring threaded connection on the stock, then place the baffle inside the cavity, with baffle fixed connection in first straight portion and first vertical portion department through the bolt, block the cavity, then pour into the second concrete layer into the lateral wall department of fixed plate, baffle and side slope.
To sum up, the utility model discloses following beneficial effect has:
1. the fixing plate can be disassembled relative to the side slope, so that the fixing plate is convenient to continue to be used subsequently, and the engineering investment is saved;
2. the clamping block at the first straight part is positioned in the clamping groove, so that the first straight part and the second straight part in the horizontal direction are connected more tightly;
3. the drainage device is arranged, so that moisture in the planting layer can be drained along the drainage hole, and adverse effects of the moisture on the fixing plate are reduced.
Drawings
FIG. 1 is a schematic view of the overall structure of the embodiment;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
FIG. 3 is a schematic sectional view of the embodiment;
FIG. 4 is an enlarged schematic view of portion B of FIG. 3;
fig. 5 is an enlarged schematic view of a portion C in fig. 2.
Reference numerals: 1. side slope; 11. an anchor rod; 111. a round bar; 112. a diagonal bar; 12. a circular groove; 13. a first concrete layer; 2. a fixing device; 21. a fixing plate; 211. a central portion; 212. a first straight portion; 213. a second straight portion; 214. a first vertical portion; 215. a second vertical portion; 22. a cavity; 23. a first locking ring; 24. a clamping block; 241. a clamping groove; 25. a square block; 251. a square groove; 26. a second locking ring; 27. a second concrete layer; 3. a baffle plate; 31. a connecting plate; 32. a bolt; 4. a drainage device; 41. a drain hole; 42. a placement groove; 43. filtering with a screen; 44. and (4) a square frame.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a side slope reinforcement system for basic building engineering, including inserting the inside stock 11 of side slope 1, the lateral wall department of side slope 1 slope is provided with the fixing device 2 that passes stock 11.
Referring to fig. 1, fixing device 2 includes a plurality of fixed plates 21 that the concatenation formed, and fixed plate 21 cross section is the cross, and adjacent fixed plate 21 is inside to be formed with cavity 22, is connected with the lid on the stock 11 and establishes the first locking ring 23 that deviates from side slope 1 one side department at fixed plate 21.
Referring to fig. 2, the fixing plate 21 includes a central portion 211 sleeved outside the anchor rod 11, a first straight portion 212 and a second straight portion 213 connected to two horizontal ends of the central portion 211, a first vertical portion 214 and a second vertical portion 215 connected to two upper and lower ends of the central portion 211, a clamping groove 241 is opened at one end of the second straight portion 213 away from the side slope 1 (shown in fig. 1) and away from the central portion 211, a clamping block 24 is connected to one end of the first straight portion 212 away from the side slope 1 and away from the central portion 211, an adjacent clamping block 24 is placed inside the clamping groove 241, the adjacent first straight portion 212 compresses the second straight portion 213, so that the connection between the first straight portion 212 and the second straight portion 213 in the horizontal direction is tight.
Referring to fig. 2, a square block 25 is connected to the bottom of the second vertical portion 215, one side of the square block 25 close to the side slope 1 and one side of the first vertical portion 214 close to the side slope 1 are arranged at intervals, a square groove 251 for placing the adjacent square block 25 is opened at the top of the first vertical portion 214, and the second vertical portion 215 fixes the adjacent first vertical portion 214, so that the two first vertical portions 214 and the second vertical portion 215 in the vertical direction are connected more tightly.
Referring to fig. 3, a plurality of circular slots 12 have been seted up to side slope 1 lateral wall department, anchor rod 11 is pegged graft inside circular slot 12, anchor rod 11 includes that peg graft at side slope 1 inside round bar 111, round bar 111 set up for the slope, round bar 111 external connection has a plurality of down tube 112, down tube 112 sets up to the one side department slope that is close to fixed plate 21 from the junction with anchor rod 11, the inside packing of circular slot 12 has first concrete layer 13, first concrete layer 13 pours with down tube 112 and round bar 111 and forms an organic whole. Due to the inclined rod 112, the anchor rod 11 is stable after being placed inside the slope 1.
Referring to fig. 2 and 4, if the anchor rod is used in some loose areas, a second concrete layer 27 needs to be arranged on the fixing plate 21 and the side wall of the side slope 1, so that a second locking ring 26 is arranged on the anchor rod 11, and the side wall of the second locking ring 26 abuts against one side of the central portion 211 close to the side slope 1, so that the fixing plate 21 and the side wall of the side slope 1 are arranged at intervals; need pack cavity 22 when pouring, so placed baffle 3 in cavity 22 inside, baffle 3 deviates from one side department of slope 1 and is connected with two connecting plates 31, and connecting plate 31 passes through bolt 32 with first straight portion 212 and first vertical portion 214 respectively and is connected.
Referring to fig. 5, in use, a planting layer is placed inside the cavity 22 (shown in fig. 2) and plants are planted inside the planting layer; in order to make the rainwater inside the cavities 22 slide down smoothly and reduce the surface runoff of the planted layer, the second straight parts 213 are all provided with drainage devices 4, each drainage device 4 comprises a drainage hole 41 formed at one side of the second straight part 213 away from the slope 1, a placement groove 42 formed at the opposite side wall of the drainage hole 41, a filter screen 43 placed inside the drainage hole 41, and a square frame 44 placed inside the placement groove 42 is connected to the corner of the filter screen 43.
When the anchor rod 11 is used, the required installation position of the anchor rod 11 is firstly marked, then the side wall of the side slope 1 is provided with the plurality of circular grooves 12 through the perforating device, then the anchor rod 11 is inserted into the circular grooves 12, and the first concrete layer 13 is poured into the circular grooves 12; then, the second locking ring 26 is screwed on the anchor rod 11, the fixing plate 21 at the bottommost layer is sequentially sleeved on the anchor rod 11, the first locking ring 23 is sleeved on the anchor rod 11, the baffle plate 3 is placed in the cavity 22, the connecting plate 31 is installed at the first straight portion 212 and the first vertical portion 214 through the bolt 32, and then the second concrete layer 27 is poured between the fixing plate 21 and the slope 1.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a side slope reinforcerment system for basic building engineering, includes offer round slot (12) in side slope (1) slope lateral wall department, insert inside stock (11) of round slot (12), pour at the inside first concrete of round slot (12), its characterized in that: slope (1) outside is provided with to cover and establishes fixing device (2) on stock (11), fixing device (2) include fixed plate (21) that a plurality of concatenations are constituteed, and are adjacent be formed with cavity (22) between fixed plate (21), be connected with on stock (11) and cover first locking ring (23) of establishing in fixed plate (21) center department.
2. A slope strengthening system for use in foundation construction work as claimed in claim 1, wherein: fixed plate (21) include central part (211), connect first straight portion (212) and second straight portion (213) at central part (211) both ends department, connect first vertical portion (214) and second vertical portion (215) at both ends department about central part (211), the end connection of first straight portion (212) has joint piece (24), one side that joint piece (24) and first straight portion (212) are close to side slope (1) sets up for the interval, joint groove (241) that are used for placing joint piece (24) are seted up to the tip of second straight portion (213).
3. A slope strengthening system for foundation construction work according to claim 2, wherein: the bottom of the second vertical portion (215) is fixedly connected with a square block (25), and the top of the first vertical portion (214) is provided with a square groove (251) for placing the square block (25).
4. A slope strengthening system for foundation construction work according to claim 2, wherein: the planting layer is arranged in the cavity (22), the second straight portion (213) is provided with a drainage device (4), and the drainage device (4) comprises a drainage hole (41) formed in one side, away from the side slope (1), of the second straight portion (213) and a filter screen (43) placed in the drainage hole (41).
5. A slope strengthening system for foundation construction work according to claim 4, wherein: a placing groove (42) is formed in the side wall opposite to the drain hole (41), and a square frame (44) placed in the placing groove (42) is connected to the corner of the filter screen (43).
6. A slope strengthening system for use in foundation construction work as claimed in claim 1, wherein: pour through the concrete between stock (11) and side slope (1), stock (11) are located a plurality of down tube (112) of side slope (1) inside lateral wall department including round bar (111), the fixed connection of inserting side slope (1) inside round bar (111).
7. A slope strengthening system for foundation construction work according to claim 6, wherein: the inclined rod (112) inclines from the joint of the anchor rod (11) to one side of the fixing plate (21).
8. A slope strengthening system for foundation construction work according to claim 2, wherein: be connected with second locking ring (26) on stock (11), the lateral wall of second locking ring (26) and one side butt of central part (211) relative side slope (1), baffle (3) have been placed to cavity (22) inside, the lateral wall department of baffle (3) is connected with two connecting plates (31), connecting plate (31) pass through bolt (32) with first straight portion (212) and first vertical portion (214) respectively and are connected, fixed plate (21) and side slope (1) lateral wall department set up second concrete layer (27).
CN201921218028.7U 2019-07-29 2019-07-29 A side slope reinforcerment system for basic building engineering Expired - Fee Related CN210439313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921218028.7U CN210439313U (en) 2019-07-29 2019-07-29 A side slope reinforcerment system for basic building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921218028.7U CN210439313U (en) 2019-07-29 2019-07-29 A side slope reinforcerment system for basic building engineering

Publications (1)

Publication Number Publication Date
CN210439313U true CN210439313U (en) 2020-05-01

Family

ID=70407052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921218028.7U Expired - Fee Related CN210439313U (en) 2019-07-29 2019-07-29 A side slope reinforcerment system for basic building engineering

Country Status (1)

Country Link
CN (1) CN210439313U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779005A (en) * 2020-07-23 2020-10-16 马鞍山斯博尔机械技术服务有限公司 Slope supports reinforcement equipment for geotechnical engineering
CN113529758A (en) * 2021-08-25 2021-10-22 石家庄铁道大学 Concrete spouts protects high slope auxiliary stay device
CN115354679A (en) * 2022-10-21 2022-11-18 唐山伟仁建筑工程有限公司 Highway subgrade side slope anti-skidding mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779005A (en) * 2020-07-23 2020-10-16 马鞍山斯博尔机械技术服务有限公司 Slope supports reinforcement equipment for geotechnical engineering
CN113529758A (en) * 2021-08-25 2021-10-22 石家庄铁道大学 Concrete spouts protects high slope auxiliary stay device
CN115354679A (en) * 2022-10-21 2022-11-18 唐山伟仁建筑工程有限公司 Highway subgrade side slope anti-skidding mechanism
CN115354679B (en) * 2022-10-21 2023-01-06 唐山伟仁建筑工程有限公司 Highway subgrade side slope anti-skidding mechanism

Similar Documents

Publication Publication Date Title
CN210439313U (en) A side slope reinforcerment system for basic building engineering
CN109594568B (en) Rock slope ecological protection structure and method thereof
MXPA03001816A (en) Integrated footings.
CN108914944A (en) Shoal high water level pipeline Support of Foundation Pit Excavation precipitation system and construction method
CN108018828B (en) Slope protection structure
CN108425366A (en) Civil engineering pattern foundation pit supporting structure safety support structure
CN113417300A (en) Slope support system and construction method thereof
KR20120109418A (en) Inclined earth retaining structure method
CN112030947A (en) Construction method of T-shaped load-bearing underground continuous wall
KR101884663B1 (en) Construction method for soil retaining wall using cap slab
CN215759085U (en) Slope reinforced structure for civil engineering
CN212225231U (en) Protective structure for bias tunnel portal
CN111206602B (en) Partially collapsed high slope lattice beam formwork system and construction method
CN109281296B (en) Construction method of irrigation water delivery channel
CN211646635U (en) Sewage intercepting gallery cantilever support structure
CN210946533U (en) A closed channel structure for open cut construction
CN209603153U (en) A kind of vertical barricade slope retaining construction of prefabricated anchor pole rib column formula frid
CN109137887B (en) Underground continuous wall structure penetrating through karst cave, construction method and supporting device
CN103572762B (en) The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method
CN208604588U (en) Underground power house partition wall rock mass pays protection structure and underground power house partition wall rock mass structure in advance
CN220099797U (en) Square skeleton slope protection structure is assembled fast
CN213143080U (en) Slope reinforcing apparatus for building municipal works
CN108331012B (en) Retaining wall structure for civil construction and construction method thereof
CN216475112U (en) Large-scale green side slope supporting system
CN210658608U (en) Cut drainage device suitable for side slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200501

Termination date: 20210729

CF01 Termination of patent right due to non-payment of annual fee