CN217759880U - Convenient quick detachable unit type scaffold - Google Patents

Convenient quick detachable unit type scaffold Download PDF

Info

Publication number
CN217759880U
CN217759880U CN202221873099.2U CN202221873099U CN217759880U CN 217759880 U CN217759880 U CN 217759880U CN 202221873099 U CN202221873099 U CN 202221873099U CN 217759880 U CN217759880 U CN 217759880U
Authority
CN
China
Prior art keywords
support column
inboard
block
spacing
run
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221873099.2U
Other languages
Chinese (zh)
Inventor
廖德新
葛丽先
唐乔宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiantuo Construction Group Co ltd
Original Assignee
Tiantuo Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiantuo Construction Group Co ltd filed Critical Tiantuo Construction Group Co ltd
Priority to CN202221873099.2U priority Critical patent/CN217759880U/en
Application granted granted Critical
Publication of CN217759880U publication Critical patent/CN217759880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a scaffold technical field just discloses a convenient quick unit formula scaffold frame of dismantling, including the support column, the support column is provided with four groups, and is per two sets of be provided with the side support pole between the inside wall of support column, be between side support pole and the support column and dismantle the connection, the equal fixedly connected with fixed block of intermediate position of support column inside wall, the slot has been seted up to the inboard of fixed block, the cooperation of pegging graft between side support pole and the slot, the fixed block runs through with the inboard of side support pole has spacing post of inserting. This application is through the inboard plug-in connection of side support pole and slot, and the through connection of spacing inserted column and fixed block and side support pole, offside support pole are spacing, and the cooperation of slip inserted block and screw rod is used, carries on spacingly to spacing inserted column, can realize the dismantlement of offside support pole, has effectively promoted the dismouting efficiency between support column and the side support pole.

Description

Convenient quick detachable unit type scaffold
Technical Field
The application relates to the technical field of scaffolds, in particular to a convenient and quick detachable unit type scaffold.
Background
The scaffold is a working platform erected for ensuring each construction process to be carried out smoothly, and is divided into an outer scaffold and an inner scaffold according to the erected position; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; according to the structural form, the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a cantilever type scaffold and a climbing type scaffold.
This type of scaffold on market is various today, can satisfy people's user demand basically, but still has certain problem, usually through welded connection between collateral branch vaulting pole and the support column on the current scaffold, causes installation time longer, and the installation effectiveness is lower, and is difficult for changing the maintenance after collateral branch vaulting pole damages.
SUMMERY OF THE UTILITY MODEL
An object of this application is to provide a convenient quick cell scaffold frame of dismantling to it is longer to solve the installation time between the collateral branch vaulting pole and the support column on the above-mentioned background art on proposing the scaffold frame, and the installation effectiveness is lower, and is difficult for changing the problem of maintenance after the collateral branch vaulting pole damages.
The application provides a unit type scaffold convenient and fast to disassemble, and the following technical scheme is adopted;
the utility model provides a convenient quick detachable's unit formula scaffold, includes the support column, the support column is provided with four groups, and is per two sets of be provided with the collateral branch vaulting pole between the inside wall of support column, be and to dismantle between collateral branch vaulting pole and the support column and be connected, the equal fixedly connected with fixed block in intermediate position of support column inside wall, the slot has been seted up to the inboard of fixed block, the cooperation of pegging graft between collateral branch vaulting pole and the slot, the inboard of fixed block and collateral branch vaulting pole runs through there is spacing inserted post, the support column inside wall is close to the top and the equal fixedly connected with coupling spring in below of fixed block, coupling spring keeps away from the one end fixedly connected with slip inserted block of support column, the slip inserted block runs through in spacing inboard top and the bottom of inserting the post, the inboard of passing spacing inserted post one end of slip inserted block has the stopper, the draw-in groove of supplying stopper plug-in connection is seted up to the fixed block inboard.
As a preferred scheme of this application, every two sets of the top of support column is provided with the roof, be the dismantlement connection between roof and the support column.
As a preferred scheme of this application, the bottom of support column both sides is provided with bearing structure, bearing structure is symmetrical structure for the central line of support column.
As an optimal scheme of this application, the roof runs through the inside top of two sets of support columns, the inside both ends of roof run through there is spacing inserted bar, one side of spacing inserted bar is inconsistent with the inside wall of support column, the inside top of spacing inserted bar and bottom all run through there is the double-screw bolt, the thread groove of being supplied with in double-screw bolt threaded connection is seted up to the support column inboard.
As a preferred scheme of this application, the roof is provided with two sets ofly, two sets of the roof is symmetrical structure.
As a preferred scheme of this application, the collateral branch vaulting pole is provided with two, two be the staggered connection between the collateral branch vaulting pole.
As an optimal selection scheme of this application, bearing structure includes connecting block and lug, connecting block fixed connection is in the bottom of support column outer wall both sides, the surface swing joint of connecting block has the connecting rod, the lateral wall swing joint of connecting rod has the movable rod, lug fixed connection is on the lateral wall of support column, the movable rod is kept away from the one end of connecting rod lateral wall and the surface swing joint of lug, the bottom fixedly connected with fixed plate of connecting rod, four inside turnings of fixed plate have all run through the screw rod.
To sum up, the present application includes the following beneficial effects:
1. through being provided with the slot, spacing post, coupling spring, slip inserted block and screw rod, can be in the use of scaffold frame, through collateral branch vaulting pole and the inboard plug-in connection of slot, spacing through connection of inserting post and fixed block and collateral branch vaulting pole, the collateral branch vaulting pole is spacing, the slip inserted block is used with the cooperation of screw rod, it is spacing to carry out spacing to spacing inserted post, can realize the dismantlement of offside bracing piece, effectively promoted the dismouting efficiency between support column and the collateral branch vaulting pole.
2. Through being provided with connecting block, connecting rod, movable rod, fixed plate, screw rod and lug, can be in the use of scaffold frame, through the swing joint of connecting rod and connecting block, swing joint between movable rod and connecting rod and the lug can be so that the interval grow between connecting rod and the support column, simultaneously under the effect of screw rod, realize the outrigger to scaffold frame bottom, greatly increased the steadiness of scaffold frame.
3. Through being provided with spacing inserted bar, double-screw bolt and thread groove, can be in the use of scaffold frame, pass between two sets of support columns through the roof, spacing inserted bar pass the inside both ends of roof and with the conflict of support column inside wall simultaneously, realize spacing to the roof, pass the inside threaded connection with the thread groove inboard of spacing inserted bar at the double-screw bolt, realize spacing to spacing inserted bar, consolidate the stability of being connected between roof and the support column, and convenient to detach, conveniently carry out be assembled between the scaffold frame.
Drawings
FIG. 1 is a front cross-sectional structural schematic view of the present application;
fig. 2 is an enlarged structural schematic view of a fixing block of the present application;
FIG. 3 is a schematic view of a partially enlarged structure of a support pillar according to the present application;
fig. 4 is an enlarged schematic structural diagram at a in fig. 1 of the present application.
In the figure: 1. a support column; 2. a top plate; 3. a side support bar; 4. a fixed block; 5. a support structure; 501. connecting blocks; 502. a connecting rod; 503. a movable rod; 504. a fixing plate; 505. a screw; 506. a bump; 6. a limiting inserted rod; 7. a stud; 8. a thread groove; 9. a slot; 10. a connecting spring; 11. sliding the insert block; 12. a limiting block; 13. and limiting the inserted column.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The present application is described in further detail below with reference to figures 1-4.
The application discloses convenient quick detachable's unit formula scaffold frame. Referring to fig. 1 and 2, a convenient and quick detachable unit scaffold includes support columns 1, the support columns 1 are provided with four groups, side support rods 3 are provided between the inner side walls of every two groups of support columns 1, the side support rods 3 are provided with two groups, the two side support rods 3 are connected in a staggered manner, the side support rods 3 and the support columns 1 are detachably connected, and the stability of connection between the support columns 1 can be achieved. The equal fixedly connected with fixed block 4 of intermediate position of 1 inside walls of support column, slot 9 has been seted up to the inboard of fixed block 4, can realize collateral branch vaulting pole 3 and the inboard grafting cooperation of slot 9.
In addition, the fixed block 4 runs through spacing inserted column 13 with the inboard of collateral branch bracing piece 3, can realize the spacing of collateral branch bracing piece 3 at the inside plug connection of slot 9. The equal fixedly connected with connecting spring 10 in top and the below that the inside wall of support column 1 is close to fixed block 4, connecting spring 10 keeps away from the one end fixedly connected with slip inserted block 11 of support column 1, and the bottom of slip inserted block 11 slides on fixed block 4, and slip inserted block 11 runs through in spacing top and the bottom of inserting 13 inboards of post, realizes spacing fixed to spacing post 13 of inserting. The inboard that slip inserted block 11 passed spacing inserted column 13 one end runs through there is stopper 12, and the draw-in groove of supplying in stopper 12 plug-in connection is seted up to fixed block 4 inboard, realizes the spacing fixed to slip inserted block 11, can realize the installation and the dismantlement between collateral branch vaulting pole 3 and the support column 1, makes things convenient for the dismouting between support column 1 and the collateral branch vaulting pole 3.
Referring to fig. 1 and 3, two groups of top plates 2 are disposed on the top of each two groups of supporting columns 1, the two groups of top plates 2 are symmetrical, and unit-type distribution sections are disposed on the top plates 2, so that operations can be performed in independent areas. Be between roof 2 and the support column 1 and dismantle the connection, roof 2 runs through the inside top of two sets of support columns 1, can realize the assembly connection between every two sets of support columns 1 through roof 2. The inside both ends of roof 2 run through there is spacing inserted bar 6, and one side of spacing inserted bar 6 is inconsistent with the inside wall of support column 1, can realize spacing to roof 2. Stud 7 is all run through on the inside top of spacing inserted bar 6 and bottom, and threaded groove 8 of supplying in 7 threaded connection of stud is seted up to support column 1 inboard, can realize the spacing to spacing inserted bar 6, has consolidated the stability of being connected between support column 1 and the support column 1 to promote the steadiness of scaffold installation.
Referring to fig. 1 and 4, the bottom of the two sides of the supporting column 1 is provided with a supporting structure 5, and the supporting structure 5 is symmetrical with respect to the center line of the supporting column 1, so as to stably support the bottom of the scaffold. The supporting structure 5 comprises a connecting block 501 and a bump 506, the connecting block 501 is fixedly connected to the bottoms of two sides of the outer wall of the supporting column 1, and the outer surface of the connecting block 501 is movably connected with a connecting rod 502 which can swing the connecting rod 502, so that the angle between the connecting rod 502 and the supporting column 1 is enlarged. The outer side wall of the connecting rod 502 is movably connected with a movable rod 503, the bump 506 is fixedly connected to the side wall of the supporting column 1, and one end of the movable rod 503, which is far away from the outer side wall of the connecting rod 502, is movably connected with the outer surface of the bump 506 to drive the movable rod 503 to change the angle. The bottom fixedly connected with fixed plate 504 of connecting rod 502, four inside corners of fixed plate 504 all run through there is screw rod 505, can be through the plug-in connection of screw rod 505 with the ground inboard, realize placing the stability of scaffold.
The application of a convenient quick cell scaffold frame of dismantling's of this application implements the principle and does:
firstly, during the use, can all insert the bottom on the top of collateral branch vaulting pole 3 to the inboard of slot 9, pass the inside of fixed block 4 and collateral branch vaulting pole 3 with spacing inserted column 13 in proper order again, stir the shifting block on slip inserted block 11 top again, make slip inserted block 11 slide and pass the inboard of spacing inserted column 13 on the surface of fixed block 4, pass the inside of slip inserted block 11 with stopper 12 and insert the one end that will pass in the draw-in groove of seting up to fixed block 4 inboard, realize spacing fixed to slip inserted block 11, thereby accomplish the assembly installation between support column 1 and the collateral branch vaulting pole 3, pass the inside top of two sets of support columns 1 with roof 2 after that, pass the inside both ends of roof 2 with spacing inserted rod 6 again and offset with the inside wall of support column 1, pass the inside top and the bottom of spacing inserted rod 6 and roof 2, accomplish the assembly installation between support column 1 and the roof 2, be provided with the ladder at the positive both ends of support column 1, can follow the higher authority of last step 2.
Secondly, through the connecting rod 502 of rocking to the both sides of support column 1 for the interval between connecting rod 502 and the support column 1 enlarges, and simultaneously the movable rod 503 changes the angle along with the outside swing of connecting rod 502, carries out the stable support to connecting rod 502, and the rethread screw rod 505 is from the inside rotatory downstream of fixed plate 504, makes screw rod 505 insert to ground inside, realizes the injecing to the connecting rod 502 position, keeps the steadiness of support column 1 in the use.
Finally, through rotating double-screw bolt 7 to the outside, make double-screw bolt 7 break away from the inside of thread groove 8 and spacing inserted bar 6 gradually, take out spacing inserted bar 6 from the inside of roof 2, extract away roof 2 from the inside of support column 1 again, extract stopper 12 upwards, make stopper 12 leave the inboard of draw-in groove and slip inserted block 11, make slip inserted block 11 slide and break away from the inboard of spacing inserted bar 13 through stirring the shifting block, extract away spacing inserted bar 13 from the inboard of fixed block 4 and collateral branch bracing piece 3 again, collateral branch bracing piece 3 takes out from the inboard of slot 9, realize the dismantlement between collateral branch bracing piece 3 and the support column 1.
It will be evident to those skilled in the art that the present application is not limited to the details of the foregoing illustrative embodiments, and that the present application may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a convenient quick dismantlement's cellular scaffold, includes support column (1), its characterized in that: support column (1) is provided with four groups, and is per two sets of be provided with collateral branch vaulting pole (3) between the inside wall of support column (1), be between collateral branch vaulting pole (3) and support column (1) and dismantle the connection, the equal fixedly connected with fixed block (4) of intermediate position of support column (1) inside wall, slot (9) have been seted up to the inboard of fixed block (4), peg graft the cooperation between collateral branch vaulting pole (3) and slot (9), fixed block (4) and collateral branch vaulting pole (3) inboard run through have spacing inserted post (13), top and the equal fixedly connected with connecting spring (10) in below that support column (1) inside wall is close to fixed block (4), connecting spring (10) keep away from the one end fixedly connected with slip inserted block (11) of support column (1), slip inserted block (11) run through in the inboard top and the bottom of spacing inserted post (13), slip inserted block (11) pass the inboard of spacing inserted post (13) one end and run through have stopper (12), stopper (4) inboard is seted up in the draw-in block (12) grafting connection of stopper (4), every two sets of roof (2) are provided with the top of support column (1).
2. A quick-release portable scaffolding according to claim 1, wherein: the top plate (2) is detachably connected with the support column (1).
3. A quick-release portable scaffolding according to claim 1, wherein: the bottom of support column (1) both sides is provided with bearing structure (5), bearing structure (5) are symmetrical structure for the central line of support column (1).
4. A quick-release portable scaffolding according to claim 2, wherein: roof (2) run through the inside top of two sets of support columns (1), roof (2) inside both ends are run through and are had spacing inserted bar (6), one side of spacing inserted bar (6) is inconsistent with the inside wall of support column (1), the inside top and the bottom of spacing inserted bar (6) all run through and have double-screw bolt (7), threaded groove (8) of supplying in double-screw bolt (7) threaded connection are seted up to support column (1) inboard.
5. A quick-release portable scaffolding according to claim 2, wherein: the two groups of top plates (2) are arranged, and the two groups of top plates (2) are of symmetrical structures.
6. A conveniently and quickly disassembled modular scaffold as claimed in claim 1, which is characterized in that: the number of the side supporting rods (3) is two, and the two side supporting rods (3) are connected in a staggered mode.
7. A quick-release portable scaffolding according to claim 3, wherein: bearing structure (5) are including connecting block (501) and lug (506), connecting block (501) fixed connection is in the bottom of support column (1) outer wall both sides, the surface swing joint of connecting block (501) has connecting rod (502), the lateral wall swing joint of connecting rod (502) has movable rod (503), lug (506) fixed connection is on the lateral wall of support column (1), the surface swing joint of one end of connecting rod (502) lateral wall and lug (506) is kept away from in movable rod (503), the bottom fixedly connected with fixed plate (504) of connecting rod (502), screw rod (505) have all been run through at four inside corners of fixed plate (504).
CN202221873099.2U 2022-07-20 2022-07-20 Convenient quick detachable unit type scaffold Active CN217759880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221873099.2U CN217759880U (en) 2022-07-20 2022-07-20 Convenient quick detachable unit type scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221873099.2U CN217759880U (en) 2022-07-20 2022-07-20 Convenient quick detachable unit type scaffold

Publications (1)

Publication Number Publication Date
CN217759880U true CN217759880U (en) 2022-11-08

Family

ID=83876458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221873099.2U Active CN217759880U (en) 2022-07-20 2022-07-20 Convenient quick detachable unit type scaffold

Country Status (1)

Country Link
CN (1) CN217759880U (en)

Similar Documents

Publication Publication Date Title
CN104196235B (en) A kind of movable stencil supports truss and constructional method thereof
CN215104737U (en) A assembled support for bridge construction
CN217759880U (en) Convenient quick detachable unit type scaffold
CN214329893U (en) Supporting structure of building construction template
CN201152024Y (en) Oblique wall ledger beam strutting piece
CN212926945U (en) Building site is with scaffold frame of just dismantling
CN216766775U (en) Construction is with pin-connected panel template
CN210737388U (en) Novel template support frame is used in public road bridge roof beam construction
CN210598068U (en) Novel scaffold convenient to install and detach
CN215561956U (en) A hybrid framed bent for construction of city overpass
CN112761305A (en) Concatenation formula bailey piece convenient to equipment
CN215331416U (en) Combined connecting and fixing device for disc-buckle type scaffold
CN220538865U (en) Steel structure support convenient to production and manufacture
CN218668406U (en) Scaffold with safety protection net
CN205531250U (en) Scaffold frame of easily dismantling
CN216681931U (en) Mounting tool for lining wall
CN214786112U (en) Rack track support bed-jig that slides
CN215717199U (en) Steel backing is consolidated with template support of being convenient for adjust to building stand is stupefied
CN218912176U (en) Scaffold arrangement structure
CN216865888U (en) Novel building scaffold fastener structure
CN215254424U (en) Split type scaffold frame that can adjust size
CN216921252U (en) Scaffold
CN220889577U (en) Building construction foundation pit guardrail