CN217760130U - Hanging device for construction of gypsum plaster boards - Google Patents

Hanging device for construction of gypsum plaster boards Download PDF

Info

Publication number
CN217760130U
CN217760130U CN202222072628.5U CN202222072628U CN217760130U CN 217760130 U CN217760130 U CN 217760130U CN 202222072628 U CN202222072628 U CN 202222072628U CN 217760130 U CN217760130 U CN 217760130U
Authority
CN
China
Prior art keywords
connecting plate
fixed connection
threaded rod
support frame
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222072628.5U
Other languages
Chinese (zh)
Inventor
金伟
李庆军
张强强
桑福坤
朱峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guochen Decoration Engineering Co ltd
Original Assignee
Shandong Guochen Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guochen Decoration Engineering Co ltd filed Critical Shandong Guochen Decoration Engineering Co ltd
Priority to CN202222072628.5U priority Critical patent/CN217760130U/en
Application granted granted Critical
Publication of CN217760130U publication Critical patent/CN217760130U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model discloses a cable suspension device is used in thistle board construction, the on-line screen storage device comprises a base, the base top is connected with lifting unit, lifting unit is connected with the support frame, the support frame top is equipped with rubber cushion, lifting unit includes motor case, perpendicular section of thick bamboo, threaded rod, driving motor, thread bush, connecting plate, spacing logical groove, elevator, montant, motor case top fixed connection erects a section of thick bamboo, the threaded rod is located in erecting a section of thick bamboo, motor case connection driving motor is stretched into to the threaded rod bottom, threaded rod threaded connection thread bush, thread bush fixed connection connecting plate, spacing logical groove is located the position that corresponds with the connecting plate on erecting a section of thick bamboo, the connecting plate passes spacing logical groove, connecting plate fixed connection elevator, elevator top fixed connection montant, montant top fixed connection support frame can assist constructor to raise the thistle board to the constructor installation fixed thistle board.

Description

Hanging device for construction of gypsum plaster boards
Technical Field
The utility model relates to a thistle board construction technical field particularly, relates to a cable suspension device is used in thistle board construction.
Background
The gypsum plaster board is a board made up by using building gypsum as main raw material, adding proper quantity of additive and fibre as core and using specially-made board paper as protective face through a certain preparation process.
General house adopts the thistle board to carry out the furred ceiling, with thistle board nail on the furred ceiling skeleton, in the construction of current thistle board, generally two people lift up the thistle board and install fixedly, just can make the thistle board damage of damaging by touch a little carelessly, be unfavorable for the construction of thistle board to need two people to work simultaneously, caused the waste of human cost.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem in the correlation technique, the utility model provides a cable suspension device is used in thistle board construction to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
a hanging device for thistle board construction comprises a base, wherein the top of the base is connected with a lifting assembly, the lifting assembly is connected with a supporting frame, and a rubber cushion block is arranged at the top of the supporting frame;
lifting unit includes motor case, vertical cylinder, threaded rod, driving motor, thread bush, connecting plate, spacing logical groove, elevator, montant, motor roof portion fixed connection vertical cylinder, the threaded rod is located in the vertical cylinder, the threaded rod bottom stretches into motor case connection driving motor, threaded rod threaded connection thread bush, thread bush fixed connection connecting plate, the position that corresponds with the connecting plate on the vertical cylinder is located to spacing logical groove, the connecting plate passes spacing logical groove, connecting plate fixed connection elevator, elevator top fixed connection montant, montant top fixed connection support frame.
Preferably, the position that the base bottom is close to the edge is equipped with the removal wheel of a plurality of even settings, remove to take turns to and install the service brake.
Preferably, the motor case is provided with a heat dissipation through hole.
Preferably, the supporting frame is formed by mutually and fixedly connecting a plurality of transverse rods and a plurality of longitudinal rods.
Preferably, a weighting block is arranged in the base.
Preferably, a reinforcing inclined rod is fixedly connected between the vertical rod and the support frame.
The beneficial effects of the utility model are that: 1. the utility model has simple structure, reasonable design, simple operation and lower manufacturing cost, and can assist constructors to lift the gypsum plaster board so that the constructors can install and fix the gypsum plaster board;
2. this device can one-man operate, compares current two people and installs, can reduce the human cost to difficult damage thistle board, easily thistle board's installation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of a general structure of a hanging device for gypsum plaster board construction according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a threaded rod of a hanging device for gypsum plaster board construction according to an embodiment of the present invention;
FIG. 3 is an external view of a vertical tube of a hanging device for gypsum plaster board construction according to an embodiment of the present invention;
fig. 4 is an enlarged view of a rubber pad of a hanging device for gypsum plaster board construction according to the embodiment of the present invention.
In the figure:
1. a base; 2. a lifting assembly; 3. a support frame; 4. a rubber cushion block; 5. a motor case; 6. a vertical cylinder; 7. a threaded rod; 8. a drive motor; 9. a threaded sleeve; 10. a connecting plate; 11. a limiting through groove; 12. a lifting block; 13. a vertical rod; 14. a moving wheel; 15. a heat dissipating through hole; 16. a transverse bar; 17. a longitudinal rod.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a cable suspension device is used in thistle board construction.
Example one
As shown in fig. 1-4, according to the utility model discloses a cable suspension device is used in thistle board construction of embodiment, including base 1, 1 top of base is connected with lifting unit 2, lifting unit 2 is connected with support frame 3, support frame 3 slightly is less than thistle board, 3 tops of support frame are equipped with rubber pad 4, lifting unit 2 includes motor case 5, chimney 6, threaded rod 7, driving motor 8, threaded bush 9, connecting plate 10, spacing logical groove 11, elevator 12, montant 13, motor case 5 top fixed connection chimney 6, threaded rod 7 is located in chimney 6, 7 bottoms of threaded rod stretch into motor case 5 and connect driving motor 8, threaded rod 7 threaded connection threaded bush 9, threaded bush 9 fixed connection connecting plate 10, spacing logical groove 11 is located the position that corresponds with connecting plate 10 on chimney 6, connecting plate 10 passes spacing logical groove 11, connecting plate 10 fixed connection elevator 12, elevator 12 top fixed connection montant 13, 13 top fixed connection support frame 3 of connecting plate 13, the device can assist the thistle board to rise with the thistle board, so that the thistle board is installed to be convenient for one man's installation fixed montant, can operate, two current thistle boards can reduce the manpower gypsum board, and the damage, and be difficult for one man power installation, the thistle board installation cost is easily reduced.
Example two
As shown in fig. 1-4, according to the utility model discloses a cable suspension device is used in thistle board construction of embodiment, including base 1, base 1 top is connected with lifting unit 2, lifting unit 2 is connected with support frame 3, support frame 3 top is equipped with rubber cushion 4, lifting unit 2 includes motor case 5, vertical section of thick bamboo 6, threaded rod 7, driving motor 8, thread bush 9, connecting plate 10, spacing logical groove 11, elevator 12, montant 13, motor case 5 top fixed connection vertical section of thick bamboo 6, threaded rod 7 is located in vertical section of thick bamboo 6, threaded rod 7 bottom stretches into motor case 5 and connects driving motor 8, threaded rod 7 threaded connection thread bush 9, thread bush 9 fixed connection connecting plate 10, spacing logical groove 11 is located the position that corresponds with connecting plate 10 on vertical section of thick bamboo 6, connecting plate 10 passes spacing logical groove 11, connecting plate 10 fixed connection elevator 12, elevator 12 top fixed connection montant 13, montant 13 top fixed connection support frame 3, the position that base 1 bottom is close to the edge is equipped with a plurality of even settings removes wheel 14, remove and install the foot on the wheel 14, remove the gypsum board of adjusting conveniently, install the thistle board in order to install the thistle board.
EXAMPLE III
As shown in fig. 1-4, according to the utility model discloses a cable suspension device is used in thistle board construction of embodiment, the on-line screen storage device comprises a base 1, 1 top of base is connected with elevating component 2, elevating component 2 is connected with support frame 3, 3 tops of support frame are equipped with rubber cushion 4, elevating component 2 includes motor case 5, vertical shaft 6, threaded rod 7, driving motor 8, thread bush 9, connecting plate 10, spacing logical groove 11, elevator 12, montant 13, motor case 5 top fixed connection vertical shaft 6, threaded rod 7 is located in vertical shaft 6, threaded rod 7 bottom stretches into motor case 5 and connects driving motor 8, threaded rod 7 threaded connection thread bush 9, thread bush 9 fixed connection connecting plate 10, spacing logical groove 11 locates the position that corresponds with connecting plate 10 on vertical shaft 6, connecting plate 10 passes spacing logical groove 11, connecting plate 10 fixed connection elevator 12, elevator 12 top fixed connection montant 13, 13 top fixed connection support frame 3, be equipped with heat dissipation through-hole 15 on the motor case 5, support frame 3 is formed by a plurality of transverse rod 16 and a plurality of longitudinal rod 17 fixed connection each other, be equipped with the weight in the base 1, be equipped with between montant 13 and the support frame 3, the reinforcing oblique rod 3, the stability of the support frame is connected with the reinforcing oblique rod.
To sum up, with the help of the above technical scheme of the utility model, this device is when using, arranges the thistle board in support frame 3 on, is supported by rubber cushion 4, starts driving motor 8, and then threaded rod 7 rotates and makes thread bush 9 shift up, and then connecting plate 10, elevator 12, montant 13 shift up, can make support frame 3 drive thistle board shift up to the mounted position, constructor can follow closely the thistle board on the furred ceiling skeleton afterwards to the installation of thistle board.
The above description is only for the preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A hanging device for thistle board construction comprises a base (1) and is characterized in that the top of the base (1) is connected with a lifting assembly (2), the lifting assembly (2) is connected with a support frame (3), and the top of the support frame (3) is provided with a rubber cushion block (4);
lifting unit (2) are including motor case (5), riser (6), threaded rod (7), driving motor (8), thread bush (9), connecting plate (10), spacing logical groove (11), lifting block (12), montant (13), motor case (5) top fixed connection erects a section of thick bamboo (6), threaded rod (7) are located in riser (6), motor case (5) connection driving motor (8) are stretched into to threaded rod (7) bottom, threaded rod (7) threaded connection thread bush (9), thread bush (9) fixed connection connecting plate (10), the position that corresponds with connecting plate (10) on riser (6) is located to spacing logical groove (11), connecting plate (10) pass spacing logical groove (11), connecting plate (10) fixed connection lifting block (12), lifting block (12) top fixed connection montant (13), montant (13) top fixed connection support frame (3).
2. The hanging device for gypsum plaster board construction as claimed in claim 1, wherein a plurality of moving wheels (14) are uniformly arranged at the bottom of the base (1) near the edge, and a foot brake is installed on the moving wheels (14).
3. The hanging device for gypsum board construction according to claim 2, wherein the motor case (5) is provided with a heat dissipating through hole (15).
4. A hanging device for gypsum plaster board construction according to claim 3, wherein the supporting frame (3) is formed by fixedly connecting a plurality of transverse rods (16) and a plurality of longitudinal rods (17).
5. A hanging device for gypsum plaster board construction according to claim 4, wherein a weight is provided in the base (1).
6. A hanging device for gypsum plaster board construction according to claim 5, wherein a reinforcing diagonal bar is fixedly connected between the vertical bar (13) and the support frame (3).
CN202222072628.5U 2022-08-08 2022-08-08 Hanging device for construction of gypsum plaster boards Active CN217760130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222072628.5U CN217760130U (en) 2022-08-08 2022-08-08 Hanging device for construction of gypsum plaster boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222072628.5U CN217760130U (en) 2022-08-08 2022-08-08 Hanging device for construction of gypsum plaster boards

Publications (1)

Publication Number Publication Date
CN217760130U true CN217760130U (en) 2022-11-08

Family

ID=83879716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222072628.5U Active CN217760130U (en) 2022-08-08 2022-08-08 Hanging device for construction of gypsum plaster boards

Country Status (1)

Country Link
CN (1) CN217760130U (en)

Similar Documents

Publication Publication Date Title
CN201268937Y (en) Double-layer hanging cradle for working aloft
CN217760130U (en) Hanging device for construction of gypsum plaster boards
CN219928744U (en) Automatic photovoltaic panel installation equipment
CN216615535U (en) Anti-shaking hanging basket for bridge construction
CN1987020B (en) Attached climbing type high mast structure mounting method and constructing device
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN208394645U (en) A kind of Bridge Erector preassembling equipment
CN215052128U (en) Platform in tower column shaft
CN218622619U (en) A assembled building frame for in construction
CN215442792U (en) Hoisting stair
CN218715451U (en) Temporary supporting device for steel structure hoisting construction
CN219363067U (en) Furred ceiling hoist and mount and roofing shaping all-in-one
CN218814587U (en) Curtain wall structure for energy-saving green building
CN215983672U (en) Green assembled building rural house roof sunning platform
CN212389248U (en) Auxiliary supporting scaffold for hydroelectric installation
CN217650773U (en) Hanging basket hoisting mechanism for inclined roof
CN214834614U (en) Suspension movable construction platform device
CN219548782U (en) Integral type bridge concrete anticollision wall safety maintenance cat ladder
CN217264129U (en) Elevator cab support convenient to installation
CN218668451U (en) Hanging basket for high-altitude auxiliary installation of aluminum plate
CN217780441U (en) Main engine base structure fixed on upper part of guide rail
CN219638359U (en) Hanging basket for constructional engineering
CN2714684Y (en) Board type combined domestic stairs
CN218596719U (en) Single-rod clothes airing machine structure
CN217479987U (en) Temporary support for construction of double-column large-cantilever bent cap