CN217631754U - Prefabricated post structure of district enclosure - Google Patents

Prefabricated post structure of district enclosure Download PDF

Info

Publication number
CN217631754U
CN217631754U CN202221156077.4U CN202221156077U CN217631754U CN 217631754 U CN217631754 U CN 217631754U CN 202221156077 U CN202221156077 U CN 202221156077U CN 217631754 U CN217631754 U CN 217631754U
Authority
CN
China
Prior art keywords
prefabricated
foundation pit
column
prefabricated post
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221156077.4U
Other languages
Chinese (zh)
Inventor
吴志海
许文杰
卢松
李宏健
彭益锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elite Architectural Co Ltd
Original Assignee
Elite Architectural Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elite Architectural Co Ltd filed Critical Elite Architectural Co Ltd
Priority to CN202221156077.4U priority Critical patent/CN217631754U/en
Application granted granted Critical
Publication of CN217631754U publication Critical patent/CN217631754U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a prefabricated post structure of district enclosure, including prefabricated post, the ground excavation foundation pit that district enclosure post corresponds, the cross sectional dimension of foundation pit is greater than prefabricated post cross sectional dimension, and in the lower extreme of prefabricated post inserted the foundation pit, plain concrete was filled in the clearance between foundation pit and the prefabricated post, forms the base after the concrete setting sclerosis, and the base links together with prefabricated post, backfills earth to foundation pit and compaction. The prefabricated column is prefabricated in a factory, on-site steel bar binding, formwork erecting, concrete pouring and other construction operations are reduced, construction time is shortened, on-site construction waste is reduced, water and energy are saved, when the prefabricated column is constructed, firstly, a foundation pit is excavated on the ground corresponding to a community enclosure column, then, the lower end of the prefabricated column is inserted into the foundation pit, plain concrete is filled in a gap between the foundation pit and the prefabricated column, and after concrete is condensed and hardened, earth is backfilled to the foundation pit and compacted.

Description

Prefabricated post structure of district enclosure
Technical Field
The utility model relates to a building field, in particular to prefabricated post structure of district enclosure.
Background
The existing fence post generally has two traditional methods: cast-in-place concrete column or brick post, cast-in-place post needs on-spot ligature reinforcing bar, and the formwork is watered and is smash the concrete, and the construction is more time-consuming, brick post basis is great, and excavation earthwork is many, and masonry work is also more time-consuming, and above-mentioned two kinds of modes all can produce more building rubbish at the scene, extravagant material and increase the work load of clearing up rubbish.
The existing wall column also has a part of prefabricated columns, but the prefabricated columns are generally connected with a foundation by adopting slurry anchor lap joints or sleeve grouting, so that the connecting materials are expensive and the construction is difficult.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated post structure of district enclosure of safe and reliable, structure and construction are simple.
The purpose of the utility model is realized like this:
the utility model provides a prefabricated post structure of district enclosure, includes prefabricated post, and the ground excavation foundation pit that district enclosure post corresponds, the cross sectional dimension of foundation pit is greater than prefabricated post cross sectional dimension, and in the lower extreme of prefabricated post inserted the foundation pit, plain concrete was filled in the clearance between foundation pit and the prefabricated post, and the concrete forms the base after setting and hardening, and the base links together with prefabricated post, backfills earth to foundation pit and compaction.
The prefabricated column is prefabricated in a factory, on-site binding of reinforcing steel bars is reduced, a formwork is erected, concrete is poured and pounded, construction time is shortened, on-site construction waste is reduced, water and energy are saved, when the prefabricated column is constructed, firstly, foundation pits are dug on the ground corresponding to the community enclosure column, then, the lower end of the prefabricated column is inserted into the foundation pits, plain concrete is filled in gaps between the foundation pits and the prefabricated column, and after the concrete is solidified and hardened, earth is backfilled to the foundation pits and compacted.
The purpose of the utility model can also adopt the following technical measures to solve:
furthermore, a hole is formed in the central area of the prefabricated column in a core pulling mode. The core pulling mode is adopted in the middle of the prefabricated column, materials are saved, the weight of the prefabricated column is reduced, and transportation and installation are facilitated.
Further, the holes are filled with a light material.
Further, the central region of the prefabricated column is filled with a lightweight material. The mode of filling light material in the middle of the prefabricated post, save material reduces prefabricated post weight simultaneously, conveniently transports and installs.
Further, still include prefabricated base, prefabricated post and prefabricated base are poured through concrete an organic whole and are formed. The prefabricated column and the prefabricated base are prefabricated together, backfilled soil is compacted, connecting materials can be saved compared with the situation that the prefabricated column and a foundation are connected through slurry anchor overlapping or sleeve grouting, construction is simplified, and construction time and difficulty are reduced.
Furthermore, a decorative surface layer is preset on the surface of the prefabricated column. The decorative surface layer of the prefabricated column can be prefabricated in a factory, the workload of manufacturing the decorative surface layer by the cast-in-place column and the masonry column is greatly reduced, and labor and time are saved.
The utility model has the advantages as follows:
the utility model discloses, prefabricated post is prefabricated at the mill, reduce on-the-spot ligature reinforcing bar, a formwork and pour a heavy and varied construction operations such as concrete, shorten the engineering time, reduce on-the-spot building rubbish, water conservation and energy saving, and the architectural surface of prefabricated post also can be prefabricated at the mill, the cast-in-place post that significantly reduces and the work load of building post preparation architectural surface, save artifical and time, during the prefabricated construction post, at first excavate the foundation pit in the ground that district enclosure wall post corresponds, insert the foundation pit with the lower extreme of prefabricated post after that, the plain concrete of gap packing between foundation pit and the prefabricated post, backfill after the concrete setting sclerosis earth to foundation pit and compaction can, the construction is simple, reduce on-the-spot building rubbish, water conservation and energy saving.
Drawings
FIG. 1 is a schematic view of a precast column.
Fig. 2 is a schematic structural diagram of a prefabricated column of a cell enclosure wall.
Fig. 3 is a cross-sectional view of fig. 2.
Fig. 4 is a schematic diagram of a prefabricated column structure of a cell fence (with a foundation base).
Fig. 5 is a schematic diagram of prefabricated column structure of cell fence.
Fig. 6 is a cross-sectional view of fig. 5.
Detailed Description
The invention will be further described with reference to the following drawings and examples:
embodiment 1, as shown in fig. 1 to 3, a prefabricated column structure for a community enclosure comprises a prefabricated column 1, a decorative surface layer 2 is preset on the surface of the prefabricated column 1, a hole 3 is formed in the central area of the prefabricated column 1 in a core-pulling manner, and a light material 4 is filled in the hole 3.
Alternatively, the central region of the prefabricated column 1 is filled with a lightweight material 4.
The foundation pit 5 is excavated on the ground corresponding to the community enclosure wall column, the section size of the foundation pit 5 is larger than that of the prefabricated column 1, the lower end of the prefabricated column 1 is inserted into the foundation pit 5, a gap between the foundation pit 5 and the prefabricated column 1 is filled with plain concrete 6, the concrete is condensed and hardened to form a base 8, the base 8 is connected with the prefabricated column 1, and earth 7 is backfilled to the foundation pit 5 and compacted.
Compared with a cast-in-place column, the construction method can reduce the multiple construction operations of reinforcing steel bar binding, formwork supporting, concrete pouring and the like on site, shorten the construction time, reduce the construction waste on site, save water and save energy.
The prefabricated column 1 can be conveniently used for manufacturing the decorative surface layer 2 during production, the workload of manufacturing the decorative surface layer 2 by using cast-in-place columns and masonry columns is greatly reduced, and labor and time are saved.
The middle of the prefabricated column 1 adopts a core-pulling or light material filling 4 mode, so that the material is saved, the weight of the prefabricated column 1 is reduced, and the transportation and the installation are convenient.
Embodiment 2, as shown in fig. 4 to 6, a prefabricated column 1 structure of district enclosure includes prefabricated column 1 and prefabricated base 8, prefabricated column 1 and prefabricated base 8 are poured through concrete an organic whole and are formed, decorative cover 2 has been preset on the surface of prefabricated column 1, prefabricated column 1 central zone adopts the mode of loosing core to form hole 3, hole 3 fills light material 4.
Alternatively, the central region of the prefabricated column 1 is filled with a lightweight material 4.
And excavating a foundation pit 5 on the ground corresponding to the community enclosure wall column, wherein the section size of the foundation pit 5 is larger than that of the prefabricated base 8, the prefabricated base 8 is arranged in the foundation pit 5, and earth 7 is backfilled to the foundation pit 5 and compacted.
The column and the base 8 are prefabricated, so that the foundation is smaller compared with a brick column, foundation excavation and backfilling can be reduced, a large number of masonry operations and generated construction waste on the site are reduced, the construction time is shortened, the quality is more reliable and durable, and the maintenance cost in the later period is reduced.
The column and the base 8 are prefabricated together, backfilled soil is compacted, connecting materials can be saved compared with the method that the prefabricated column 1 and a foundation are connected through slurry anchor overlapping or sleeve grouting, construction is simplified, and construction time and difficulty are reduced.

Claims (6)

1. The utility model provides a prefabricated post structure of district enclosure, includes prefabricated post, its characterized in that: a foundation pit is excavated on the ground corresponding to the community enclosure wall column, the section size of the foundation pit is larger than that of the prefabricated column, the lower end of the prefabricated column is inserted into the foundation pit, a gap between the foundation pit and the prefabricated column is filled with plain concrete, the concrete is solidified and hardened to form a base, the base is connected with the prefabricated column, and soil is backfilled to the foundation pit and compacted.
2. The prefabricated post structure of district enclosure of claim 1, characterized in that: and a hole is formed in the central area of the prefabricated column in a core pulling mode.
3. The prefabricated post structure of district enclosure of claim 2, characterized in that: the holes are filled with a lightweight material.
4. The prefabricated post structure of district enclosure of claim 1, characterized in that: the central area of the prefabricated column is filled with a lightweight material.
5. The prefabricated post structure of district enclosure of claim 1, characterized in that: still include prefabricated base, prefabricated post and prefabricated base are pour through concrete an organic whole and are formed.
6. The prefabricated post structure of district enclosure of claim 1, characterized in that: and a decorative surface layer is preset on the surface of the prefabricated column.
CN202221156077.4U 2022-05-12 2022-05-12 Prefabricated post structure of district enclosure Active CN217631754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221156077.4U CN217631754U (en) 2022-05-12 2022-05-12 Prefabricated post structure of district enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221156077.4U CN217631754U (en) 2022-05-12 2022-05-12 Prefabricated post structure of district enclosure

Publications (1)

Publication Number Publication Date
CN217631754U true CN217631754U (en) 2022-10-21

Family

ID=83651654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221156077.4U Active CN217631754U (en) 2022-05-12 2022-05-12 Prefabricated post structure of district enclosure

Country Status (1)

Country Link
CN (1) CN217631754U (en)

Similar Documents

Publication Publication Date Title
CN112323777A (en) Hollow precast pile for rock embedding and rock embedding construction method using precast pile
CN114319376A (en) Deep foundation pit supporting and excavating structure for complicated irregular staged implementation and construction method
CN110306989B (en) Non-open-cut assembled pipe trench excavation supporting and reinforcing method
CN1043263C (en) Construction method for building foundation pit stope support
CN213143117U (en) Assembled keyway basis retaining wall structure
CN201649076U (en) Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN217631754U (en) Prefabricated post structure of district enclosure
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN104480947A (en) Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN114922195A (en) Construction method of soft soil deep and large foundation pit adjacent to protected object
CN112575771B (en) Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns
CN212896435U (en) Combined prefabricated bearing platform pile foundation
CN109137884B (en) Assembled guide wall of impervious wall and construction method thereof
KR20130073336A (en) Pile structure and construction methods
CN111733855A (en) Construction method of underground continuous wall and underground continuous wall
CN110258621B (en) Assembled retaining wall convenient to quick construction
CN112301998A (en) Construction method of prefabricated reinforced concrete spliced underground continuous wall
CN111733830B (en) Super high-rise building foundation pit bearing and enclosing system
CN218148385U (en) Precast concrete foundation ditch bank protection
CN111501832B (en) Two-in-one underground pipe gallery construction method and two-in-one underground pipe gallery structure
CN216664087U (en) Chain prefabricated underground continuous wall
CN215669972U (en) Prefabricated shaft structure
CN216007035U (en) Ultrahigh-performance concrete square combined gravity retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant