CN217710710U - Pile pulling device for building construction - Google Patents

Pile pulling device for building construction Download PDF

Info

Publication number
CN217710710U
CN217710710U CN202220873150.3U CN202220873150U CN217710710U CN 217710710 U CN217710710 U CN 217710710U CN 202220873150 U CN202220873150 U CN 202220873150U CN 217710710 U CN217710710 U CN 217710710U
Authority
CN
China
Prior art keywords
pile pulling
fixedly connected
pulling device
pile
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220873150.3U
Other languages
Chinese (zh)
Inventor
夏伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Shendu Intelligent Technology Co ltd
Original Assignee
Hangzhou Shendu Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Shendu Intelligent Technology Co ltd filed Critical Hangzhou Shendu Intelligent Technology Co ltd
Priority to CN202220873150.3U priority Critical patent/CN217710710U/en
Application granted granted Critical
Publication of CN217710710U publication Critical patent/CN217710710U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the construction, especially, construction is with pulling out stake device, including drive division, power arm portion, pulling out stake portion and rotation portion, drive division and rotation portion articulate the both ends that set up at the power arm portion respectively. This pile pulling device for construction makes progress and takes power arm one end to upwards articulate and lift up through setting up the drive division, and the rotation portion sets up realizes articulated action at the other end of power arm, has reached and has avoided causing destruction to geology and building and pile body internal diameter around, and has the effect that reduces the construction noise and reduce construction cost.

Description

Pile pulling device for building construction
Technical Field
The utility model relates to a construction technical field especially relates to a pile pulling device for construction.
Background
At present, in the process of urbanization, because the land resources of cities are limited, high-rise residential buildings are more and more, a foundation needs to be piled and reinforced before the high-rise residential buildings are built, and a steel pipe pile used in piling needs to be pulled out for recycling after the steel pipe pile is used up.
The basic principle of the existing pile pulling technology and special equipment is to destroy the extrusion force of the geology around the pile foundation to the pile, loosen the soil around the pile, reduce the friction force of the soil to the pile, and then adopt corresponding hoisting machinery to carry out swinging, hanging and pulling.
SUMMERY OF THE UTILITY MODEL
Based on current pile pulling expense is higher, easily produces serious destruction to peripheral geology to the technical problem of fragile pile body internal diameter, the utility model provides a pile pulling device for construction.
The utility model provides a pile pulling device for building construction, which comprises a driving part, a force arm part, a pile pulling part and a rotating part, wherein the driving part and the rotating part are respectively hinged at two ends of the force arm part;
the driving part drives one end of the force arm part to be hinged and lifted upwards, and the rotating part is arranged at the other end of the force arm part to realize hinging action;
the pile pulling part is arranged in the middle of the force arm part, and the steel pipe pile is movably clamped by the pile pulling part and then is upwards hinged and pulled by the force arm part;
the driving part comprises a first hydraulic cylinder, one end of a piston rod of the first hydraulic cylinder is hinged to a second mounting seat through a pin shaft, and a top plate is fixedly connected to the lower surface of the second mounting seat.
Preferably, the arm of force portion includes metal bars, and two opposite surfaces of metal bars are fixedly connected with first hollow shaft, second hollow shaft respectively, the one end fixedly connected with first mount pad of metal bar.
Preferably, the inner wall of the first mounting seat is hinged to the outer surface of the first hydraulic cylinder, first reinforcing blocks distributed in a linear array are fixedly connected to the surface of one side of the first mounting seat, and the surface of one side of each first reinforcing block is fixedly connected to the surface of one side of the metal bar.
Preferably, it includes third mount pad and staple bolt to pull out stake portion, the lower fixed surface of third mount pad is connected with the second boss that is linear array and distributes, a side surface of second boss with the opposite side fixed surface of metal thick stick is connected, the inner wall fixedly connected with bracing piece of third mount pad, wire rope has been cup jointed in the surface activity of bracing piece, wire rope's both ends all run through and extend to the lower surface of metal thick stick.
Preferably, the two ends of the steel wire rope are fixedly connected with hooks, the inner wall of the hoop is movably sleeved with the outer surface of the steel pipe pile, the upper surface of the hoop is fixedly connected with a hanging shaft, the outer surface of the hanging shaft is in contact with the inner wall of the hooks, the back surface of the hoop is respectively fixedly connected with a first installation block and a second installation block, the inner wall of the first installation block is hinged to a second hydraulic cylinder, and one end of a piston rod of the second hydraulic cylinder is hinged to the inner wall of the second installation block.
Preferably, the rotating part comprises a force bearing block, a fixed seat is fixedly connected to the upper surface of the force bearing block, and the inner wall of the fixed seat is hinged to the outer surface of the second tubular shaft.
Preferably, the opposite surfaces of the two metal bars are fixedly connected with a third tubular shaft respectively, and the third tubular shaft is positioned at the outer side of the second tubular shaft, namely at the side far away from the first tubular shaft.
The utility model provides a beneficial effect does:
upwards take power arm one end to upwards articulate through setting up the drive division and lift up, the other end that the rotation portion set up at the power arm realizes articulated action, has reached and has avoided causing destruction to geology and pile body internal diameter on every side, and has the effect that reduces construction noise and reduce construction cost.
Drawings
Fig. 1 is a schematic view of a pile pulling device for building construction;
FIG. 2 is a perspective view of a third mounting seat structure of a pile pulling device for building construction;
FIG. 3 is a sectional view of the anchor ear structure of the pile pulling device for building construction;
FIG. 4 is a perspective view of a driving part of a pile pulling apparatus for construction;
FIG. 5 is a perspective view of a force arm structure of a pile pulling device for construction;
FIG. 6 is a perspective view of a pile pulling device for construction;
fig. 7 is a perspective view of a rotating part structure of a pile pulling device for building construction.
In the figure: 1. steel pipe piles; 2. a metal bar; 3. a first spool; 4. a second tubular shaft; 5. a third tubular shaft; 6. a fixed seat; 7. a stress block; 8. a first mounting seat; 9. a first hydraulic cylinder; 91. a first reinforcing block; 92. a second mounting seat; 93. a top plate; 94. a third mounting seat; 95. a second reinforcing block; 96. a support bar; 97. a wire rope; 98. hooking; 99. hooping; 910. hanging a shaft; 911. a first mounting block; 912. a second mounting block; 913. and a second hydraulic cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-7, a pile pulling device for building construction comprises metal bars 2 for pulling up a steel pipe pile 1, wherein the opposite surfaces of the two metal bars 2 are fixedly connected with a first pipe shaft 3, a second pipe shaft 4 and a third pipe shaft 5 respectively, the outer surface of the second pipe shaft 4 is hinged with a fixed seat 6, the fixed seat 6 is symmetrically distributed to help to realize stable connection, the lower surface of the fixed seat 6 is fixedly connected with a stress block 7, and the stress block 7 is U-shaped and can be effectively sleeved on the steel pipe pile; one end of the metal bar 2 is fixedly connected with a first mounting seat 8;
the inner wall of first mount pad 8 is provided with drive division, and drive division includes first pneumatic cylinder 9, and first pneumatic cylinder 9 makes its cooperation articulated first mount pad 8 drive metal thick stick 2 and upwards promotes and pull out the stake through the thrust that the piston rod stretches out.
Further, the surface of first pneumatic cylinder 9 is articulated through the inner wall of round pin axle with first mount pad 8, a side fixed surface of first mount pad 8 is connected with first boss 91 that is linear array distribution, a side fixed surface of first boss 91 is connected with a side fixed surface of metal thick stick 2, the one end of first pneumatic cylinder 9 piston rod articulates through the round pin axle has second mount pad 92, first hollow shaft 3 and second hollow shaft 4 correspond two kinds of pile driving distances of conventional at present, all can connect atress piece 7 through fixing base 6 according to the site conditions.
The third tubular shaft 5 is matched with the first tubular shaft 3 and the second tubular shaft 4 to improve the stability of the metal bar 2, and the first reinforcing block 91 is used for improving the firmness of connection between the first mounting seat 8 and the metal bar 2. In addition, also can be articulated with third hollow shaft 5 and fixing base 6 to the effect of pile pulling is realized to different stake intervals.
Further, a top plate 93 is fixedly connected to the lower surface of the second mounting seat 92, a third mounting seat 94 is fixedly connected to the upper surface of the metal bar 2, second reinforcing blocks 95 distributed in a linear array are fixedly connected to the lower surface of the third mounting seat 94, and the second reinforcing blocks 95 improve the firmness of the connection between the third mounting seat 94 and the metal bar 2.
Further, a side surface of the second reinforcing block 95 is fixedly connected with the other side surface of the metal bar 2, a supporting rod 96 is fixedly connected with the inner wall of the third mounting seat 94, a steel wire rope 97 is sleeved on the outer surface of the supporting rod 96 in a movable mode, the bottom of the third mounting seat 94 can adopt an interlayer structure, vibration is reduced when pile pulling is conducted by adding a rubber shock pad, and the supporting rod 96 bears the lower pulling force generated by the steel wire rope 97.
Further, both ends of wire rope 97 run through and extend to the lower surface of metal thick stick 2, and wire rope 97's both ends fixedly connected with couple 98, and staple bolt 99 has been cup jointed in the surface activity of steel-pipe pile 1, and the last fixed surface of staple bolt 99 is connected with peg 910 that is symmetric distribution, uses through the cooperation of couple 98 with peg 910, plays the effect that drives staple bolt 99 through wire rope 97 and upwards stimulates.
Furthermore, the outer surface of the hanging shaft 910 is in contact with the inner wall of the hook 98, the back of the hoop 99 is fixedly connected with a first installation block 911 and a second installation block 912 respectively, the inner wall of the first installation block 911 is hinged with a second hydraulic cylinder 913, one end of a piston rod of the second hydraulic cylinder 913 is hinged with the inner wall of the second installation block 912, and the extension and retraction of the piston rod of the second hydraulic cylinder 913 play a role in locking and unlocking the hoop 99 through the matching of the first installation block 911 and the second installation block 912.
Upwards take power arm one end to upwards articulate through setting up the drive division and lift up, the other end that the rotation portion set up at the power arm realizes articulated action, has reached and has avoided causing destruction to geology and pile body internal diameter on every side, and has the effect that reduces construction noise and reduce construction cost.
The working principle is as follows: firstly, sleeving a hook 98 on a hanging shaft 910, sleeving a clamp on the outer surface of a steel pipe pile 1, starting a piston rod of a second hydraulic cylinder 913 to extend out, tightening the clamp through the matching of a first mounting block 911 and a second mounting block 912 to fix the steel pipe pile 1, then contacting the lower part of a top plate 93 with the ground, and then placing a stress block 7 above the adjacent steel pipe pile 1;
step two, starting the first hydraulic cylinder 9 to extend, enabling a piston rod of the first hydraulic cylinder 9 to extend to match with a top plate 93 to be in contact with the ground to extrude to generate a reverse thrust, and enabling one end of the metal bar 2 to swing and rise through matching of the fixed seat 6 and the stress block 7, so that the steel pipe pile 1 is driven to be pulled out upwards through matching of the steel wire rope 97, the hook 98, the hanging shaft 910 and the hoop 99;
and step three, retracting the piston rod of the second hydraulic cylinder 913 by starting again to enable the clamp to fix the steel pipe pile 1, retracting the piston rod of the first hydraulic cylinder 9 at the moment to enable the clamp to slide downwards along the outer wall of the steel pipe pile 1, after the piston rod of the first hydraulic cylinder 9 retracts, locking the clamp again by starting the piston rod of the second hydraulic cylinder 913 after the piston rod of the first hydraulic cylinder extends, and then pulling out the steel pipe pile 1 by repeating the steps.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a pile pulling device for construction which characterized in that: the pile pulling device comprises a driving part, a force arm part, a pile pulling part and a rotating part, wherein the driving part and the rotating part are respectively hinged at two ends of the force arm part;
the driving part drives one end of the force arm part to be hinged and lifted upwards, and the rotating part is arranged at the other end of the force arm part to realize hinging action;
the pile pulling part is arranged in the middle of the force arm part, and the steel pipe pile (1) is movably clamped through the pile pulling part and then is upwards hinged and pulled by the force arm part.
2. The pile pulling device for building construction according to claim 1, characterized in that: the drive part comprises a first hydraulic cylinder (9), one end of a piston rod of the first hydraulic cylinder (9) is hinged to a second mounting seat (92) through a pin shaft, and a top plate (93) is fixedly connected to the lower surface of the second mounting seat (92).
3. The pile pulling device for building construction according to claim 2, wherein: the force arm part comprises metal bars (2), and the opposite surfaces of the two metal bars (2) are fixedly connected with a first tubular shaft (3) and a second tubular shaft (4) respectively; one end of the metal bar (2) is fixedly connected with a first mounting seat (8).
4. The pile pulling device for building construction according to claim 3, wherein: the inner wall of first mount pad (8) with the surface of first pneumatic cylinder (9) is articulated, one side fixed surface of first mount pad (8) is connected with first boss (91) that are linear array and distribute, one side surface of first boss (91) with one side fixed surface of metal thick stick (2) is connected.
5. The pile pulling device for building construction according to claim 3, wherein: pile pulling portion includes third mount pad (94) and staple bolt (99), the lower fixed surface of third mount pad (94) is second boss (95) that the linear array distributes, a side surface of second boss (95) with the opposite side fixed surface of metal thick stick (2) is connected, the inner wall fixedly connected with bracing piece (96) of third mount pad (94), wire rope (97) have been cup jointed in the surface activity of bracing piece (96), wire rope (97) both ends all run through and extend to the lower surface of metal thick stick (2).
6. The pile pulling device for building construction according to claim 5, wherein: the steel wire rope (97) is fixedly connected with hooks (98) at two ends, the inner wall of an anchor ear (99) is movably sleeved with the outer surface of a steel pipe pile (1), the upper surface of the anchor ear (99) is fixedly connected with a hanging shaft (910), the outer surface of the hanging shaft (910) is in contact with the inner wall of the hooks (98), the back surface of the anchor ear (99) is fixedly connected with a first installation block (911) and a second installation block (912) respectively, the inner wall of the first installation block (911) is hinged with a second hydraulic cylinder (913), and one end of a piston rod of the second hydraulic cylinder (913) is hinged with the inner wall of the second installation block (912).
7. The pile pulling device for building construction according to claim 3, wherein: the rotation part comprises a stress block (7), a fixed seat (6) is fixedly connected to the upper surface of the stress block (7), and the inner wall of the fixed seat (6) is hinged to the outer surface of the second tubular shaft (4).
8. The pile pulling device for building construction according to claim 7, wherein: the opposite surfaces of the two metal bars (2) are fixedly connected with a third tubular shaft (5) respectively, and the third tubular shaft (5) is positioned on the outer side of the second tubular shaft (4).
CN202220873150.3U 2022-04-15 2022-04-15 Pile pulling device for building construction Expired - Fee Related CN217710710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220873150.3U CN217710710U (en) 2022-04-15 2022-04-15 Pile pulling device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220873150.3U CN217710710U (en) 2022-04-15 2022-04-15 Pile pulling device for building construction

Publications (1)

Publication Number Publication Date
CN217710710U true CN217710710U (en) 2022-11-01

Family

ID=83788000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220873150.3U Expired - Fee Related CN217710710U (en) 2022-04-15 2022-04-15 Pile pulling device for building construction

Country Status (1)

Country Link
CN (1) CN217710710U (en)

Similar Documents

Publication Publication Date Title
CN201924360U (en) Multifunctional hydraulic static pile press
CN210288383U (en) Rotary drilling and piling integrated machine
CN110080236B (en) But device is transferred to cyclic utilization steel reinforcement cage who hangs muscle
CN217710710U (en) Pile pulling device for building construction
CN211395670U (en) Piling device for building construction
CN201334660Y (en) Filling pile machine of static-pressure immersed pipe
CN210393466U (en) Construction device for pile foundation engineering
CN2148778Y (en) Multi-function hydraulic pile-pressing machine
CN214219654U (en) Pipe pole reverse-pulling device
CN215441884U (en) Drilling and hammering integrated machine
CN206174014U (en) Static pressure stake device suitable for transmission tower rectifies on basis
CN210421090U (en) Middle-arranged inclined pile pressing machine
CN210421089U (en) Middle-arranged inclined pile pressing machine for supporting single-row construction of support-free prefabricated inclined piles of foundation pit
CN1071983A (en) Anchor beam type hydrostatic piledriving method and equipment thereof
CN218025000U (en) Movable anti-seismic support hoisting device
CN218841519U (en) Underground lifting frame
CN214272027U (en) Carrier pile construction equipment
CN220202663U (en) Electric pile driver
CN201162217Y (en) Construction equipment for concrete pedestal pile
CN2661770Y (en) Behind inserting reinforcing cage for long screw pore-forming guncreting piling and conveying device therefor
CN212863855U (en) Convenient repeatedly usable's manual hole digging pile dregs hoisting device
CN216475014U (en) Device for pulling out steel sheet pile in narrow range
CN2349262Y (en) Pile feeder
CN218990157U (en) Pile driver suitable for pile core reinforced pipe pile
CN216290109U (en) Optical cable bridge tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221101