CN217762415U - Fixing sleeve in bank integration pouring structure - Google Patents

Fixing sleeve in bank integration pouring structure Download PDF

Info

Publication number
CN217762415U
CN217762415U CN202221532679.5U CN202221532679U CN217762415U CN 217762415 U CN217762415 U CN 217762415U CN 202221532679 U CN202221532679 U CN 202221532679U CN 217762415 U CN217762415 U CN 217762415U
Authority
CN
China
Prior art keywords
ring
sleeves
positioning
rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221532679.5U
Other languages
Chinese (zh)
Inventor
张龙玉
雷华兵
范鹏飞
郭帅飞
曹旺
卿志伟
单虹博
刘学良
李果
周子豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202221532679.5U priority Critical patent/CN217762415U/en
Application granted granted Critical
Publication of CN217762415U publication Critical patent/CN217762415U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The application relates to the technical field of pipeline installation engineering, in particular to a fixed sleeve row integrated pouring structure which comprises a row of sleeves arranged on adjacent floors, ring positioning assemblies arranged on the row of sleeves and rod positioning assemblies vertically arranged on the ring positioning assemblies; the row of sleeves comprises a fixed strip and a plurality of fixed sleeves fixedly connected to the same side surface of the fixed strip; the row of sleeves is provided with at least two ring positioning assemblies which are detachably connected to the fixed sleeves, and the rod positioning assemblies are detachably connected to the ring positioning assemblies on the adjacent floors; the ring positioning assembly comprises a positioning ring piece with a central axis coinciding with the central axis of the fixed sleeve; the rod positioning assembly comprises a telescopic rod piece with a central axis coinciding with the central axis of the positioning ring piece. This application has the effect that a plurality of fixed sleeving one-to-one concentric correspondence that operating personnel will be on the adjacent floor of being convenient for was pour.

Description

Fixing sleeve in bank integration pouring structure
Technical Field
The application relates to the technical field of pipeline installation engineering, in particular to a fixing sleeve row integrated pouring structure.
Background
When the pipeline of installation need pass the floor board in the floor, need insert on the floor board and establish fixed sleeve, the pipeline is inserted and is established in fixed sleeve, and the pipeline rigid coupling is on fixed sleeve, and fixed sleeve plays the effect of fixing and protection to the pipeline.
The row of pipeline is that many pipelines pass through the mounting to be fixed one row, and when vertical installation becomes row pipeline in the floor, because many pipelines have been in a row fixed together, the distance between the adjacent pipeline has been fixed, therefore a plurality of fixed sleeving between the adjacent two-layer floor about upper and lower need the one-to-one concentric correspondence, pours again and fixes on the floor board, just can install into row pipeline between adjacent two-layer floor.
The method for firstly pouring and installing the fixed sleeves and then fixedly connecting the fixed sleeves to the pipelines in rows is adopted because a plurality of fixed sleeves between two adjacent floors are difficult to be concentrically arranged one by one, and the method for firstly installing the pipelines in rows and then fixedly connecting the fixed sleeves is adopted.
The method comprises the steps of firstly, mounting the row of pipelines at the position of the row of pipelines, damaging floor plates to form hanging holes, mounting and fixing the row of pipelines, sleeving fixed sleeves on the row of pipelines, respectively arranging two ends of the row of pipelines in the hanging holes of two adjacent layers of floor plates, positioning the row of pipelines, arranging pouring templates on the floor plates where the hanging holes are located, arranging steel reinforcement frameworks between the pouring templates, sleeving a plurality of fixed sleeves on the row of pipelines, fixing the fixed sleeves on the pouring templates and the steel reinforcement frameworks, vibrating after concrete is poured, discharging air bubbles from the concrete by using a vibrator, detaching the pouring templates after the concrete is solidified, and then fixedly connecting the fixed sleeves with the row of pipelines.
Research and development personnel find in research and development improvements: when the row pipelines are installed firstly and then the fixed sleeves are fixedly connected, the vibrating machine vibrates the concrete to an overlarge amplitude, the fixed sleeves can damage the row pipelines, but when the vibrating amplitude of the concrete is insufficient, the problems that the concrete at the hanging hole is not compact in vibrating, the pouring quality is poor, the fixed sleeves incline and the like are easily caused, the water leakage condition is easily caused after the concrete is poured at the hanging hole part, and therefore the structure for constructing the row pipelines by pouring the fixed sleeves firstly and then fixedly connecting the fixed sleeves needs to be realized.
SUMMERY OF THE UTILITY MODEL
In order to make a plurality of fixed sleeves on the adjacent floor one-to-one concentric correspondence setting, can realize pouring earlier and install the construction method of fixed sleeve rigid coupling in bank pipeline again, pour the fixed sleeve and can vibrate by a wide margin, improve and pour the quality, this application provides a fixed sleeve in bank integration casting structure.
The application provides a set sleeve in bank integration pouring structure adopts following technical scheme:
a fixed sleeve row integrated pouring structure comprises a row of sleeves arranged on adjacent floors, ring positioning assemblies arranged on the row of sleeves and rod positioning assemblies vertically arranged on the ring positioning assemblies;
the row of sleeves comprises a fixed strip and a plurality of fixed sleeves fixedly connected to the same side surface of the fixed strip;
the row of sleeves is provided with at least two ring positioning assemblies which are detachably connected to the fixed sleeves, and the rod positioning assemblies are detachably connected to the ring positioning assemblies of adjacent floors;
the ring positioning assembly comprises a positioning ring piece with a central axis coinciding with the central axis of the fixed sleeve;
the rod positioning assembly comprises a telescopic rod piece, wherein the central axis of the telescopic rod piece is coincident with the central axis of the positioning ring piece.
By adopting the technical scheme, the central axis of the telescopic rod piece coincides with the central axis of the positioning ring piece, and after the central axis of the positioning ring piece coincides with the central axis of the fixed sleeve, the ring positioning assembly connected to the adjacent floor can be disassembled, the ring positioning assembly can be disassembled and connected to the fixed sleeve, so that the fixed sleeves on the adjacent floor are concentrically arranged, and after the fixed sleeves are fixedly connected to the fixed strip to form a row of sleeves, at least two fixed sleeves are determined to be concentrically arranged on the adjacent floor one by one, all the fixed sleeves can be determined to be concentrically arranged one by one, thereby being convenient for an operator to concentrically arrange the fixed sleeves on the adjacent floor one by one, realizing the construction method of firstly pouring and installing the fixed sleeves and then fixedly connecting the fixed sleeves to the row of pipelines, pouring the fixed sleeves can be vibrated greatly, and the pouring quality is improved.
Optionally, the ring positioning assembly further includes an inserting and fixing cylinder arranged on the plate surface of the positioning ring piece and used for being inserted into the inner wall of the fixing sleeve, one end of the inserting and fixing cylinder is vertically arranged at a position of the positioning ring piece close to the inner ring, and the central axis of the inserting and fixing cylinder coincides with the central axis of the positioning ring piece.
By adopting the technical scheme, the inserting and fixing cylinder is inserted into the fixing sleeve, so that the ring positioning assembly is detachably connected to the fixing sleeve, and the central axis of the positioning ring piece coincides with the central axis of the fixing sleeve.
Optionally, the ring positioning assembly further comprises an elastic soft cylinder arranged on the plate surface of the positioning ring piece and used for being sleeved on the outer wall of the fixed sleeve, and one end of the elastic soft cylinder is vertically arranged at a position of the positioning ring piece close to the outer ring.
By adopting the technical scheme, the elastic soft barrel is sleeved on the fixed sleeve, so that the ring positioning assembly is more stably connected with the fixed sleeve.
Optionally, the ring positioning assembly further includes an internal thread cylinder fixedly connected to an inner annular wall of the positioning ring member and detachably connected to the rod positioning assembly, and the internal thread cylinder is perpendicular to the positioning ring member;
the number of the internal thread cylinders is at least two, and the two internal thread cylinders are symmetrically arranged around the circle center of the positioning ring piece.
Optionally, the rod positioning assembly further comprises an external thread member in threaded connection with the two internal thread barrels, and the telescopic rod member is vertically arranged at a central line position of the external thread member;
the external screw thread spare is provided with two at least, and two the external screw thread spare sets up respectively the both ends of flexible member.
Through adopting above-mentioned technical scheme, external screw thread spare and internal thread section of thick bamboo threaded connection, the operating personnel of being convenient for can dismantle the connection at ring locating component with pole locating component, and make the central axis of flexible member and fixed sleeving's the central axis coincidence.
Optionally, the external thread member includes a mounting plate and a bolt rod rotatably connected to the mounting plate and adapted to the internal thread cylinder, one end of the bolt rod vertically penetrates through the mounting plate, and a hexagonal head is disposed at one end of the bolt rod close to the mounting plate;
the bolt rods are at least two and are symmetrically arranged around the center line of the mounting plate.
Through adopting above-mentioned technical scheme, operating personnel rotates the hexagonal head, can drive the shank of bolt and rotate, and the operation personnel of being convenient for are with shank of bolt threaded connection on the internal thread section of thick bamboo.
Optionally, the telescopic rod comprises an inserting rod, an adjusting cylinder sleeved on one end of the inserting rod, and a plug rod movably inserted between the inserting rod and the adjusting cylinder;
and a plurality of adjusting holes matched with the bolt rods are formed in the adjusting cylinder along the length direction.
Through adopting above-mentioned technical scheme, the bolt pole sets up in the regulation hole of different positions, and the operating personnel of being convenient for adjusts and inserts the length of establishing the pole and inserting and establish in adjusting a section of thick bamboo to the length of adjustment telescopic rod spare.
Optionally, a limiting convex strip is arranged on the outer wall of the inserting rod along the length direction, and a limiting sliding groove matched with the limiting convex strip is formed in the inner wall of the adjusting cylinder.
Through adopting above-mentioned technical scheme, the activity of spacing sand grip is inserted and is established in spacing spout, makes to insert and establishes the pole and adjust and can not appear rotating between the section of thick bamboo.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the row of sleeves, the fixing strips, the fixing sleeves, the ring positioning assemblies, the positioning ring members, the rod positioning assemblies and the telescopic rod members, the central axes of the telescopic rod members are superposed with the central axes of the positioning ring members, and after the central axes of the positioning ring members are superposed with the central axes of the fixing sleeves, the rod positioning assemblies are detachably connected with the ring positioning assemblies on adjacent floors, and the ring positioning assemblies are detachably connected with the fixing sleeves, so that the fixing sleeves on the adjacent floors are concentrically arranged, a plurality of fixing sleeves are fixedly connected on the fixing strips to form the row of sleeves, and at least two fixing sleeves are determined to be concentrically arranged on the adjacent floors one by one, so that all the fixing sleeves can be determined to be concentrically arranged one by one, an operator can conveniently arrange the fixing sleeves on the adjacent floors in a concentric one-to-one correspondence manner, a construction method of firstly pouring and installing the fixing sleeves and then fixedly connecting the row of pipelines can be realized, the pouring of the fixing sleeves can be vibrated greatly, and the pouring quality is improved;
2. by arranging the inserting and fixing barrel, the internal thread barrel, the external thread piece, the mounting plate, the bolt rod and the hexagonal head, the inserting and fixing barrel is inserted into the fixing sleeve, so that the ring positioning assembly is detachably connected to the fixing sleeve, the central axis of the positioning ring piece is overlapped with the central axis of the fixing sleeve, the external thread piece is in threaded connection with the internal thread barrel, an operator can conveniently detachably connect the rod positioning assembly to the ring positioning assembly, the central axis of the telescopic rod piece is overlapped with the central axis of the fixing sleeve, the operator can drive the bolt rod to rotate by rotating the hexagonal head, and the operator can conveniently connect the bolt rod to the internal thread barrel in a threaded manner;
3. through setting up regulation section of thick bamboo, bolt pole, regulation hole, spacing sand grip and spacing spout, the bolt pole sets up in the regulation hole of different positions, and the operating personnel adjustment of being convenient for is inserted and is established the pole and insert the length of establishing in adjusting the section of thick bamboo to the length of the flexible member of adjustment, spacing sand grip activity is inserted and is established in spacing spout, and the messenger is inserted and is established the pole and adjust and can not appear rotating between the section of thick bamboo.
Drawings
Fig. 1 is a schematic structural diagram of a row of integrated casting structures of a retaining sleeve in an embodiment of the present application.
Fig. 2 is a schematic cross-sectional view of a row of integrated casting structures of the retaining sleeve according to the embodiment of the present application.
Fig. 3 is an enlarged schematic view of a portion a in fig. 2.
Fig. 4 is an enlarged schematic view of a portion B in fig. 2.
Description of reference numerals: 1. rows of sleeves; 11. a fixing strip; 12. fixing the sleeve; 2. a ring positioning assembly; 21. a positioning ring member; 22. inserting and fixing the cylinder; 23. an elastic soft cylinder; 24. an internal threaded barrel; 3. a rod positioning assembly; 4. a telescopic rod member; 41. inserting the rod; 42. an adjusting cylinder; 43. a latch rod; 44. an adjustment hole; 45. limiting convex strips; 46. a limiting chute; 5. an external screw member; 51. mounting a plate; 52. a bolt shank; 53. a hexagonal head.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses adapter sleeve in bank integration pouring structure. Referring to fig. 1 and 2, a casing fixing row integrated casting structure comprises a row of casings 1 arranged on adjacent floors, a ring positioning assembly 2 detachably connected to the row of casings 1, and a rod positioning assembly 3 vertically arranged on the ring positioning assembly 2.
The row of sleeve pipes 1 sets up two at least, it is provided with two to become row sleeve pipes 1 in this embodiment, in use, fix a position two row sleeve pipes 1 through ring locating component 2 and pole locating component 3, can pour two row sleeve pipes 1 respectively on adjacent two-layer floor simultaneously, also can pour a row sleeve pipe 1 on the floor board earlier, through ring locating component 2 and pole locating component 3, fix a row sleeve pipe 1 on the adjacent floor, pour fixedly again with row sleeve pipe 1 on the adjacent floor.
Referring to fig. 1 and 2, the row of sleeves 1 includes a fixing strip 11 and a plurality of fixing sleeves 12 fixedly connected to the same side of the fixing strip 11, the fixing sleeves 12 are used for inserting pipes, the number of the fixing sleeves 12 is equal to the number of the pipes, the distance between adjacent fixing sleeves 12 is set according to the distance between adjacent pipes in the row of pipes, and the plurality of fixing sleeves 12 are integrated in a row through the fixing strip 11.
In this embodiment, the two fixing strips 11 are arranged on the same horizontal plane, the five fixing sleeves 12 are arranged, and the fixing strips 11 are welded on the outer wall of the fixing sleeve 12 close to the bottom end, so that when the fixing sleeve 12 is poured, the fixing strips 11 can be poured in concrete at the same time.
Referring to fig. 2 and 3, at least two ring positioning assemblies 2 are disposed on a single row of sleeves 1, in this embodiment, two ring positioning assemblies 2 are disposed on a single row of sleeves 1, each ring positioning assembly 2 includes a ring-shaped plate-shaped positioning ring member 21, an insertion fixing cylinder 22 and an elastic soft cylinder 23 vertically fixedly connected to the same plate surface of the positioning ring member 21, and a plurality of internal threaded cylinders 24 vertically fixedly connected to the positioning ring member 21.
The top end of the inserting and fixing cylinder 22 is arranged at the position of the positioning ring piece 21 close to the inner annular wall, the inserting and fixing cylinder 22 is matched with the fixed sleeve 12, so that the inserting and fixing cylinder 22 can be inserted into the inner wall of the fixed sleeve 12, the top end of the elastic soft cylinder 23 is arranged at the position of the positioning ring piece 21 close to the outer annular wall, and the elastic soft cylinder 23 is matched with the fixed sleeve 12, so that the elastic soft cylinder 23 can be sleeved on the outer wall of the fixed sleeve 12.
Referring to fig. 2 and 3, in the single ring positioning assembly 2, at least two internal thread cylinders 24 are provided, in the present embodiment, two internal thread cylinders 24 are provided, and the two internal thread cylinders 24 are symmetrically arranged about the center of the positioning ring member 21, and through the insertion fixing cylinder 22 and the elastic soft cylinder 23, an operator can conveniently detachably connect the positioning ring member 21 and the internal thread cylinder 24 to the fixed sleeve 12, and the central axis of the insertion fixing cylinder 22 and the central axis of the elastic soft cylinder 23 are both coincident with the central axis of the positioning ring member 21, so that the central axis of the positioning ring member 21 is coincident with the central axis of the fixed sleeve 12.
The pole locating component 3 is including the flexible member 4 that is used for adjusting self length and set up on flexible member 4 with the external screw thread spare 5 of an internal thread section of thick bamboo 24 threaded connection, flexible member 4 sets up the central line position at external screw thread spare 5, make the length direction of flexible member 4 coincide with external screw thread spare 5's central line, external screw thread spare 5 is provided with two at least, external screw thread spare 5 is provided with two in single pole locating component 3 in this embodiment, two external screw thread spare 5 symmetries set up on flexible member 4's both ends.
Referring to fig. 2 and 4, the telescopic rod 4 includes a round rod-shaped inserting rod 41, an adjusting cylinder 42 sleeved on one end of the inserting rod 41 and a plug rod 43 movably inserted between the inserting rod 41 and the adjusting cylinder 42, one end of the inserting rod 41 is vertically and fixedly connected to the external thread member 5, the other end of the inserting rod 41 is provided with an inserting hole matched with the inserting hole, the adjusting cylinder 42 is provided with a plurality of adjusting holes 44 matched with the plug rod 43 along the length direction, and the external thread member 5 is fixedly connected to one end of the adjusting cylinder 42 far away from the adjusting hole 44.
The plug pin rod 43 is inserted into the inserting fixing hole and the adjusting hole 44, so that the inserting rod 41 and the adjusting cylinder 42 can be fixed, the plug pin rod 43 is inserted into the adjusting holes 44 at different positions by adjusting the plug pin rod 43, an operator can conveniently adjust the length of the inserting rod 41 inserted into the adjusting cylinder 42, and adjust the length of the telescopic rod piece 4, so that the distance between the two external thread pieces 5 is adjusted.
The outer wall of the inserting rod 41 is provided with a limiting convex strip 45 along the length direction, the inner wall of the adjusting cylinder 42 is provided with a limiting sliding groove 46 matched with the limiting convex strip 45, and the inserting rod 41 and the adjusting cylinder 42 can be prevented from rotating by inserting the limiting convex strip 45 into the limiting sliding groove 46.
Referring to fig. 2 and 3, the external screw member 5 includes a mounting plate 51 having a rectangular plate shape and a bolt bar 52 rotatably coupled to the mounting plate 51, one end of the bolt bar 52 vertically penetrates the mounting plate 51, and both ends of the mounting plate 51 are provided with rounded corners so that the mounting plate 51 can be transversely inserted into the fixing tube 12
Be provided with hexagonal head 53 at the one end that bolt pole 52 is close to mounting plate 51, set up on the periphery that bolt pole 52 kept away from mounting plate 51 with the outer screw thread of interior screw thread section of thick bamboo 24 adaptation, hexagonal head 53 and outer screw thread set up respectively in the relative both sides of mounting plate 51, and the operating personnel of being convenient for drives bolt pole 52 and rotates through rotatory hexagonal head 53.
The number of the bolt rods 52 is at least two, and two bolt rods 52 are arranged in the single external thread member 5 of the embodiment, and the two bolt rods 52 are symmetrically arranged about the center line of the mounting plate 51, so that the central axis of the telescopic rod member 4 coincides with the central axis of the positioning ring member 21.
The implementation principle of the integrated pouring structure for rows of fixed sleeves in the embodiment of the application is as follows: the external thread piece 5 is fixedly connected to the telescopic rod piece 4, the external thread piece 5 is in threaded connection with the inner thread cylinder 24 through the bolt rod 52, the rod positioning component 3 is detachably connected with the ring positioning component 2, the central axis of the telescopic rod piece 4 is overlapped with the central axis of the positioning ring piece 21, the inserting and fixing cylinder 22 is inserted into the fixed sleeve 12, the ring positioning component 2 is detachably connected with the fixed sleeve 12, the central axis of the positioning ring piece 21 is overlapped with the central axis of the fixed sleeve 12, the rod positioning component 3 is detachably connected with the ring positioning component 2 of an adjacent floor, so that the fixed sleeves 12 on the adjacent floor are concentrically arranged, after the fixed sleeves 12 are fixedly connected to the fixing strip 11 to form the row of sleeves 1, at least two fixed sleeves 12 are concentrically arranged on the adjacent floor one by one to one, all the fixed sleeves 12 can be determined to be concentrically arranged one by one to one, an operator can conveniently arrange the fixed sleeves 12 one by one to one, a construction method for firstly pouring and mounting the fixed sleeves 12 and then fixedly connecting the row of pipelines can be realized, the poured, the fixed sleeves 12 can vibrate greatly, and the pouring quality can be improved.
The above are all the preferred embodiments of the present application, and the protection scope of the present application is not limited thereby, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a structure is pour in integration of fixed sleeve in bank which characterized in that: the device comprises a row of sleeves (1) arranged on adjacent floors, a ring positioning assembly (2) arranged on the row of sleeves (1) and a rod positioning assembly (3) vertically arranged on the ring positioning assembly (2);
the row of sleeves (1) comprises a fixed strip (11) and a plurality of fixed sleeves (12) fixedly connected to the same side surface of the fixed strip (11);
at least two ring positioning assemblies (2) detachably connected to the fixed sleeves (12) are arranged on the rows of sleeves (1), and the rod positioning assemblies (3) are detachably connected to the ring positioning assemblies (2) on adjacent floors;
the ring positioning assembly (2) comprises a positioning ring piece (21) with the central axis coinciding with the central axis of the fixed sleeve (12);
the rod positioning assembly (3) comprises a telescopic rod piece (4) with the central axis coinciding with the central axis of the positioning ring piece (21).
2. The integrated casting structure for the rows of the fixed sleeves according to claim 1, wherein: the ring positioning assembly (2) further comprises an inserting and fixing cylinder (22) which is arranged on the plate surface of the positioning ring piece (21) and used for being inserted into the inner wall of the fixing sleeve (12), one end of the inserting and fixing cylinder (22) is vertically arranged at the position, close to the inner ring, of the positioning ring piece (21), and the central axis of the inserting and fixing cylinder (22) is overlapped with the central axis of the positioning ring piece (21).
3. The integrated casting structure for the rows of the fixed sleeves according to claim 2, wherein: the ring positioning assembly (2) further comprises an elastic soft cylinder (23) which is arranged on the plate surface of the positioning ring piece (21) and used for being sleeved on the outer wall of the fixed sleeve (12), and one end of the elastic soft cylinder (23) is vertically arranged at a position, close to the outer ring, of the positioning ring piece (21).
4. The integrated casting structure for the rows of the fixed sleeves as claimed in claim 3, wherein: the ring positioning assembly (2) further comprises an internal thread cylinder (24) fixedly connected to the inner ring wall of the positioning ring member (21) and used for detachably connecting the rod positioning assembly (3), and the internal thread cylinder (24) is perpendicular to the positioning ring member (21);
the number of the internal thread cylinders (24) is at least two, and the two internal thread cylinders (24) are symmetrically arranged around the circle center of the positioning ring piece (21).
5. The integrated casting structure for the rows of the fixed sleeves as claimed in claim 4, wherein: the rod positioning assembly (3) further comprises an external thread piece (5) in threaded connection with the two internal thread cylinders (24), and the telescopic rod piece (4) is vertically arranged at the center line position of the external thread piece (5);
the number of the external thread pieces (5) is at least two, and the two external thread pieces (5) are respectively arranged at two ends of the telescopic rod piece (4).
6. The integrated casting structure for the rows of the fixed sleeves as claimed in claim 5, wherein: the external thread member (5) comprises a mounting plate (51) and a bolt rod (52) which is rotatably connected to the mounting plate (51) and is matched with the internal thread barrel (24), one end of the bolt rod (52) vertically penetrates through the mounting plate (51), and one end, close to the mounting plate (51), of the bolt rod (52) is provided with a hexagonal head (53);
at least two bolt rods (52) are arranged, and the two bolt rods (52) are symmetrically arranged around the center line of the mounting plate (51).
7. The integrated casting structure for the rows of the fixed sleeves according to claim 1, wherein: the telescopic rod piece (4) comprises an inserting rod (41), an adjusting cylinder (42) sleeved on one end of the inserting rod (41) and a bolt rod (43) movably inserted between the inserting rod (41) and the adjusting cylinder (42);
and a plurality of adjusting holes (44) matched with the bolt rods (43) are formed in the adjusting cylinder (42) along the length direction.
8. The integrated casting structure for the rows of the fixed sleeves as claimed in claim 7, wherein: the outer wall of the inserting rod (41) is provided with a limiting convex strip (45) along the length direction, and the inner wall of the adjusting cylinder (42) is provided with a limiting sliding groove (46) matched with the limiting convex strip (45).
CN202221532679.5U 2022-06-17 2022-06-17 Fixing sleeve in bank integration pouring structure Active CN217762415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221532679.5U CN217762415U (en) 2022-06-17 2022-06-17 Fixing sleeve in bank integration pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221532679.5U CN217762415U (en) 2022-06-17 2022-06-17 Fixing sleeve in bank integration pouring structure

Publications (1)

Publication Number Publication Date
CN217762415U true CN217762415U (en) 2022-11-08

Family

ID=83895177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221532679.5U Active CN217762415U (en) 2022-06-17 2022-06-17 Fixing sleeve in bank integration pouring structure

Country Status (1)

Country Link
CN (1) CN217762415U (en)

Similar Documents

Publication Publication Date Title
CN109723398B (en) Dig bored concrete pile drilling cleaning device soon
CN107965065B (en) Buckling support Combined type pre-embedded member construction method
CN109930629B (en) Prefabricated assembled concrete inspection shaft pouring template
WO2014193023A1 (en) Housing bracket for constructing foundation of underwater bridge support and method for constructing foundation of underwater bridge support using same
KR101010608B1 (en) A mold for channel
CN217762415U (en) Fixing sleeve in bank integration pouring structure
CN212249293U (en) Electric spool fixing device based on manger plate platform
CN217151317U (en) Precise positioning and adjusting device for foundation bolt
CN209868938U (en) Prefabricated piping lane forming die
CN113882565B (en) Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN113802562B (en) Steel reinforcement cage circulating hanging bar device and use method thereof
CN215282577U (en) Cement pouring equipment for cement telegraph pole
CN213573057U (en) Concrete centralized vibrating device for reinforcing steel bar dense area
CN212984631U (en) Plate lowering hanging die
CN113073846A (en) Template reinforcing structure and method for horizontal construction joint of underground outer wall
CN208040405U (en) A kind of tunnel double-lining trolley vault assembled secondary grouting system
CN215801774U (en) Pre-buried frock
CN105604579A (en) Bridge-tunnel strengthening member insert type grouting device and grouting method
CN111636678A (en) Manufacturing method of detachable toilet hanging mold supporting tool
CN220377358U (en) Municipal road inspection well Zhou Jiagu device
CN221321809U (en) Auxiliary vibrating device for bare concrete shear wall
CN219491001U (en) Steel cofferdam cast-in-place concrete back cover construction structure
CN110965787A (en) Reverse construction method construction wall body reinforcing bar location structure
CN219386398U (en) Assembled cantilever retaining wall unit connecting device
CN214738084U (en) Fixing support for cast-in-place concrete pile guide pipe and collecting hopper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant