CN217734019U - Pile extension positioning device for soft geological prestressed concrete pile - Google Patents

Pile extension positioning device for soft geological prestressed concrete pile Download PDF

Info

Publication number
CN217734019U
CN217734019U CN202221221701.4U CN202221221701U CN217734019U CN 217734019 U CN217734019 U CN 217734019U CN 202221221701 U CN202221221701 U CN 202221221701U CN 217734019 U CN217734019 U CN 217734019U
Authority
CN
China
Prior art keywords
hoop
footboard
pile
prestressed concrete
hoop board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221221701.4U
Other languages
Chinese (zh)
Inventor
童传锟
张剑平
许�鹏
施俊
顾先锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingshui Rongguo Liang Construction Engineering Co ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202221221701.4U priority Critical patent/CN217734019U/en
Application granted granted Critical
Publication of CN217734019U publication Critical patent/CN217734019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a weak geology prestressed concrete pile is with pile extension positioner, including supporting platform and direction staple bolt, supporting platform includes the footboard, and the notch of stepping down has been seted up to the upper surface of footboard, and the last fixed surface of footboard is connected with the carrier block, and the side slip of carrier block is inserted and is equipped with the telescopic link, and the hoist and mount screw hole has been seted up to the tip fixedly connected with location staple bolt of telescopic link, the upper surface of footboard, the direction staple bolt includes first hoop board and second hoop board, and the side of first hoop board and second hoop board is run through to be inserted and is equipped with first adjusting bolt, and a plurality of welding window have all been seted up on the surface of first hoop board and second hoop board. This positioner is through setting up the footboard to utilize the location staple bolt to connect footboard and pile body surface, the footboard forms work platform at weak subaerial, supplies the staff to stand, conveniently realizes the pile extension location to pile body butt joint department installation direction staple bolt, and makes things convenient for operations such as welding, makes things convenient for people's work greatly, improves work efficiency.

Description

Pile extension positioning device for soft geological prestressed concrete pile
Technical Field
The utility model relates to a construction technical field specifically is a weak geology prestressed concrete pile is with pile extension positioner.
Background
The pile foundation technical specification and the construction quality acceptance specification GB50202-2002 of the building foundation engineering all have requirements: for large diameter piles, the height of the pile top entering the bearing platform is not smaller than 100mm, for medium diameter piles, the height of the pile top entering the bearing platform is not smaller than 50mm, the large diameter piles are larger than or equal to 800mm, the medium diameter piles are smaller than 800mm, the small diameter piles are smaller than 250 mm, and the deviation of the pile top elevation is 50mm. The piling must be done strictly under the specification requirements below the design of the pile top 50.
At present, the guide hoop is generally utilized to bind and position during pile splicing, the dislocation deviation of the upper pile head and the lower pile head is guaranteed to be not more than 2mm, then spot welding is carried out at the butt joint part for fixation, the guide hoop is taken down for layered welding until full welding, however, when pile sinking ground is weak, a worker can not conveniently stand on the ground and walk, the guide hoop is assembled and disassembled, welding is difficult to carry out, the working efficiency is low, and the pile splicing positioning device for the weak geological prestressed concrete pile is provided by the application aiming at the current situation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a weak geology prestressed concrete pile is with pile extension positioner to solve the problem that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a weak geology prestressed concrete stake is with pile extension positioner, includes supporting platform and direction staple bolt, supporting platform includes the footboard, and the notch of stepping down has been seted up to the upper surface of footboard, and the last fixed surface of footboard is connected with the carrier block, and the side slip of carrier block is inserted and is equipped with the telescopic link, and the tip fixedly connected with location staple bolt of telescopic link, hoist and mount screw hole have been seted up to the upper surface of footboard, the direction staple bolt includes first hoop board and second hoop board, and the side of first hoop board and second hoop board is run through and is inserted and be equipped with first adjusting bolt, and a plurality of welding windows have all been seted up on the surface of first hoop board and second hoop board.
Preferably, the upper surface of footboard is seted up the installation screw hole to install the connection bridge plate through the bolt in installation screw hole department, the connection bridge plate spans the notch of stepping down.
Preferably, a nut is installed on the surface of the first adjusting bolt in a threaded manner, so that the first hoop plate and the second hoop plate are tightly held at the butt joint, wherein the butt joint is the joint of the ends of the upper pile body and the lower pile body.
Preferably, the positioning hoop comprises a third hoop plate and a fourth hoop plate, rubber gaskets are fixedly mounted on the inner surfaces of the third hoop plate and the fourth hoop plate, a second adjusting bolt penetrates through the side surfaces of the third hoop plate and the fourth hoop plate, and the third hoop plate and the fourth hoop plate are tightly held on the surface of the lower pile body through tightening of the second adjusting bolt.
Preferably, the quantity of carrier block is two, and two carrier block symmetries set up the upper surface at the footboard to be located the both sides of the notch of stepping down, every carrier block sliding connection has a set of telescopic link, and the quantity of every group telescopic link is two at least, and the tip of two sets of telescopic links is connected with the fixed surface of third hoop board and fourth hoop board respectively.
Preferably, the number of the hoisting threaded holes is four, and the four hoisting threaded holes are respectively arranged at four corners of the pedal.
Advantageous effects
The utility model provides a weak geology prestressed concrete pile is with pile extension positioner possesses following beneficial effect:
1. this weak geology prestressed concrete pile is with pile extension positioner is through setting up the footboard to utilize the location staple bolt to connect footboard and pile body surface, the footboard forms work platform at weak subaerial, supplies the staff to stand, conveniently realizes pile extension location to pile body butt joint installation direction staple bolt, and makes things convenient for operations such as welding, makes things convenient for people's work greatly, improves work efficiency.
2. This weak geology prestressed concrete pile is with pile extension positioner, through be provided with the notch of stepping down on the footboard, make the footboard place around the pile foundation, utilize detachable to connect the bridge plate and install on the footboard, seal the notch of stepping down, it makes things convenient for people's walking more complete to make things convenient for the footboard, at its internally mounted hoist and mount ring, the convenient hoist and mount to the footboard, reach the effect of the handling of being convenient for, through being provided with the welding window on location staple bolt surface, it is pre-fixed to carry out spot welding to pile body butt joint position in welding window department, then dismantle the direction staple bolt, full welding again, thereby realize making things convenient for welded effect.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
fig. 2 is a schematic view of the overlooking structure of the positioning hoop of the present invention;
fig. 3 is a schematic view of the pedal of the present invention.
In the figure: the device comprises a guide hoop 1, a pedal 2, a abdicating notch 3, a bearing block 4, a telescopic rod 5, a positioning hoop 6, a hoisting threaded hole 7, a first hoop plate 8, a second hoop plate 9, a first adjusting bolt 10, a welding window 11, a threaded mounting hole 12, a connecting bridge plate 13, a third hoop plate 15, a fourth hoop plate 16, a second adjusting bolt 17, an upper pile body 18 and a lower pile body 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a weak geology prestressed concrete pile is with pile extension positioner, including supporting platform and direction staple bolt 1, supporting platform includes footboard 2, notch 3 of stepping down has been seted up to the upper surface of footboard 2, installation screw hole 12 has been seted up to the upper surface of footboard 2, and install connection bridge plate 13 through the bolt in installation screw hole 12 department, connection bridge plate 13 spans notch 3 of stepping down, through be provided with notch 3 of stepping down on footboard 2, make footboard 2 can place around the pile foundation, utilize detachable connection bridge plate 13 to install on footboard 2, seal notch 3 of stepping down, make footboard 2 more complete make things convenient for people to walk, hoist and mount screw hole 7 has been seted up to the upper surface of footboard 2, the quantity of hoist and mount screw hole 7 is four, four hoist and mount screw hole 7 set up respectively in footboard 2's four corners department, through setting up hoist and mount screw hole 7, at its inside installation hoist and mount ring, the convenient hoist and mount to footboard 2.
The direction staple bolt 1 includes first hoop board 8 and second hoop board 9, the side of first hoop board 8 and second hoop board 9 is run through and is inserted and be equipped with first adjusting bolt 10, surface thread mounting nut at first adjusting bolt 10, make first hoop board 8 and second hoop board 9 hold the butt joint department tightly, the butt joint department is the end junction of pile body 18 and lower pile body 19, a plurality of welding window 11 have all been seted up on the surface of first hoop board 8 and second hoop board 9, through setting up welding window 11 on 6 surfaces of location staple bolt, it is pre-fixed to carry out spot welding in welding window 11 department to pile body butt joint position, then dismantle direction staple bolt 1, full weld again, thereby realize the effect of convenient welding.
The upper surface fixedly connected with carrier block 4 of footboard 2, the side of carrier block 4 slides and inserts and be equipped with telescopic link 5, the tip fixedly connected with location staple bolt 6 of telescopic link 5, location staple bolt 6 includes third hoop 15 and fourth hoop 16, the equal fixed mounting of internal surface of third hoop 15 and fourth hoop 16 has the rubber gasket, the cartridge has been run through to the side of third hoop 15 and fourth hoop 16, third hoop 15 and fourth hoop 16 tighten up through second adjusting bolt 17 and hold tightly the surface at lower pile body 19, the quantity of carrier block 4 is equal two, two carrier block 4 symmetries set up the upper surface at footboard 2, and be located the both sides of the notch 3 of stepping down, every carrier block 4 sliding connection has a set of telescopic link 5, the quantity of every group telescopic link 5 is two at least, the tip of two sets of telescopic links 5 is connected with the external surface fixed of third hoop 15 and fourth hoop 16 respectively.
Through setting up footboard 2 to utilize location staple bolt 6 to connect footboard 2 and pile body surface, footboard 2 forms work platform at weak subaerial, supplies the staff to stand, conveniently realizes the pile extension location to pile body butt joint department installation direction staple bolt 1, and makes things convenient for people's work greatly, improves work efficiency.
The installation of footboard 2, two lamellas of location staple bolt 6 slide to both sides and part, install rings in hoist and mount screw hole 7, it is around lower pile body 19 with the hoist and mount, and place subaerial, make lower pile body 19 be located the notch of stepping down 3, location staple bolt 6 hugs closely on lower pile body 19 surface, then installation connection bridge plate 13, the staff stands on footboard 2, go up pile body 18 handling to lower pile body 19 top, install direction staple bolt 1 in its butt joint department, make the butt joint department of upper pile body 18 and lower pile body 19 align, then through in welding window 11 department, carry out spot welding preliminary fixation with butt joint department, then dismantle direction staple bolt 1, the butt joint department carries out the layering welding again, until full welding, use the footboard 2 can dismantle the handling and move away, thereby make the device have the function of auxiliary pile positioning, it is convenient to use, the operation of staff has greatly made things convenient for.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a weak geology prestressed concrete pile is with pile extension positioner, includes supporting platform and direction staple bolt (1), its characterized in that: support platform includes footboard (2), and notch (3) of stepping down has been seted up to the upper surface of footboard (2), and the last fixed surface of footboard (2) is connected with carrier block (4), and the side slip of carrier block (4) is inserted and is equipped with telescopic link (5), and tip fixedly connected with location staple bolt (6) of telescopic link (5), and hoist and mount screw hole (7) have been seted up to the upper surface of footboard (2), direction staple bolt (1) is including first hoop board (8) and second hoop board (9), and the side of first hoop board (8) and second hoop board (9) is run through and is inserted and is equipped with first adjusting bolt (10), and a plurality of welding window (11) have all been seted up on the surface of first hoop board (8) and second hoop board (9).
2. A pile extension positioning device for a soft geological prestressed concrete pile according to claim 1, characterized in that: installation screw hole (12) have been seted up to the upper surface of footboard (2) to install connection bridge plate (13) through the bolt in installation screw hole (12) department, connection bridge plate (13) span notch of stepping down (3).
3. A pile extension positioning device for a soft geological prestressed concrete pile, according to claim 2, characterized in that: and (3) mounting a nut on the surface of the first adjusting bolt (10) in a threaded manner, so that the first hoop plate (8) and the second hoop plate (9) tightly hold a butt joint, wherein the butt joint is the joint of the ends of the upper pile body (18) and the lower pile body (19).
4. A pile extension positioning device for a prestressed concrete pile for weak geology according to claim 3, characterized in that: the positioning hoop (6) comprises a third hoop plate (15) and a fourth hoop plate (16), rubber gaskets are fixedly mounted on the inner surfaces of the third hoop plate (15) and the fourth hoop plate (16), a second adjusting bolt (17) penetrates through the side faces of the third hoop plate (15) and the fourth hoop plate (16), and the third hoop plate (15) and the fourth hoop plate (16) tightly hold the surface of a lower pile body (19) through tightening of the second adjusting bolt (17).
5. A pile extension positioning device for a soft geological prestressed concrete pile according to claim 4, characterized in that: the quantity of carrier block (4) is two, and two carrier block (4) symmetry sets up the upper surface at footboard (2) to be located the both sides of notch (3) of stepping down, every carrier block (4) sliding connection has a set of telescopic link (5), and the quantity of every group telescopic link (5) is two at least, the tip of two sets of telescopic links (5) respectively with the outer fixed surface of third hoop board (15) and fourth hoop board (16) be connected.
6. A pile extension positioning device for a soft geological prestressed concrete pile according to claim 5, characterized in that: the number of the hoisting threaded holes (7) is four, and the four hoisting threaded holes (7) are respectively arranged at four corners of the pedal (2).
CN202221221701.4U 2022-05-19 2022-05-19 Pile extension positioning device for soft geological prestressed concrete pile Active CN217734019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221221701.4U CN217734019U (en) 2022-05-19 2022-05-19 Pile extension positioning device for soft geological prestressed concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221221701.4U CN217734019U (en) 2022-05-19 2022-05-19 Pile extension positioning device for soft geological prestressed concrete pile

Publications (1)

Publication Number Publication Date
CN217734019U true CN217734019U (en) 2022-11-04

Family

ID=83835572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221221701.4U Active CN217734019U (en) 2022-05-19 2022-05-19 Pile extension positioning device for soft geological prestressed concrete pile

Country Status (1)

Country Link
CN (1) CN217734019U (en)

Similar Documents

Publication Publication Date Title
CN111593666A (en) Bent cap hoop mounting platform and integral beam hoop mounting process
CN217734019U (en) Pile extension positioning device for soft geological prestressed concrete pile
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN213741552U (en) Roof rooting suspender suspension type multilayer air corridor
CN108194107B (en) Composite rubber vertical rod telescopic plug plate mechanism and application method thereof
CN211396543U (en) Telescopic channel steel cantilever beam device
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN108221702B (en) Integral lifting device for arch rib of inward-tilting steel box arch bridge
CN115788083A (en) Automatic quick installation correcting unit of steel column
CN214033785U (en) Unilateral template braced system
CN201321723Y (en) Steel column none-cable wind rope correcting structure
CN211945901U (en) Adjustable steel reinforcement cage lifting appliance
CN111424708B (en) Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
CN208472690U (en) A kind of cushion cap system
CN209990015U (en) House building steel constructs roof beam
CN112523258A (en) Portable single-side formwork supporting system and construction method thereof
CN217629901U (en) Steel reinforcement cage suspension device
CN218406025U (en) Assembled prefabricated construction
CN110714653A (en) Tower structure and method for distribution line water area emergency training
CN213387443U (en) Clamp for improving installation of stiff steel column
CN219080931U (en) Tool type buttress triangular protection device for close-spliced prefabricated outer wall
CN214169486U (en) Stand module of prefabricated building
CN211644415U (en) Special tower crane for wind power installation
CN212866373U (en) Large-size connecting plate mounting assembly for beam column node
CN219195934U (en) Tubular pile butt joint fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240605

Address after: 741400 Shop No. 61, Caochuan Road Intersection, Yongqing Town, Qingshui County, Tianshui City, Gansu Province

Patentee after: Qingshui Rongguo Liang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 410000 No. 158 Zhongyi Road, Yuhua District, Changsha, Hunan

Patentee before: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

Country or region before: China