CN217637530U - Monitoring device for hydropower station water level management - Google Patents

Monitoring device for hydropower station water level management Download PDF

Info

Publication number
CN217637530U
CN217637530U CN202221917359.1U CN202221917359U CN217637530U CN 217637530 U CN217637530 U CN 217637530U CN 202221917359 U CN202221917359 U CN 202221917359U CN 217637530 U CN217637530 U CN 217637530U
Authority
CN
China
Prior art keywords
installation
pole
piece
water level
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221917359.1U
Other languages
Chinese (zh)
Inventor
覃泽美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221917359.1U priority Critical patent/CN217637530U/en
Application granted granted Critical
Publication of CN217637530U publication Critical patent/CN217637530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Level Indicators Using A Float (AREA)

Abstract

The utility model discloses a monitoring devices for power station water level management, including even wall installed part and installation shell, even the wall installed part is fixed and is provided with the support for the device on existing building, and the below of even wall installed part is provided with the installation shell, the inside slidable mounting of installation shell has the installation pole to the below of installation pole is provided with connects long, connects the below of long to be connected with and floats the pole, controls the installation depth of floating the pole through connecting long, and the position monitor fixes in the inside of installation shell, monitors the position of installation pole, the below of installation pole is provided with the second spread groove. This a monitoring devices for power station water level management will float pole and installation pole through connecing the length piece and connect, and connect the length piece and can carry out the concatenation equipment of arbitrary number, but the different mounting height needs of adaptation, the suitability is stronger, and follow-up extension piece can be dismantled on installation pole and float pole, reduces the whole length of device, conveniently carries and preserves.

Description

Monitoring device for hydropower station water level management
Technical Field
The utility model relates to a power station water level monitoring technical field specifically is a monitoring devices for power station water level management.
Background
The hydropower station is a common corollary equipment of hydroelectric power generation, when managing the water level of hydropower station, often cooperates monitoring devices to carry out real-time monitoring to the water level of hydropower station to learn the water level condition of hydropower station, make things convenient for the follow-up relevant equipment of adjusting, but current water level monitoring devices still have some weak points when using:
when current water level monitoring device was installed through the top support in the power station, water level monitoring position suspension was on the surface of water, and the device adopts the mode of hanging to establish to install, and the distance between top and the water level upper surface is great, leads to the whole length increase of device self, and follow-up be not convenient for carry and deposit, has reduced its convenience of use.
In order to solve the problems, innovative design is urgently needed on the basis of the original water level monitoring device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a monitoring devices for power station water level management to when solving the current water level monitoring devices in the existing market that above-mentioned background art provided and installing through the top support in the power station, water level monitoring position suspends on the surface of water, and the device adopts the mode of hanging to establish to install, and the distance between top and the water level upper surface is great, leads to the whole length increase of device self, follow-up be not convenient for carry and the problem of depositing.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a monitoring devices for power station water level management, includes even wall installed part and installation shell, even the wall installed part is fixed and is provided with the support for the device on existing building, and even the below of wall installed part is provided with the installation shell, the inside slidable mounting of installation shell has the installation pole to the below of installation pole is provided with and connects the length, and the below of connecing the length is connected with floats the pole, controls the installation depth of floating the pole through connecing the length, the top of installation pole is provided with the position monitor, and the position monitor is fixed in the inside of installation shell, monitors the position of installation pole, the below of installation pole is provided with the second spread groove, will install the pole through the second spread groove and connect the length to connect, and connect through dismantling docking mechanism interconnect between the length, the top of floating the pole is fixed with the second connector, floats the pole through the second connector and connect and constitute between the length and can dismantle the connection, will connect and can make things convenient for it to carry after carrying out the split between length and the float pole and the installation pole.
Further optimize this technical scheme, installation pole, extension piece and float pole are light plastics material and constitute, and the vertical central line of installation pole, extension piece and float pole three coincides the setting each other, make the follow-up stable showy of ability of float pole on the liquid level, change along with the change of liquid level height.
Further optimizing the technical scheme, the detachable butt joint mechanism comprises a first connecting head and a first connecting groove;
the first connecting head is fixed at the upper end of the connecting long piece, the first connecting head and the second connecting groove form threaded connection, and the connecting long piece is arranged below the mounting rod through the connection of the first connecting head and the second connecting groove;
the first connecting groove is formed below the long connecting piece, threaded connection is formed between the first connecting groove and the first connector as well as between the first connecting groove and the second connector, and the long connecting piece can be spliced through the threaded connection between the first connector and the first connecting groove.
Further optimize this technical scheme, the upper end of installation pole is fixed with the deflector, and the overlooking cross-section of deflector is the design of rectangle structure to sliding construction about constituting between deflector and the installation shell can prevent the rotation of installation pole in the installation shell through the deflector, and convenient follow-up will extend the piece and install.
Further optimize this technical scheme, the top of installation shell is provided with the movable ball, and the movable ball rotates the top of installing at the installation shell to the top of movable ball is fixed with the connecting rod, and the connecting rod is fixed in the below of even wall installed part, makes the installation shell can rotate the adjustment in the below of movable ball, makes the pole that floats and connect the long piece to keep vertical state.
Further optimize this technical scheme, the outside of activity ball is provided with stop gear, locks the connection of activity ball and installation shell, prevents the removal of installation shell at the activity ball.
Further optimizing the technical scheme, the limiting mechanism comprises a limiting block and an adjusting rod;
the limiting block is arranged on the outer side of the movable ball, and a left-right sliding structure is formed between the limiting block and the mounting shell;
adjust the pole, the bearing is installed on the right side of stopper, and the right-hand member of adjusting the pole runs through and constitutes threaded connection between the surface of installation shell and the installation shell, follow-up regulation pole through the rotation can be controlled the position of stopper.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) The monitoring device for hydropower station water level management is characterized in that the floating rod and the mounting rod are connected through the extension piece, the extension piece can be spliced and assembled in any number, can be adapted to different mounting height requirements, and has stronger applicability, the subsequent extension piece can be disassembled on the mounting rod and the floating rod, the overall length of the device is reduced, the device is convenient to carry and store, and the water level can be monitored through the position change of the mounting rod in the mounting shell;
(2) This a monitoring devices for power station water level management is provided with and connects the ball, and the ball is connected in the installation shell accessible and is rotating in the below of even wall installed part to can adjust the vertical position of installation shell, make the float pole can keep vertical state, avoid even the wall installed part install the measuring accuracy who influences the float pole on the holding surface of unevenness.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic view of the main cut-away structure of the present invention;
FIG. 3 is a schematic perspective view of the extension member of the present invention;
FIG. 4 is a schematic view of the installation rod of the present invention;
fig. 5 is the utility model discloses link wall installed part and installation shell and connect main structure schematic diagram of cuing open.
In the figure: 1. a wall attachment member; 2. mounting a shell; 3. mounting a rod; 4. a floating rod; 5. an extension piece; 6. a first connector; 7. a first connecting groove; 8. a second connector; 9. a second connecting groove; 10. a location monitor; 11. a guide plate; 12. a movable ball; 13. a connecting rod; 14. a limiting block; 15. and adjusting the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a monitoring device for hydropower station water level management comprises a connecting wall mounting piece 1 and a mounting shell 2, wherein the connecting wall mounting piece 1 is fixed on an existing building to support the device, the mounting shell 2 is arranged below the connecting wall mounting piece 1, a mounting rod 3 is slidably mounted inside the mounting shell 2, an extension piece 5 is arranged below the mounting rod 3, a floating rod 4 is connected below the extension piece 5, the mounting depth of the floating rod 4 is controlled through the extension piece 5, a position monitor 10 is arranged above the mounting rod 3, the position monitor 10 is fixed inside the mounting shell 2 and monitors the position of the mounting rod 3, a second connecting groove 9 is arranged below the mounting rod 3, the mounting rod 3 and the extension piece 5 are connected through the second connecting groove 9, the extension pieces 5 are connected through a detachable butt joint mechanism, a second connector 8 is fixed above the floating rod 4, the floating rod 4 is detachably connected with the extension piece 5 through the second connecting groove 8, the extension piece 5, the floating rod 4 and the mounting rod 3 can be conveniently carried after being detached;
the installation rod 3, the long connecting piece 5 and the floating rod 4 are made of light plastic materials, vertical center lines of the installation rod 3, the long connecting piece 5 and the floating rod 4 are overlapped with each other, so that the floating rod 4 can stably float on a liquid level in a follow-up mode and changes along with the change of the height of the liquid level, the detachable butt-joint mechanism comprises a first connecting head 6 and a first connecting groove 7, the first connecting head 6 is fixed at the upper end of the long connecting piece 5, the first connecting head 6 is in threaded connection with a second connecting groove 9, the long connecting piece 5 is installed below the installation rod 3 through the connection of the first connecting head 6 and the second connecting groove 9, the first connecting groove 7 is formed below the long connecting piece 5, the first connecting groove 7 is in threaded connection with the first connecting head 6 and the second connecting groove 8, the long connecting piece 5 can be spliced through the threaded connection between the first connecting head 6 and the first connecting groove 7, a guide plate 11 is fixed at the upper end of the installation rod 3, the overlooking section of the guide plate 11 is in a rectangular structural design, the guide plate 11 and the installation shell 2 are convenient to prevent the installation rod from rotating up and down installation shell 3 through the installation structure, and the installation shell 2;
when the device is used, the connecting wall mounting part 1 is installed on an existing building to support the device, the using quantity of the long part 5 can be adjusted according to installation requirements, the floating rod 4 can float on the liquid level after being installed, when the device is installed, the first connecting head 6 at the upper end of the long part 5 can be inserted into the second connecting groove 9 and connected with the second connecting groove 9 in a rotating mode, the installation rod 3 can be limited in rotation through the guide plate 11, the installation rod can be kept stable when the long part 5 is installed, the adjacent long part 5 is in butt joint through the threaded connection of the first connecting head 6 and the first connecting groove 7, then the floating rod 4 is connected with the first connecting groove 7 on the long part 5 at the lowest end through the second connecting head 8, the floating rod 4 can monitor and record the initial position of the installation rod 3 through the position monitor 10 after normally floating, the position monitor 10 can be an infrared distance meter or other device with a distance measuring function, after subsequent changes occur, the floating rod 4 moves along with the height of the liquid level, the installation rod 3 moves through the position monitor, and drives the installation rod 3 to measure the change quantity through the installation rod 3.
A movable ball 12 is arranged above the mounting shell 2, the movable ball 12 is rotatably mounted above the mounting shell 2, a connecting rod 13 is fixed above the movable ball 12, the connecting rod 13 is fixed below the wall connecting mounting piece 1, the mounting shell 2 can be rotatably adjusted below the movable ball 12, the floating rod 4 and the extension piece 5 can be kept in a vertical state, a limiting mechanism is arranged outside the movable ball 12, the connection between the movable ball 12 and the mounting shell 2 is locked, the mounting shell 2 is prevented from moving on the movable ball 12, the limiting mechanism comprises a limiting block 14 and an adjusting rod 15, the limiting block 14 is arranged outside the movable ball 12, a left-right sliding structure is formed between the limiting block 14 and the mounting shell 2, the adjusting rod 15 is mounted on the right side of the limiting block 14 through a bearing, the right end of the adjusting rod 15 penetrates through the outer surface of the mounting shell 2 to form threaded connection with the mounting shell 2, and the position of the limiting block 14 can be controlled by rotating the adjusting rod 15;
when even wall installed part 1 is non-horizontality after the installation, installation shell 2 is acquiescent with even wall installed part 1 is perpendicular, installation shell 2 will also be non-vertical state this moment, rotatable regulation pole 15 this moment, make adjust pole 15 pass through and install the threaded connection between the shell 2 drive stopper 14 and move, remove stopper 14 and activity ball 12's connection, make installation shell 2 rotate in the outside of activity ball 12, can adjust the position of installation shell 2, make and keep vertical state, rotate regulation pole 15 once more after the adjustment is accomplished and control stopper 14 and move, make stopper 14 and activity ball 12 connect, spacing activity ball 12, make the position of installation shell 2 keep stable.
Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. A monitoring device for hydropower station water level management comprises a wall connecting installation piece (1) and an installation shell (2), wherein the wall connecting installation piece (1) is fixed on an existing building to provide support for the device, and the installation shell (2) is arranged below the wall connecting installation piece (1);
the method is characterized in that: the utility model discloses a floating pole, including installation shell (2), installation pole (3) and installation pole (3), the inside slidable mounting of installation shell (2) has installation pole (3) to the below of installation pole (3) is provided with and connects long piece (5), and the below of connecting long piece (5) is connected with and floats pole (4), controls the installation depth of floating pole (4) through connecting long piece (5), the top of installation pole (3) is provided with position monitor (10), and position monitor (10) are fixed in the inside of installation shell (2), monitors the position of installing pole (3), the below of installation pole (3) is provided with second spread groove (9), will install pole (3) and connect long piece (5) through second spread groove (9) and connect, and connect between long piece (5) through dismantling docking mechanism interconnect mutually, the top of floating pole (4) is fixed with second connector (8), and floating pole (4) constitute through second connector (8) and connect between long piece (5) and can dismantle the connection.
2. A monitoring device for hydropower station water level management according to claim 1, characterized in that: installation pole (3), extension piece (5) and float pole (4) are light plastics material and constitute, and installation pole (3), extension piece (5) and float pole (4) three's vertical center line coincide each other sets up.
3. A monitoring device for hydropower station water level management according to claim 1 or 2, characterized in that: the detachable butt joint mechanism comprises a first connecting head (6) and a first connecting groove (7);
the first connecting head (6) is fixed at the upper end of the extension piece (5), the first connecting head (6) and the second connecting groove (9) form threaded connection, and the extension piece (5) is arranged below the mounting rod (3) through the connection of the first connecting head (6) and the second connecting groove (9);
the first connecting groove (7) is arranged below the long connecting piece (5), and the first connecting groove (7), the first connector (6) and the second connector (8) are in threaded connection.
4. A monitoring device for hydropower station water level management according to claim 3, characterized in that: the upper end of the mounting rod (3) is fixed with a guide plate (11), the overlooking section of the guide plate (11) is in a rectangular structural design, and an up-and-down sliding structure is formed between the guide plate (11) and the mounting shell (2).
5. A monitoring device for hydropower station water level management according to claim 1, characterized in that: the top of installation shell (2) is provided with activity ball (12), and activity ball (12) rotate and install the top at installation shell (2) to the top of activity ball (12) is fixed with connecting rod (13), and connecting rod (13) are fixed in the below of linking wall installed part (1).
6. A monitoring device for hydropower station water level management according to claim 5, characterized in that: and a limiting mechanism is arranged on the outer side of the movable ball (12) to lock the connection between the movable ball (12) and the mounting shell (2) and prevent the mounting shell (2) from moving on the movable ball (12).
7. A monitoring device for hydropower station water level management according to claim 6, characterized in that: the limiting mechanism comprises a limiting block (14) and an adjusting rod (15);
the limiting block (14) is arranged on the outer side of the movable ball (12), and a left-right sliding structure is formed between the limiting block (14) and the mounting shell (2);
the adjusting rod (15) is mounted on the right side of the limiting block (14) through a bearing, and the right end of the adjusting rod (15) penetrates through the outer surface of the mounting shell (2) and is in threaded connection with the mounting shell (2).
CN202221917359.1U 2022-07-25 2022-07-25 Monitoring device for hydropower station water level management Expired - Fee Related CN217637530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221917359.1U CN217637530U (en) 2022-07-25 2022-07-25 Monitoring device for hydropower station water level management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221917359.1U CN217637530U (en) 2022-07-25 2022-07-25 Monitoring device for hydropower station water level management

Publications (1)

Publication Number Publication Date
CN217637530U true CN217637530U (en) 2022-10-21

Family

ID=83635986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221917359.1U Expired - Fee Related CN217637530U (en) 2022-07-25 2022-07-25 Monitoring device for hydropower station water level management

Country Status (1)

Country Link
CN (1) CN217637530U (en)

Similar Documents

Publication Publication Date Title
CN217637530U (en) Monitoring device for hydropower station water level management
CN112864953B (en) Cable laying device for power communication engineering
CN208899333U (en) A kind of space curved surface suspension cable beam-ends cable guide pipe positioning device
CN219571409U (en) Intelligent fusion terminal mounting structure
CN214460230U (en) Reservoir surface floater intercepting device
CN214890338U (en) Hydraulic engineering dam intelligent management device
CN217923652U (en) Slope protection net structure for water and soil conservation engineering
CN211091105U (en) Mechanical underground irrigation device
CN219551636U (en) Water level online measurement device for reservoir management
CN208257366U (en) A kind of splice type cable ditch bracket of adjustable angle
CN220819151U (en) Reservoir water level monitoring device
CN220061202U (en) Hydraulic engineering equipment mounting frame with limiting function
CN220322494U (en) Liquid level monitoring device adopting ultrasonic liquid level sensor
CN217234978U (en) Water level monitoring terminal based on big dipper location finding technique
CN221404432U (en) Online safety monitor for reservoir
CN216590697U (en) Water conservancy water and electricity construction auxiliary device
CN216116235U (en) Water conservancy and hydropower engineering water level detection device capable of being positioned and installed
CN221545942U (en) U-shaped embedded bolt fixing device for mountain photovoltaic bored concrete pile
CN115650053B (en) Assembled wall body lifting appliance with laser positioning function
CN213809932U (en) Computer network monitoring device
CN216839235U (en) Water conservancy construction is with segment river guiding device
CN221075829U (en) Security monitoring device for power dispatching
CN212518221U (en) Plug-in type support for cable bridge
CN221422697U (en) Novel reverse bank template reinforcing device
CN212080580U (en) Monitoring device for building engineering convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221021

CF01 Termination of patent right due to non-payment of annual fee