CN217741155U - Cable installation adjusting frame for electric power engineering construction - Google Patents

Cable installation adjusting frame for electric power engineering construction Download PDF

Info

Publication number
CN217741155U
CN217741155U CN202221228146.8U CN202221228146U CN217741155U CN 217741155 U CN217741155 U CN 217741155U CN 202221228146 U CN202221228146 U CN 202221228146U CN 217741155 U CN217741155 U CN 217741155U
Authority
CN
China
Prior art keywords
buffering
electric power
paster
engineering construction
power engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221228146.8U
Other languages
Chinese (zh)
Inventor
程明
赵东坡
郑川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Zhongte Power Engineering Co ltd
Original Assignee
Jinan Zhongte Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Zhongte Power Engineering Co ltd filed Critical Jinan Zhongte Power Engineering Co ltd
Priority to CN202221228146.8U priority Critical patent/CN217741155U/en
Application granted granted Critical
Publication of CN217741155U publication Critical patent/CN217741155U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a cable installation alignment jig for electric power engineering construction, including fixed block, buffer spring, buffering paster, the draw-in groove has been seted up to the inner chamber of fixed block, the inner chamber bottom fixedly connected with buffer spring of draw-in groove, buffer spring keeps away from one side fixedly connected with buffering paster of draw-in groove, the chute has been seted up to the inner chamber of buffering paster, buffer spring, buffering paster and chute set up some multiunit parallel symmetric distribution, sets up buffer spring and buffering paster through the inner chamber at the fixed block, when the epaxial nut of rotation regulation, thereby make two sets of fixed blocks can fix and adjust the cable, and buffer spring and buffering paster set up and have certain elasticity to can play the effect of the protection of a buffering when the cable of fixed block to the inner chamber carries out the chucking, make this cable installation alignment jig for electric power engineering construction practical convenient more.

Description

Cable installation adjusting frame for electric power engineering construction
Technical Field
The utility model relates to a cable installation technical field for the electric power engineering construction specifically is a cable installation alignment jig for the electric power engineering construction.
Background
Electric power engineering, i.e. engineering related to the production, transmission, distribution of electric energy, also broadly includes engineering where electricity is used as a power and energy source in a variety of fields. Meanwhile, the power cable has the characteristics of high power supply reliability, no influence from the ground and space buildings, no damage from severe weather, safety, concealment, durability and the like, so that the power cable is more and more widely applied, and therefore, an adjusting frame is adopted in the installation process of the power cable, so that a user can conveniently install the power cable.
For the traditional cable installation adjusting frame, the moving and carrying are inconvenient, the effect of telescopic height adjustment is not achieved, and the cable is not protected in the fixed installation, so that the cable installation adjusting frame is not practical.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cable installation alignment jig for electric power engineering construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a cable installation alignment jig for electric power engineering construction, includes fixed block, buffer spring, and the buffering paster, the draw-in groove has been seted up to the inner chamber of fixed block, the inner chamber bottom fixedly connected with buffer spring of draw-in groove, one side fixedly connected with buffering paster that buffer spring kept away from the draw-in groove, the chute has been seted up to the inner chamber of buffering paster, buffer spring, buffering paster and chute are provided with the parallel symmetric distribution of a few multiunit.
Preferably, the fixed blocks are arranged in two groups and symmetrically distributed, and adjusting shafts are arranged on two sides of each fixed block.
Preferably, the top of regulating spindle is provided with the nut, nut and regulating spindle threaded connection, regulating spindle and nut are provided with two sets of and symmetric distribution altogether.
Preferably, the bottom of fixed block is provided with the telescopic link, the bottom of telescopic link is provided with telescopic cylinder, telescopic cylinder's bottom fixedly connected with cylinder fixing base.
Preferably, the bottom of the cylinder fixing seat is fixedly connected with a base, and the front and the back of the base are provided with fixing screw rods.
Preferably, the bottom of the fixing screw is in threaded connection with a fixing nut, the bottom of the fixing screw is fixedly connected with a fixing cone, and the fixing screw, the fixing nut and the fixing cone are arranged in two groups and are symmetrically distributed.
Preferably, the bottom of base is provided with the rotation axis, the bottom of rotation axis is provided with the universal wheel.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this cable installation alignment jig for electric power engineering construction, thereby conveniently remove the position of carrying needs cable installation for the construction through setting up the universal wheel, through pulling out clamping screw, it is fixed with the ground of cable position for the construction to make fixed awl, thereby it is fixed to make whole device fixed through rotatory fixation nut, thereby it drives the flexible of telescopic link to drive through the flexible cylinder of drive, thereby it makes the fixed block upwards flexible to make by upwards flexible of telescopic link, thereby satisfy the position that the cable installation needs, make this alignment jig have altitude mixture control's effect.
2. This cable installation alignment jig for electric power engineering construction sets up buffer spring and buffering paster through the inner chamber at the fixed block, when the epaxial nut of rotation regulation to make two sets of fixed blocks can fix and adjust the cable, buffer spring and buffering paster's setting has certain elasticity, thereby can carry out the effect of the protection of a buffering when the chucking at the cable of fixed block to the inner chamber, make this cable installation alignment jig for electric power engineering construction practical convenient more.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic structural view of the structural fixing cone of the present invention;
FIG. 3 is a schematic view of the fixing block of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 3 according to the present invention.
In the figure: 1. a fixed block; 101. a card slot; 2. a buffer spring; 3. a buffer patch; 301. a chute; 4. an adjustment shaft; 401. a nut; 5. a telescopic rod; 6. a telescopic cylinder; 7. a cylinder fixing seat; 8. a base; 9. fixing the screw rod; 10. fixing a nut; 11. fixing the cone; 12. a rotating shaft; 13. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b): referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a cable installation alignment jig for electric power engineering construction, includes fixed block 1, buffer spring 2, buffering paster 3, and draw-in groove 101 has been seted up to the inner chamber of fixed block 1, and draw-in groove 101's inner chamber bottom fixedly connected with buffer spring 2, one side fixedly connected with buffering paster 3 that draw-in groove 101 was kept away from to buffer spring 2, and chute 301 has been seted up to buffering paster 3's inner chamber, and buffer spring 2, buffering paster 3 and chute 301 are provided with the parallel symmetric distribution of a few multiunit.
Wherein, fixed block 1 is provided with two sets and symmetric distribution, and the both sides of fixed block 1 are provided with regulating spindle 4.
In this embodiment, this cable installation alignment jig is used in electric power engineering construction, when using, thereby make things convenient for the removal of this equipment to carry the position of needs cable installation for the construction through setting up universal wheel 13, through pulling out clamping screw 9, it is fixed with the ground of construction cable position to make fixed awl 11, thereby it is fixed to make whole device through rotatory fixation nut 10, thereby it is flexible to drive telescopic link 5 through drive telescopic cylinder 6, thereby it upwards stretches out and draws back to make fixed block 1 by upwards stretching out and drawing back of telescopic link 5, thereby satisfy the position that the cable installation needs, make this alignment jig have altitude mixture control's effect.
Wherein, the top of regulating spindle 4 is provided with nut 401, nut 401 and regulating spindle 4 threaded connection, and regulating spindle 4 and nut 401 are provided with two sets of and symmetric distribution altogether.
Wherein, the bottom of fixed block 1 is provided with telescopic link 5, and the bottom of telescopic link 5 is provided with telescopic cylinder 6, and telescopic cylinder 6's bottom fixedly connected with cylinder fixing base 7.
In this embodiment, this cable installation alignment jig for electric power engineering construction, inner chamber through at fixed block 1 sets up buffer spring 2 and buffering paster 3, when the nut 401 on the rotation regulation axle 4, thereby make two sets of fixed blocks 1 can fix and adjust the cable, buffer spring 2 and buffering paster 3's setting has certain elasticity, thereby can carry out the effect of the protection of a buffering when the cable of fixed block 1 to the inner chamber carries out the chucking, make this cable installation alignment jig for electric power engineering construction practical convenient more.
Wherein, the bottom fixedly connected with base 8 of cylinder fixing base 7, the front and the back of base 8 are provided with clamping screw 9.
Wherein, the bottom threaded connection of clamping screw 9 has fixation nut 10, and the bottom fixedly connected with of clamping screw 9 is fixed awl 11, and clamping screw 9, fixation nut 10 and fixed awl 11 are provided with two sets of and symmetric distribution altogether.
Wherein, the bottom of base 8 is provided with rotation axis 12, and the bottom of rotation axis 12 is provided with universal wheel 13.
The working principle is as follows: this cable installation alignment jig for electric power engineering construction, when using, thereby make things convenient for the removal of this equipment to carry the position that needs the cable installation for the construction through setting up universal wheel 13, through pulling out clamping screw 9, make fixed awl 11 fixed with the ground of construction cable position, through rotatory fixation nut 10 and make whole device fixed, thereby it is flexible to drive telescopic link 5 through driving telescopic cylinder 6, thereby make fixed block 1 upwards flexible by upwards flexible of telescopic link 5, thereby satisfy the position that the cable installation needs, make this alignment jig have altitude mixture control's effect, through setting up buffer spring 2 and buffering paster 3 at the inner chamber of fixed block 1, when nut 401 on the rotation regulation axle 4, thereby make two sets of fixed blocks 1 can fix and adjust the cable, buffer spring 2 and buffering paster 3's setting has certain elasticity, thereby can play the effect of the protection of a buffering when the cable of inner chamber carries out the chucking at fixed block 1, make this cable installation alignment jig for electric power engineering construction practical convenient more.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a cable installation alignment jig for electric power engineering construction, includes fixed block (1), buffer spring (2), buffering paster (3), its characterized in that: draw-in groove (101) have been seted up to the inner chamber of fixed block (1), inner chamber bottom fixedly connected with buffer spring (2) of draw-in groove (101), one side fixedly connected with buffering paster (3) of draw-in groove (101) are kept away from in buffer spring (2), chute (301) have been seted up to the inner chamber of buffering paster (3), buffer spring (2), buffering paster (3) and chute (301) are provided with some multiunit parallel symmetric distribution.
2. The cable mounting and adjusting frame for electric power engineering construction according to claim 1, characterized in that: the fixed block (1) is provided with two sets of symmetrical distribution, and the both sides of fixed block (1) are provided with regulating spindle (4).
3. The cable mounting and adjusting frame for electric power engineering construction as claimed in claim 2, wherein: the top of regulating spindle (4) is provided with nut (401), nut (401) and regulating spindle (4) threaded connection, regulating spindle (4) and nut (401) are provided with two sets of and symmetric distribution altogether.
4. The cable mounting and adjusting frame for electric power engineering construction according to claim 1, characterized in that: the bottom of fixed block (1) is provided with telescopic link (5), the bottom of telescopic link (5) is provided with telescopic cylinder (6), the bottom fixedly connected with cylinder fixing base (7) of telescopic cylinder (6).
5. The cable mounting and adjusting frame for electric power engineering construction as claimed in claim 4, wherein: the bottom fixedly connected with base (8) of cylinder fixing base (7), the front and the back of base (8) are provided with clamping screw (9).
6. The cable mounting and adjusting frame for electric power engineering construction as claimed in claim 5, wherein: the bottom threaded connection of clamping screw (9) has fixation nut (10), the fixed awl (11) of bottom fixedly connected with of clamping screw (9), fixation nut (10) and fixed awl (11) are provided with two sets of and symmetric distribution altogether.
7. The cable mounting and adjusting frame for electric power engineering construction as claimed in claim 5, wherein: the bottom of base (8) is provided with rotation axis (12), the bottom of rotation axis (12) is provided with universal wheel (13).
CN202221228146.8U 2022-05-22 2022-05-22 Cable installation adjusting frame for electric power engineering construction Active CN217741155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221228146.8U CN217741155U (en) 2022-05-22 2022-05-22 Cable installation adjusting frame for electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221228146.8U CN217741155U (en) 2022-05-22 2022-05-22 Cable installation adjusting frame for electric power engineering construction

Publications (1)

Publication Number Publication Date
CN217741155U true CN217741155U (en) 2022-11-04

Family

ID=83835896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221228146.8U Active CN217741155U (en) 2022-05-22 2022-05-22 Cable installation adjusting frame for electric power engineering construction

Country Status (1)

Country Link
CN (1) CN217741155U (en)

Similar Documents

Publication Publication Date Title
CN215344460U (en) Photovoltaic device for adjusting inclination angle of photovoltaic module
CN217741155U (en) Cable installation adjusting frame for electric power engineering construction
CN106711853A (en) Vibration damper reset machine
CN219960453U (en) Support of auxiliary maintenance photovoltaic power station
CN209134353U (en) The adjustment structure of round brush
CN209919707U (en) Novel protection of electrical component device
CN221447966U (en) Cable erection device for electromechanical installation
CN220527216U (en) Novel convenient and fast adjusting conducting rod mechanism of diamond wire equipment
CN209515882U (en) A kind of battery, which is remodeled, automatically adjusts mechanical unit
CN220317070U (en) Semi-ring wind power tower lifting device
CN215581012U (en) Photovoltaic power generation board fixing device
CN213937680U (en) Power plant motor overhauls equipment convenient to operation
CN219087056U (en) Solar generator with adjustable illumination angle
CN220754248U (en) Electric wire installation support tripod
CN221329124U (en) Microphone fixing structure
CN110299890A (en) Photovoltaic plate bracing frame
CN219937703U (en) Mounting structure of distribution box
CN201746029U (en) Autorotation device of coating assembly line
CN211733704U (en) Radial shaft cylinder transmission mechanism
CN219477887U (en) Photovoltaic power generation assembly
CN215452189U (en) Novel distribution box of wall-mounted support
CN215835363U (en) Take cup joint formula pivot of solar rack
CN215772321U (en) Cable protection device
CN220341880U (en) Circuit bottle lifting frame
CN220173829U (en) Cotton picker fixing base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant