CN217734012U - Pile foundation construction platform on water - Google Patents
Pile foundation construction platform on water Download PDFInfo
- Publication number
- CN217734012U CN217734012U CN202221152466.XU CN202221152466U CN217734012U CN 217734012 U CN217734012 U CN 217734012U CN 202221152466 U CN202221152466 U CN 202221152466U CN 217734012 U CN217734012 U CN 217734012U
- Authority
- CN
- China
- Prior art keywords
- water
- well accuse
- platform
- pile foundation
- foundation construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 43
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 241000406668 Loxodonta cyclotis Species 0.000 claims abstract description 12
- 238000002347 injection Methods 0.000 claims abstract description 8
- 239000007924 injection Substances 0.000 claims abstract description 8
- 238000005188 flotation Methods 0.000 claims abstract 10
- 238000007689 inspection Methods 0.000 claims description 4
- 239000004566 building material Substances 0.000 description 3
- DMBHHRLKUKUOEG-UHFFFAOYSA-N diphenylamine Chemical compound C=1C=CC=CC=1NC1=CC=CC=C1 DMBHHRLKUKUOEG-UHFFFAOYSA-N 0.000 description 3
- 239000000243 solution Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model relates to a photovoltaic construction technical field, and pile foundation construction platform on water is disclosed, including well accuse platform, three flotation pontoon, "worker" style of calligraphy frame, a plurality of lift tower hangers, four elephant legs, four hoists and four propellers, the fixed intercommunication pipeline that is equipped with interconnect of one end of three flotation pontoon, the equal fixed mounting of three flotation pontoon in the inside of well accuse platform, the top that the top of well accuse platform was fixed respectively to be equipped with is provided with generator position and hydraulic press position, the top that is located the top flotation pontoon is provided with the water injection pump water inlet, the top that is located the bottom flotation pontoon is provided with the drain pump delivery port, four elephant leg fixed mounting in the four corners department of well accuse platform, four propellers are fixed mounting around the bottom of well accuse platform respectively, "worker" style of calligraphy frame fixed mounting in the top of well accuse platform. The utility model discloses the staff of being convenient for is under construction to the foundation pile at the surface of water, and construction platform's steadiness is strong, has improved the efficiency of construction.
Description
Technical Field
The utility model relates to a photovoltaic construction technical field especially relates to pile foundation construction platform on water.
Background
With the rapid development of the photovoltaic industry, the regional selection of the photovoltaic industry is limited by more conditions, and the sites are more and more selected in mountainous regions, water and other places with complex environments.
At present, when the photovoltaic support is arranged on water, foundation piles need to be driven into an underwater soil layer, and great difficulty is brought to construction of the foundation piles in photovoltaic engineering construction, so that a water pile foundation construction platform needs to be provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that photovoltaic construction strength is large in the prior art, and the pile foundation construction platform on water that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the overwater pile foundation construction platform comprises a central control platform, three floating barrels, an I-shaped frame, a plurality of lifting suspension towers, four elephant legs, four winches and four propellers, wherein one ends of the three floating barrels are fixedly provided with communicated pipelines which are connected with each other, the three floating barrels are fixedly installed inside the central control platform, the tops of the central control platform are fixedly provided with a generator position and a hydraulic machine position respectively, the tops of the floating barrels are provided with water injection pump water inlets, the bottoms of the floating barrels are provided with water discharge pump water outlets, the four elephant legs are fixedly installed at four corners of the central control platform, the four winches are fixedly installed at four corners of the top of the central control platform and drive the elephant legs to move, the four propellers are fixedly installed around the bottom of the central control platform respectively, the I-shaped frame is fixedly installed at the top of the central control platform, and the plurality of lifting suspension towers are arranged at the top of the I-shaped frame.
Preferably, the top of the I-shaped frame is provided with a walking vehicle, and the lifting tower crane is fixedly arranged at the bottom of the walking vehicle.
Preferably, a buoy inspection hole is formed in the top of the buoy in the middle.
Preferably, the top of the center console is also fixedly provided with a Beidou positioning coordinate base point and a double-shaft tilt angle sensor.
Preferably, the floating barrel is positioned in the middle and protrudes outwards.
Preferably, four of the elephant legs are automatically controlled to be horizontally supported by the two-axis tilt sensor.
Preferably, a plurality of uniformly distributed electric rammers are arranged around the top of the center console.
Compared with the prior art, the utility model provides a pile foundation construction platform on water possesses following beneficial effect:
1. according to the overwater pile foundation construction platform, the floating barrel is lifted and sunk by water injection or drainage energy through the floating barrel arranged in the middle of the central control platform, the water level is injected or drained according to the water level during construction, and the water injection is stopped to enable the central control platform to descend so as to prevent wind waves; and the propeller arranged at the bottom of the central console can push the central console to move forwards on the water surface, so that the central console is moved to the water surface construction site.
2. This pile foundation construction platform on water through setting up like leg and the hoist engine in well accuse platform four corners department, the hoist engine rotates clockwise can rise like the leg, and the hoist engine rotates anticlockwise will like the leg decline to increase the steadiness of well accuse platform.
3. This pile foundation construction platform on water through setting up the lift tower crane at "worker" font frame top, and the lift tower crane can carry out the handling to the construction building materials, and the lift tower crane removes at "worker" font frame top through the travelling car to can be with the remote handling of building materials.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses the staff of being convenient for is under construction to the foundation pile at the surface of water, and construction platform's steadiness is strong, has improved the efficiency of construction.
Drawings
Fig. 1 is a schematic structural view of an above-water pile foundation construction platform provided by the utility model;
FIG. 2 is a schematic top view of the console shown in FIG. 1;
fig. 3 is a schematic structural view of the elephant leg folding device provided by the utility model;
FIG. 4 is a schematic view of the elephant leg support structure proposed by the present invention;
fig. 5 is an enlarged view of a portion a of fig. 4.
In the figure: 1. a center console; 2. a float bowl; 3. a communicating pipe; 4. a generator location; 5. a hydraulic machine position; 6. a water inlet of the water injection pump; 7. a water outlet of the draining pump; 8. like a leg; 9. an I-shaped frame; 10. a hoist; 11. lifting the tower crane; 12. a propeller; 13. a walking vehicle; 14. an electric rammer; 15. a buoy inspection hole; 16. a dual-axis tilt sensor; 17. and a Beidou positioning coordinate base point.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-5, the overwater pile foundation construction platform comprises a central control platform 1, three buoys 2, an I-shaped frame 9, a plurality of lifting towers 11, four elephant legs 8, four winches 10 and four propellers 12, wherein one ends of the three buoys 2 are fixedly provided with mutually connected communication pipelines 3, the three buoys 2 are all fixedly arranged inside the central control platform 1, and the buoys 2 in the middle are arranged in a protruding manner; the top of the central console 1 is respectively and fixedly provided with a generator position 4 and a hydraulic machine position 5, the top of the top buoy 2 is provided with a water injection pump water inlet 6, the top of the bottom buoy 2 is provided with a drainage pump water outlet 7, and water is injected or drained by utilizing the water injection pump water inlet 6 and the drainage pump water outlet 7, so that the central console 1 ascends and descends; a buoy inspection hole 15 is formed in the top of the middle buoy 2; four elephant legs 8 are fixedly mounted at four corners of the central console 1, four winches 10 are fixedly mounted at four corners of the top of the central console 1 and drive the elephant legs 8 to move, four propellers 12 are respectively and fixedly mounted around the bottom of the central console 1, a plurality of uniformly distributed electric rammers 14 are arranged around the top of the central console 1, and the electric rammers 14 can hammer the foundation pile.
The I-shaped frame 9 is fixedly arranged at the top of the central control platform 1, the lifting hoisting towers 11 are all arranged at the top of the I-shaped frame 9, the traveling vehicle 13 is arranged at the top of the I-shaped frame 9, the lifting hoisting towers 11 are fixedly arranged at the bottom of the traveling vehicle 13, and the lifting hoisting towers 11 move at the top of the I-shaped frame 9 through the traveling vehicle 13, so that the building materials can be hoisted remotely.
The top of well accuse platform 1 still fixed mounting has big dipper location coordinate basic point 17 and biax angular transducer 16, and big dipper location coordinate basic point 17 is used for installing the big dipper locator, can be used for fixing a position construction platform, and four like legs 8 all support through 16 automatic control levels of biax angular transducer.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. Pile foundation construction platform on water, including well accuse platform (1), three flotation pontoon (2), "worker" font frame (9), a plurality of lift tower crane (11), four like legs (8), four hoist engine (10) and four propeller (12), its characterized in that, it is three the fixed intercommunication pipeline (3) that are equipped with interconnect of one end of flotation pontoon (2), it is three equal fixed mounting in flotation pontoon (2) in the inside of well accuse platform (1), the top of well accuse platform (1) is fixed the top that is equipped with respectively is provided with generator position (4) and hydraulic machine position (5), is located the top of flotation pontoon (2) is provided with water injection pump water inlet (6), is located the bottom the top of flotation pontoon (2) is provided with drain pump delivery port (7), four like legs (8) fixed mounting in the four corners department of well accuse platform (1), four hoist engine (10) fixed mounting in the four corners department of top of well accuse platform (1) drives like legs (8) remove, four propeller (12) fixed mounting respectively in well accuse platform (1) all around the font frame (9) the top of many word tower crane (11) set up in the equal top of a plurality of hoist tower crane (11) sets up in the top of well accuse platform (11).
2. The water pile foundation construction platform according to claim 1, wherein a walking vehicle (13) is mounted at the top of the I-shaped frame (9), and the lifting tower crane (11) is fixedly mounted at the bottom of the walking vehicle (13).
3. The water pile foundation construction platform according to claim 1, characterized in that a pontoon inspection hole (15) is provided at the top of the pontoon (2) at the middle portion.
4. The water pile foundation construction platform according to claim 1, wherein a Beidou positioning coordinate base point (17) and a double-shaft inclination angle sensor (16) are fixedly mounted at the top of the central console (1).
5. The water pile foundation construction platform of claim 1, wherein the buoys (2) are arranged in the middle in a protruding manner.
6. The aquatic pile foundation construction platform according to claim 4, wherein four elephant legs (8) are each automatically controlled horizontally supported by the two-axis tilt sensor (16).
7. The overwater pile foundation construction platform according to claim 1, characterized in that a plurality of uniformly distributed electric rammers (14) are arranged around the top of the central console (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221152466.XU CN217734012U (en) | 2022-05-13 | 2022-05-13 | Pile foundation construction platform on water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221152466.XU CN217734012U (en) | 2022-05-13 | 2022-05-13 | Pile foundation construction platform on water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217734012U true CN217734012U (en) | 2022-11-04 |
Family
ID=83836374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221152466.XU Expired - Fee Related CN217734012U (en) | 2022-05-13 | 2022-05-13 | Pile foundation construction platform on water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217734012U (en) |
-
2022
- 2022-05-13 CN CN202221152466.XU patent/CN217734012U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107542101B (en) | Construction method of offshore four-buoy-buoyancy tank combined foundation structure | |
CN109629568A (en) | The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating | |
CN111661273B (en) | Installation and construction method of deep and open sea semi-submersible fan | |
CN201695381U (en) | Three-cylindrical foundation one-legged mooring platform | |
CN101837929B (en) | Operation method for lifting fan for barge in shoal area | |
JP2004001750A (en) | Special working ship and execution method for offshore structure | |
CN112726548B (en) | Construction method for split jacket foundation of deep-open sea converter station | |
EP3276086A1 (en) | Gravity foundation for the installation of offshore wind turbines | |
CN208167744U (en) | A kind of boom hoisting for Overwater floating job platform decentralization pile foundation steel pile casting | |
CN218506092U (en) | C-shaped assembly type floating transportation structure for split floating transportation of offshore substation | |
CN115787645A (en) | Quick pile sinking construction process for four-pile jacket foundation by offshore wind power deepwater pile-first method | |
CN114370041A (en) | Basic platform of offshore converter station | |
CN113417808A (en) | Pontoon suitable for single pile foundation and floating fan combined structure system | |
CN217734012U (en) | Pile foundation construction platform on water | |
JP2012112370A (en) | Ship for installing offshore wind turbine and method for installing offshore wind turbine using the same | |
JP2606799B2 (en) | Installation method of marine platform | |
CN115704209A (en) | Shallow water area offshore platform installation method | |
CN209816899U (en) | Floating pile-stabilizing platform for construction of steel pipe piles of offshore jacket type fan foundation | |
CN2559685Y (en) | Self-mounting marine fixed platform | |
CN112227400A (en) | Construction method of embedded bearing platform | |
TW202106602A (en) | Work ship having tower crane and crane operating method therefor | |
CN214219658U (en) | Floating type guide frame for wind power pile construction | |
CN87103253A (en) | The scene suspention job practices of open caisson and coffer work | |
KR102645338B1 (en) | Subsea space platform elevating system | |
WO2024189945A1 (en) | Lifting auxiliary device, lifting system, disassembling method, and installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221104 |