CN217711565U - Plastering device for house building - Google Patents

Plastering device for house building Download PDF

Info

Publication number
CN217711565U
CN217711565U CN202221367079.8U CN202221367079U CN217711565U CN 217711565 U CN217711565 U CN 217711565U CN 202221367079 U CN202221367079 U CN 202221367079U CN 217711565 U CN217711565 U CN 217711565U
Authority
CN
China
Prior art keywords
cement
plastering
trowel
base
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221367079.8U
Other languages
Chinese (zh)
Inventor
周国军
许慧文
杜国圣
胡月玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN202221367079.8U priority Critical patent/CN217711565U/en
Application granted granted Critical
Publication of CN217711565U publication Critical patent/CN217711565U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a housing construction plastering unit, including the mechanical float body, the inside of mechanical float body is provided with the material jar, and the top surface of material jar is provided with the discharge mouth, and a side surface of mechanical float body is provided with the elevating platform, and the lift has been cup jointed on the surface of elevating platform, and a side surface of lift is provided with the trowel, and the both sides of trowel all are provided with the baffle, and a side baffle surface of trowel is provided with the drain hole, and the flexible hose has been cup jointed to the inside of drain hole. The utility model discloses a material jar first cement transportation pump of bottom extracts cement and from first shower nozzle blowout, has alleviateed the workman and has laid the work load of cement at the wall, drives the trowel through the lift and reciprocates, trowels spun cement, guarantees to wipe well that cement is smooth level and smooth, draws unnecessary cement from the baffle is inside through second cement transportation pump to send to the material jar inside, reached the function that the cement that drips was recycled.

Description

Plastering device for house building
Technical Field
The utility model relates to an architectural decoration field, in particular to housing construction plastering unit.
Background
As is well known, plastering is a decorative work of the conventional practice of applying mortar to the walls, floors, ceilings and surfaces of a building construction. In some areas of China, also called as 'painting' or 'painting', plastering engineering refers to a system construction process of smearing surface mortar on the surface of a substrate material, having the functions of protecting the substrate and improving the appearance and providing special functions for buildings. The plastering engineering has two major functions: the wall has the advantages that firstly, the wall is protected from being eroded by wind, rain and snow, the moistureproof, weatherproof and heat insulation capabilities of the wall are improved, and the durability and thermal performance of the wall are improved; and secondly, the functions of beautifying, improving indoor sanitary conditions, purifying air, beautifying the environment and improving the living comfort level are realized. According to different construction processes, plastering projects are divided into general plastering, jointing of plain masonry and the like. The general plastering means that lime mortar, cement mixed mortar, polymer cement mortar, gunny knife lime, paper reinforcement lime, gypsum plaster and the like are painted on the wall surface of a building; the decorative plastering means that watery sand stone, chopped stone and the like are smeared on the wall surface of a building. Most of the existing plastering devices also have the problems that the process of cement paving on the wall surface is complicated and difficult, the plastered cement wall surface is difficult to level, the dropped cement is difficult to reuse, and the like.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a housing construction plastering unit.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a housing construction plastering unit, including the mechanical float body, the inside of mechanical float body sets up to cavity, and the inside of mechanical float body is provided with the material jar, the top surface of material jar is provided with the material pouring mouth, a side surface of material jar is provided with the interlayer, a side surface of mechanical float body is provided with the elevating platform, the elevator has been cup jointed on the surface of elevating platform, a side surface of elevator is provided with the trowel, a side surface top of trowel is provided with first shower nozzle, first shower nozzle side surface is provided with first pipe, first pipe communicates with each other with first shower nozzle is inside, the other end of first pipe is close to material jar department and is provided with first cement transportation pump, first pipe runs through inside elevator and first cement transportation pump and extend to the material jar, the both sides of trowel all are provided with the baffle, a side baffle surface of trowel is provided with the hourglass material mouth, and the hourglass material mouth runs through the baffle, the inside of hourglass material mouth has cup jointed flexible hose, flexible hose's one end is connected with the second pipe, the one end of second pipe is provided with the second flexible hose and extends to the interlayer inside the transportation cylinder.
As a preferred technical scheme of the utility model, the bottom of bellows is provided with a supporting bench, a side surface of supporting bench is provided with the second pipe, the bellows communicates with each other with the second pipe is inside, the other end of second pipe is provided with the second shower nozzle.
As a preferred technical scheme of the utility model, the gim peg has been cup jointed in the activity of the flexible hose's trowel one end that is close to, the gim peg has been cup jointed in the activity of the second pipe that is close to pouring hole one end.
As a preferred technical scheme of the utility model, the mechanical float body bottom surface is provided with the base, the inside bottom surface of base is provided with the power, the bottom surface of base is provided with four universal wheel supports, universal wheel support bottom is provided with the universal wheel.
As a preferred technical scheme of the utility model, a side surface of base is provided with two through-holes side by side, the base is close to through-hole one side and is provided with flexible motor, a side surface of flexible motor is provided with two guiding rulers side by side, the guiding ruler runs through and extends to the through-hole outside, one side of flexible motor is provided with the button, the button runs through and extends to the base outside.
As a preferred technical scheme of the utility model, button and flexible motor electric connection, flexible motor and power electric connection, lift and power electric connection, first cement transportation pump and power electric connection, second cement transportation pump and power electric connection.
As an optimal technical scheme of the utility model, the lift is hydraulic stem drive structure.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a material jar bottom's first cement transportation pump extracts cement and from first shower nozzle blowout, has alleviateed the workman and has laid the work load of cement at the wall, drives the trowel through the lift and reciprocates, trowels spun cement, guarantees that the cement that has smeared is smooth level and smooth, draws unnecessary cement from the baffle is inside through second cement transportation pump to send to inside the material jar, reached the function that the cement of drippage is recycled.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the material cylinder of the present invention;
FIG. 3 is a schematic view of the structure of the trowel of the present invention;
FIG. 4 is a side view of the structure of the trowel of the present invention;
fig. 5 is a schematic view of a second catheter structure of the present invention;
fig. 6 is a schematic view of the base structure of the present invention;
in the figure: 1. a plastering machine body; 2. a material cylinder; 3. pouring a material port; 4. an interlayer; 5. a lifting platform; 6. an elevator; 7. a trowel; 8. a first nozzle; 9. a first conduit; 10. a first cement transport pump; 11. a baffle plate; 12. a material leakage port; 13. a flexible hose; 14. a second conduit; 15. a second cement delivery pump; 16. a support table; 17. a base; 18. a universal wheel support; 19. a universal wheel; 20. a guiding rule; 21. a telescopic motor; 22. a button; 23. a power source; 24. and a second spray head.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Wherein like reference numerals refer to like parts throughout.
Example 1
As shown in fig. 1-6, the utility model provides a housing construction plastering unit, including plastering machine body 1, plastering machine body 1's inside sets up to cavity, and plastering machine body 1's inside is provided with material jar 2, the top surface of material jar 2 is provided with material pouring port 3, a side surface of material jar 2 is provided with interlayer 4, a side surface of plastering machine body 1 is provided with elevating platform 5, elevating platform 5's surface has cup jointed lift 6, a side surface of lift 6 is provided with trowel 7, a side surface top of trowel 7 is provided with first shower nozzle 8, 8 a side surface of first shower nozzle is provided with first pipe 9, first pipe 9 communicates with each other with 8 insides of first shower nozzle, the other end of first pipe 9 is close to material jar 2 department and is provided with first cement transportation pump 10, first pipe 9 runs through lift 6 and first cement transportation pump 10 and extends to inside material jar 2, the both sides of trowel 7 all are provided with baffle 11, one side baffle 11 surface of trowel 7 is provided with material leaking port 12, and material leaking port 12 runs through baffle 11, the inside of material leaking cup joints, the one end of second telescopic hose 13 that is provided with second telescopic hose 14 and extends to the second hose 14 one end that is provided with telescopic hose.
Further, a support table 16 is disposed at a bottom end of the flexible hose 13, a second conduit 14 is disposed on a side surface of the support table 16, the flexible hose 13 is communicated with the inside of the second conduit 14, a second nozzle 24 is disposed at the other end of the second conduit 14, the support table 16 is used for supporting the flexible hose 13 and communicating the flexible hose 13 and the second conduit 14, and the second nozzle 24 is used for spraying the recycled cement into the feed cylinder 2 again.
The fixing bolt is movably sleeved at one end, close to the trowel 7, of the telescopic hose 13, the fixing bolt is movably sleeved at one end, close to the material pouring opening 3, of the second conduit 14, and the fixing bolt is used for fixing the telescopic hose 13 and the second conduit 14 to prevent the telescopic hose 13 and the second conduit 14 from falling off.
The bottom end surface of the plastering machine body 1 is provided with a base 17, the inner bottom end surface of the base 17 is provided with a power supply 23, the bottom end surface of the base 17 is provided with four universal wheel supports 18, the bottom ends of the universal wheel supports 18 are provided with universal wheels 19, and the universal wheels 19 enable the plastering machine body 1 to move
One side surface of base 17 is provided with two through-holes side by side, base 17 is close to through-hole one side and is provided with flexible motor 21, one side surface of flexible motor 21 is provided with two guiding rulers 20 side by side, guiding ruler 20 runs through and extends to the through-hole outside, one side of flexible motor 21 is provided with button 22, button 22 runs through and extends to the base 17 outside, press button 22 and start flexible motor 21, flexible motor 21 stretches out guiding ruler 20, guiding ruler 20 is flexible motor 21 stop work behind the touching wall, guiding ruler 20 is used for confirming the distance of wall and plastering machine.
Button 22 and flexible motor 21 electric connection, flexible motor 21 and power 23 electric connection, lift 6 and power 23 electric connection, first cement transportation pump 10 and power 23 electric connection, second cement transportation pump and power 23 electric connection, the power 23 is for flexible motor 21, lift 6, first cement transportation pump 10 and the power 15 power supply of second cement transportation pump, button 22 is used for controlling flexible motor 21 to extend or shorten.
The lifter 6 is of a hydraulic rod driving structure, and the lifter 6 is used for controlling the trowel 7 to move up and down.
It is specific, need install the circuit in the inside of troweling machine body 1 before using, power 23 and flexible motor 21, lift 6, first cement transportation pump 10 and second cement transportation pump 15 carry out electric connection, switch-on 23, move troweling machine body 1 before the wall that needs to plaster, the distance of troweling machine body 1 and wall has been adjusted, make between troweling machine 7 and the wall just can form the distance of the cement of certain thickness, press button 22, start flexible motor 21, flexible motor 21 pushes forward with its inside guiding ruler 20, guiding ruler 20 withstands behind the wall, flexible motor 21 stops work, later the top of guaranteeing guiding ruler 20 in-process of smearing all with the laminating of wall can, pour cement from pouring mouth 3, cement gets into material jar 2 through pouring mouth 3, first cement transportation pump 10 of material jar 2 bottom pumps cement to first shower nozzle 8 through first pipe 9, spout first shower nozzle 8 at the wall again, simultaneously, the removal of troweling machine 7 of lift 6 one side will spout along with the removal of lift 6 will the removal of spouting the surplus cement transportation pipe, the water jet that the second drives the surplus pipe 7 and is pushed into the water jet head 8 through the second surplus pipe 13, make the universal water jet that the troweling machine body 13 and the surplus mud is pushed into from the second surplus pipe 14 and the troweling machine after the surplus pipe 13, it is pushed into the second, it is carried to the surplus to follow the surplus pipe to carry on the surplus pipe 1 again, the second, it to continue to utilize the surplus shower nozzle to push the troweling machine, the surplus pipe 12.
To sum up, the utility model discloses a material jar bottom's first cement transportation pump extracts cement and follow first shower nozzle blowout, has alleviateed the workman and has laid the work load of cement at the wall, drives the trowel through the lift and reciprocates, trowels spun cement, guarantees that the cement that smears is smooth level and smooth, draws unnecessary cement from the baffle is inside through second cement transportation pump to send to the material jar inside, reached the function that the cement of drippage is recycled.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The house building plastering device comprises a plastering machine body (1), and is characterized in that the interior of the plastering machine body (1) is hollow, a material cylinder (2) is arranged in the plastering machine body (1), a material pouring port (3) is arranged on the top surface of the material cylinder (2), an interlayer (4) is arranged on one side surface of the material cylinder (2), a lifting platform (5) is arranged on one side surface of the plastering machine body (1), a lifting machine (6) is sleeved on the surface of the lifting platform (5), a trowel (7) is arranged on one side surface of the lifting machine (6), a first spray head (8) is arranged on the top end of one side surface of the trowel (7), a first guide pipe (9) is arranged on one side surface of the first spray head (8), the first guide pipe (9) is communicated with the interior of the first spray head (8), a first cement transportation pump (10) is arranged at the position of the other end of the first guide pipe (9) close to the material cylinder (2), the first cement transportation pump (9) penetrates through the lifting machine (6) and the first cement transportation pump (10) and extends to the material pouring port (11), and a baffle (11) is arranged on one side surface of the trowel (7), expansion hose (13) have been cup jointed to the inside of drain hole (12), the one end of expansion hose (13) is connected with second pipe (14), the one end that second pipe (14) are close to expansion hose (13) is provided with second cement transportation pump (15), the other end of second pipe (14) runs through interlayer (4) and extends to inside material jar (2).
2. A plastering apparatus for house construction according to claim 1, wherein a supporting stand (16) is provided at a lower end of the flexible hose (13), a second guide pipe (14) is provided at a side surface of the supporting stand (16), the flexible hose (13) communicates with the inside of the second guide pipe (14), and a second nozzle (24) is provided at the other end of the second guide pipe (14).
3. A plastering device for house buildings as claimed in claim 2, wherein a fixing bolt is movably sleeved on one end of the flexible hose (13) close to the trowel (7), and a fixing bolt is movably sleeved on one end of the second conduit (14) close to the pouring port (3).
4. Plastering device for house buildings according to claim 1, characterized in that the bottom end surface of the plastering machine body (1) is provided with a base (17), the inner bottom end surface of the base (17) is provided with a power source (23), the bottom end surface of the base (17) is provided with four universal wheel supports (18), and the bottom ends of the universal wheel supports (18) are provided with universal wheels (19).
5. House building plastering device according to claim 4, characterized in that one side surface of the base (17) is provided with two through holes side by side, one side of the base (17) close to the through holes is provided with a telescopic motor (21), one side surface of the telescopic motor (21) is provided with two guiding rules (20) side by side, the guiding rules (20) extend through to the outside of the through holes, one side of the telescopic motor (21) is provided with a button (22), and the button (22) extends through to the outside of the base (17).
6. Plastering apparatus for housing construction according to claim 5, characterized in that said push button (22) is electrically connected to a telescopic motor (21), said telescopic motor (21) is electrically connected to a power source (23), said lifting machine (6) is electrically connected to a power source (23), said first cement transporting pump (10) is electrically connected to a power source (23), and said second cement transporting pump is electrically connected to a power source (23).
7. Plastering apparatus for house buildings according to claim 1, characterized in that the lift (6) is a hydraulic lever driven structure.
CN202221367079.8U 2022-06-01 2022-06-01 Plastering device for house building Expired - Fee Related CN217711565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221367079.8U CN217711565U (en) 2022-06-01 2022-06-01 Plastering device for house building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221367079.8U CN217711565U (en) 2022-06-01 2022-06-01 Plastering device for house building

Publications (1)

Publication Number Publication Date
CN217711565U true CN217711565U (en) 2022-11-01

Family

ID=83799308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221367079.8U Expired - Fee Related CN217711565U (en) 2022-06-01 2022-06-01 Plastering device for house building

Country Status (1)

Country Link
CN (1) CN217711565U (en)

Similar Documents

Publication Publication Date Title
CN109868977B (en) Automatic guniting machine for plastering and napping
CN111075165A (en) Wall cement patching machine
CN110409775B (en) Construction equipment and construction method for inorganic mortar self-leveling terrace
CN111236589A (en) Mortar spraying device with adjustable nozzle size
CN202099901U (en) Troweling structure for treatment on junction part of concrete wall column and filler wall
CN217711565U (en) Plastering device for house building
CN108277908B (en) Energy-saving environment-friendly CL wall engineering construction method
CN105437354A (en) Method for pasting face bricks in prefabrication of concrete floor and concrete wallboard
CN2506728Y (en) Automatic plastering machine
CN212176454U (en) Wall cement patching machine
CN111749361B (en) Construction method of gypsum spraying wall
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
CN111335598A (en) Wall cement patching machine
CN113089851A (en) Anti-leakage construction process for building block wall
CN218881488U (en) Wall plastering device
CN209053397U (en) External wall plastering machine
CN212176440U (en) Transverse moving mechanism of wall cement guniting machine
CN216340707U (en) Integrated device for wall body guniting and plastering
CN111075161A (en) Building mortar paints device
CN111042531A (en) Quick construction method for common plastering engineering plaster cake
CN212078736U (en) Automatic mortar trowelling and building device
CN214090839U (en) Home decoration plastering device
CN215484452U (en) Mortar spraying device for anticorrosive building engineering construction
CN216042446U (en) A novel device for being directed at automatic thoughtlessly congeal thick liquid of paining of external wall insulation board
CN218438364U (en) Cement spraying and curing device for energy-saving construction of civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221101