CN217760997U - Combined split mounting type rack for tunnel three-step construction - Google Patents

Combined split mounting type rack for tunnel three-step construction Download PDF

Info

Publication number
CN217760997U
CN217760997U CN202221789791.7U CN202221789791U CN217760997U CN 217760997 U CN217760997 U CN 217760997U CN 202221789791 U CN202221789791 U CN 202221789791U CN 217760997 U CN217760997 U CN 217760997U
Authority
CN
China
Prior art keywords
construction platform
construction
tunnel
platform
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221789791.7U
Other languages
Chinese (zh)
Inventor
余洋
乔红彦
李勇
熊军
方兵
肖伟志
罗勇
刘健利
徐�明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202221789791.7U priority Critical patent/CN217760997U/en
Application granted granted Critical
Publication of CN217760997U publication Critical patent/CN217760997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a combination pin-connected panel rack for construction of three steps in tunnel, including two bases and the first construction platform of erectting in two base tops, wholly be "door" shape, first construction platform's top surface is the arch, leans on top position department to be provided with the second construction platform that the level extends respectively in first construction platform's both sides, and the top surface of two bases all extends to one side of keeping away from first construction platform and forms third construction platform, is provided with the cat ladder between one of them third construction platform and ground. The utility model discloses the installation is quick and convenient, and first construction platform's top surface is the arch, can increase first construction platform's height, and the convenience is put to tunnel top central point and is under construction, and second construction platform and third construction platform's formation has increased the scope of action of this rack, avoids appearing the construction dead angle.

Description

Combined split mounting type rack for tunnel three-step construction
Technical Field
The utility model relates to a tunnel construction technical field, in particular to a combination pin-connected panel rack for construction of three steps in tunnel.
Background
At present, for domestic soft rock tunnel construction, the excavating method with the widest application range is a three-step construction method, the construction process is simple, and the soft rock tunnel can be organized for quick construction; when the three-step construction method is adopted, the method has the greatest characteristic that the face can be operated in parallel, and further the construction progress of the face is accelerated. When the surrounding rock is loess or other soft rocks, the upper step is generally constructed by reserving core soil during the three-step construction, and the core soil is used as a construction operation platform.
When the face is IV-level surrounding rock or V-level rocky surrounding rock, blasting excavation is generally needed due to high rocky strength of the face, core soil can be cancelled, a construction platform needs to be temporarily erected for excavation and supporting operation during step construction of the face, and the disclosed technology at the present stage is mainly a fixed operation rack which needs large-scale equipment for hoisting and carrying, but hoisting and carrying are difficult, so that the construction progress is not facilitated by three steps, and the construction progress is greatly influenced.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the above-mentioned prior art, the utility model aims at providing a combination pin-connected panel rack for construction of three steps in tunnel, this combination pin-connected panel rack easy dismounting can solve the problem of current fixed operation rack hoist and mount, transport difficulty.
In order to realize the above-mentioned purpose, the utility model provides a combination pin-connected panel rack for construction of three steps in tunnel, including two bases and erect the first construction platform in two base tops, wholly be "door" shape, first construction platform's top surface is the arch, leans on top position department to be provided with the second construction platform that the level extends respectively, two in first construction platform's both sides the top surface of base all extends to one side of keeping away from first construction platform and forms third construction platform, is provided with the cat ladder between one of them third construction platform and ground.
In the scheme, the method comprises the following steps: the top surface of the first construction platform comprises three H-shaped steel arch frames which are longitudinally arranged along the tunnel, and reinforcing steel meshes are paved between every two adjacent H-shaped steel arch frames, so that the reinforcing steel meshes are favorable for increasing the foot falling area of the first construction platform, and the safety of constructors is ensured.
In the scheme, the method comprises the following steps: the spacing distance between two adjacent I-steel arches is 3-4 m, so that the coverage area of the first construction platform is large enough.
In the scheme, the method comprises the following steps: the bottom both sides of first construction platform all are equipped with the arch, bellied transversal personally submits the inverted trapezoid, are equipped with on the base and supply protruding male card hole, when first construction platform erects on two bases, the protruding card of its bottom goes into in the card hole. The structure is beneficial to ensuring the installation stability of the combined assembled rack and preventing the first construction platform rack and the base from collapsing due to unstable assembly; the cross section of the bulge is in an inverted trapezoid shape with a narrow lower part and a wide upper part, and the lower part of the bulge has a guiding function, so that the bulge can be conveniently and quickly inserted into the clamping hole.
In the scheme, the method comprises the following steps: all transversely be provided with 2 ~ 4 card holes on every base, position's regulation about first construction platform can be realized through inserting the arch in different card holes. The first construction platform can realize fine adjustment of left and right positions and can meet construction requirements under special conditions.
In the scheme, the method comprises the following steps: and an inclined strut is arranged between the third construction platform and the base, so that the structural strength of the third construction platform is improved, and the shock resistance of the third construction platform is improved.
The beneficial effects of the utility model are that:
the first construction platform is directly erected on the two bases, so that the installation is quick and convenient; and the top surface of the first construction platform is arched, so that the height of the first construction platform can be increased, and the construction is conveniently carried out on the center position of the top of the tunnel.
The formation of second construction platform and third construction platform all is favorable to increasing the effect scope of this rack, avoids appearing the construction dead angle for constructor can accomplish the construction of whole tunnel arch face.
Because first construction platform directly puts on two bases, so first construction platform accessible is controlled little range and is removed in order to adjust its left and right sides position, perhaps changes the first construction platform of not unidimensional according to the tunnel width, so this rack application scope is wide, application prospect is big.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic top view of a first construction platform.
Fig. 3 is an enlarged schematic view at a in fig. 1.
Detailed Description
As shown in figures 1-3, a combined split mounting type rack for tunnel three-step construction mainly comprises two bases and a first construction platform erected above the two bases, and the whole rack is in a door shape.
The top surface of first construction platform is the arch, leans on top position department to be provided with the second construction platform that the level extends respectively in first construction platform's both sides, and the top surface of two bases all extends to one side of keeping away from first construction platform and forms third construction platform, is provided with the cat ladder between one of them third construction platform and ground.
Preferably, the top surface of the first construction platform 2 comprises three h-shaped steel arches 21 arranged longitudinally along the tunnel, and a reinforcing mesh 22 is laid between two adjacent h-shaped steel arches 21, wherein the reinforcing mesh 22 is beneficial to increasing the foot drop area of the first construction platform 2 and ensuring the safety of constructors.
Preferably, the distance between two adjacent h-shaped steel arches 21 is 3-4 m to ensure that the coverage of the first construction platform 2 is sufficiently large.
Preferably, the two sides of the bottom of the first construction platform 2 are both provided with protrusions 23, the cross section of each protrusion 23 is in an inverted trapezoid shape, the two bases 1 are both provided with clamping holes 11 for the protrusions 23 to be inserted into, and when the first construction platform 2 is erected on the two bases 1, the protrusions 23 at the bottom of the first construction platform are clamped into the corresponding clamping holes 11. The structure is beneficial to ensuring the installation stability of the combined split mounting type rack and preventing the first construction platform rack 2 and the base 1 from being unstably split and collapsing; the cross section of the bulge 23 is in an inverted trapezoid with a narrow lower part and a wide upper part, and the lower part of the bulge has a guiding function, so that the bulge can be conveniently and quickly inserted into the clamping hole 11.
Preferably, each base 1 is transversely provided with 2-4 clamping holes 11, and the first construction platform 2 can realize the adjustment of the left and right positions by inserting the protrusions 23 into the different clamping holes 11. The first construction platform 2 can realize fine adjustment of left and right positions and can meet construction requirements under special conditions.
Preferably, an inclined strut 5 is arranged between the third construction platform 4 and the base 1, so that the structural strength of the third construction platform 4 is improved, and the shock resistance of the third construction platform is improved.

Claims (6)

1. The utility model provides a combination pin-connected panel rack for construction of three steps in tunnel which characterized in that: including two bases (1) and erect first construction platform (2) in two bases (1) tops, wholly be "door" shape, the top surface of first construction platform (2) is the arch, leans on top position department to be provided with second construction platform (3) that the level extends respectively, two in the both sides of first construction platform (2) the top surface of base (1) all extends to one side of keeping away from first construction platform (2) and forms third construction platform (4), is provided with the cat ladder between one of them third construction platform (4) and ground.
2. The combined assembled rack for tunnel three-step construction according to claim 1, wherein: the top surface of the first construction platform (2) comprises three H-shaped steel arches (21) arranged longitudinally along the tunnel, and reinforcing mesh (22) are laid between every two adjacent H-shaped steel arches (21).
3. The combined assembled rack for tunnel three-step construction according to claim 2, wherein: the spacing distance between two adjacent H-shaped steel arches (21) is 3-4 m.
4. The combined assembled rack for tunnel three-step construction according to claim 1, wherein: the bottom both sides of first construction platform (2) all are equipped with arch (23), the transversal trapezoidal of personally submitting of arch (23) is equipped with on base (1) and supplies protruding (23) male card hole (11), and when first construction platform (2) erect on two bases (1), the card is gone into in card hole (11) to protruding (23) card of its bottom.
5. The combined assembled type rack for tunnel three-step construction according to claim 4, wherein: all transversely be provided with 2 ~ 4 card holes (11) on every base (1), the regulation of position about can realizing through inserting arch (23) in different card holes (11) in first construction platform (2).
6. The combined assembled rack for tunnel three-step construction according to claim 1, wherein: and an inclined strut (5) is arranged between the third construction platform (4) and the base (1).
CN202221789791.7U 2022-07-12 2022-07-12 Combined split mounting type rack for tunnel three-step construction Active CN217760997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221789791.7U CN217760997U (en) 2022-07-12 2022-07-12 Combined split mounting type rack for tunnel three-step construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221789791.7U CN217760997U (en) 2022-07-12 2022-07-12 Combined split mounting type rack for tunnel three-step construction

Publications (1)

Publication Number Publication Date
CN217760997U true CN217760997U (en) 2022-11-08

Family

ID=83872904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221789791.7U Active CN217760997U (en) 2022-07-12 2022-07-12 Combined split mounting type rack for tunnel three-step construction

Country Status (1)

Country Link
CN (1) CN217760997U (en)

Similar Documents

Publication Publication Date Title
CN108457666A (en) A kind of liftable adjustable type tunnel multi-step excavates rack
CN106120881A (en) A kind of high-rise correcting and then reinforcing device
CN102936897B (en) Steel bridge capable of being used as supporting and reinforcing structure
CN114396176B (en) Reinforcing device and reinforcing method for steel beam column connecting node
CN217760997U (en) Combined split mounting type rack for tunnel three-step construction
CN208010356U (en) A kind of liftable adjustable type tunnel multi-step excavates rack
CN212482296U (en) Foundation ditch stone side blasting protector
CN112030996B (en) A construction platform for foundation ditch crown beam upper portion
CN205778936U (en) A kind of support bracket and supporting construction
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane
CN209873759U (en) Portable pile foundation construction platform
CN209949014U (en) Dead weight formula photovoltaic support
CN209339157U (en) A kind of boundling stake pile structure for pattern foundation pit supporting structure
CN220644285U (en) Foundation pit steel support supporting device
CN209277903U (en) A kind of one-above-the-other layout between Tunnel steelframe
CN208934293U (en) Vertical shaft stair
CN213448504U (en) A construction platform for foundation ditch crown beam upper portion
CN213574126U (en) Steel frame supporting structure for vertical jacking excavation method
CN218301545U (en) Base station base and communication base station comprising same
CN216740010U (en) Steel frame structure
CN214741374U (en) Tunnel preliminary bracing bow member reinforcing apparatus
CN218147838U (en) A integration construction platform for construction of support bed stone
CN216640606U (en) Ground beam device is strutted to bridge cushion cap steel sheet pile
CN211368734U (en) Novel steel structure combined support close to existing building deep foundation pit
CN216110034U (en) Support structure of outdoor tent

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant