CN217733783U - Double-guide-beam type bridging rack - Google Patents
Double-guide-beam type bridging rack Download PDFInfo
- Publication number
- CN217733783U CN217733783U CN202221903144.4U CN202221903144U CN217733783U CN 217733783 U CN217733783 U CN 217733783U CN 202221903144 U CN202221903144 U CN 202221903144U CN 217733783 U CN217733783 U CN 217733783U
- Authority
- CN
- China
- Prior art keywords
- fixed mounting
- transmission case
- frame
- wire rope
- transmission shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a two nose girder formula frame of building bridge relates to beam type frame of building bridge technical field, specifically is a two nose girder formula frame of building bridge, including the carriage, the top fixed mounting of carriage has the connecting plate, the top fixed mounting of connecting plate has a supporting beam, fixed mounting has a fixed box in the middle of the top of a supporting beam, one side fixed mounting of fixed box has first transmission case, top one side fixed mounting of first transmission case has the connecting seat. This two guide beam formula frame of building bridge through first transmission case, connecting seat, a servo motor, the wire rope reel, wire rope, link, electric telescopic handle, propelling movement post, connecting block, connecting axle, connecting rod, axis of rotation, sliding tray and the cooperation setting of pressing from both sides tight frame, can carry out quick fixed the hoisting to the piece of girder at the in-process that uses to the effect that increases the efficiency of construction of engineering has been played, and reached the purpose that reduces the potential safety hazard in the construction.
Description
Technical Field
The utility model relates to a beam type frame of building bridge technical field specifically is a two nose beam type frame of building bridge.
Background
Constructing a bridge, namely constructing the bridge according to design contents; the bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass through, and is also extended to be a building which spans mountain stream, unfavorable geology or is erected to meet other traffic requirements to enable the bridge to pass through more conveniently in order to adapt to the modern high-speed developed traffic industry.
When current bridge girder erection machine functions, transport prefabricated beam piece to needs with the pier department of establishing earlier, need some technical staff to go up to the beam piece fixed with wire rope afterwards, this process is not only wasted time and energy, also brings the risk for technical staff's personal safety moreover, has very big potential safety hazard, and influences the engineering progress.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a two nose girder formula frame of bridging has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a two guide beam formula frame of building bridge, includes the carriage, the top fixed mounting of carriage has the connecting plate, the top fixed mounting of connecting plate has a supporting beam, fixed mounting has fixed case in the middle of the top of a supporting beam, one side fixed mounting of fixed case has first transmission case, top one side fixed mounting of first transmission case has the connecting seat, the bottom fixed mounting of connecting seat has a servo motor, a servo motor's output fixed mounting is in the one end of the transmission shaft that is located the installation of one side top of first transmission case, the inside of fixed case is provided with the wire rope reel, the one end of wire rope reel is passed through transmission shaft fixed mounting in the one end of the transmission shaft that is located the installation of one side below of first transmission case, the outside winding of wire rope reel has wire rope, wire rope's one end fixed mounting has the link, the inside fixed mounting of link has electric telescopic handle.
Optionally, the end fixed mounting that stretches out of electric telescopic handle has the propelling movement post, the one end fixed mounting of propelling movement post has the connecting block, one side of connecting block is rotated and is connected with the connecting axle, the outside fixed mounting of connecting axle has the connecting rod.
Optionally, a rotating shaft is fixedly mounted at one end of the connecting shaft, a sliding groove is formed in one end of the connecting frame, a clamping frame is connected to the inside of the sliding groove in a sliding mode, and one end of the rotating shaft is rotatably connected to one side of the clamping frame.
Optionally, a support plate is fixedly mounted on one side of the sliding frame, a second transmission case is fixedly mounted on one side of the support plate, a motor base is fixedly mounted above one side of the second transmission case, and a second servo motor is fixedly mounted on one side of the motor base.
Optionally, the output end of the second servo motor is fixedly mounted at one end of a transmission shaft mounted above one side of the second transmission case, and a movable groove is formed in the bottom of the sliding frame.
Optionally, the internally mounted of activity groove has the stopper, one side of stopper is rotated through the transmission shaft and is connected with the pulley, the axle center department of pulley is through the one end of the transmission shaft of transmission shaft fixed mounting in one side below installation of second transmission case.
(III) advantageous effects
The utility model provides a two nose girder formula frame of bridging possesses following beneficial effect:
1. this two guide beam formula frame of building bridge through first transmission case, connecting seat, a servo motor, the wire rope reel, wire rope, link, electric telescopic handle, propelling movement post, connecting block, connecting axle, connecting rod, axis of rotation, sliding tray and the cooperation setting of pressing from both sides tight frame, can carry out quick fixed the hoisting to the piece of girder at the in-process that uses to the effect that increases the efficiency of construction of engineering has been played, and reached the purpose that reduces the potential safety hazard in the construction.
2. This two girder formula frame of building bridge sets up through the cooperation setting of second transmission case, motor cabinet, second servo motor, activity groove, stopper and pulley, can make the frame bridge machine slide on predetermined track fast at the in-process that uses to play and used more convenient effect, and reached simple structure's purpose.
Drawings
Fig. 1 is a schematic three-dimensional structure of the present invention;
FIG. 2 is a schematic structural view of the front side of the present invention;
FIG. 3 is a schematic structural view of the bottom of the movable frame of the present invention;
FIG. 4 is an enlarged schematic view of the structure of the present invention at A in FIG. 3;
fig. 5 is an enlarged schematic structural diagram of the present invention at B in fig. 3.
In the figure: 1. a carriage; 2. a connecting plate; 3. a support beam; 4. a stationary box; 5. a first transmission case; 6. a connecting seat; 7. a first servo motor; 8. a wire rope drum; 9. a wire rope; 10. a connecting frame; 11. An electric telescopic rod; 12. pushing the column; 13. connecting blocks; 14. a connecting shaft; 15. a connecting rod; 16. a rotating shaft; 17. a sliding groove; 18. a clamping frame; 19. a support plate; 20. a second transmission case; 21. a motor base; 22. a second servo motor; 23. a movable groove; 24. a limiting block; 25. a pulley.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 5, the present invention provides a technical solution: a double-guide-beam type bridging rack comprises a sliding frame 1, a connecting plate 2 is fixedly installed at the top of the sliding frame 1, a supporting beam 3 is fixedly installed at the top of the connecting plate 2, a fixed box 4 is fixedly installed in the middle of the top of the supporting beam 3, a first transmission box 5 is fixedly installed at one side of the fixed box 4, a connecting seat 6 is fixedly installed at one side of the top of the first transmission box 5, a first servo motor 7 is fixedly installed at the bottom of the connecting seat 6, the output end of the first servo motor 7 is fixedly installed at one end of a transmission shaft installed above one side of the first transmission box 5, a steel wire rope reel 8 is arranged inside the fixed box 4, one end of the steel wire rope reel 8 is fixedly installed at one end of the transmission shaft installed below one side of the first transmission box 5 through the transmission shaft, a steel wire rope 9 is wound outside the steel wire rope reel 8, and a connecting frame 10 is fixedly installed at one end of the steel wire rope 9, an electric telescopic rod 11 is fixedly arranged inside a connecting frame 10, a pushing column 12 is fixedly arranged at the extending end of the electric telescopic rod 11, a connecting block 13 is fixedly arranged at one end of the pushing column 12, a connecting shaft 14 is rotatably connected to one side of the connecting block 13, a connecting rod 15 is fixedly arranged outside the connecting shaft 14, a rotating shaft 16 is fixedly arranged at one end of the connecting rod 15, a sliding groove 17 is formed in one end of the connecting frame 10, a clamping frame 18 is slidably connected inside the sliding groove 17, one end of the rotating shaft 16 is rotatably connected to one side of the clamping frame 18, and the beam can be quickly and fixedly lifted in the using process through the matching arrangement of a first transmission case 5, the connecting seat 6, a first servo motor 7, a steel wire rope reel 8, a steel wire rope 9, the connecting frame 10, the electric telescopic rod 11, the pushing column 12, the connecting block 13, the connecting shaft 14, the connecting rod 15, the rotating shaft 16, the sliding groove 17 and the clamping frame 18, thereby the effect of the efficiency of construction of increase engineering has been played, and the purpose of reducing the potential safety hazard in the construction has been reached, one side fixed mounting of carriage 1 has backup pad 19, one side fixed mounting of backup pad 19 has second transmission case 20, one side top fixed mounting of second transmission case 20 has motor cabinet 21, one side fixed mounting of motor cabinet 21 has second servo motor 22, the output fixed mounting of second servo motor 22 is in the one end of the transmission shaft of being located the one side top installation of second transmission case 20, movable slot 23 has been seted up to the bottom of carriage 1, the internally mounted of movable slot 23 has stopper 24, one side of stopper 24 is connected with pulley 25 through the transmission shaft rotation, the axle center department of pulley 25 passes through the one end of the transmission shaft of transmission shaft fixed mounting in one side below of second transmission case 20, through second transmission case 20, motor cabinet 21, second servo motor 22, movable slot 23, stopper 24 and pulley 25's cooperation setting, can make the bridge crane slide on predetermined track fast in the in-process of using, thereby play more convenient effect of use, and reach the simple structure's purpose.
During the use, start second servo motor 22, the output of second servo motor 22 can drive pulley 25 through second transmission case 20 and slide on predetermined track, make carriage 1 remove to suitable position, at this moment start first servo motor 7, the output of first servo motor 7 can drive wire rope reel 8 through first transmission case 5 and rotate in the inside of fixed box 4, make link 10 transfer to suitable position through wire rope 9, at this moment open electric telescopic handle 11, the end that stretches out of electric telescopic handle 11 can drive propelling movement post 12 motion, the one end of propelling movement post 12 can drive the one end motion of connecting rod 15 through its connecting axle 14 of installing in connecting block 13 one side, make the other end of connecting rod 15 drive one side of clamping frame 18 through axis of rotation 16, make clamping frame 18 slide in the inside of sliding tray 17, and then make the bottom of clamping frame 18 can fix the beam piece and hang.
In summary, the following steps: the double-guide-beam type bridging rack is characterized in that a beam piece can be quickly fixed and hoisted in the using process through the matched arrangement of a first transmission box 5, a connecting seat 6, a first servo motor 7, a steel wire rope reel 8, a steel wire rope 9, a connecting frame 10, an electric telescopic rod 11, a pushing column 12, a connecting block 13, a connecting shaft 14, a connecting rod 15, a rotating shaft 16, a sliding groove 17 and a clamping frame 18, so that the construction efficiency of engineering is increased, and the purpose of reducing potential safety hazards in construction is achieved; through the cooperation setting of second transmission case 20, motor cabinet 21, second servo motor 22, activity groove 23, stopper 24 and pulley 25, can make the bridge crane slide on predetermined track fast at the in-process that uses to play convenient effect more of use, and reached simple structure's purpose.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a two nose beam formula frame of building bridge, includes carriage (1), its characterized in that: the utility model discloses a steel wire rope winding machine, including carriage (1), connecting plate (2), the top fixed mounting of connecting plate (2) has a supporting beam (3), fixed mounting has fixed box (4) in the middle of the top of supporting beam (3), one side fixed mounting of fixed box (4) has first transmission case (5), top one side fixed mounting of first transmission case (5) has connecting seat (6), the bottom fixed mounting of connecting seat (6) has first servo motor (7), the output fixed mounting of first servo motor (7) is in the one end of the transmission shaft that is located one side top installation of first transmission case (5), the inside of fixed box (4) is provided with wire rope reel (8), the one end of wire rope reel (8) is through the one end of transmission shaft fixed mounting in the transmission shaft that is located one side below installation of first transmission case (5), the outside winding of wire rope reel (8) has wire rope (9), the one end fixed mounting of wire rope (9) has link (10), the inside fixed mounting of link (10) has electric telescopic handle (11).
2. The dual-girder bridging machine frame of claim 1, wherein: the utility model discloses a propelling movement pole, including electric telescopic handle (11), the end fixed mounting that stretches out of propelling movement pole (11) has propelling movement post (12), the one end fixed mounting of propelling movement post (12) has connecting block (13), one side of connecting block (13) is rotated and is connected with connecting axle (14), the outside fixed mounting of connecting axle (14) has connecting rod (15).
3. The dual-girder bridging machine frame of claim 2, wherein: one end fixed mounting of connecting rod (15) has axis of rotation (16), sliding tray (17) have been seted up to the one end of link (10), the inside sliding connection of sliding tray (17) has clamping frame (18), the one end of axis of rotation (16) is rotated and is connected in one side that clamping frame (18) presss from both sides.
4. The dual-girder bridging machine frame of claim 1, wherein: one side fixed mounting of carriage (1) has backup pad (19), one side fixed mounting of backup pad (19) has second transmission case (20), one side top fixed mounting of second transmission case (20) has motor cabinet (21), one side fixed mounting of motor cabinet (21) has second servo motor (22).
5. The dual-girder bridging machine frame of claim 4, wherein: the output end of the second servo motor (22) is fixedly installed at one end of a transmission shaft installed above one side of the second transmission box (20), and a movable groove (23) is formed in the bottom of the sliding frame (1).
6. The bridge erection frame of claim 5, wherein: the internally mounted of activity groove (23) has stopper (24), one side of stopper (24) is rotated through the transmission shaft and is connected with pulley (25), the axle center department of pulley (25) is through the one end of the transmission shaft of transmission shaft fixed mounting in one side below installation of second transmission case (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221903144.4U CN217733783U (en) | 2022-07-18 | 2022-07-18 | Double-guide-beam type bridging rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221903144.4U CN217733783U (en) | 2022-07-18 | 2022-07-18 | Double-guide-beam type bridging rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217733783U true CN217733783U (en) | 2022-11-04 |
Family
ID=83850153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221903144.4U Active CN217733783U (en) | 2022-07-18 | 2022-07-18 | Double-guide-beam type bridging rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217733783U (en) |
-
2022
- 2022-07-18 CN CN202221903144.4U patent/CN217733783U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201250064Y (en) | Front launching nose type bridge girder erection machine for bridge erection | |
CN217733783U (en) | Double-guide-beam type bridging rack | |
CN215100151U (en) | Double-track EMS (energy management system) aerial conveying trolley | |
CN210315551U (en) | Local convertible single pile embracing pile ware | |
CN111168808A (en) | Intelligent pouring device for precast concrete box girder | |
CN210508299U (en) | Concrete pouring operation rack for building floor slab | |
CN209652772U (en) | Box girder bridge cantilever construction main truss cradle system | |
CN206901613U (en) | A kind of section bar special mobile formula gantry | |
CN216038287U (en) | Wisdom roof beam field is with automatic bale lifting machine of unmanned | |
CN210973617U (en) | Electric hoist bridge crane | |
CN214187661U (en) | Hydraulic template for special-shaped bridge construction | |
CN214828507U (en) | General gantry crane with safety brake | |
CN215798047U (en) | Special crane for grinding roller | |
CN211004232U (en) | Hanging beam crane with floor function | |
CN210262760U (en) | Handling frame is used in bridge maintenance | |
CN217352166U (en) | Anticollision wall template platform truck | |
CN215402644U (en) | Automatic RGV crane for galvanizing production line | |
CN218090565U (en) | Hang basket mounting structure | |
CN214570221U (en) | Electric hoist double-beam crane | |
CN211496629U (en) | Container deep water pier cart mobile device | |
CN211640403U (en) | Intelligent pouring device for precast concrete box girder | |
CN220845192U (en) | Port container crane | |
CN210505297U (en) | Gantry type tipping winch | |
CN217863804U (en) | Electric multifunctional contact net tower wagon | |
CN213834274U (en) | Lifting trolley for walking type self-balancing overpass bridge girder erection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: No. 19 Kuang Road, Changnuo Industrial Zone, Weizhuang Town, Changyuan City, Xinxiang City, Henan Province, 453400 Patentee after: HENAN SHENGYUAN HOISTING MACHINERY Co.,Ltd. Address before: 453700 changnao Industrial Zone, Xinxiang, Henan Province** Patentee before: HENAN SHENGYUAN HOISTING MACHINERY Co.,Ltd. |