CN217680358U - Assembled scaffold for construction - Google Patents

Assembled scaffold for construction Download PDF

Info

Publication number
CN217680358U
CN217680358U CN202221441270.2U CN202221441270U CN217680358U CN 217680358 U CN217680358 U CN 217680358U CN 202221441270 U CN202221441270 U CN 202221441270U CN 217680358 U CN217680358 U CN 217680358U
Authority
CN
China
Prior art keywords
fixedly connected
extension
bearing plate
blowing
hollow pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221441270.2U
Other languages
Chinese (zh)
Inventor
赵士光
王晓龙
刘伟男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Chuangzao Construction Technology Co ltd
Original Assignee
Shandong Chuangzao Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Chuangzao Construction Technology Co ltd filed Critical Shandong Chuangzao Construction Technology Co ltd
Priority to CN202221441270.2U priority Critical patent/CN217680358U/en
Application granted granted Critical
Publication of CN217680358U publication Critical patent/CN217680358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses an assembled scaffold frame for construction, including first hollow pillar and second hollow pillar, two the equal fixedly connected with fixed plate in first hollow pillar and the hollow pillar external diameter intermediate position of second, four fixed plate top four corners department all runs through and is provided with the trompil, four the fixed plate top is provided with the bearing plate. The utility model discloses in, start micro motor, micro motor work output end drives each fan leaf of blowing and rotates, thereby can constitute a fan of blowing, and then can blow the cooling work to the workman of bearing plate top, can be certain avoid the workman to stand sun insolate and high strength for a long time and carry out work, the phenomenon that can the heatstroke takes place, the hole dish at both ends can be certain around the section of thick bamboo of blowing in addition avoids the fan leaf of blowing can hinder and reach the workman, the aperture of this kind of hole dish top can not be too big in addition, avoid at the in-process of construction, have the stone to get into in the section of thick bamboo of blowing.

Description

Assembled scaffold for construction
Technical Field
The utility model relates to a scaffold technical field especially relates to an assembled scaffold frame for construction.
Background
Scaffold (scaffold) refers to various supports which are erected for workers on construction sites and solve vertical and horizontal transportation, and a general term in the building field refers to a place which is used on an outer wall, interior decoration or high floor height on a construction site and cannot be directly constructed, and mainly aims to ensure that constructors can do up and down or a peripheral safety net enclosure, high-altitude installation components and the like, namely the scaffold is erected, and scaffold manufacturing materials usually comprise: bamboo, wood, steel pipes or synthetic materials, etc.
Present traditional scaffold frame, comparatively loaded down with trivial details at the in-process of installation dismantlement, traditional scaffold frame result of use is also comparatively single moreover to do not possess the cooling mechanism of blowing to the workman carries out work in high temperature weather or high strength for a long time, and the phenomenon that the heat stroke appears very easily takes place.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the assembled scaffold frame for construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides an assembled scaffold for construction, includes first hollow pillar and the hollow pillar of second, two the equal fixedly connected with fixed plate of first hollow pillar and the equal fixedly connected with of the hollow pillar external diameter intermediate position of second, four fixed plate top four corners department all runs through and is provided with the trompil, four the fixed plate top is provided with the bearing plate, equal fixedly connected with bearing plate bolt and bearing plate bolt of bearing plate bottom four corners department all are located the trompil, two the first hollow pillar external diameter is by the fixed section of thick bamboo of the equal fixed connection in top position, two the inboard equal fixedly connected with of fixed section of thick bamboo extends the hangers, two it is provided with the section of thick bamboo of blowing to extend between the hangers, the equal fixedly connected with extension board in the section of thick bamboo left and right sides intermediate position of blowing and extension board all are located and extend hanger front position, two it all runs through and threaded connection to extend hanger rear end position and threaded connection extend the hangers bolt and extend hanger bolt one end and all run through extension board and threaded connection, the three evenly distributed's connecting rod of the section of thick bamboo internal diameter of blowing, it is three evenly distributed's connecting rod fixedly connected with micro motor output fan leaf.
As a further description of the above technical solution:
two the first hollow pillar and the hollow pillar external diameter of second lean on the equal fixedly connected with mounting panel in bottom position.
As a further description of the above technical solution:
four the four corners department at mounting panel top all runs through and sliding connection has set screw.
As a further description of the above technical solution:
and four bearing plate bolts are all in threaded connection with bearing plate nuts, and the bearing plate nuts are all located at the bottom of the fixing plate.
As a further description of the above technical solution:
two it has the extension hangers nut and extends the hangers nut and all be located extension board front position to extend all threaded connection on the hangers bolt.
As a further description of the above technical solution:
the positions of the front end and the rear end of the air blowing cylinder are fixedly connected with hole discs.
As a further description of the above technical solution:
and the bearing plate bolt is connected with the opening in a sliding manner.
The utility model discloses following beneficial effect has:
the utility model discloses in, at first start micro motor, micro motor work output end drives each fan leaf of blowing and rotates, thereby can constitute a fan of blowing, and then can blow the cooling work to the workman of bearing plate top, can be certain avoid the workman to stand sun insolation and high strength for a long time and carry out work, the phenomenon that can heatstroke takes place, the hole dish at both ends can be certain around the section of thick bamboo of blowing in addition avoid blowing the fan leaf and can injure the workman, the aperture of this kind of hole dish top can not be too big in addition, avoid at the in-process of construction, have the stone to get into in the section of thick bamboo of blowing.
Drawings
Fig. 1 is a perspective view of an assembled scaffold for building construction according to the present invention;
fig. 2 is a rear perspective view of the assembled scaffold for building construction according to the present invention;
fig. 3 is a schematic structural view of an extension lug and an extension plate of the fabricated scaffold for building construction according to the present invention;
fig. 4 is an exploded view of a blowing tube of the fabricated scaffold for building construction according to the present invention;
fig. 5 is the utility model provides a structural schematic of bearing plate and fixed plate of assembled scaffold for construction.
Illustration of the drawings:
1. a first hollow pillar; 2. a second hollow strut; 3. a fixing plate; 4. opening a hole; 5. mounting a plate; 6. a set screw; 7. a bearing plate; 8. a bearing plate bolt; 9. a bearing plate nut; 10. a fixed cylinder; 11. extending the hangers; 12. an extension plate; 13. an extension lug bolt; 14. an extension lug nut; 15. a micro motor; 16. a connecting rod; 17. a blower blade; 18. a hole plate; 19. an air blowing cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: an assembled scaffold for building construction comprises a first hollow pillar 1 and a second hollow pillar 2, fixing plates 3 are fixedly connected at the middle positions of the outer diameters of the two first hollow pillars 1 and the second hollow pillar 2, four corners of the tops of the four fixing plates 3 penetrate through and are provided with openings 4, bearing plates 7 are arranged at the tops of the four fixing plates 3, bearing plate bolts 8 are fixedly connected at the four corners of the bottoms of the bearing plates 7, the bearing plate bolts 8 are positioned in the openings 4, fixing cylinders 10 are fixedly connected at the positions, close to the top ends, of the outer diameters of the two first hollow pillars 1, extension lugs 11 are fixedly connected at the inner sides of the two fixing cylinders 10, a blowing cylinder 19 is arranged between the two extension lugs 11, extension plates 12 are fixedly connected at the middle positions of the left side and the right side of the blowing cylinder 19, and the extension plates 12 are positioned at the front ends of the extension lugs 11, the rear ends of two extending lugs 11 are both penetrated through and are in threaded connection with extending lug bolts 13, one ends of the extending lug bolts 13 are both penetrated through and are in threaded connection with an extending plate 12, the front end of the inner diameter of a blowing cylinder 19 is fixedly connected with three uniformly distributed connecting rods 16, a micro motor 15 is fixedly connected between the three connecting rods 16, the output end of the micro motor 15 is fixedly connected with uniformly distributed blowing fan blades 17, the micro motor 15 is started, the working output end of the micro motor 15 drives each blowing fan blade 17 to rotate, so that a blowing fan can be formed, blowing cooling work can be carried out on workers above a bearing plate 7, the workers can be prevented from being exposed to the sun for a long time and working at high intensity, sunstroke can occur, in addition, hole plates 18 at the front end and the rear end of the blowing cylinder 19 can be prevented from injuring the workers to the blowing fan blades 17 to a certain extent, and in addition, the hole diameter above the hole plates 18 cannot be too large, avoiding stones entering the blow cylinder 19 during construction.
The outer diameters of the two first hollow pillars 1 and the outer diameters of the second hollow pillars 2 are fixedly connected with mounting plates 5 by bottom end positions, four top four corners of the four mounting plates 5 are respectively penetrated through and are slidably connected with fixing screws 6, four bearing plate bolts 8 are respectively in threaded connection with bearing plate nuts 9, the bearing plate nuts 9 are respectively located at the bottom positions of the fixing plates 3, two extending lug bolts 13 are respectively in threaded connection with extending lug nuts 14, the extending lug nuts 14 are respectively located at the front ends of the extending plates 12, the front ends and the rear ends of the blowing cylinder 19 are respectively and fixedly connected with hole discs 18, the bearing plate bolts 8 are slidably connected with the holes 4, the bearing plates 7 are placed above the four fixing plates 3, then the positions are adjusted, the bearing plate bolts 8 penetrate through the holes 4, finally, the bearing plates 7 are locked and fixed through the bearing plate nuts 9, the phenomenon that the bearing plates 7 are unstable in the later use process is avoided, and at the bottom ends of the first hollow pillars 1 and the second hollow pillars 2 are installed and fixed through the fixing screws 6; remove a section of thick bamboo 19 of will blowing to two and extend between the hangers 11, then twist respectively through extending hangers bolt 13 and move and pass and extend hangers 11 and extension board 12, at last will blow a section of thick bamboo 19 through extending hangers nut 14 screw up fixed can, avoid a section of thick bamboo 19 of blowing at the in-process of work, the condition that can appear rocking takes place.
The working principle is as follows: when the fixing device is used, the bearing plate 7 is placed above the four fixing plates 3, the position is adjusted, the bearing plate bolt 8 penetrates through the opening 4, and finally the bearing plate 7 is locked and fixed through the bearing plate nut 9, so that the phenomenon that the bearing plate 7 is unstable in the later use process is avoided, and at the moment, the bottom ends of the first hollow pillar 1 and the second hollow pillar 2 are installed and fixed through the fixing screw 6; the air blowing tube 19 is moved between the two extension lugs 11, then the extension lug bolts 13 are screwed to penetrate through the extension lugs 11 and the extension plate 12 respectively, and finally the air blowing tube 19 is screwed and fixed through the extension lug nuts 14, so that the situation that the air blowing tube 19 shakes during working is avoided; start micro motor 15, micro motor 15 work output end drives each fan blade 17 and rotates, thereby can constitute a fan of blowing, and then can blow the cooling work to the workman of bearing plate 7 top, can be certain avoid the workman to stand sun insolation and high strength for a long time and carry out work, the phenomenon of heatstroke can appear takes place, the hole dish 18 at both ends can be certain around the section of thick bamboo 19 of blowing in addition avoids fan blade 17 can injure the workman, the aperture of this kind of hole dish 18 top can not be too big in addition, avoid at the in-process of construction, have the stone to get into in the section of thick bamboo 19 of blowing.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a fabricated scaffold for construction, includes first hollow pillar (1) and second hollow pillar (2), its characterized in that: the middle positions of the outer diameters of the two first hollow pillars (1) and the second hollow pillars (2) are fixedly connected with fixing plates (3), four corners of the tops of the four fixing plates (3) penetrate through and are provided with openings (4), bearing plates (7) are arranged at the tops of the four fixing plates (3), the four corners of the bottom of the bearing plate (7) are fixedly connected with bearing plate bolts (8), the bearing plate bolts (8) are positioned in the holes (4), the outer diameters of the two first hollow pillars (1) are fixedly connected with fixed cylinders (10) by the top end positions, the inner sides of the two fixed cylinders (10) are fixedly connected with extension lugs (11), and a blowing cylinder (19) is arranged between the two extension lugs (11), the middle positions of the left side and the right side of the air blowing cylinder (19) are fixedly connected with extension plates (12), the extension plates (12) are positioned at the front ends of the extension lugs (11), the rear ends of the two extension lugs (11) are respectively penetrated through and in threaded connection with extension lug bolts (13), one ends of the extension lug bolts (13) are respectively penetrated through and in threaded connection with the extension plates (12), the front end of the inner diameter of the air blowing cylinder (19) is fixedly connected with three connecting rods (16) which are uniformly distributed, a micro motor (15) is fixedly connected among the three connecting rods (16), the output end of the micro motor (15) is fixedly connected with the uniformly distributed blowing fan blades (17).
2. The fabricated scaffold for building construction according to claim 1, wherein: two first hollow pillar (1) and second hollow pillar (2) external diameter lean on equal fixedly connected with mounting panel (5) in bottom position.
3. The fabricated scaffold for building construction according to claim 2, wherein: four all run through and sliding connection has set screw (6) in mounting panel (5) top four corners department.
4. The fabricated scaffold for building construction according to claim 1, wherein: four equal threaded connection has bearing plate nut (9) and bearing plate nut (9) all are located fixed plate (3) bottom position on bearing plate bolt (8).
5. The fabricated scaffold for building construction according to claim 1, wherein: and the two extension lug bolts (13) are all in threaded connection with extension lug nuts (14) and the extension lug nuts (14) are all located at the front end of the extension plate (12).
6. The fabricated scaffold for building construction according to claim 1, wherein: the front end and the rear end of the air blowing cylinder (19) are fixedly connected with hole discs (18).
7. The fabricated scaffold for building construction according to claim 1, wherein: and the bearing plate bolt (8) is in sliding connection with the opening (4).
CN202221441270.2U 2022-06-10 2022-06-10 Assembled scaffold for construction Active CN217680358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221441270.2U CN217680358U (en) 2022-06-10 2022-06-10 Assembled scaffold for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221441270.2U CN217680358U (en) 2022-06-10 2022-06-10 Assembled scaffold for construction

Publications (1)

Publication Number Publication Date
CN217680358U true CN217680358U (en) 2022-10-28

Family

ID=83707338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221441270.2U Active CN217680358U (en) 2022-06-10 2022-06-10 Assembled scaffold for construction

Country Status (1)

Country Link
CN (1) CN217680358U (en)

Similar Documents

Publication Publication Date Title
CN217680358U (en) Assembled scaffold for construction
CN213329946U (en) Scaffold for building construction
CN113969635A (en) Unsmooth molding stone material curtain unitized design structure with adjustable
CN211822955U (en) Windproof ventilating device for urban high-rise building
CN211949754U (en) Constructional engineering support
CN109339487B (en) Quickly-built wooden house and building method thereof
CN214462443U (en) Scaffold convenient to adjust
CN213538731U (en) Building construction warning device
CN217439498U (en) Shaped steel scaffold frame of encorbelmenting convenient to dismouting
CN218991074U (en) Wood-plastic integrated garage convenient to assemble and disassemble
CN217480759U (en) Scaffold convenient for outdoor construction
CN219715377U (en) Air quality monitoring equipment fixing device for environment detection
CN210795557U (en) Construction elevator cab with overhead air conditioner protective structure
CN221053114U (en) Interior decoration frame
CN219045780U (en) Mounting structure
CN219508968U (en) Hook-up type aluminum veneer suspended ceiling
CN221171577U (en) Monitoring camera support
CN218952744U (en) Building construction frame
CN213509530U (en) High-altitude operation hanging basket with high safety
CN218092208U (en) Clamp plate type triangular support for climbing frame internal corner
CN214995765U (en) Civil engineering construction support
CN219898758U (en) Lateral plate turnover machine for artificial plate
CN215631568U (en) Aluminum alloy template and building plastic formwork sharing support system
CN221169019U (en) High-stability enclosure structure
CN216380487U (en) Telescopic scaffold suitable for indoor use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant